Loading...
HomeMy WebLinkAbout20080058 Ver 1_Year 5 Monitoring Report_2015_20150414Unnamed Tributary to Crab Creek Stream and Wetland Restoration NCEEP Project Number: 857 Monitoring Contract Number: 004495 Monitoring Year 5 2014 Report Submitted to North Carolina Ecosystem Enhancement Program North Carolina Department of Environment and Natural Resources January 2015 r�i LE QS Lem nf Iancement PROGRAM 1652 Mail Service Center Raleigh, NC 27699 Monitoring Firm Jr EQUINOX balance through properpfanning 37 Haywood Street, Suite 100 Asheville, North Carolina 28801 Phone: 828 - 253 -6856 Project Contact: Hunter Terrell Email: hunter @equinoxenvironmental.com Unnamed Tributary to Crab Creek Stream and Wetland Restoration 2014 Monitoring Report (MY 5) Table of Contents 1.0 Executive Summary / Project Abstract Page 1 2.0 Methodology Page 3 3.0 References Page 4 Appendices Appendix A. Project Vicinity Map and Background Tables Figure 1. Vicinity Map and Directions Table la. Project Components Table lb. Component Summations Table 2. Project Activity and Reporting History Table 3. Project Contacts Table 4. Project Attributes Appendix B. Visual Assessment Data Figure 2. Integrated Current Condition Plan View Table 5. Visual Stream Morphology Stability Assessment Table 6. Vegetation Condition Assessment Photo Station Photos Appendix C. Vegetation Plot Data Table 7. Vegetation Plot Criteria Attainment Vegetation Monitoring Plot Photos Table 8. CVS Vegetation Plot Metadata Table 9. Planted and Total Stem Counts (Species by Plot with Annual Means) Table 9a. Random Circular Vegetation Plot Stem Counts Appendix D. Stream Survey Data Cross - Sections with Annual Overlays and Photos Longitudinal Profiles with Annual Overlays Pebble Count Plots with Annual Overlays Table 10a. Baseline Stream Data Summary Table 10b. Baseline Stream Data Summary (Substrate, Bed, Bank, and Hydrologic Containment Parameter Distributions) Table 1 la. Monitoring Data — Dimensional Morphology Summary (Dimensional Parameters — Cross - Sections) Table 1 lb. Monitoring Data — Stream Reach Data Summary Appendix E. Hydrologic Data Table 12. Verification of Bankfull Events Monthly Precipitation Data Compared to 30th and 70th Percentiles for Alleghany County, NC Precipitation and Water Level Plots Table 13. Wetland Gauge Attainment Data in 1.0 EXECUTIVE SUMMARY / PROJECT ABSTRACT The goals and objectives stated in the Unnamed Tributary to Crab Creek Restoration Plan (NCEEP 2007) are as follows: Project Goals: • Reduce bank sediment export and nutrient inputs to the receiving watershed of Crab Creek, a Class C Trout Water; • Enhance and preserve riparian buffers of a headwater trout stream; • Enhance aquatic and terrestrial habitat along an intact stream corridor; • Improve wetland functions by connecting and expanding the following wetland communities: Swamp Forest -Bog Complex, Southern Appalachian Bog, and Montane Alluvial Forest and; • Improve and expand Southern Appalachian Bog wetland habitat for the Bog Turtle Clemmys muhlenburgii. Project Objectives: • Restore 4,026 linear feet of stream channel with appropriate pattern, profile, and dimension to support a gravel transport system; • Re- establish the natural stream features (bed heterogeneity) to restore aquatic habitat; • Improve aquatic organism passage and habitat corridor continuity by replacing the culvert; and • Convert existing croplands into Swamp Forest -Bog Complex and Southern Appalachian Bog communities. Project Performance: Vegetation data were collected during August 2014. Based on the planted totals for plots within the 30 foot buffer surrounding the restored channel, 6 of the 9 vegetation plots fell short of the 260 stems per acre criterion for monitoring year 5. The planted mean was 243 stems per acre with a range of 121 to 566. However, the inclusion of natural recruits results in a mean of approximately 700 stems per acre with a range of 243 to 1700. A different methodology was used to sample the Southern Appalachian Bog wetland features surrounding the mainstem and lower portion of the tributary due to the early successional planting plan associated with this community type (See sheet 15 of the planting plan in the approved mitigation plan). In keeping with an early successional reference for this community type, the planting plan consisted of a low density shrub assemblage with various sedges and rush species making for an herbaceous dominated system. These bog systems are characterized by a mosaic of patchy shrub assemblages and meadows. Therefore the woody density of this community type is lower than those of typical mitigation (50 stems per acre - see sheet 15 of the planting plan and section 7.4 in the approved mitigation plan for zones D and F). Random circular plots were sampled during monitoring years two and five within the five year monitoring period. In these bog areas the woody stem density ranged from 61to 627 stems per acre (with a mean of 323 stems per acre) in year 5 and is accompanied by a dense herbaceous layer. Therefore the bog features on the site possess the distribution of strata and densities that meet or exceed those targeted in the planting plan. Due in large part to the project elevations resulting in shorter growing seasons, the size of UT Crab Creek Stream & Wetland 1 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 the woody stems are generally smaller than that observed at many sites after 5 years of monitoring. There are also approximately 20 isolated patches of high threat invasive plants that are distributed throughout the project area. Four percent of the easement acreage is comprised of these invasive plants. The one percent increase in invasive coverage is due to two new areas added during MY5. One of these areas is associated with the powerline right -of -way at the downstream end of the easement. The dominant species is multiflora rose Rosa multiflora; other species present include oriental bittersweet Celastrus orbiculatus, privet Ligustrum sp., and Japanese honeysuckle Lonicera japonica. There also are two areas with low stem densities that are associated with the streambank erosion areas as noted below. All cross sections have remained stable through MY5. All cross sections show no signs of erosion or deterioration. Stream reach geomorphological data indicates the stream channels have remained very stable since construction. Stream channel problems observed during MY5 were minimal and consisted of seven small problems areas, 2 areas of aggradation and 5 areas of degradation, throughout all assessed reaches. Particle -size distributions remain stable, with no significant trends towards coarser or finer materials. This indicates that the channel is transporting sediment as designed. Data from the eight groundwater monitoring stations indicated that all stations, with the exception of MW -1, met the soil saturation criterion of groundwater being within 12 inches of the soil surfaces for at least five percent of the hydroperiod during the MY5 growing season. The on -site rain gauge documented above normal precipitation during May -July. During normal rainfall years all groundwater gauges are expected to meet the minimum criteria. One bankfull event was documented during a November 2014 field visit (Table 12). This is the fifth documented bankfull event since construction was completed, meeting the criterion of two bankfull events since completion of construction. In October 2013, wetland boundary delineations were performed to confirm the boundary of wetland features on the project site. A total of 21.8 acres of wetland were delineated within the project site. This included 10.9 acres of restoration, 3.1 acres of enhancement, 0.1 acres of creation, and 7.7 acres of preservation. The total acreage showed a 5.1 acre increase in total wetland area compared to the original baseline delineation of 16.7 acres, resulting from a 2.9 acre and a 2.2 acre increase in restoration and preservation acreage, respectively. The increase in wetland acreage increased primarily as a result of including wetlands within the beltwidth of the stream that were excluded during the initial delineation. Two areas within Wetlands 1 and 2 that were included in the original wetland delineation failed to meet all three indicators for wetland jurisdiction. The failing area in Wetland 2 was located in the restoration area around Monitoring Well 1, which has failed to meet the hydrologic success criteria three out of four monitoring years. Additionally, this area failed to meet the hydric soil indicator. The failing area in Wetland 3, consisting of both restoration and creation, failed to meet the hydric soil indicator; which, was due to a large deposit of sand burying hydric soil. The origin of the sand layer is likely from the adjacent agricultural field. These areas have been excluded from the wetland acreages included in Table 1 a and 1 b. UT Crab Creek Stream & Wetland 2 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 During a May field visit, mountain redbelly dace (Phoxinus oreas) were observed spawning over creek chub beds along the mainstem within the restoration area. Mountain redbelly dace are important indicators of stream health because they thrive in soft, unpolluted, clear water. The evidence of this spawning taking place illustrates the success of the UT -Crab Creek project in providing aquatic habitat and enhancing overall water quality within the watershed. Follow the link below to watch a video of mountain redbelly dace (http: / /portal.nedenr.ora /web /eep /eep- news /- /blogs /video -of- redbelly- dace- spawning-at-eep- project- site?_33 redirect=%2Fweb%2Feep%2Feep-news). Summary information and data related to the occurrence of items such as beaver or easement encroachment and statistics related to performance of various project and monitoring elements can be found in the tables and figures in the report appendices. Narrative background and supporting information formerly found in these reports can be found in the mitigation and restoration plan documents available on NCEEP's website. All raw data supporting tables and figures in the appendices are available from NCEEP upon request. UT Crab Creek Stream & Wetland 3 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 2.0 Methodology The stream monitoring methodologies utilized in MY4 replicate those employed during the previous monitoring years and are based on standard guidance and procedures documents (Rosgen 1996; USACE 2003). Vegetation plot monitoring data were collected following the standard CVS -EEP Protocol for Recording Vegetation, Level II, Version 4.2 (Lee et al. 2008). Wetland hydrology was considered established if groundwater monitoring data indicated saturated soils within 12 inches of the soil surface for 5% of the Hydro period. Due to the Alleghany County data set being based on a site with elevations approximately 1,000 feet different from the project site, the growing season for the site was based on the Natural Resource Conservation Service (NRCS) data set for Ashe County (MRCS 2009). During October 2013, a wetland boundary delineation was performed to confirm the presence of wetland features on the project site. The delineation utilized the Level II Routine Wetland Determination method as defined in the 1987 USACE Wetlands Delineation Manual and the 2010 USACE Interim Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Eastern Mountains and Piedmont Region. UT Crab Creek Stream & Wetland 4 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 3.0 References Lee, M.T., R.K. Peet, S.D. Roberts, and T.R. Wentworth. 2008. CVS -EEP Protocol for Recording Vegetation. Version 4.2. The University of North Carolina at Chapel Hill, Department of Biology. NCEEP (North Carolina Ecosystem Enhancement Program). 2007. UT to Crab Creek Restoration Site. Alleghany County, North Carolina. Restoration Plan. Raleigh. NRCS (Natural Resources Conservation Service). Undated. Climate Analysis for Wetlands by County. http: / /www.wcc.nres.usda.gov /climate /wetlands.html; accessed November 2012. Rosgen, D.L. 1996. Applied River Morphology. Wildland Hydrology Books. Pagosa Springs, Colorado. USACE (U.S. Army Corps of Engineers). 2003. Stream Mitigation Guidelines. U.S. Army Corps of Engineers, U.S. Environmental Protection Agency, North Carolina Wildlife Resources Commission, North Carolina Department of Environment and Natural Resources - Division of Water Quality. Wilmington District. UT Crab Creek Stream & Wetland 5 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix A Project Vicinity Map and Background Tables ,_ i `.