Loading...
HomeMy WebLinkAbout20070514 Ver 1_DCM Permit_20150126Permit Class RENEWAL MAINTENANCE -5 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission Vermit for Permit Number 88 -07 FEg 0 2 2015 X Major Development in an Area of Environmental Concern pursuant to NCGS 113A -118 X Excavation and/or filling pursuant to NCGS 113 -229 Issued to Mr. Everett W. Spence and Ms. Rosemary White PO Box 35826 Richmond VA 23235 Authorizing development in Dare County at Pamlico Sound, NC 12 adjacent to Hatteras Jacks Tackle Shop, Rodanthe as requested in the permittee's email dated 12/9/14 This permit, issued on January 26. 2015 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. I) This renewal shall be attached to the original Permit No 88 -07, which was issued on 7/3/07, and copies of both documents shall be readily available on site when Division personnel inspect the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. Maintenance Clause 3) The Division of Coastal Management shall be notified in writing at least two (2) weeks in advance of any maintenance work authorized by this permit and that notification include: A The number of the original permit B. A statement that no dimensional changes are proposed C. A copy of the original permit plan(s) with cross - hatching indicating the area to be maintained and the area to be used for dredge spoil, and the estimated amount of material to be removed. D The date of plan revision and the permittee's signature shown anew on the original plan This permit action may be appealed by the permmee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2019 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission �.� V, H, ' 6 bK' Braxton C. Davis, Director "Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee