Loading...
HomeMy WebLinkAbout20010404 Ver 3_Information Letter_20071023a,~~~a~. ..~A •~ Gu.r.~d~~ STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ' MICHAEL F. EASLEY GOVERNOR October 23, 2007 DWQ -Fayetteville Regional Office 225 Green Street, Suite 714 Systel Building Fayetteville, NC 28301-5043 Mr. Paul Rawls Chief, Surface Water Protection Section NC Division of Water Quality NPS Assistance and Compliance Oversight Unit 1617 Mail Service Center Raleigh, NC 27699-1617 J ^~1 ~~ V LYNDO TIPPETT SECRETARY Subject: NCDOT-NCDENR DWQ Settlement Agreement for US 1 Vass Bypass, Moore/Lee County; TIP No. R-0210; Federal Aid No. NHS-1 (108); State Project No. 6.569005T; Division 8; WBS 34330.4.3. Dear Sirs: Pursuant to paragraph 8 of the Settlement Agreement entered into on October 20, 2006, by the North Carolina Department of Transportation (NCDOT) and the North Carolina Department of Environment & Natural Resources -Division of Water Quality (DWQ) regarding the Vass Bypass Project (TIP Project R-210), NCDOT is providing the following information: A. NCDOT has installed all of the emergency spill control measures and devices as listed in Attachment A to the Settlement Agreement, with the exception explained below, and all the measures and devices are now operational. Attachment A required NCDOT to construct grass swales on Section C of the project at station numbers 29+10 (Lt) [labeled as 29+10 Med in the Settlement Agreement] and 31+10 (Lt) [labeled as 31+10 in the Settlement Agreement]. NCDOT constructed the swales earlier this year and installed the final device on June 25, 2007, but received a Cease and Desist letter from the United States Corps of Engineers on July 3, 2007 requiring the removal of the swales and the restoration of the site. NCDOT has fully complied with all requirements of the Corps regarding the site. It is NCDOT's understanding that DWQ will require no further action at those station numbers. MAILING ADDRESS: TELEPHONE: 919-733-9425 LOCATION: NC DEPARTMENT OF TRANSPORTATION FAX: 919-733-9428 TRANSPORTATION BUILDING PRECONSTRUCTION SECTION 1 SOUTH WILMINGTON STREET 1541 MAIL SERVICE CENTER WEBSITE: WWW.DOH.DOT.STATE.NC.US RALEIGH NC RALEIGH NC 27699-1541 DWQ Fayetteville Regional Office & Mr. Paul Rawls October 23, 2007 Page 2 B. Spill kits and maps were delivered to the following personnel in the manner indicated below. Each spill kit contained the items listed in the November 13, 20061etter from Debbie Barbour to Paul Rawls and as approved in a memo from Paul Rawls dated December 8, 2006. Lee County Or anization Received Date and Method of Distribution Office of Emergency Services 1 set of maps October 12, 2007, Hand Delivered Tramway Volunteer Fire 1 spill kit May 25, 2007, Hand Delivered Dept. 1 set of ma s October 12, 2007, Hand Delivered Lemon Springs Volunteer 1 s ill kit May 25, 2007, Hand Delivered Fire Dept. 1 set of ma s October 12, 2007, Hand Delivered Moore County Or anization Received Date and Method of Distribution Moore County EMS 1 set of maps October 12, 2007, Hand Delivered Cameron Volunteer Fire 1 s ill kit October 4, 2007, Hand Delivered Dept. 1 set of ma s October 12, 2007, Hand Delivered Circle "V" Volunteer Fire 1 s ill kit October 4, 2007, Hand Delivered Dept. 1 set of ma s October 12, 2007, Hand Delivered NCDOT has now completed its obligations under the Settlement Agreement, and would like to receive a letter for its files from DWQ acknowledging this completion. Please contact me if you have any questions. Sincerely, ~ d~~ Deborah Barbour, PE Director of Preconstruction DMB DWQ Fayetteville Regional Office & Mr. Paul Rawls October 23, 2007 Page 3 cc: Bill Rosser, PE, State Highway Administrator Steve Varnedoe, PE, Chief Engineer-Operations Art McMillan, PE, State Highway Design Engineer . Greg Thorpe, Ph.D., Manager of Project Development & Envirorunental Analysis Tim Johnson, PE, Division Engineer Dave Henderson, PE, State Hydraulics Engineer Don Lee, State Roadside Environmental Engineer Lisa Glover, NCDOJ John Hennessy, DWQ man Wrenn, DWQ Richard Spencer, USACE