• 6 /r �� Yr /ice f v The subject project site is an environmental restoration site of the NCDENR Ecosystem Enhancement Program (NCEEP) and is - - . i' �";;= ''�, r (� I t /' / i� • i i encompassed by a recorded conservation easement, but is bordered; by land under private ownership. Accessing the site may require �'� , ` ' ` _ / •'fr r++ traversing areas near or along the easement boundary and therefor 14 't personnel of state andf federal agencies or their designees /contractors +� access b the general public is not permitted. Access b authorized h, . 1; - involved m the development, oversight and stewardship of the �I i restoration site 7s permitted within the terms and timeframes of their ztry defined roles. Any intended site visitation or activity by any person /� 'r, -w': ' t _ • I lh r � 1', "� f� r � 'u- ,� .r outside of these previously sanctioned roles and activities requires ✓_^' l 1j �� I ` RI. ' �� Garr, yy� J�` 11� 7 prior coordination with NCEEP. ' ( n f/ r S r / t. - I lira Spdn¢ Q - - t I �' � r ��� � �t41 I •, � � � ,, •, -. r Il� f �ert � �I �� 1 .. "' 4 . ,.� ,- ,. - X43 ! ��l° �I 9-`/ _ ass r r _� L 3 I t l ✓ l `� Savannah C'' __ -� y r E`t3monds N- r -,p-h. Gem — „ 18 I Eunice l =J - �t 270.3 T{ UT to Crab Creek Stream C) — & Wetland Restoration Site M Y' l p C ;•cek _ ( Iy X" t9 E k f t r + wyme oioyd smNh county c unry ca,nry Carron conny Grayson Patrick County UT to Crab Creek Stream County &Wetland Restoration Site Allghany Ashe County County Surry Stokes County County Wilkes County Yadkin County Forsyth County Directions: From Raleigh, proceed west on I -40 towards Winston Salem. Take Exit 193 B (NC- 8N/US -52N) towards Mount Airy. Proceed on US -52N to I -74W towards Wytheville, VA. Take Exit 5 (I -77S) and proceed to Exit 100 (Mount Airy/Galax/NC -89). Turn left and proceed west on NC -89. Turn left at NC -18 and go approximately 6 miles to the project site. The site is located on the north side of NC -18. Figure 1 - Vicinity Map - r `r UT to Crab Creek Stream & EQUINOX &0gs'stem E NVIR )NMENTAL Wetland Restoration Site • ° ° ° ° °• ° ° °° emen PROGRAM Project No. 857 N 0 1,250 2,500 5,000 Feet Alleghany County, North Carolina 7.5 Minute Series Cumberland Knob Quadrangle Appendix A Project Vicinity Map and Background Tables Table la. Project Components UT Crab Creek Stream &Wetland / Project No. 857 Project Riparian Wetland (Ac)' Non - Riparian (Ac) Upland (Ac) Footage BMP Creditable Riverine Non- Riverine Component or Existing Restoration Approach or Stationing Footage or Ratio Credits BMP Elements Comment Reach ID Feet /Acres Level Acreage' Acre age 2 Enhancement I 0 Enhancement II 100 +00 - 101 +71 Creation 0.08 Stream channel stabilized with in- 103+00- 104 +35 7.89 R P3 1,775 1,775 1.0 1,775 stream structures, including step pools 105 +34 -112+29 0.0 0.0 and riffle grade control. 113+51-116+88 1 20.98 0 0 0 0 Existing culvert and 120 +26 - 124 +65 UT I 2,313 If crossing removed. 101 +71 - 103 +00 104 +35 - 105 +34 Included revegetation and stream bank E EII 496 496 2.5 198 stabilization. 112 +29 - 113 +51 116 +88 - 118 +34 Existing culvert and crossing replaced Stream channel stabilized with m- UTCC-US 2,086 If R P2 2,485 10 +00 - 34 +85 2,423 1.0 2,423 stream structures, including step pools with open bottom and riffle grade control. arch culvert. UTCC -DS 2,1721f P 2,172 34 +85 -56 +57 2,067 5.0 413 M ontane Alluvial Ditch filled and existing fill, debris, and Forest 3.00 E 3.01 2.90 2 1.45 culvert drain removed. Existing seep Enhancement M ontane Alluvial heads developed and additional hardwood trees planted to restore and Forest 0.90 R 0.83 0.82 I O.g2 enhance M ontane Alluvial Forest. Restoration Southern Preservation m Appalachian Appalachaan Bog 2.70 P 2.23 2.17 5 0.43 Bog Community. og ornm (Preservation) Southem Appalachaan Bog 0.00 C 0.08 0.08 3 0.03 Overfill cropland soil removed, (Creation) groundwater springs exposed, and bog create species planted to restore and create Southern Appalachian Bog Southern, Appalachaan Bog 6.70 R 9.57 9.29 1 9.29 Community hydrology. (Restoration) Swamp Forest Bog Preservation of Swamp Fort -Bog Complex 5.81 P 5.81 5.72 5 1.14 (Preservation) Comp lex along UTCC -DS reach. = Non - Applicable 'Acreaw undated based on MY4 wetland boundary delineation 2 Creditable amounts account for removal of any crossings and 50% asset reduction for utility crossovers Table lb. Component Summations UT Crab Creek Stream & Wetland / Project No. 857 Restoration Level Stream (10 Riparian Wetland (Ac)' Non - Riparian (Ac) Upland (Ac) Buffer (Ac) BMP Riverine Non- Riverine Restoration 4,198 10.1 Enhancement 2.9 Enhancement I 0 Enhancement II 496 Creation 0.08 Preservation 2,172 7.89 HQ Preservation 0 0 0.0 0.0 Totals 6,866 1 20.98 0 0 0 0 = Non - Applicable IAcrea2e undated based on MY4 wetland boundary delineation UT Crab Creek Stream & Wetland A -2 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 Appendix A Project Vicinity Map and Background Tables Table 2. Project Activity & Reporting History UT Crab Creek Stream & Wetland / Project No. 857 Activity or Report Data Collection Complete Actual Completion or Delivery Land Acquisition N/A May 2006 Environmental Resource Technical Report 2006 May 2007 Restoration Plan 2007 Dec 2007 Permit Date N/A A H 2008 Final Desi - Construction Plans N/A Aug 2008 Construction N/A A ri12010 Teworary S &E mix applied N/A 2009-2010 Permanent seed mix a lied N/A A H 2010 Planting N/A A H 2010 Initial Wetland Monitoring Gauges & Rain Gauge Installed N/A A ri12010 Morphological Data Collection June 2010 N/A Mitigation Plan / As -built Year 0 Monitoring - Baseline June 2010 Feb 2011 Year 1 Monitoring March 2011 Oct 2011 Year 2 Monitoring Oct 2011 Dec 2011 Year 3 Monitoring Nov 2012 Jan 2013 Year 4 Monitoring Nov 2013 Jan 2014 Year 5 Monitoring Nov 2014 Nov 2014 N/A - Item does not apply. UT Crab Creek Stream & Wetland A -3 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 Appendix A Project Vicinity Map and Background Tables Table 3. Project Contacts UT Crab Creek Stream & Wetland / Project No. 857 Designer KCI Associates of North Carolina Landmark Center II, Suite 220 4601 Svc Forks Road Raleigh, NC 27609 Primary Project Design POC Aril Davis 919 783 -9214 Construction Contractor Carolina Environmental Contracting Inc. P.O. Box 1905 Mount Airy, NC 27030 Construction Contractor POC Stephen James (336) 320 -3849 Planting Contractor Carolina Environmental Contracting Inc. P.O. Box 1905 Mount Airy, NC 27030 Planting Contractor POC Stephen James 336 320 -3849 Seeding Contractor Carolina Environmental Contracting Inc. P.O. Box 1905 Mount Airy, NC 27030 Seeding Contractor POC Stephen James 336) 320 -3849 Seed Mix Sources Green Resources Nursery Stock Suppliers Mellow Marsh Farm (919) 742 -1200 Monitoring Performers (YO) - 2009 Equinox Environmental Consultation & Design, Inc. 37 Haywood Street, Suite 100 Asheville, North Carolina 28801 Stream Monitoring POC Win Taylor 828 253 -6856 Vegetation Monitoring POC Win Taylor 828 253 -6856 Wetland Monitoring POC Win Taylor 828 253 -6856 Monitoring Performers (Yl) - 2010 Equinox Environmental Consultation & Design, Inc. 37 Haywood Street, Suite 100 Asheville, North Carolina 28801 Stream Monitoring POC Win Taylor (828 ) 253 -6856 Vegetation Monitoring POC Win Taylor 828 253 -6856 Wetland Monitoring POC Win Taylor 828 253 -6856 Monitoring Performers (Y2) - 2011 Equinox Environmental Consultation & Design, Inc. 37 Haywood Street, Suite 100 Asheville, North Carolina 28801 Stream Monitoring POC Win Taylor (828) 253 -6856 Vegetation Monitoring POC Win Taylor 828 253 -6856 Wetland Monitoring POC Win Taylor 828 253 -6856 Monitoring Performers (Y3)- 2012 Equinox Environmental Consultation & Design, Inc. 37 Haywood Street, Suite 100 Asheville, North Carolina 28801 Stream Monitoring POC Kevin Mitchell 828) 253 -6856 Vegetation Monitoring POC Kevin Mitchell (828) 253 -6856 Wetland Monitoring POC Kevin Mitchell 828 253 -6856 Monitoring Performers (Y4)- 2013 Equinox Environmental Consultation & Design, Inc. 37 Haywood Street, Suite 100 Asheville, North Carolina 28801 Stream Monitoring POC Hunter Terrell (828) 253 -6856 Vegetation Monitoring POC Hunter Terrell 828) 253 -6856 Wetland Monitoring POC Hunter Terrell (828 ) 253 -6856 Monitoring Performers (Y5)- 2014 Equinox Environmental Consultation & Design, Inc. 37 Haywood Street, Suite 100 Asheville, North Carolina 28801 Stream Monitoring POC Hunter Terrell 828 253 -6856 Vegetation Monitoring POC Hunter Terrell (828) 253 -6856 Wetland Monitoring POC Hunter Terrell 828 253 -6856 UT Crab Creek Stream & Wetland A -4 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 Appendix A Project Vicinity Map and Background Tables Table 4. Project Attributes UT Crab Creek Stream & Wetland / Project No. 857 Project County Alle han Ph sio ra hic Region Blue Ridge Ecore ion New River Plateau River Basin Little River USGS I UC 05050001030020 NCDW Sub -Basin 05 -07 -03 Within Extent ofEEP Watershed Plan Little River and Laurel Branch Local Watershed Plans WRC Class Cold % of Project Easement Fenced or Demarcated 1000/0 Beaver Activity Observed During Design Phase No Restoration Component Attributes UTl UTCC -US UTCC -DS Drainage Areas .mi. 0.53 1.65 2.64 Stream Order First Second Second Restored Length feet 1,775 2,485 N/A Perennial or Intermittent Perennial Perennial Perennial Watershed Type Rural Watershed LULC Distribution Forest /Wetland Pasture /Managed Herbaceous Other 53% 45% 2% Watershed Impervious Cover - - - NCDW AU /IndexNumber 10 -9 -12 10 -9 -12 10 -9 -12 NCDWQ Classification C; Tr C; Tr C; Tr 303d Listed No No No Upstream of 303d Listed Segment No No No Reasons for 303d Listing or Stressor N/A N/A N/A Total Acreage of Easement 47.8 Total Vegetated Acreage within Easement 9.0 10.6 19.7 Total Planted Acreage as Part of Restoration 3.3 10.6 1.5 Ros en Classification of Pre- Existin 64 /C4 CA FA Ros en Classification of As -Built Cb /C C N/A Valley Type - - - Valley Sloe 0.025 0.010 - Valley Side Slope Range - - - Valley Toe Slope Range - Cowardin Classification N/A N/A N/A Trout Waters Designation Yes Yes Yes Species of Concern, Endangered, Etc. Bog Turtle, American Speedwell, and Canadian Burnet Dominant Soil Series and Characteristics Series Depth Clay% K T Nikwas i - - Information unavailable. N/A - Item does not apply. UT Crab Creek Stream & Wetland A -5 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 Appendix B Visual Assessment Data Figure 2. Integrated Current Condition Plan View Legend — • - Easement Boundary - -- Stream Alignment Power Line ROW ® Roads Longitudinal Profile Begin /End Cross Sections Structures Control Points • Crest Gauges • Rain Gauge Photo Points Wetlands ® Creation Enhancement Restoration Preservation ® Expansion- Enhancements ® Expansion- Preservation Expansion- Restoration ® MY4- Not Meeting Wetland Criteria Community Types Montane Alluvial Forest Southern Appalachian Bog Swamp Forest -Bog Complex Prepared for _r_14 E aamement PROGRAM C Year 5 Conditions Beaver Dam Vegetation Plots 0 Criteria Met - MY5 Criteria Not Met - MY5 O Circular Vegetation Plot- MY5 Wetland Gauges 0 Criteria Met - MY5 Criteria Not Met - MY5 Bank /Bed Conditions Scoured / Eroding RI 4 �1 • ' R ! i �F Vk Sheet 2 'r 1 y j r f •' fi3A — 18 Project: UT to Crab Creek Stream and Wetland Restoration Year 5 Monitoring Alleghany County, North Carolina Sheet 1 of 4 Date November 2014 � =rr i Notes: 1) Base Map from CAD file "Crab—base—final" Provided by KCI Associates of NC P.A. 2) NC OneMap 2010 Aerial Photo 3) Wetland boundaries updated using MY4 Wetland Boundary Delineation data Project Number NCEEP # 857 N W E S Prepared by �NFro EQUINOX Mass Wasting Vegetation Problem Areas Easement Encroachment Low Stem Densities ® Invasives - Dense Invasives - Present RI 4 �1 • ' R ! i �F Vk Sheet 2 'r 1 y j r f •' fi3A — 18 Project: UT to Crab Creek Stream and Wetland Restoration Year 5 Monitoring Alleghany County, North Carolina Sheet 1 of 4 Date November 2014 � =rr i Notes: 1) Base Map from CAD file "Crab—base—final" Provided by KCI Associates of NC P.A. 2) NC OneMap 2010 Aerial Photo 3) Wetland boundaries updated using MY4 Wetland Boundary Delineation data Project Number NCEEP # 857 N W E S Prepared by �NFro EQUINOX Figure 2. Integrated Current Condition Plan View R Year 5 Conditions Legend Beaver Dam — • - Easement Boundary Aq ' I Vegetation Plots - - -- Stream Alignment - ` ■ Criteria Met - MY5 Power Line ROW Criteria Not Met - MY5 Roads �`O\ • Circular Vegetation Plot- MY5 Longitudinal Profile Begin /End I Wetland Gauges Cross Sections Criteria Met -MY5 N. Structures i Criteria Not Met - MY5 /.\ Control Points <` I Bank /Bed Conditions ® Crest Gauges e Q Scoured / Eroding • Rain Gauge Photo Points � — Mass Wasting Vegetation Problem Areas Easement Encroachment Wetlands Creation ®Enhancement T z I Low Stem Densities Restoration UT1 - Upper ' ` Invasives -Dense �' Invasives - Present � Preservation ® Expansion- Enhancements Longitudinal Profile Reach ,_ ® Expansion- Preservation s ;{� Expansion- Restoration MY4- Not Meeting Wetland Criteria Community Types [�s Montane Alluvial Forest js Southern Appalachian Bog Swamp Forest -Bog Complex 3 N } p , W E 1 1 i 111 NC • neMap Prepared for Project: UT to Crab Creek stream and Wetland Year 5 Monitoring Restoration Notes: 1) Base Map from CAD file "Crab base final' Provided by KCI Associates of NC P.A. 2) NC OneMap 2010 Aerial Photo Prepared by 1, Alleghany County, North Carolina 3) Wetland boundaries updated using MY4 Wetland Boundary Delineation data Sheet 2 of 4 En °�ement EQUINOX Date Project Number a PROGRAM November 2014 NCEEP # 857 Figure 2. Integrated Current Condition Plan View ' `a,,� ' s�•������ �� • � '-� x Year 5 Conditions Legend Beaver Dam — • - Easement Boundary ,E c K 4a' :. t`. Vegetation Plots - - -- Stream Alignment r. .''P�' + e ■ Criteria Met - MY5 Criteria Not Met MY5 Power Line ROW r' - ® Roads "�' i • Circular Vegetation Plot- MY5 Longitudinal Profile Begin /End ° r UT1 - Lower +, Wetland Gauges Cross Sections Longitudinal Profile Reach — 0 Criteria Met - MY5 Criteria Not Met - MY5 Structures Control Points f .z Bank /Bed Conditions Crest Gauges Scoured / Eroding ® Rain Gauge Photo Points y . . - -� Mass Wasting Wetlands — ` - �. . .. . _ _ _ _ • - • • Vegetation Problem Areas ® Creation • Easement Encroachment Enhancement • 9 r :: . . Low Stem Densities Invasives -Dense Restoration �7zz Preservation -8 fi .' . :. ........................ Invasives - Present ® Expansion - Enhancements :::.Wetland #2 :: ® Expansion- Preservation - /rff rte} f - Expansion - Restoration _ _ 1 • • • .� •�'1 ^, ��_ ®MY4- Not Meeting Wetland Criteria R • f .. ..jr� -. ' 1 • •.� < -. ... .... .. . . • . • . ��` �`` ' r •!.. Community Types Montane Alluvial Forest + . :::::::::::::::::::::::::::Wetland .......Wet . ..... ..... ....... land #2 _ .I • • . :.. :: ... lum5 : ,r • �tirc -s: : i f r 3' Southern Appalachian Bog Swamp Forest -Bog Complex 50 �.., Wetland #2 �. r' ..: }`^ _ 1 f : { ;r. / ! :�uT / Wetland #2 ., o- .� �' • � �,,� � �� � Longitudinal Profile'Reach 1 ,+ N W E r ,, NC OneMap, NC Center for Geographic Information and Analysis, NC 911 Board Prepared for Project: UT to Crab Creek Stream and Wetland Restoration Year 5 Monitoring Alleghany County, North Carolina Notes: 1) Base Map from CAD file "Crab—base—final" Provided by KCI Associates of NC P.A. 2) NC OneMap 2010 Aerial Photo 3) Wetland boundaries updated using MY4 Wetland Boundary Delineation data Prepared by y Sheet 3 of 4 Ea °�eme L `J /\ U E I N O X Date Project Number PROGRAM November 2014 NCEEP # 857 ` Figure 2. Integrated Current Condition Plan View Legend Year 5 Conditions - -- 4 - • - Easement Boundary Beaver Dam - - -- Stream Alignment Vegetation Plots Power Line ROW Criteria Met - MY5 Roads ❑ Criteria Not Met - MY5 Longitudinal Profile Begin /End 0 Circular Vegetation Plot- MY5 Cross Sections Wetland Gauges f**• Structures 0 Criteria Met - MY5 A, Control Points Criteria Not Met - MY5 "A • Crest Gauges Bank /Bed Conditions �.. • Rain Gauge -� Scoured / Eroding Photo Points 4' - - - Mass Wasting Wetlands ® Creation Vegetation Problem Areas - Enhancement Easement Encroachment •� Restoration Low Stem Densities ❑ Preservation Invasives -Dense l :''i ® Expansion- Enhancements Invasives - Present ' ::l s 416 » „� =:aj0 ! ® Expansion - Preservation _ p: « , ; 0 Expansion- Restoration ,�,-� ,_ i • {K Wit" ttte ® MY4- Not Meeting Wetland Criteria / Community Types Montane Alluvial Forest . ;, .. ..: , -;� _ ,�.. ::::::::.:::::::::::::::: , ^.--.— , / •' —• —•— —•— �� • �. / : : . '• Southern Appalachian Bog ♦��ea ....................... ...... ... ............. #2 �•�������J ... ,� .............. ::::We tl an d Swamp Forest -Bog Complex +����������� ♦01♦�� �.: R•�����������•� '' , Wetland #2 : ............... :: ✓ .. a`' 1. x> Wetland #3 n,x $ .. , Wetland 42� \ f f I `� • Wetland #2 18 ' WE p ®sue Prepared for Project: UT to Crab Creek Stream and Wetland Restoration Year 5 Monitoring Alleghany County, North Carolina Notes: 1) Base Map from CAD file "Crab—base—final" Provided by KCI Associates of NC P.A. 2) NC OneMap2010 Aerial Photo 3) Wetland boundaries updated using MY4 Wetland Boundary Delineation data Prepared by y Sheet 4 of 4 - E a°r�eme L EQUINOX Date Project Number PROGRAM November 2014 NCEEP # 857 Appendix B Visual Assessment Data Table 5. Visual Stream Morphology Stability Assessment UT Crab Creek Stream & Wetland / Project No. 857 - UTl - Upper Assessed Length 1,832 feet Major Channel Category Channel Sub Category Metric Number Stable, Performing as Intended Total Number in As -built Number of Unstable Segments Amount of Unstable Footage % Stable, Performing as Intended Number with Stabilizing Woody Vegetation Footage with Stabilizing Woody Vegetation Adjusted% for Stabilizing Woody Vegetation 1. Bed 1. Vertical Stability 1. Aegradation - Bar formation/growth sufficient to significantly deflect flow laterally not to include point bars). 0 0 100% 2 Degradation - Evidence of downcutting. 0 0 100% (Riffle and Run Units) 2. Riffle Condition 1. Texture /Substrate - Riffle maintains coarser substrate. 17 17 100% 3. Meander Pool 1. Depth Sufficient (Max Pool Depth: Mean Bankfull Depth? 1.6). 20 _'u 100% Condition 2. Length appropriate (>30% of centerline distance between tail of upstream riffle and head of downstream riffle). �10 0 100% 1. Thalweg centering at up stream of meander bend (Run). 20 20 100% 4. Thalweg Position 2. Thalweg centering at downstream of meander bend (Glide). 19 95% 2. Bank 1. Scoured /Eroding Bank lacking vegetative cover resulting simply frompoorgrowth and/or scour and erosion. 4 117 97% 3 45 98% Banks undercut /overhangingto the extent that mass wasting appears 2. Undercut likely. Does NOT include undercuts that are modest, appear 0 0 100% 0 0 100% sustainable and are providing habitat. 3. Mass Wasting Bank slumping calving or collapse. 0 0 100% 0 0 100% Totals 4 117 97% 3 45 98% 3. Engineered Structures 1. Overall Integrity Structures physically intact with no dislodged boulders or logs. 15 15 100% 2. Grade Control Grade control structures exhibiting maintenance of grade across the sill 15 15 100% 2a. Piping Structures lacking any substantial flow underneath sills or arms. 15 15 100% 3. Bank Protection Bank erosion within the structures extent of influence does NOT exceed 15 %. 15 15 100 ° / Pool forming structures maintaining — M ax Pool Depth : Mean 4. Habitat Bankfull Depth Ratio ? 1.6. Rootwads / logs providing some cover at 15 15 100° base -flow. N/A - Item does not apply. UT Crab Creek Stream & Wetland B -2 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix B Visual Assessment Data Table 5. Visual Stream Morphology Stability Assessment UT Crab Creek Stream & Wetland / Project No. 857 - UTl - Lower Assessed Len th 438 feet Major Channel Category Channel Sub Category Metric Number Stable, Performing as Intended Total Number in As -built Number of Unstable Segments Amount of Unstable Footage % Stable, Performing as Intended Number with Stabilizing Woody Vegetation Footage with Stabilizing Woody Vegetation Adjusted% for Stabilizing Woody Vegetation 1. Bed 1. Vertical Stability 1. Aegradation - Bar formation/growth sufficient to significantly deflect flow laterally not to include point bars). 0 0 100% 2 Degradation - Evidence of downcutting. 0 0 100% (Riffle and Run Units) 2. Riffle Condition 1. Texture /Substrate - Riffle maintains coarser substrate. 5 5 100° 3. Meander Pool 1. Depth Sufficient (Max Pool Depth: Mean Bankfull Depth? 1.6). 4 + 100° Condition 2. Length appropriate (>30% of centerline distance between tail of upstream riffle and head of downstream riffle). 4 4 100% 1. Thalweg centering at up stream of meander bend (Run). 4 4 100% 4. Thalweg Position 2. Thalweg centering at downstream of meander bend (Glide). 4 4 100% 2. Bank 1. Scoured /Eroding Bank lacking vegetative cover resulting simply frompoorgrowth and/or scour and erosion. 2 33 96% 1 15 98% Banks undercut /overhangingto the extent that mass wasting appears 2. Undercut likely. Does NOT include undercuts that are modest, appear 0 0 100% 0 0 100% sustainable and are providing habitat. 3. Mass Wasting Bank slumping calving or collapse. 0 0 100% 0 0 100% Totals 2 33 96% 0 0 96% 3. Engineered Structures 1. Overall Integrity Structures physically intact with no dislodged boulders or logs. 5 5 100% 2. Grade Control Grade control structures exhibiting maintenance of grade across the sill 5 5 100% 2a. Piping Structures lacking any substantial flow underneath sills or arms. 5 5 100% 3. Bank Protection Bank erosion within the structures extent of influence does NOT exceed 15 %. 5 100° Pool forming structures maintaining— Max Pool Depth: Mean 4. Habitat Bankfull Depth Ratio ? 1.6. Rootwads / logs providing some cover at 5 - 100% base -flow. N/A - Item does not apply. UT Crab Creek Stream & Wetland B -3 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix B Visual Assessment Data Table 5. Visual Stream Morphology Stability Assessment UT Crab Creek Stream & Wetland / Project No. 857 - UTCC - US Assessed Length 2,485 feet Major Channel Category Channel Sub Category Metric Number Stable, Performing as Intended Total Number in As -built Number of Unstable Segments Amount of Unstable Footage % Stable, Performing as Intended Number with Stabilizing Woody Vegetation Footage with Stabilizing Woody Vegetation Adjusted% for Stabilizing Woody Vegetation 1. Bed 1. Vertical Stability 1. Aegradation - Bar formation/growth sufficient to significantly deflect flow laterally not to include point bars). 0 0 100% 2 Degradation - Evidence of downcutting. 0 0 100% (Riffle and Run Units) 2. Riffle Condition 1. Texture /Substrate - Riffle maintains coarser substrate. 17 17 100° 3. Meander Pool 1. Depth Sufficient (Max Pool Depth: Mean Bankfull Depth? 1.6). 15 15 100° Condition 2. Length appropriate (>30% of centerline distance between tail of upstream riffle and head of downstream riffle). 15 15 100% 1. Thalweg centering at up stream of meander bend (Run). 15 15 100% 4. Thalweg Position 2. Thalweg centering at downstream of meander bend (Glide). 15 15 100% 2. Bank 1. Scoured /Eroding Bank lacking vegetative cover resulting simply frompoorgrowth and/or scour and erosion. 110 98% 2 25 98% Banks undercut /overhangingto the extent that mass wasting appears 2. Undercut likely. Does NOT include undercuts that are modest, appear 0 0 100% 0 0 100% sustainable and are providing habitat. 3. Mass Wasting Bank slumping calving or collapse. 1 21 100 % 1 21 100% Totals 4 131 97% 3 46 98% 3. Engineered Structures 1. Overall Integrity Structures physically intact with no dislodged boulders or logs. 7 7 100% 2. Grade Control Grade control structures exhibiting maintenance of grade across the sill 7 7 100% 2a. Piping Structures lacking any substantial flow underneath sills or arms. 7 - 100% 3. Bank Protection Bank erosion within the structures extent of influence does NOT exceed 15 %. exceed 7 100° Pool forming structures maintaining- Max Pool Depth: Mean 4. 7Hbitat 4. Habitat ll Depth Ratio ? 1.6. Rootwads logs providing some cover at 7 �7 100° base -flow. N/A - Item does not apply. UT Crab Creek Stream & Wetland B -4 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix B Visual Assessment Data Table 6. Vegetation Condition Assessment UT Crab Creek Stream & Wetland / Project No. 857 Planted Acreage 15.4 % of Number of Combined Vegetation Category Definitions CCPV Depiction Planted Polygons Acreage Acreage 1. Bare Areas Very limited cover of both woody and herbaceous material. N/A 0 0.00 0% Woody stem densities clearly below target levels based on MY3, Stipple 2. Low Stem Density Areas 2 0.06 <1% 4, or 5 stem count criteria. Black Dots White Background Totals 2 0.06 0% Areas with woody stems of a size class that are obviously small 3. Areas of Poor Growth Rates or Vigor given the monitoring year. N/A 0 0.00 ° 0 /o Cumulative Totals 2 0.06 0% Easement Acreage 47.8 of Number of Combined Vegetation Category Definitions CCPV Depiction Easement Polygons Acreage Acreage Foss Hatch 4. Invasive Areas of Concern Areas or points (if too small to render as polygons at map scale). (Red - Dense/Yellow - Present) 20 1.90 4% Stipple 5. Easement Encroachment Areas Areas or points (if too small to render as polygons at map scale). Orange Dots White Background 7 0.47 °- & ATV Trail N/A - Item does not apply. UT Crab Creek Stream & Wetland B -5 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix B Visual Assessment Data Unnamed Tributary 1 — Permanent Photo Station 1 Upstream Unnamed Tributary 1 — Permanent Photo Station 2 Upstream UT Crab Creek Stream & Wetland B -6 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix B Visual Assessment Data Unnamed Tributary 1 — Permanent Photo Station 3 Upstream Unnamed Tributary 1 — Permanent Photo Station 3 Downstream UT Crab Creek Stream & Wetland B -7 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix B Visual Assessment Data Unnamed Tributary 1 — Permanent Photo Station 4 Upstream Unnamed Tributary 1 — Permanent Photo Station 5 Upstream UT Crab Creek Stream & Wetland B -8 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix B Visual Assessment Data Unnamed Tributary 1 — Permanent Photo Station 6 Upstream —� -. r I a/4 CC i r Unnamed Tributary 1 Permanent Photo Station 7 Upstream UT Crab Creek Stream & Wetland B -9 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix B Visual Assessment Data Unnamed Tributary Crab Creek Upper — Permanent Photo Station 7 Upstream Unnamed Tributary Crab Creek Upper — Permanent Photo Station 7 Downstream UT Crab Creek Stream & Wetland B -10 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix B Visual Assessment Data A A. r 4 Wetland Area 2 — Permanent Photo Station 8 North Wetland Area 2 — Permanent Photo Station 8 Southwest UT Crab Creek Stream & Wetland B -11 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 Appendix B Visual Assessment Data Wetland Area 2 — Permanent Photo Station 9 North Wetland Area 2 — Permanent Photo Station 9 West UT Crab Creek Stream & Wetland B -12 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix B Visual Assessment Data Unnamed Tributary Crab Creek Upper — Permanent Photo Station 10 Upstream Unnamed Tributary Crab Creek Upper — Permanent Photo Station ll Upstream UT Crab Creek Stream & Wetland B -13 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix B Visual Assessment Data Unnamed Tributary Crab Creek Upper — Permanent Photo Station 11 Downstream Unnamed Tributary Crab Creek Upper — Permanent Photo Station 12 Upstream UT Crab Creek Stream & Wetland B -14 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix B Visual Assessment Data 2 7k ��j s � t� ---7 6' Unnamed Tributary Crab Creek Upper — Permanent Photo Station 13 Upstream Wetland Area 2 — Permanent Photo Station 14 West UT Crab Creek Stream & Wetland B -15 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix B Visual Assessment Data f � } Wetland Area 2 — Permanent Photo Station 15 Southwest Wetland Area 3 — Permanent Photo Station 16 South UT Crab Creek Stream & Wetland B -16 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix C Vegetation Plot Data Appendix C Table 7. Vegetation Plot Criteria Attainment UT Crab Creek / Project No. 857 Vegetation Plot ID Vegetation Survival Threshold Met? Tract Mean 1 No 33 % 2 Yes 3 Yes 4 No 5 No 6 No 7 Yes 8 No 9 No UT Crab Creek Stream & Wetland C -1 Project No. 857 Monitoring Year 5 of 5 Vegetation Plot Data Equinox January 2015 Appendix C Vegetation Plot Data Vegetation Monitoring Plot 1 Monitoring Year 5 — Aug 28, 2014 Vegetation Monitoring Plot 2 Monitoring Year 5 — Aug 28, 2014 UT Crab Creek Stream & Wetland C -2 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix C Vegetation Plot Data Vegetation Monitoring Plot 3 Monitoring Year 5 — Aug 28, 2014 Vegetation Monitoring Plot 4 Monitoring Year 5 — Aug 28, 2014 UT Crab Creek Stream & Wetland C -3 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix C Vegetation Plot Data Vegetation Monitoring Plot 5 Monitoring Year 5 — Aug 28, 2014 Vegetation Monitoring Plot 6 Monitoring Year 5 — Aug 28, 2014 UT Crab Creek Stream & Wetland C -4 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix C Vegetation Plot Data Vegetation Monitoring Plot 7 Monitoring Year 5 — Aug 28, 2014 Vegetation Monitoring Plot 8 Monitoring Year 5 — Aug 28, 2014 UT Crab Creek Stream & Wetland C -5 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix C Vegetation Plot Data Vegetation Monitoring Plot 9 Monitoring Year 5 — Aug 28, 2014 UT Crab Creek Stream & Wetland C -6 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 Appendix C Vegetation Plot Data Table 8. CVS Vegetation Plot Metadata UT Crab Creek - 857 Report Prepared By Owen Carson Date Prepared 8/29/2014 9:44 Database Name Equinox- 2014- A- UTCrab- MY5.mdb Database Location Z: \ES \NRI &M \EEP Monitoring \UT Crab Creek \UTC -MY5- 2014 \Data \Veg Computer Name FIELDTECH3 -PC File Size 13638 8864 DESCRIPTION OF WORKSHEETS IN THIS DOCUMENT------- - - - -- M e tadata Description of database file, the report worksheets, and a summary of project(s) and project data. Proj. Planted Each project is listed with its PLANTED stems per acre, for each year. This excludes live stakes. Proj. Total Stems Each project is listed with its TOTAL stems per acre, for each year. This includes live stakes, all planted stems, and all natural/volunteer stems. Plots List of plots surveyed with location and summary data (live stems, dead stems, missing, etc.). Vigor Frequency distribution of vigor classes for stems for all plots. Vigor by Spp Frequency distribution of vigor classes listed by species. Damage List of most frequent damage classes with number of occurrences and percent of total stems impacted by each. Damage by Spp Damage values tallied by type for each species. Damage by Plot Damage values tallied by type for each plot. Planted Stems by Plot and Spp A matrix of the count of PLANTED living stems of each species for each plot; dead and missing stems are excluded. ALL Stems by Plot and spp A matrix of the count of total living stems of each species (planted and natural volunteers combined) for each plot; dead and missing stems are excluded. PROJECT SUMMARY------------------------------------- Project Code 857 Project Name UT -Crab Creek Stream & Wetland Restoration Description River Basin New Le ngth(ft) Stream -to -Edge Width (ft) Area (s q m) Required Plots (calculated) Sampled Plots 19 UT Crab Creek Stream & Wetland C -7 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 Appendix C Vegetation Plot Data Table 9. Planted and Total Stem Counts (Species by Plot with Annual Means) UT Crab Creek Stream & Wetland / Project No. 857 Species Current Plot Data (MY5 2014) Annual Means 2 3 4 857 -01 -0001 857 -01 -0002 857 -01 -0003 857 -01 -0004 857 -01 -0005 857 -01 -0006 857 -01 -0007 1 857 -01 -0008 1 857 -01 -0009 MY5(2014) MY4(2013) MY3(2012) MY2(2011) 1 MY1(2010) MYO(2010) Scientific Name Common Name Species Type PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T Acer rubrum red maple Tree 1 1 1 4 6 Total Stems 5 12 9 28 31 3 14 29 131 Stems Per Acre 101 243 182 567 627 61 283 587 4 3 Alnusserrulata hazel alder Shrub 1 1 4 7 7 7 8 8 8 2 2 2 2 2 35 4 4 22 1 1 18 3 3 3 4 4 4 32 32 103 35 35 119 35 35 133 32 32 89 21 21 50 11 11 11 Aronia arbutifolia Red Chokeberry Shrub 1 1 1 6 6 6 7 7 7 7 7 7 8 8 8 8 8 8 8 8 8 6 6 6 Aronia prunifolia 1 1 Betula lenta var. lenta Isweet birch Tree 1 1 1 9 9 9 9 9 9 15 15 15 Betula nigra Iriver birch Tree 2 2 2 2 2 2 5 5 5 5 5 5 Carpinus caroliniana var. virginiana Tree 1 4 4 8 15 151 151 25 25 25 Cornusamomum siIkydogwood Shrub 5 4 1 9 31 43 2 1 Ilexverticillata common winterbern Shrub 3 3 3 1 1 1 1 1 1 1 1 1 6 6 6 6 6 6 6 6 6 11 11 11 12 12 12 7 7 7 Lindera benzoin var. ben northern spicebush Shrub 1 1 1 1 1 1 1 1 1 4 4 5 7 7 7 11 11 11 23 23 23 Nyssa sylvatica blackgum Tree 4 4 4 4 4 4 5 5 5 5 5 5 Physocarpus opulifolius common ninebark Shrub 2 2 Prunus serotina black cherry Tree 1 Robinia pseudoacacia black locust Tree 1 Rosa palustris swamp rose Shrub 13 13 10 9 Salix nigra blackwillow Tree 2 2 3 1 Sambucuscanadensis Common Elderberry IShrub 5 5 4 7 2 2 Unknown IShrub or Tree 5 5 5 Viburnum nudum possumhaw IShrub 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 8 8 8 8 8 8 Stem count 3 3 6 14 14 14 9 9 11 4 4722 3 3 42 5 5 23 7 7 24 3 3 8 6 6 6 54 54 156 61 61 190 66 66 232 73 73 143 84 84 117 100 100 100 size (ares) 1 1 1 1 1 1 1 1 1 9 9 9 9 9 9 size (ACRES) 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.22 0.22 0.22 0.22 0.22 0.22 Species count 2 2 2 3 3 3 2 2 3 3 3 5 2 2 4 2 2 2 2 2 2 1 1 2 2 2 2 7 7 12 7 7 10 8 8 14 7 7 12 7 7 10 8 8 8 Stems per ACRE 121.4 121.4 242.8 566.6 566.6 566.6 364.2 364.2 445.2 161.9 161.9 890.3 121.4 1700 202.3 202.3 930.8 283.3 971.2 121.4 323.7 242.8 242.8 242.8 242.8 242.8 701.5 274.3 854.3363 296.8 1043 328.2 328.2 643 377.7 377.7 526.1 44917 449.7 449.7 Exceeds requirements by 101/6 Exceeds requirements, but by less than 10.1 Fails to meet requirements, by less than 10% et requirements by more than 10% Table 9a. Random Circular Vegetation Plot Stem Counts UT Crab Creek Stream & Wetland/Project No. 857 Species Plot 1 2 3 4 5 6 7 8 Total Stems Alnus serrulata 3 9 5 22 23 4 7 73 Aronia arbutifolia 3 3 Cornus amomum 1 3 4 3 7 14 32 Pinus strobus 1 1 Pinus virginiana 6 6 Rosa palustris 2 3 5 10 Salix nigra 1 2 4 6 Total Stems 5 12 9 28 31 3 14 29 131 Stems Per Acre 101 243 182 567 627 61 283 587 Average Stem Density- 332 Stems Per Acre UT Crab Creek Stream & Wetland Project No. 857 Monitoring Year 5 of 5 C -8 Equinox January 2015 Appendix D Stream Survey Data Appendix D Stream Survey Data Unnamed Tributary 1 - Upper Cross - Section 1 - Riffle Station 106 + 83.73 2609 2608 2607 2606 m w 0 2605 - - - - -- - - - -- - - -- - - - - -- - - - -- _,,. - - - - -- - ----- -- ------ - - - - -- 'L W 2604 2603 2602 2601 0+00 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 0 +35 0+40 0+45 0+50 0+55 Station (feet) —� As -built 6/22010 — MY1 3/1/2011 � MY2 10/17/2011 — MY3 5/2/2012 — MY4 5/1/2013 — MY5 4/16/2014 - - - B Upstream Downstream UT Crab Creek Stream & Wetland D -1 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix D Stream Survey Data Unnamed Triburary 1 - Upper Cross - Section 2 - Pool Station 107 + 77.18 2607 2606 2605 2604 m w_ A ,LO 2603 ca m W 2602 i 2601 2600 2599 0+00 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 0 +35 0+40 0+45 0+50 0+55 0+60 Station (feet) �— As -built 6/2/2010 — MY1 3/1/2011 � MY2 10/17/2011 � MY3 5/2/2012 � MY4 5/1/2013 � MY5 4/16/2014 — — — B Upstream Downstream UT Crab Creek Stream & Wetland D -2 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix D Stream Survey Data Unnamed Tributary 1 - Upper Cross - Section 3 - Riffle Station 109 + 65.00 2602 2601 2600 2599 m w_ 2598 ,LO ca m W 2597 2596 2595 2594 0+00 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 0+35 0 +40 0 +45 Station (feet) As-bu0t 6/3/2010 --- MY1 3/1/2011 —MY2 10/17/2011 —MY3 5/2/2011 — MY4 5/1/2013 —MY5 4/16/2014 — — — - KI:t Upstream UT Crab Creek Stream & Wetland Project No, 857 Monitoring Year 5 of 5 D -3 Downstream Equinox January 2015 Appendix D Stream Survey Data Unnamed Tributary 1 - Lower Cross - Section 4 - Pool Station 123 + 11.85 2575 2574 2573 2572 w a 0 L -- -- - -- -- - - -- - -- -- >' _ - - -- - - -- - - -- -- - - - - -- - - -- - -- - - -- ca- 2571 W 2570 �i 2569 2568 0+00 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 0 +35 0+40 0+45 0+50 0+55 0+60 0+65 0 +70 0 +75 0 +80 Station (feet) As -built 6/3 /2010 — MYl 3/2/2011 — MY2 10/17/2011 —MY3 5/2/2012 — MY4 5/1/2013 —MY5 4/16/2014 — — — Bkt Upstream UT Crab Creek Stream & Wetland Project No, 857 Monitoring Year 5 of 5 D -4 Downstream Equinox January 2015 Appendix D Stream Survey Data Unnamed Tributary 1 - Lower Cross - Section 5 - Riffle Station 123 + 54.60 2574 2573 2572 d 2571 w. 0 2570 a� W 2569 2568 2567 0+00 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 0 +35 0 +40 0+45 0 +50 0+55 0 +60 0+65 Station (feet) As -bunt 6/3/2010 - MYI 3/2/2011 - MY2 10/17/2011 - MY3 512/2012 - MY4 5/1/2013 - MY5 4/16/2014 - - - - Bk Upstream UT Crab Creek Stream & Wetland Project No, 857 Monitoring Year 5 of 5 D -5 Downstream Equinox January 2015 Appendix D Stream Survey Data UT Crab Creek- Upstream Cross - Section 6 - Riffle Station 11 + 47.00 2575 2574 2573 2572 w d 0 C 0 2571 W 2570 2569 2568 0+00 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 0 +35 0+40 0+45 0+50 0+55 0+60 0+65 0 +70 0 +75 Station (feet) As -built 6/32010 - MYl 3/2/2011 - MY2 10/17/2011 - MY3 5/2/2012 - MY4 5/1/2013 - MY5 4/16/2014 - -- Bk Upstream UT Crab Creek Stream & Wetland Project No, 857 Monitoring Year 5 of 5 Downstream Equinox January 2015 Appendix D Stream Survey Data UT Crab Creek- Upstream Cross - Section 7 - Pool Station 12 + 02.03 2575 2574 2573 2572 m w 2571 C O F SLI > 2570 FTa /F 2569 2568 2567 2566 0+00 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 0 +35 0+40 0+45 0+50 0+55 0+60 0+65 0 +70 0 +75 Station (feet) �— As -bu0t 6/3/2010 — MY 1 3/2/2011 —W210/17/2011 — MY3 5/2/2012 —W45/1/2013 — MY5 4/16/2014 ----B Lcu vcMwiiuuiL! uaIin Upstream Downstream UT Crab Creek Stream & Wetland D -7 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix D Stream Survey Data UT Crab Creek - Upstream Cross - Section 8 - Riffle Station 17 + 49.02 2570 2569 2568 2567 m u C 2566 m - - -- - -- - -- - - -- - -- - -- - - - - -- - -- - -- - -- -- -'- ----------- _d W 2565 2564 s 2563 2562 0+00 0 +05 0 +10 0 +15 0 +20 0 +25 0 +30 0 +35 0 +40 0+45 0+50 0+55 0+60 0+65 0 +70 0 +75 0 +80 0 +85 Station (feet) As -bait 6/3/2010 -W13/2/2011 - MY2 10/18/2011 - MY3 5/3/2012 .--._ MY4 512/2013 -W54/17/2014 ---'B Upstream UT Crab Creek Stream & Wetland Project No, 857 Monitoring Year 5 of 5 D -8 Downstream Equinox January 2015 Appendix D Stream Survey Data UT Crab Creek- Upstream Cross - Section 9 - Pool Station 32 + 30.85 2558 2557 2556 2555 d w 2554 - - -- --- - - -- ----------------- _. 7 W 2553 2552 2551 2550 0+00 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 0 +35 0+40 0+45 0+50 0+55 0+60 0+65 0 +70 0 +75 0 +80 0 +85 0+90 Station (feet) —°— As -built 6/4/2010 — MY1 3/3/2011 — MY2 10/18/2011 — MY3 5/3/2012 — MY4 5/2/2013 — MY5 4/17/2014 - - - - Bkt Upstream UT Crab Creek Stream & Wetland Project No, 857 Monitoring Year 5 of 5 D -9 Downstream Equinox January 2015 Appendix D Stream Survey Data UT Crab Creek- Upstream Cross - Section 10 - Riffle Station 33 + 08.78 2558 2557 2556 2555 m w 0 2554 L _m W 2553 2552 2551 2550 0+00 0+05 0 +10 0 +15 0 +20 0 +25 0 +30 0+35 0+40 0+45 0+50 0+55 0+60 0+65 0 +70 0 +75 0 +80 Station (feet) As -built 6/4/2010 - MY13/3/2011 - MY2 10/18/2011 - MY3 53/2012 - MY4 5/2/2013 - MY5 4/17/2014 - - - Bk Lett Descending BanK A01; 7'.7t s= _ 7' ,may JS Upstream UT Crab Creek Stream & Wetland Project No. 857 Monitoring Year 5 of 5 D -10 Downstream Equinox January 2015 Appendix D 2610 2608 2606 2604 2602 a w 0 2600 e� W 2598 2596 2594 2592 2.590 10 .Sx SO Stream Survey Data UT to Crab Creek - Upper Longitudinal Profile Stationing 105 +63 - 110 +63 10 6x .SO 10 �x .SO Station (feet) 10 `px .SO 10 9 .SO TW- As- Built6 /2/2010 TW- MY13/1/2011 - TW- MY2- 10/17/2011 - TW- MY3- 5/2/2012 - TW- MY4- 5/1/13 - TW MY5 4 /16/14 • Bkf - -------- WS <` Structures-MYO II Ox SO UT Crab Creek Stream & Wetland Final D -2 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 - - - - -- -- - - - - -- - - ------------- Average Bankfull Slope XS1 - R •'--- - - - - -, XS2 - P --- - • • XS3 - R 10 6x .SO 10 �x .SO Station (feet) 10 `px .SO 10 9 .SO TW- As- Built6 /2/2010 TW- MY13/1/2011 - TW- MY2- 10/17/2011 - TW- MY3- 5/2/2012 - TW- MY4- 5/1/13 - TW MY5 4 /16/14 • Bkf - -------- WS <` Structures-MYO II Ox SO UT Crab Creek Stream & Wetland Final D -2 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix D 2577 2576 2575 2574 2573 2572 a� w, 2571 a 0 2570 W 2569 2568 2567 2566 2565 2564 12 OX 00 Stream Survey Data UT to Crab Creek- Lower Longitudinal Profile Stationing 120 +36 - 124 +33 I�OXS J��xOO J� ✓��JO I���SO l��JO l��XSO ����OO ���xso /XSO O Station (feet) ----------- Average Bankfu11S1 pe C Structures -MYO TW -As -Built 6/3/2010 TW -MYI 3/2/2011 • TW -MY2 10/17/2011 ----------------------- - • Bkf WS VV - ---- - - - - -- - - - - -- • • • XS5 - R I�OXS J��xOO J� ✓��JO I���SO l��JO l��XSO ����OO ���xso /XSO O Station (feet) C Structures -MYO TW -As -Built 6/3/2010 TW -MYI 3/2/2011 • TW -MY2 10/17/2011 TW- MY3- 5/2/2012 TW -MY4- 5/1/2013 TW MY5 4/13/14 • Bkf WS UT Crab Creek Stream & Wetland Final D -3 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix D LO /It 2573 2572 2571 2570 2569 2568 2567 2566 2565 2564 ,1 2563 a w 2562 0 2561 2560 W 2559 2558 2557 2.556 25.55 2554 2553 2552 2551 2550 2549 2548 Stream Survey Data UT to Crab Creek- Upstream Longitudinal Profile Stationing 10 +02 - 34 +57 ! °x Ij J� I� l� IS 16. 1) lip ly 2° 11 1� 2�x 2yX 1sX 2�pX 29x .��x .��x 00 'b° 'O° 'b° 'b° 'O° 'b° 'o° 'o° 'b° 'b° 'o° 'bo 00 0° oo 'b° 'b° 190 00 "o° o° 1919 "o° "oo 'b° Station (feet) —� TW -As -Built 6/4/2011 TW -MY1 3/3/2011 TW -MY2- 10/18/2011 TW -MY3- 5/3/2012 — TW -MY4- 5/2/2013 TW MY5 4/17/14 • Bkf --------- WS Structures -MYO UT Crab Creek Stream & Wetland Final D -4 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 •- XS6 - R XS7 -P r rN A ...... ' Aver ge Ban full Slof e XS8 - R ---- Wi - - - -•- . • Ing XS9 - P XS10 - R ! °x Ij J� I� l� IS 16. 1) lip ly 2° 11 1� 2�x 2yX 1sX 2�pX 29x .��x .��x 00 'b° 'O° 'b° 'b° 'O° 'b° 'o° 'o° 'b° 'b° 'o° 'bo 00 0° oo 'b° 'b° 190 00 "o° o° 1919 "o° "oo 'b° Station (feet) —� TW -As -Built 6/4/2011 TW -MY1 3/3/2011 TW -MY2- 10/18/2011 TW -MY3- 5/3/2012 — TW -MY4- 5/2/2013 TW MY5 4/17/14 • Bkf --------- WS Structures -MYO UT Crab Creek Stream & Wetland Final D -4 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix D Stream Survey Data UT Crab Creek Stream & Wetland / Project No. 857 UT1 - Upper - Cross - Section 1 - Riffle Pebble Count Summary D50 Monitoring Year 5 Description Material Size (mm) Total # Item % Cum % Silt /Clay silt/clay 0.062 7 7% 7% Sand very fine sand 0.125 0 0% 7% fine sand 0.25 7 7% 13% medium sand 0.50 19 18% 31% coarse sand 1.00 7 7% 37% very coarse sand 2.00 7 7% 44% very fine gravel 4.0 0 0% 44% fine gravel 5.7 3 3% 47% fine gravel 8.0 2 2% 49% Gravel medium gravel 11.3 5 5% 53% medium gravel 16.0 7 7% 60% coarse gravel 22.3 1 1% 61% coarse gravel 32 8 7% 68% very coarse gravel 45 8 7% 76% very coarse gravel 64 11 10% 86% Cobble small cobble 90 9 8% 94% medium cobble 128 3 3% 97% large cobble 180 2 2% 99% very large cobble 256 0 0% 99% small boulder 362 1 1% 100% Boulder small boulder 512 0 0% 100% medium boulder 1024 0 0% 100% large boulder 2048 0 0% 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 100% TOTALS 107 100% 100% Summary Data D50 8.8 D84 60 D95 97 UT Crab Creek Stream & Wetland D -5 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix D Stream Survey Data UT Crab Creek Stream & Wetland D -6 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 Unnamed Tributary 1 - Upper Pebble Count - Percent Cumulative Cross Section 1 -Riffle 100% 90% 80% a r 70% F L d C W 60% d 50% L d P. 40% > 30 y U 20 10% O 0% O O N V b d f-0 Particle Size (mm) F—MY1 —MY2 10/18 /2011 —MY3 6/6/2012 --#--W45/2/2013 -f-MYS 4/17/2014 Unnamed Tributary 1 - Upper Pebble Count - Percent Individual Cross Section 1 - Riffle 20 - y b 15% C u 10% n 5% 0% d Qa Particle Size (mm) ■MY13 /1/2011 ■W210 /18/2011 ■MY36/6/2012 ■MY45/212013 ■MY54/17/2014 UT Crab Creek Stream & Wetland D -6 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 Appendix D Stream Survey Data UT Crab Creek Stream & Wetland / Project No. 857 UT1 - Upper - Cross - Section 2 - Pool Pebble Count Summary D50 Monitoring Year 5 Description Material Size (mm) Total # Item % Cum % Silt /Clay silt/clay 0.062 22 21% 21% Sand very fine sand 0.125 4 4% 24% fine sand 0.25 0 0% 24% medium sand 0.50 9 8% 33% coarse sand 1.00 2 2% 35% very coarse sand 2.00 7 7% 41% Gravel very fine gravel 4.0 1 1% 42% fine gravel 5.7 2 2% 44% fine gravel 8.0 4 4% 48% medium gravel 11.3 6 6% 53% medium gravel 16.0 8 7% 61% coarse gravel 22.3 2 2% 63% coarse gravel 32 9 8% 71% very coarse gravel 45 8 7% 79% very coarse gravel 64 6 6% 84% Cobble small cobble 90 3 3% 87% medium cobble 128 10 9% 96% large cobble 180 3 3% 99% very large cobble 256 1 1% 100% Boulder small boulder 362 0 0% 100% small boulder 512 0 0% 100% medium boulder 1024 0 0% 100% large boulder 2048 0 0% 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 100% TOTALS 107 100% 100% Summary Data D50 9.1 D84 64 D95 120 UT Crab Creek Stream & Wetland D -7 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix D Stream Survey Data UT Crab Creek Stream & Wetland D -8 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 Unnamed Tributary 1 - Upper Pebble Count - Percent Cumulative Cross Section 2 - Pool 100% 90% 80% C F 70% L d C 60% y' C u 50% L d P. 40% 30% 1 � 20 0% O CO Particle Size (mm) F—MY1 —MY2 10/18 /2011 —MY3 6/6/2012 --#--MY4 5/2/2013 -411,-MY5 4/17/2014 Unnamed Tributary 1 - Upper Pebble Count - Percent Individual Cross Section 2 - Pool 20% - b 15% C d u s. n 10% 5% O N N rl rl N M 7 �O 01 N 00 �A D ti N 7 O� u 0% d Qa Particle Size (mm) ■MY13 /1/2011 ■W210 /18/2011 ■MY36/6/2012 ■MY45/212013 ■MY54/17/2014 UT Crab Creek Stream & Wetland D -8 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 Appendix D Stream Survey Data UT Crab Creek Stream & Wetland / Project No. 857 UT1 - Upper - Cross - Section 3 - Riffle Pebble Count Summary D50 Monitoring Year 5 Description Material Size (mm) Total # Item % Cum % Silt /Clay silt/clay 0.062 18 17% 17% Sand very fine sand 0.125 10 10% 27% fine sand 0.25 3 3% 30% medium sand 0.50 1 1% 30% coarse sand 1.00 2 2% 32% very coarse sand 2.00 9 9% 41% very fine gravel 4.0 1 1% 42% fine gravel 5.7 1 1% 43% fine gravel 8.0 4 4% 47% Gravel medium gravel 11.3 2 2% 49% medium gravel 16.0 5 5% 53% coarse gravel 22.3 2 2% 55% coarse gravel 32 10 10% 65% very coarse gravel 45 9 9% 73% very coarse gravel 64 8 8% 81% Cobble small cobble 90 8 8% 89% medium cobble 128 10 10% 98% large cobble 180 2 2% 100% very large cobble 256 0 0% 100% small boulder 362 0 0% 100% Boulder small boulder 512 0 0% 100% medium boulder 1024 0 0% 100% large boulder 2048 0 0% 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 100% TOTALS 105 100% 100% Summary Data D50 12 D84 73 D95 110 UT Crab Creek Stream & Wetland D -9 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix D Stream Survey Data UT Crab Creek Stream & Wetland D -10 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 Unnamed Tributary 1 - Upper Pebble Count - Percent Cumulative Cross Section 3 - Riffle 100% 90% 80% c c .c 70% — sF. as c W 60% d 50% L P. 40% > c 30 c U 20% if 10% 0% O O N V b d CG Particle Size (mm) F—MY13/l/2011 —MY2 10/18 /2011 —MY3 6/6/2012 --#--MY4 5/2/2013 -0-MY5 4/17/2014 Unnamed Tributary 1 - Upper Pebble Count - Percent Individual Cross Section 3 - Riffle 20 c b 15% C Q 10"/. �- 5% b 00 �O N N kn 7 O OD O �D O N N rl rl N M 7 �O CT N 00 M N N 7 00 �D �O 4 0% as Qa Particle Size (mm) ■MY13 /1/2011 ■W210 /18/2011 ■MY36/6/2012 ■MY45/212013 ■MY54/17/2014 UT Crab Creek Stream & Wetland D -10 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 Appendix D Stream Survey Data UT Crab Creek Stream & Wetland / Project No. 857 UTI - Lower - Cross - Section 4 - Pool Pebble Count Summary D50 Monitoring Year 5 Description Material Size (mm) Total # Item % Cum % Silt /Clay silt/clay 0.062 10 9% 9% Sand very fine sand 0.125 0 0% 9% fine sand 0.25 9 8% 17% medium sand 0.50 25 22% 39% coarse sand 1.00 1 1% 40% very coarse sand 2.00 7 6% 46% very fine gravel 4.0 3 3% 49% fine gravel 5.7 2 2% 51% fine gravel 8.0 4 4% 54% Gravel medium gravel 11.3 9 8% 63% medium gravel 16.0 7 6% 69% coarse gravel 22.3 15 13% 82% coarse gravel 32 5 4% 87% very coarse gravel 45 4 4% 90% very coarse gravel 64 2 2% 92% Cobble small cobble 90 4 4% 96% medium cobble 128 4 4% 99% large cobble 180 1 1% 100% very large cobble 256 0 0% 100% small boulder 362 0 0% 100% Boulder small boulder 512 0 0% 100% medium boulder 1024 0 0% 100% large boulder 2048 0 0% 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 100% TOTALS 112 100% 100% Summary Data D50 4.9 D84 26 D95 86 UT Crab Creek Stream & Wetland D -11 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix D Stream Survey Data UT Crab Creek Stream & Wetland D -12 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 Unnamed Tributary 1 - Lower Pebble Count - Percent Cumulative Cross Section 4 - Pool 100% 90% 80% a r 70% y, d C W 60% d 50% L d P. 40% > 30 y U 20% 10% O 0% d f-0 Particle Size (mm) F—MY1 —MY2 10/18 /2011 —MY3 6/6/2012 —*--MY4 5/2/2013 -f-MYS 4/17/2014 Unnamed Tributary 1 - Lower Pebble Count - Percent Individual Cross Section 4 - Pool 20% b 15% C Q �- loo/. 5% N lf1 n Vi '-I N R �O 00 rl b N N � 7 00 O �D N N 7 O b.ti 0% d Qa Particle Size (mm) ■MY13 /2/2011 ■MY210 /18/2011 ■MY36/6/2012 ■MY45/212013 ■MY54/17/2014 UT Crab Creek Stream & Wetland D -12 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 Appendix D Stream Survey Data UT Crab Creek Stream & Wetland / Project No. 857 UTl - Lower - Cross - Section 5 - Riffle Pebble Count Summary D50 Monitoring Year 5 Description Material Size (mm) Total # Item % Cum % Silt /Clay silt/clay 0.062 4 4% 4% Sand very fine sand 0.125 0 0% 4% fine sand 0.25 9 9% 12% medium sand 0.50 21 20% 32% coarse sand 1.00 0 0% 32% very coarse sand 2.00 8 8% 40% very fine gravel 4.0 0 0% 40% fine gravel 5.7 0 0% 40% fine gravel 8.0 1 1% 41% Gravel medium gravel 11.3 5 5% 46% medium gravel 16.0 8 8% 53% coarse gravel 22.3 4 4% 57% coarse gravel 32 6 6% 63% very coarse gravel 45 3 3% 66% very coarse gravel 64 12 11% 77% Cobble small cobble 90 11 10% 88% medium cobble 128 5 5% 92% large cobble 180 8 8% 100% very large cobble 256 0 0% 100% small boulder 362 0 0% 100% Boulder small boulder 512 0 0% 100% medium boulder 1024 0 0% 100% large boulder 2048 0 0% 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 100% TOTALS 105 105% 100% Summary Data D50 14 D84 80 D95 140 UT Crab Creek Stream & Wetland D -13 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix D Stream Survey Data UT Crab Creek Stream & Wetland D -14 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 Unnamed Tributary 1 - Lower Pebble Count - Percent Cumulative Cross Section 5 - Riffle 100% 90% 80% c 70% r sF. d c W 60% 50% d L d P. 40% > — c 30 20% c U 10% O 0% O O N V b d f-0 Particle Size (mm) —MY13/2/2011 —MY2 10/18 /2011 —MY3 6/6/2012 —*--MY4 5/2/2013 -0-MY5 4/17/2014 Unnamed Tributary 1 - Lower Pebble Count - Percent Individual Cross Section 5 - Riffle 7 20% b 15% C u n 10% 5% N lf1 n Vi .-- O N N N 7 �O 00 rl N N V7 7 O 00 O rl rl N M 7 �O 01 N 00 kn �A N N 7 O (71 7 N O� ti 7 0% d Qa Particle Size (mm) ■MY13 /2/2011 ■MY210 /18/2011 ■MY36/6/2012 ■MY45/212013 ■MY54/17/2014 UT Crab Creek Stream & Wetland D -14 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 Appendix D Stream Survey Data UT Crab Creek Stream & Wetland / Project No. 857 UTCC - Upstream - Cross - Section 6 - Riffle Pebble Count Summary D50 Monitoring Year 5 Description Material Size (mm) Total # Item % Cum % Silt /Clay silt/clay 0.062 0 0% 0% Sand very fine sand 0.125 0 0% 0% fine sand 0.25 0 0% 0% medium sand 0.50 0 0% 0% coarse sand 1.00 0 0% 0% very coarse sand 2.00 9 8% 8% very fine gravel 4.0 2 2% 10% fine gravel 5.7 5 5% 15% fine gravel 8.0 3 3% 17% Gravel medium gravel 11.3 6 6% 23% medium gravel 16.0 5 5% 28% coarse gravel 22.3 12 11% 39% coarse gravel 32 15 14% 52% very coarse gravel 45 17 16% 68% very coarse gravel 64 10 9% 77% Cobble small cobble 90 13 12% 89% medium cobble 128 7 6% 95% large cobble 180 2 2% 97% very large cobble 256 3 3% 100% small boulder 362 0 0% 100% Boulder small boulder 512 0 0% 100% medium boulder 1024 0 0% 100% large boulder 2048 0 0% 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 100% TOTALS 109 100% 100% Summary Data D50 30 D84 78 D95 130 UT Crab Creek Stream & Wetland D -15 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix D Stream Survey Data UT Crab Creek Stream & Wetland D -16 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 UT Crab Creek- Upstream Pebble Count - Percent Cumulative Cross Section 6 - Riffle 100% 90% 80% r 70% �I y, d C W 60% d 50% L d P. 40% > - — 30 y U 20 10% 0% O O N V b d f-0 Particle Size (mm) —MY13/2/2011 —MY2 10/18 /2011 —MY3 6/6/2012 --#--MY4 5/2/2013 — ,-MYS 4/17/2014 UT Crab Creek - Upstream Pebble Count - Percent Individual Cross Section 6 - Riffle - 20% r � I .y 15% C u 10% �- 5% N lf1 n Vi .-- N 7 �O 00 rl � N N V7 7 O 00 O �D N N 7 O b1i 0% d Qa Particle Size (mm) ■MY13 /2/2011 ■MY210 /18/2011 ■MY36/6/2012 ■MY45/212013 ■MY54/17/2014 UT Crab Creek Stream & Wetland D -16 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 Appendix D Stream Survey Data UT Crab Creek Stream & Wetland / Project No. 857 UTCC - Upstream - Cross - Section 7 - Pool Pebble Count Summary D50 Monitoring Year 5 Description Material Size (mm) Total # Item % Cum % Silt /Clay silt/clay 0.062 38 35% 35% Sand very fine sand 0.125 6 6% 40% fine sand 0.25 7 6% 47% medium sand 0.50 1 1% 48% coarse sand 1.00 13 12% 60% very coarse sand 2.00 3 3% 62% very fine gravel 4.0 0 0% 62% fine gravel 5.7 3 3% 65% fine gravel 8.0 2 2% 67% Gravel medium gravel 11.3 0 0% 67% medium gravel 16.0 1 1% 68% coarse gravel 22.3 1 1% 69% coarse gravel 32 0 0% 69% very coarse gravel 45 4 4% 72% very coarse gravel 64 4 4% 76% Cobble small cobble 90 13 12% 88% medium cobble 128 4 4% 92% large cobble 180 7 6% 98% very large cobble 256 2 2% 100% small boulder 362 0 0% 100% Boulder small boulder 512 0 0% 100% medium boulder 1024 0 0% 100% large boulder 2048 0 0% 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 100% TOTALS 109 100% 100% Summary Data D50 0.062 D84 80 D95 150 UT Crab Creek Stream & Wetland D -17 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix D Stream Survey Data UT Crab Creek Stream & Wetland D -18 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 UT Crab Creek- Upstream Pebble Count - Percent Cumulative Cross Section 7 - Pool 100% 90% 80% a .c 70% F- L d C W 60% d 50% L P. 40% > — 30 y U 20% - 10% N O 4 Vi V VI ti N R N C D 00 O N N M R O x O � .� .�-i N M R �C 0\ N W M b � N R W N R 0% � Y O O' d f-0 Particle Size (mm) F—MY13/2/2011 —MY2 10/17/2011 —MY3 6/6/2012 --#--MY4 5/2/2013 -0-MY5 4/17/2014 UT Crab Creek - Upstream Pebble Count - Percent Individual Cross Section 7 - Pool I E 20% b 15% C u s. 10% n 5% N lf1 n Vi '-I N R �O 00 rl b N N V7 7 O 00 O �D N N 7 O b1i 0% d Qa Particle Size (mm) ■MY13 /2/2011 ■MY210 /18/2011 ■MY36/6/2012 ■MY45/212013 ■MY54/17/2014 UT Crab Creek Stream & Wetland D -18 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 Appendix D Stream Survey Data UT Crab Creek Stream & Wetland / Project No. 857 UTCC - Upstream - Cross - Section 8 - Riffle Pebble Count Summary D50 Monitoring Year 5 Description Material Size (mm) Total # Item % Cum % Silt /Clay silt/clay 0.062 5 5% 5% Sand very fine sand 0.125 0 0% 5% fine sand 0.25 3 3% 8% medium sand 0.50 4 4% 11% coarse sand 1.00 0 0% 11% very coarse sand 2.00 2 2% 13% very fine gravel 4.0 0 0% 13% fine gravel 5.7 0 0% 13% fine gravel 8.0 0 0% 13% Gravel medium gravel 11.3 0 0% 13% medium gravel 16.0 1 1% 14% coarse gravel 22.3 2 2% 16% coarse gravel 32 9 8% 25% very coarse gravel 45 10 9% 34% very coarse gravel 64 17 16% 50% Cobble small cobble 90 23 22% 72% medium cobble 128 16 15% 87% large cobble 180 11 10% 97% very large cobble 256 3 3% 100% small boulder 362 0 0% 100% Boulder small boulder 512 0 0% 100% medium boulder 1024 0 0% 100% large boulder 2048 0 0% 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 100% TOTALS 106 100% 100% Summary Data D50 64 D84 120 D95 170 UT Crab Creek Stream & Wetland D -19 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix D Stream Survey Data UT Crab Creek Stream & Wetland D -20 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 UT Crab Creek- Upstream Pebble Count - Percent Cumulative Cross Section 8 - Riffle 100% 90% 80% a .c 70% �I y, d C W 60% d 50% L d P. 40% > 30 y U 20% 10% O N W M b � N Q O 0% O O' O N V b d f-0 Particle Size (mm) F—MY1 —MY2 10/18 /2011 —MY3 6/6/2012 --#--MY4 5/2/2013 — ,-MYS 4/17/2014 UT Crab Creek - Upstream Pebble Count - Percent Individual Cross Section 8 - Riffle 20 y b 15% C u 10 M. �- 5% i 0% d Qa Particle Size (mm) ■MY13 /2/2011 ■MY210 /18/2011 ■MY36/6/2012 ■MY45/212013 ■MY54/17/2014 UT Crab Creek Stream & Wetland D -20 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 Appendix D Stream Survey Data UT Crab Creek Stream & Wetland / Project No. 857 UTCC - Upstream - Cross - Section 9 - Pool Pebble Count Summary D50 Monitoring Year 5 Description Material Size (mm) Total # Item % Cum % Silt /Clay silt/clay 0.062 6 5% 5% Sand very fine sand 0.125 0 0% 5% fine sand 0.25 14 13% 18% medium sand 0.50 6 5% 23% coarse sand 1.00 0 0% 23% very coarse sand 2.00 9 8% 31% very fine gravel 4.0 2 2% 33% fine gravel 5.7 0 0% 33% fine gravel 8.0 0 0% 33% Gravel medium gravel 11.3 3 3% 36% medium gravel 16.0 8 7% 43% coarse gravel 22.3 11 10% 53% coarse gravel 32 9 8% 61% very coarse gravel 45 10 9% 70% very coarse gravel 64 16 14% 84% Cobble small cobble 90 10 9% 93% medium cobble 128 6 5% 98% large cobble 180 1 1% 99% very large cobble 256 1 1% 100% small boulder 362 0 0% 100% Boulder small boulder 512 0 0% 100% medium boulder 1024 0 0% 100% large boulder 2048 0 0% 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 100% TOTALS 112 100% 100% Summary Data D50 20 D84 64 D95 100 UT Crab Creek Stream & Wetland D -21 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix D Stream Survey Data UT Crab Creek Stream & Wetland D -22 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 UT Crab Creek- Upstream Pebble Count - Percent Cumulative Cross Section 9 - Pool 100% 90% 80% a r 70% y, as C W 60% d 50% L P. 40% > 30 y U 20% 10% 0% d CG Particle Size (mm) — MY13/3/2011 —MY2 10/18 /2011 —MY3 6/6/2012 --#--MY4 5/2/2013 -0-MY5 4/17/2014 UT Crab Creek - Upstream Pebble Count - Percent Individual Cross Section 9 - Pool 20 y b 15% C Q loo/. �- 5% N lf1 V1 Vi .-- N R O N N �O 00 rl �O N N V7 7 O OD O �O N rl rl N M 7 �O O\ N 00 M �O N 7 00 �O 0% O O � N 7 ,d as Qa Particle Size (mm) ■MY13 /3/2011 ■MY210 /18/2011 ■MY36/6/2012 ■MY45/212013 ■MY54/17/2014 UT Crab Creek Stream & Wetland D -22 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 Appendix D Stream Survey Data UT Crab Creek Stream & Wetland / Project No. 857 UTCC - Upstream - Cross - Section 10 - Riffle Pebble Count Summary D50 Monitoring Year 5 Description Material Size (mm) Total # Item % Cum % Silt /Clay silt/clay 0.062 13 12% 12% Sand very fine sand 0.125 0 0% 12% fine sand 0.25 4 4% 16% medium sand 0.50 11 10% 27% coarse sand 1.00 3 3% 30% very coarse sand 2.00 4 4% 33% very fine gravel 4.0 0 0% 33% fine gravel 5.7 0 0% 33% fine gravel 8.0 0 0% 33% Gravel medium gravel 11.3 0 0% 33% medium gravel 16.0 3 3% 36% coarse gravel 22.3 3 3% 39% coarse gravel 32 11 10% 50% very coarse gravel 45 17 16% 66% very coarse gravel 64 7 7% 72% Cobble small cobble 90 14 13% 86% medium cobble 128 10 10% 95% large cobble 180 5 5% 100% very large cobble 256 0 0% 100% small boulder 362 0 0% 100% Boulder small boulder 512 0 0% 100% medium boulder 1024 0 0% 100% large boulder 2048 0 0% 100% very large boulder 4096 0 0% 100% Bedrock bedrock >4096 0 0% 100% TOTALS 105 100% 100% Summary Data D50 32 D84 86 D95 130 UT Crab Creek Stream & Wetland D -23 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix D Stream Survey Data UT Crab Creek Stream & Wetland D -24 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 UT Crab Creek- Upstream Pebble Count - Percent Cumulative Cross Section 10 -Riffle 100% — 90% 80% a r 70% F L d C W 60% d 50% L d P. 40% > 30 y U 20% 10% O N W M � b N Q O 0% O O' O N V b d f-0 Particle Size (mm) F—MY1 —MY2 10/18 /2011 —MY3 6/6/2012 --#--MY4 5/2/2013 -0-MY5 4/17/2014 UT Crab Creek - Upstream Pebble Count - Percent Individual Cross Section 10 - Riffle 20% r - b 15% C u 10% n 5% N lf1 n Vi .-- N 7 D 00 rl � N N V7 7 O 00 O �D N N 7 OD b1i 0% d Qa Particle Size (mm) ■MY13 /3/2011 ■MY210 /18/2011 ■MY36/6/2012 ■MY45/212013 ■MY54/17/2014 UT Crab Creek Stream & Wetland D -24 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 Appendix D Stream Survey Data - Information unavailable. N/A - Item does not apply. * The design cross - section criteria were developed using an analytical design approach. Pattern and profile data derived from stable enhancement reaches from the existing UT 1 data. Non - Applicable. UT Crab Creek Stream & Wetland Final D -25 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Table 10a. Baseline Stream Data Summary UT Crab Creek Stream & Wetland / Project No. 857 - UTl - Upper 500 feet Parameter Regional Curve Pre- Fxisting Condition Reference Reach Data Design* Monitoring Baseline Dimension & Substrate -Riffle LL UL Eq. Min Mean Med Max SD N Min Mean Med Max SD N Min Mean Max Min Mean Med Max SD N Bankfull Width (ft) 9.9 13.5 13.6 15.8 2.51 5 N/A N/A N/A N/A N/A N/A - 13.1 - 14.8 15.3 15.3 15.7 N/A 2 Floodprone Width (ft) 18.2 N/A N/A >55 N/A 5 N/A N/A N/A N/A N/A N/A 22 - 33 >100 >100 >100 >100 N/A 2 Bankfull Mean Depth (ft) 0.90 1.20 1.20 1.50 0.23 5 N/A N/A N/A N/A N/A N/A - 1.10 - 1.30 1.50 1.50 1.60 N/A 2 Bankfull Max Depth (ft) 1.20 1.80 1.80 2.40 0.51 5 N/A N/A N/A N/A N/A N/A 2.00 2.40 2.50 2.50 2.50 N/A 2 Bankfull Cross Sectional Area (ft) 14.0 14.1 15.1 15.0 15.9 0.72 5 N/A N/A N/A N/A N/A N/A 14.8 20.3 22.2 22.2 24.0 N/A 2 Width/Depth Ratio 6.5 12.2 11.7 16.7 4.12 5 N/A N/A N/A N/A N/A N/A 12.0 9.2 10.7 10.7 12.2 N/A 2 Entrenchment Ratio 1.2 3.4 3.3 >5.6 1.561 5 1 N/A I N/A I N/A I N/A I N/A I N/A 1 1 1.7 1 1 >6.4 1 >6.6 >6.6 >6.7 N/A 2 Bank Height Ratio 1.0 1.6 1 1.7 2.4 0.54 5 N/A N/A N/A I N/A I N/A N/A 1.0 1.0 1.1 1.1 1.1 N/A 2 Profile Riffle Length (ft) - - - - - - N/A N/A N/A N/A N/A N/A - 5.8 28.7 22.6 68.2 23.42 7 Riffle Slope (ft /ft) 0.023 0.057 0.014 0.03 0.014 0.03 0.014 0.023 0.022 0.033 0.007 7 Pool Length (ft) 7.0 13.0 14 47 14.0 47.0 3.5 8.6 8.1 19.8 4.44 13 Pool Max Depth (ft) 1.9 2.1 2.1 2.2 0.13 5 N/A N/A N/A N/A N/A N/A - 1.0 - 3.2 3.2 3.2 3.2 N/A 1 Pool Spacing (ft) 60.0 - - 65.0 - - 54 126 54.0 - 126.0 6.8 38.9 34.0 113.1 30.33 12 Pattern Channel Belt Width ft 21.0 58.0 32 58 32.0 58.0 26.8 37.4 40.1 44.4 7.06 6 Radius of Curvature (ft) 11.0 37.0 20 37 20.0 37.0 28.7 34.7 32.4 51.3 8.35 6 Re: Bankfull Width (ft/ft) 0.7 3.7 N/A N/A N/A N/A N/A N/A 1.5 2.8 1.9 2.3 2.1 3.3 N/A N/A Meander Wavelength (ft) 90.0 191.0 90.0 - - 191.0 - - 90.0 191.0 117.9 135.5 130.7 162.6 20.10 4 Meander Width Ratio 1.3 5.8 N/A N/A N/A N/A N/A N/A 2.4 4.4 2.6 2.6 2.6 2.7 N/A 2 Transport Parameters Reach Shear Stress (Competency) lb /ft2 N/A 2.08 Max Part Size (nun) Mobilized at Bankfull N/A 262 Stream Power (Transport Capacity) W /m2 N/A Additional Reach Parameters Rosgen Classification G4 /C4 N/A 134c/C4 Cb Bankfull Velocity (fps) - 3.9-4.7 N/A 4.5 Bankfull Discharge (cfs) 62 59-71 N/A 66 Valley Length (ft) - N/A - Channel Thalweg Length (ft) 1,730 N/A 1,621 500 Sinuosity 1.19 N/A 1.14 1.14 Water Surface Slope (ft/ft) 0.0210 N/A 0.0210 0.0238 Bankfull Slope (ft /ft) - N/A - 0.0251 Bankfull Floodplain Area (acres) N/A % of Reach with Eroding Banks Channel Stability or Habitat Metric N/A Biological or Other N/A - Information unavailable. N/A - Item does not apply. * The design cross - section criteria were developed using an analytical design approach. Pattern and profile data derived from stable enhancement reaches from the existing UT 1 data. Non - Applicable. UT Crab Creek Stream & Wetland Final D -25 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix D Stream Survey Data - Information unavailable. N/A - Item does not apply. * The design cross - section criteria were developed using an analytical design approach. Pattern and profile data derived from stable enhancement reaches from the existing UT 1 data. Non - Applicable. UT Crab Creek Stream & Wetland Final D -26 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Table 10a. Baseline Stream Data Summary UT Crab Creek Stream & Wetland / Project No. 857 - UT1 - Lower 397 feet Parameter Regional Curve Pre - Existing Condition Reference Reach Data Design* Monitoring Baseline Dimension & Substrate -Riffle LL UL Eq. Min Mean Med Max SD N Min Mean Med Max SD N Min Mean Max Min Mean Med Max SD N Bankfull Width (ft) 9.9 13.5 13.6 15.8 2.51 5 N/A N/A N/A N/A N/A N/A - 13.1 - 11.5 11.5 11.5 11.5 N/A 1 Floodprone Width (ft) 18.2 N/A N/A >55 N/A 5 N/A N/A N/A N/A N/A N/A 22.0 - 33.0 >100 >100 >100 >100 N/A 1 Bankfull Mean Depth (ft) 0.90 1.20 1.20 1.50 0.23 5 N/A N/A N/A N/A N/A N/A - 1.1 - 1.50 1.50 1.50 1.50 N/E Bankfull Max Depth (ft) 1.20 1.80 1.80 2.40 0.51 5 N/A N/A N/A N/A N/A N/A 2.0 2.50 2.50 2.50 2.50 N/ Bankfull Cross Sectional Area (ft2) 14.0 14.1 15.1 15.0 15.9 0.72 5 N/A N/A N/A N/A N/A N/A 14.8 17.6 17.6 17.6 17.6 N/ Width/Depth Ratio 6.5 12.2 11.7 16.7 4.12 5 N/A N/A N/A N/A N/A N/A 12.0 7.5 7.5 7.5 7.5 N/Entrenchment Ratio 1.2 3.4 3.3 >5.6 1.56 5 N/A N/A N/A N/A N/A N/A 1.7 >8.7 >8.7 >8.7 >8.7 N/Bank Height Ratio 1.0 1.6 1.7 2.4 0.54 5 N/A N/A N/A N/A N/A N/A 1.0 1.0 1.0 1.0 1.0 N/ Profile Riffle Length (ft) - - - - - - N/A N/A N/A N/A N/A N/A - 21.0 37.6 40.2 52.6 15.19 5 Riffle Slope (ft /ft) 0.023 0.057 0.014 0.030 0.014 0.030 0.020 0.026 0.027 0.033 0.005 5 Pool Length (ft) 7.0 13.0 14.0 47.0 14.0 47.0 11.8 17.4 17.4 27.1 6.24 5 Pool Max Depth (ft) 1.9 2.1 2.1 2.2 0.13 5 N/A N/A N/A N/A N/A N/A - 1.0 - 2.6 2.6 2.6 2.6 N/A 1 Pool Spacing (ft) 60.0 - - 65.0 - - 54.0 126.0 54.0 - 126.0 45.0 71.3 73.4 93.6 121.55 4 Pattern Channel Belt Width ft 21.0 58.0 32 58 32.0 58.0 57.2 62.9 64.2 66.2 3.9 4 Radius of Curvature (ft) 11.0 37.0 20 37 20.0 37.0 31.2 36.6 37.8 39.7 3.8 4 Re: Bankfull Width (ft/ft) 0.7 3.7 N/A N/A N/A N/A N/A N/A 1.5 2.8 2.71 3.18 3.28 3.45 N/A N/A Meander Wavelength (ft) 90.0 191.0 90.0 - - 191.0 - - 90.0 191.0 142.0 196.0 202.0 244.0 N/A 3 Meander Width Ratio 1.3 5.8 N/A N/A N/A N/A N/A N/A 2.4 4.4 5.58 5.58 5.58 5.58 N/A I Transport Parameters Reach Shear Stress (Competency) lb /ft2 N/A 1.36 Max Pan Size (mm) Mobilized at Bankfull N/A 191 Stream Power (Transport Capacity) W /m2 N/A Additional Reach Parameters Rosgen Classification G4 /C4 N/A B4c /C4 C Bankfull Velocity (fps) - 3.9-4.7 N/A 4.5 Bankfull Discharge (cfs) 62 59-71 N/A 66 Valley Length (ft) - N/A - Channel Thalweg Length (ft) 1,730 N/A 1,621 397 Sinuosity 1.19 N/A 1.14 1.15 Water Surface Slope (ft/ft) 0.0210 N/A 0.0210 0.0156 Bankfull Slope (ft /ft) - N/A - 0.0174 Bankfull Floodplain Area (acres) N/A % of Reach with Eroding Banks Channel Stability or Habitat Metric N/A Biological or Other N/A - Information unavailable. N/A - Item does not apply. * The design cross - section criteria were developed using an analytical design approach. Pattern and profile data derived from stable enhancement reaches from the existing UT 1 data. Non - Applicable. UT Crab Creek Stream & Wetland Final D -26 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix D Stream Survey Data - Information unavailable. N/A - Item does not apply. *Existing stream has been channelized and does not have a natural meander pattern with distinct pool and riffle features. Non- Applicable. UT Crab Creek Stream & Wetland Final D -27 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Table 10a. Baseline Stream Data Summary UT Crab Creek Stream & Wetland / Project No. 857 - UTCC -US (2,455 feet Parameter Regional Curve Pre - Existing Condition Reference Reach Data Design Monitoring Baseline Dimension & Substrate - Riffle LL UL Eq. Min Mean Med Max SD N Min Mean Med Max SD N Min Mean Max Min Mean Med Max SD N Bankfull Width (ft) 17.6 20.4 19.8 24.5 2.91 4 59.7 62.3 62.3 64.9 N/A 2 24.0 25.0 26.7 26.5 28.7 N/A 3 Floodprone Width (ft) 65 - - >80 - 4 200 248 248 296 N/A 2 - 54.0 >200 >200 >200 >200 N/A 3 Bankfull Mean Depth (ft) 1.40 1.65 1.70 1.80 0.17 4 3.30 3.35 3.35 3.40 N/A 2 1.4 1.40 1.53 1.50 1.70 N/A 3 Bankfull M ax Depth (ft) 2.40 2.78 2.75 3.20 0.33 4 5.00 5.40 5.40 5.80 N/A 2 2.3 2.40 2.50 2.50 2.60 N/A 3 Bankfull Cross Sectional Area (ft) 39.0 30.8 33.1 33.7 34.2 1.57 4 198.0 208.0 208.0 218.0 N/A 2 34.2 37.0 40.5 42.1 42.4 N/A 3 Width/Depth Ratio 1 10.01 12.71 11.51 17.9 3.52 4 18.1 18.6 - 19.1 17.1 14.7 17.7 19.0 19.5 N/A 3 Entrenchment Ratio 3.1 >4.1 4 3.1 4.0 5.0 >7.5 >7.5 >7.5 >8.0 N/A 3 Bank Height Ratio 1.0 1.1 1.0 1.2 0.10 4 1.0 1.0 1.0 1.0 N/A 1.0 1.0 1.0 1.0 1.1 N/A 3 Profile Riffle Length (ft) - - - 14.9 60.5 64.9 100.0 22.55 19 Riffle Slope (ft /ft) 0.020 0.042 0.015 0.029 0.027 0.048 0.012 5 0.014 0.045 0.006 0.013 0.012 0.021 0.005 19 Pool Length (ft) 29.0 51 0 - - - - - - 21.0 105.0 10.4 41.1 39.0 79.2 21.76 19 Pool M ax Depth (ft) 3.0 3.1 3.1 3.3 NA 3 - - - - - - - 1.9 - 2.7 2.9 2.9 3.0 N/A 2 Pool Spacing (ft) - 95.0 - - 116.0 190.0 161.0 188.0 93.70 4 45.0 - 136.0 51.7 130.7 113.2 241.7 52.31 18 Pattern Channel Belt Width ft) 13.0 - 43.0 - 500 - - N/A 1 75.0 211.0 54.7 101.7 102.5 132.8 23.59 15 Radius of Curvature (ft) 0.0* 51* - 55.1 - - N/A 1 43.0 128.0 37.5 51.1 42.5 146.7 26.21 16 Re: Bankfull Width (ft /ft) 0.0* 2.9* 0.88 0.88 0.88 0.88 - - 1.7 5.1 1.5 1.9 1.6 5.1 N/A N/A Meander Wavelength (ft) * * 51.3 159.0 61.6 540.0 213.0 5 20.0 228.0 204.4 238.7 234.4 314.2 32.62 15 Meander Width Ratio 0.5 2.4 8.0 8.0 8.0 8.0 N/A - 3.0 8.4 3.6 3.9 3.9 4.1 N/A 3 Transport Parameters Reach Shear Stress Com etenc 1b/ft2 0.89 0.73 0.71 Max Part Size (nun) Mobilized at Bankfulll 1 130 125 1 118 Stream Power (Transport Capacity) W /mZ - Additional Reach Parameters Rosgen Classification C4 C3 C4 C Bankfull Velocity (fps) - 3.3 -3.8 3.3 Bankfull Discharge (cfs) 197 111-130 117 Valley Length (ft) - - - Channel Thalweg Length (ft) 2,086 1,034 2,405 2,455 Sinuosity 1.04 1.20 1.20 1.21 Water Surface Slope (Channel) (ft /ft) 0.0090 0.0088 0.0080 0.0080 Bankfull Slope (ft /ft) - - - 0.0083 Bankfull Floodplain Area (acres) % of Reach with Eroding Banks Channel Stability or Habitat Metric Channel Stability or Habitat Metric Biological or Other - Information unavailable. N/A - Item does not apply. *Existing stream has been channelized and does not have a natural meander pattern with distinct pool and riffle features. Non- Applicable. UT Crab Creek Stream & Wetland Final D -27 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix D Stream Survey Data Table 1Ob. Baseline Stream Data Summary (Substrate, Bed, Bank, and Hydrologic Containment Parameter Distributions) UT to Crab Creek Stream & Wetland / Project No. 857 - UTl -U er 500 feet Parameter Pre - Existing Condition Reference Reach Data Design Monitoring Baseline Ri% /Ru % /P % /G % /S% - - - - - - - N/A N/A N/A N/A N/A N/A N/A - - - - - - - 42 8 24 22 4 - - SC % /Sa % /G % /C % /B % /Be% <1* 10* 59* 28* 3* 0* 3* N/A N/A N/A N/A N/A N/A N/A N/A 18 5 48 18 II d16 / D35 / d50 / d84 / d95 /diP / di- (mm) 7.2* 22.2* 40.0* 103.0* 197.0* - - N/A N/A N/A N/A N/A N/A N/A N/A N/A 144 512 - - - Entrenchment Class <1.5/1.5- 1.99/2 - 4.9/5.0- 9.9/ >10 - - - - - Entrenchment Class - - - - - Incision Class <1.2/1.2- 1.49/1.5- 1.99/>2.0 - - - - <1.5/1.5- 1.99/2- 4.9/5.0- 9.9/>10 - - - - - - - - - - - Information unavailable. N/A - Item does not apply. * Numbers reported are the mean percentages from the riffle surface pebble counts. Non - Applicable. Table 10b. Baseline Stream Data Summary (Substrate, Bed, Bank, and Hydrologic Containment Parameter Distributions) UT to Crab Creek Stream & Wetland / Project No. 857 - UTl -Lower 397 feet Parameter Pre - Testing Condition Reference Reach Data Design Monitoring Baseline Ri% / Ru% / P% / G% / S% - - - - - - - N/A N/A N/A N/A N/A - - - - - - - - - - - - 47 9 SC % /Sa % /G % /C % /B % /Be% <1* 10* 59* 28* 3* 0* 1* N/A N/A N/A N/A N/A N/A 18 5 48 18 II dl6 / D35 / d50 / d84 / d95 / di° / di- mm 7.2* 22.2* 40.0* 103.0* 197.0* 11* 23* N/A N/A N/A N/A N/A N/A N/A 144 512 - - - Entrenchment Class Entrenchment Class <1.5/1.5- 1.99/2 - 4.9/5.0- 9.9/ >10 <1.5/1.5- 1.99/2- 4.9/5.0- 9.9/>10 - - - - - - - - - - Incision Class Incision Class <1.2/1.2- 1.49/1.5- 1.99/ >2.0 - - - - <1.2/1.2- 1.49/1.5- 1.99/ >2.0 - - - - - Information unavailable. N/A - Item does not apply. * Numbers reported are the mean percentages from the riffle surface pebble counts. Non - Applicable. Table 10b. Baseline Stream Data Summary (Substrate, Bed, Bank, and Hydrologic Containment Parameter Distributions) UT to Crab Creek Stream & Wetland / Project No. 857 - UTCC -US (2,455 feet Pre - Existing Condition Reference Reach Data Design Monitoring Baseline Parameter Ri% /Ru % /P % /G % /S% - - - - - - - - - - - - - - - - - 47 9 32 12 0 SC % /Sa % /G % /C % /B% /Be% 0* 1* 62* 36* <1* 0* 0 18 5 48 18 II d16/D35/d50/d84/d95 / dip /dep mm 11* 23* 44* 104* 150* - - 1.4 - 144 512 - - - Entrenchment Class <1.5/1.5- 1.99/2- 4.9/5.0- 9.9/>10 - - - - - - - - - - Incision Class <1.2/1.2- 1.49/1.5- 1.99/ >2.0 - Information unavailable. * Numbers reported are the mean percentages from the riffle surface pebble counts. Non - Applicable. UT Crab Creek Stream & Wetland Final D -28 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix D Stream Survey Data Table l la. Monitoring Data - Dimensional Morphology Summary UT Crab Creek Stream & Wetland / Project No. 857 - UT1 - Upper (500 Feet) (Dimensional Parameters - Cross - Sections) UT Crab Stream & Wetland / Project No. 857 - UTl -Upper (500 feet) Cross - Section 1 Riffle Cross - Section 2 Pool Cross - Section 3 Riffle Dimension Base MY1 MY2 MY3 MY4 MY5 Base MY1 MY2 MY3 MY4 MY5 Base MY1 MY2 MY3 MY4 MY5 Record Elevation (datum) Used 2,605 2,605 2,605 2,605 2,605 2,605 2,603 2,603 2,603 2,603 2,603 2,603 2,598 2,598 2,598 2,598 2,598 2,598 Bankfull Width (ft) 15.7 15.9 15.3 16.0 17.3 18.4 18.4 18.0 17.6 18.0 17.9 17.9 14.8 14.7 14.9 15.0 15.0 15.3 Floodprone Width (ft) >100 >100 >100 >100 >100 >100 >100 >100 >100 >100 >100 >100 >100 >100 >100 >100 >100 >100 Bankfull Mean Depth (ft) 1.3 1.2 1.3 1.2 1.2 1.1 1.9 1.9 1.8 1.8 1.7671 1.7 1.6 1.6 1.6 1.6 1.618 1.6 Bankfull Max Depth (ft) 2.4 2.4 2.5 2.4 2.5 2.4 3.2 3.2 3.3 3.1 3.0831 2.9 2.5 2.5 2.6 2.6 2.698 2.8 Bankfull Cross Sectional Area ftZ 1 20.3 18.5 19.3 19.5 20.0 20.1 34.3 33.4 32.2 32.4 31.651 29.8 24.0 23.8 23.8 24.4 24.25 23.9 Bankfull Width/Depth Ratio 12.2 13.8 12.1 13.1 14.9 16.9 9.9 9.7 9.6 10.0 10.136 10.8 9.2 9.1 9.4 9.2 9.262 9.8 Bankfull Entrenchment Ratio >6.4 >6.3 >6.5 >6.3 >5.8 >5.4 >5.4 >5.5 >5.7 >5.5 >5.6 >5.6 >6.7 >6.8 >6.7 >6.7 >6.7 >6.5 Bankfull Bank Height Ratio 1.0 1.0 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.0649 1.1 1.1 1.1 1.1 1.1 1.096 1.1 Cross Sectional Area between End Pins (ft2) 20.3 19.0 19.4 19.6 20.0 20.1 34.3 33.6 32.2 32.4 32 29.8 24.3 24.1 24.2 24.6 24 1 23.9 d50 (mm) I N/A 17 4.6 6.6 19 8.8 N/A 11 1.7 1 6.4 4.9 9.1 N/A 23 12 19 26 12 N/A - Item does not apply. UT Crab Creek Stream & Wetland Final D -29 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix D Stream Survey Data Table l la. Monitoring Data -Dimensional Morphology Summary (Dimensional Parameters - Cross - Sections) UT Crab Creek Stream & Wetland / Project No. 857 - UT1 -Lower (397 feet) Cross - Section 4 Pool Cross - Section 5 Riffle Dimension Base MY1 MY2 MY3 MY4 MY5 Base MYI MY2 MY3 MY4 MY5 Record Elevation (datum) Used 2,571 2,571 2,571 2,571 2,571 2,571 2,571 2,571 2,571 2,571 2,571 2,571 Bankfull Width (ft) 16.7 14.3 14.7 14.7 14.4 14.2 11.5 12.2 12.3 11.8 11.7 12.3 Floodprone Width (ft) >100 >100 >100 >100 >100 >100 >100 >100 >100 >100 >100 >100 Bankfull Mean Depth (ft) 1.1 1.3 1.1 1.1 1.2 1.1 1.5 1.4 1.4 1.4 1.42 1.3 Bankfull Max Depth (ft) 2.6 2.5 2.4 2.5 2.5 2.5 2.5 2.6 2.6 2.5 2.72 2.6 Bankfull Cross Sectional Area (ft 2 18.8 18.0 16.7 16.7 17.3 15.4 17.6 17.5 17.3 16.8 16.5 15.8 Bankfull Width/Depth Ratio 14.8 11.4 12.9 13.0 12.0 13.2 7.5 8.5 8.8 8.3 8.25 9.5 Bankfull Entrenchment Ratio >6.0 >7.0 >6.8 >6.8 1 >6.9 >7.0 >8.7 1 >8.2 >8.1 1 >8.5 >8.6 >8.1 Bankfull Bank Height Ratio 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.02 1.0 Cross Sectional Area between End Pins ft2 18.9 18.0 16.7 16.7 17.3 15.4 21.1 21.5 21.6 21.1 16.5 15.8 d50 (mm) N/A 8.4 1 4 2 0.4 4.9 N/A 0.91 2 1.3 0.06 14 N/A - Item does not apply. UT Crab Creek Stream & Wetland D -30 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 Appendix D Stream Survey Data Table 11a. Monitoring Data - Dimensional Moprhology Summary (Dimensional Parameters - Cross - Sections) UT Crab Creek Stream & Wetland / Project No. 857 - UTCC -US (2,455 feet) Cross - Section 6 Riffle Cross - Section 7 Pool Cross -Section 8 Riffle Cross - Section 9 Pool Cross - Secti on 10 Riffle Dimension Base MYl MY2 MY3 MY4 MY5 Base MYl MY2 MY3 MY4 MY5 Base MYl MY2 MY3 MY4 MY5 Base MYl MY2 MY3 MY4 MY5 Base MYl MY2 MY3 MY4 MY5 Record Elevation (datum) Used 2,571 2,571 2,571 2,571 2,571 2,571 2,571 2,571 2,571 2,571 2,571 2,571 2,566 2,566 2,566 2,566 2,566 2,566 2,554 2,554 2,554 2,554 2,554 2,554 2,554 2,554 2,554 2,554 2,554 2,544 Bankfull Width (ft) 25.0 24.7 27.2 25.1 24.3 23.7 27.7 27.8 27.8 27.6 27.4 27.6 28.7 27.9 28.0 27.9 27.5 27.7 23.5 23.8 23.0 23.1 23.7 22.9 26.5 27.2 26.4 27.8 27.3 26.4 Floodprone Width (ft) >200 >200 >200 >200 >200 >2001 >200 >200 >200 >200 >200 >200 >200 >200 >200 >200 >200 >200 >200 >200 >200 >200 >200 >200 >200 >200 >200 >200 >200 >200 Bankfull Mean Depth (ft) 1.7 1.7 1.5 1.6 1.6 1.6 1.7 1.7 1.6 1.6 1.5 1.4 1.5 1.4 1.4 1.3 1.3 1.2 1.7 1.7 1.6 1.6 1.5 1.4 1.4 1.4 1.4 1.3 1.38 1.4 BankfullMax Depth (ft) 2.6 2.5 2.5 2.6 2.6 2.5 3.0 3.4 3.4 3.5 3.46 3.2 2.5 2.4 2.5 2.4 2.43 2.5 2.7 2.9 2.7 2.8 2.75 2.7 2.4 2.4 2.5 2.6 2.56 2.6 Bankfull Cross Sectional Area ftZ 42.4 41.9 41.3 41.0 40.0 37.6 47.3 47.1 45.1 43.9 40.9 38.1 42.1 39.5 38.4 37.6 35.9 34.5 40.7 40.9 36.1 36.8 35.6 32.2 37.0 37.2 35.9 37.5 37.5 36.6 Bankfull Width/Depth Ratio 14.7 14.6 17.9 15.3 14.8 14.9 16.3 1 16.4 1 17.1 1 17.4 18.3 20.0 19.5 19.7 20.4 20.7 21.1 22.3 13.5 13.9 14.6 1 14.5 15.8 16.3 19.0 19.9 19.4 20.6 19.8 19.1 Bankfull Entrenchment Ratio >8.0 >8.1 >7.4 >8.0 >8.2 >8.4 >7.2 17.2 >7.2 >7.2 >7.3 1 >7.2 1 >7.0 1 >7.2 >7.1 >7.2 >7.3 >7.2 >8.5 >8.4 >8.7 >8.7 1 >8.4 1 >8.7 >7.5 >7.3 >7.6 >7.2 >7.3 >7.6 Bankfull Bank Height Ratio 1.0 1.0 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.05 1.1 1.0 1.0 1.0 1.0 1 1.041 1.0 1.0 1.0 1.0 1.0 1.04 1.0 Cross Sectional Area between End Pins ft2 42.4 41.9 41.3 41.0 40.0 37.6 47.3 47.3 45.1 43.9 40.9 38.1 43.2 40.1 38.5 37.6 35.9 34.5 41.5 41.2 36.1 36.8 35.6 32.2 38.6 39.9 37.1 39.7 37.5 36.6 d50 nm N/A 51 48 46 38 30 N/A 32 6 1 8.7 1 1.3 1 0.06 N/A 33 26 33 33 64 N/A 8.8 27 33 1 31 1 20 NA 24 IS 25 30 32 N/A - Item does not apply. UT Crab Creek Stream & Wetland D -31 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix D Stream Survey Data Table Ilb. Monitoring D. Data Summary UT Crab Cmek Stream & Wetland Project No. 857 - UT1-Upper (503 feet) • , ®����a ® ®�� ®a ®�� ®moo ® ®���a� ®��� ® ®�� ®�® • . ® ® ® ®� ®� ®® ®tea ® ® ® ®� ® ® ® ® ®� ® ® ®® ®tea ® ®® ®tea N/A - Information does not apply. Ri = RifBe / Ro= R- / P =Pool / G= Glide / S= S[ep SC = Silt -Clay / SA = Sand / G= Gavel / C = Cobble / B = Boulder / Be = Bedrock "Percentages based on riffle and pool pebble conata. UT Crab Creek Stream & Wetland D -32 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix D Stream Survey Data Table Ilb. Monitoring D. Data Stromnary UT Crab Cmek Stream & Wetland Project No. 857 - UTI-Lower (396 feet) tt tt 1. It • N/A - Information does not apply. Ri =RifB /Ro= R- /P= Pool /G= Glide /S =Step SC = Silt -Clay / SA = Sand / G= Gavel / C = Cobble / B = Boulder / Be = Bedrock "Percentages based on riffle and pool pebble courts. UT Crab Creek Stream & Wetland D -33 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix D Stream Survey Data Table I I b. Monitoring D. Data Summary UT Crab Creek Stream & Welland Proiject No. 857 - UTCC-US (2,465 feet) • , � ® ®��o ® ® ®� ®o ® ®® ®moo ® ® ®��o ®� ®�� ® ® ®���® t, I t l t t : t tt : tt : I ll:• t tl: I tt: I tt . I tt. I tt ., N/A - Information does not apply. Ri =RifB /Ro= R- /P= Pool /G= Glide /S =Step SC = Silt -Clay / SA = Sand / G= Gavel / C = Cobble / B = Boulder / Be = Bedrock "Percentages based on riffle and pool pebble courts. UT Crab Creek Stream & Wetland D -34 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix E Hydrologic Data Appendix E Hydrologic Data Table 12. Verification ofBankfull Events UT Crab Creek Stream & Wetland / Project No. 857 Date of Data Collection Date of Occurrence Method Photo # (if available) 4/2010 4/2010 Wrack lines 2/2/2011 12/2/2010 Crest gauge & wrack lines 4/10/2013 2/26/2013 Crest gauge & wrack lines 10/30/2013 Unknown Wrack lines 11/5/2014 Unknown Wrack lines UT Crab Creek Stream & Wetland E -1 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015 Appendix E 14.0 WWI 10.0 C O 8.0 .Q .� 6.0 L IL 4.0 2.0 0.0 monunlly rrecipitation vata uomparea to su_.. ana ./u_.. rercentnes for Allegnany t_;ounty, ivy: Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec -2014 Rainfall 30th Percentile • • • • • • 70th Percentile Hydrologic Data UT Crab Creek Stream & Wetland E -2 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix E Hydrologic Data UTC -1 Precipitation and Water Level Plot UT Crab Creek Stream & Wetland E -3 Equinox Project No. 857 January 2015 5.0 Beginning of ; Maximum# of Consecutive Days >12 ": 3 35.0 Growing Season May 2 % ofHydroperiodDuringGrowing Season: 1.9% 30.0 4.5 ; 25.0 4.0 ; 20.0 15.0 = .i 10.0 Ground Surface ; ) :.. 3.0 5.0 3 0.0 M Required i 2.5 Depth -5.0 O Q .� -10.0 (� 2.0 J 1 - 15.0 — a 1.5 -20.0 a End of Growing Season -25.0 0 Octobers 1.0 ; , ; -30.0 -35.0 0.5 Rain Gauge Malfunction -40.0 0.0 -45.0 r r r r r r r r r r r r r r r r r r r r r r r r r r r C C i L L L L R R C G� 01 -2 01 C Q V V 0 > d V U V m 4) a a 6 a a V O Z Z 0 D LO (D N N M N N 4 O O ti e N O N N L6 T ti r M N N UT Crab Creek Stream & Wetland E -3 Equinox Project No. 857 January 2015 Appendix E U l U -L ana water Levu riot Hydrologic Data UT Crab Creek Stream & Wetland E -4 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 5.0 15.0 Beginning of Growing Season ; Maximum #of Consecutive Days >12 ": 45 May 2 o /o of Hyd ro period During G rowi ng Season: Q 28.7 /0 4 � 10.0 .5 Ground Surface 5.0 4.0 1 .-. 3.5 ; Required -5.0 4) Depth �I 3.0 -10.0 C 'r End of 2.5 ; ; Growing Season -15.0 p Q ; ; October5 .V 2.0 -20.0 p i -25.0 Q 1.5 -30.0 1.0 -35.0 0.5 Rain Gauge Malfunction I -40.0 0.0 IL 1 1111[ Ut -45.0 1 1 . . I I . I 1 i 1 T r r T T T T T r T T r T T r T r T T T T T r r T r T r3 t0 r6 a) y R ciC Q. I O. f�6 I R � � 7 7 3 7 3 d d V V O O d a) N > LL L 2 a a 9 o o z z o 0 0 r W) O) N CO N CO M M r` T 4 CO I� M O 4 00 N o O M ` r T N N N N N T N N N M UT Crab Creek Stream & Wetland E -4 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix E u i u -s rrecipitation ana water Level not Hydrologic Data UT Crab Creek Stream & Wetland E -5 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 5.0 10.0 Beginning Growing Seas on Maximum #of Consecutive Days >12 ": 157 May 2 % ofHydro period DuringGrovang Season: 100% 4.5 Ground Surface 5.0 4.0 , , 3.5 Ily Required -5.0 = Depth L .-. -10.0 � 3.0 3 O -15.0 2.5 End of � Growing Season O Q October -20.0 .� 2.0 O i -25.0 a s 1.5 ' a -30.0 Q 1.0 -35.0 0.5 ; Rain Gauge Malfunction -40.0 0.0 -45.0 v P v P v P T P P P P r r r P P r r r r r r r T P r r P P T C C C M W M 0 i L i i M M C Cg :� :;" C C 01 LA C. Q 6 O 0 d U 0) V 41 u. u. 2 2 Q Q � -?'2 O C? Z Z 0 O D LO (D N t0 N 6 01 M N r V 00 N P O V O N 0 A M N ti r N N N N N M UT Crab Creek Stream & Wetland E -5 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix E U I L -4 rrecipitation ana water Level not Hydrologic Data UT Crab Creek Stream & Wetland E -6 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 5.0 i 10.0 Maximum# of Consecutive Days >12 ":45 % of Hyd roperiod During Growing Season : 28.7% 4.5 Ground Surface 5.0 •�. . • - -� _ — -♦ 0.0 Beginning of 3.5 Growing Season Required -5.0 =_ .-. May 2 Depth L -10.0 y :.. 3.0 Gauge Malfunction 3 � O� -15.0 = +=� 2 5 End of Growing Season O Q October5 -20.0 .� 2.0 O i -25.0 a s 1.5 ' a -30.0 Q 1.0 -35.0 0.5 ; Rain Gauge Malfunction -40.0 0.0 -45.0 v v P P v P T P P P P r r r P P r r r r r r r T P r r T P T C C f6 M C M M 41 M C i L i i R M C Cg :� :;" C C C 61 Q d 0 O > d v y v d J -7 -7 u- u- 2 2 Q Q � -? -? 2 Q V1 V1 O C? Z Z 0 O D P LO C N N t0 N t0 01 M N r V W N P O V O N 0 T M N ti r r N N N r N N M UT Crab Creek Stream & Wetland E -6 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix E u i u -5 rrecipitation ana water Level not Hydrologic Data UT Crab Creek Stream & Wetland E -7 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 5.0 10.0 Beginning of Maximum# of Consecutive Days >12 ": 157 Growing Season % of Hyd roperiod During GroWng Season: 100% 4.5 Ground Surface May 5.0 0.0 4 .0 Required -5.0 = Depth L .-. -10.0 3.0 3 O ; -15.0 2.5 End of ; Growing Season O Q "V ; ; October5 -20.0 L- 2.0 O i -25.0 a s 1.5 ' a -30.0 Q 1.0 -35.0 0.5 Rain Gauge Malfunction -40.0 0.0 -45.0 P P P T P P P P r r r P P r r r r r r r T P r r T P T C C f6 M C M M W M C i L i i R M C Cg :� :;" C C & & C Q 0 O > d v d v y J -7 -7 u- u- 2 2 Q Q � -? -? 2 Q O C? Z Z 0 P LO C N N t0 N t0 01 M N r V 0 N 0 O M ti P M O e O N 0 T M N IO - - TD r N N N r N N M UT Crab Creek Stream & Wetland E -7 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix E u i u -6 rrecipitation ana water Level not Hydrologic Data UT Crab Creek Stream & Wetland E -8 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 5.0 10.0 Maximum # of Consecutive Days> 12": 31 % of Hyd roperiod During Growing Season : 19.7% 4.5 Ground Surface 5.0 \ 0.0 4.0 3.5 Beginningof Required -5.0 = .i Growing Season i Depth .-. a May 2 �� -10.0 3.0 3 c O -15.0 � 2.5 End of � Growing Season O Q October5 -20.0 .� 2.0 O i -25.0 a� � s 1.5 ' a -30.0 Q 1.0 -35.0 0.5 Rain Gauge Malfunction -40.0 0.0 -45.0 v P v P v P T P P P P r r r P P r r r r r r r T P r r P P T C f6 C fC C R M W M i L 0I M M i C. i C. :� :;" C C C & & = 7 z -2 C. d Q d > > V O O d v d v 41 u u- 2 2 Q Q -? -7 Q Q O C? Z Z 0 O D LO (D N t0 N 6 01 M N 00 N 10 O IZ P M O -4 O N Lh Im N r N N N N N M UT Crab Creek Stream & Wetland E -8 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix E Hydrologic Data UTC -7 Precipitation and Water Level Plot 5.0 Beginning of Maximum# of Consecutive Days >12 ": 10 10.0 Growing Season ; %of Hydroperiod During GrowingSeason: 6.4% May 2 4.5 * ♦ ` Ground Surface 5.0 4.0 0.0 3.5 Required -5.0 .-. Depth L \ M i \y 3.0 -10.0 3 'a O -15.0 r- 2.5 ; O -20.0 .O 2.0 O O a ' -25.0 t 1.5 a End of -30.0 Growing Season 1.0 ; October 5 -35.0 0.5 Rain Gauge Malfunction -40.0 It0.0 -45.0 r r r r r r r r r r r r r r r r r r r r r r r r r r r C C i L L L L 01 01 Q Q a R a a g � r � r � Q � V U 0 o > Q d J ? ? u- u- 2 2 Q Q ' ? V1 V I? I? Z Z 0 O U D LO M t0 N t0 01 M t V CO N t0 O O -4 O N Lh Im � N N N N N r N N N V m Cl) UT Crab Creek Stream & Wetland E -9 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix E u i u -s rrecipitation ana water Levei not Hydrologic Data UT Crab Creek Stream & Wetland E -10 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 5.0 Beginning of Growing Season ; � 10.0 Maximum #of Consecutive Days >12 ": 34 Ma 2 y ; o o / o ofHydroperiodDuringGrowingSeason :21.7/0 4.5 Ground Surface 5.0 4.0 ; 0.0 Required -5'0 v 3.5 Depth L c -10.0 m f° c 3.0 c o w ; ;Gauge Malfunction o > -15.0 t9 •C 2.5 $ W C. L IL ; End of -20.0 C 2.0 Growing Season October s -25.0 1.5 -30.0 1.0 -35.0 0.5 Rain Gauge Malfunction -40.0 0.0 -45.0 r T r T T T T r T r T r T r T r r T r T r T T r T r T M M O. O. !�4 3 j O 3 7 7 7 d d V 0 O O d d d 7 LL LL co 0 0 Z Z O r In 01 N N t0 N t0 07 M N ti r Op T M M f� O �F O N lCf O N r r N r N N r r N r N r r co) UT Crab Creek Stream & Wetland E -10 Equinox Project No. 857 January 2015 Monitoring Year 5 of 5 Appendix E Hydrologic Data Table 13. Wetland Gauge Attainment Data Summary of Groundwater Gauge Results UT Crab Creek Stream & Wetland / Project No. 857 Success Criteria Achieved/Max Consecutive Days During Growing Season (Percentage) Gauge ID Year 1 Year 2 Year 3 Year 4 Year 5 (2010) (2011) (2012) (2013) (2014) No /6 No /6 No /4 Yes /9 No /3 UTC -1 3.8 Percent 3.8 Percent 2.5 Percent 5.7 Percent 1.9 Percent Yes /70 Yes /30 Yes /39 Yes /148 Yes /45 LTC-2 44.6 Percent 19.1 Percent 24.8 Percent 94.3 Percent 28.7 Percent Yes /35 Yes /33 Yes /143 Yes /74 Yes /157 UTC 3 22.3 Percent 21.0 Percent 91.1 Percent 47.1 Percent 100.0 Percent Yes /52 Yes /61 Yes /55 Yes /157 Yes /45 LTC -4 33.1 Percent 38.9 Percent 35.0 Percent 100.0 Percent 28.7 Percent Yes /157 Yes /155 Yes /157 Yes /157 Yes /157 UTC -5 100.0 Percent 98.7 Percent 100.0 Percent 100.0 Percent 100.0 Percent Yes /22 Yes /38 Yes /45 Yes /132 Yes /31 UTC -6 14.0 Percent 24.2 Percent 28.7 Percent 84.1 Percent 19.7 Percent Yes /15 Yes /8 No /6 Yes /68 Yes /10 UTC -7 9.6 Percent 5.1 Percent 3.8 Percent 43.3 Percent 6.4 Percent Yes /37 Yes /58 Yes /48 Yes /45 Yes/ 34 UTC -8 23.6 Percent 36.9 Percent 30.6 Percent 28.7 Percent 21.7 Percent Crowing season = 157 days UT Crab Creek Stream & Wetland E -11 Project No. 857 Monitoring Year 5 of 5 Equinox January 2015