Loading...
HomeMy WebLinkAbout20081868 Ver 1_Modifications_20150123og 1860 NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary MEMORANDUM TO: Jonathan Howell Assistant Major Permit Coordinator FROM: Jason Dail Field Representative {{ rl THROUGH: Debra Wilsony�i WiRO District Manager DATE: January 23, 2015 SUBJECT:Modiflcation Request CAMA Major Permit No. 18 -09 Donald Caison Pender County Mr. Hal Fogleman, acting as agent for Donald Caison, has submitted a request to modify CAMA Major Permit No. 18 -09, which was issued on May 22, 2009. The permit was scheduled to expire on December 31, 2012; however, it was extended in accordance with Session Law 2009 -406, and amended by Session Law 2010 -177, the Extension Act. The new expiration date for State Permit No. 18 -09 is August 11, 2015. The permittee is requesting authorization to allow for alteration of the permitted boat basin, bulkhead and docking facility. As permitted, a 20' deep x 40' wide boat basin was to be constructed in the center portion of the lot, bordering the canal. An 8' wide x 22' long floating dock was to be placed in the center of the basin, running perpendicular to the shoreline. In addition, two boat lifts were to be installed, one on either side of the floating dock. Currently, the permittee is seeking to abandon the original design and shorten the depth of the basin and place the floating dock closer to the run of the canal, parallel with the shoreline (see attached drawing dated received by DCM on January 22, 2015). As designed, the new bulkhead alignment would originate from the property line and would cut back into the high ground at a 45 degree angle. The angled portions of the proposed bulkhead would measure 15' in length and would cut back toward the center of the basin where they would connect to a straight section of wall measuring approximately 35' in length (running parallel to the shoreline). A new 6' x 10' fixed elevated platform.would be located along the southern side of the basin (originating from high ground and extending out over the bulkhead into open water) and this structure would provide access to a 6' x 24' floating dock (which would run parallel to the shoreline). 127 Cardinal Drive Ext., Wilmington, NC 28405 Phone: 9 10-796-7215 1 FAX: 910- 395 -3964 Internet: www.nccoastalmanagement.net An Eqval Opportunity 1 Affirmative Action Employer Donald Caison Page Two January 23, 2015 To summarize, the revised basin and docking system design would eliminate one of the previously permitted slips. Additionally, the area of high ground excavation would be reduced by nearly half of that originally permitted and the total length of the bulkhead would be reduced by more than one-third. As designed, the proposed changes would not impact any coastal wetlands as the development area is void of wetland vegetation. The permittee's agent has submitted a check 0#7143) in the amount of $ 100.00 for the modification. This office has no objection to the modification request, provided all other local, State and federal regulations are adhered to. By copy of this memo, DCM is requesting that the USACE, DWR and DCM]Fisberies Resource Specialist, provide any comment that your agency may have on the proposed project to Jonathan Howell of DCM's Morehead City office within 10 days of receipt of this memo. Enclosures: cc: Wilmington Files Joanne Steenhuis — DWR Megan O'Hare — Pender Co. LPO Tyler Crumbley - COE 127 Cardinal Drive Ext., Wilmington, NC 28405 Phone: 910- 796 -72151 FAX: 910-395-3964 Internet; www,nccoastaimanagement.net An Equal opportunity 1 Affirmative Action Employer _p JAN 2 3 205 Donald Caison Major Permit 18 -09 Minor Modification Donald Caison would like to modify the original work drawings, The new proposal allows for a 6 x 24 floating dock that is parallel to the channel. The bulkhead is set back from the channel 16'. The previous design was a slip that was set back 40' and was perpendicular to the channel. There will be a 6 x 10 fixed dock with 3 x 10 ramp to the floating dock. JAN 2, i X015 n rrr �o /I d-It U, f -� eo"q RECEIVED g)CM WILMINGTON, NIC -msit Class }, _. i NEW t � erinii Number r STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission w1k " t la'Rrml IF for JL Major Development in an Area of Environmental Concern pursuant to NCGS 113A -118 X Excavation and /or filling pursuant to NCGS 113 -,229 18 -09 Issued to Donald Caison, PO Box 11040,'Wilmin ton, NC 28443 Authorizing development in Pender_ County at Lot 1 Mallard Drive Harn stead NC 2$443 as requested in the permittee's application MP -1 dated 9115/08 & NiP -2 IyIP- 3, & MP -4 dated 9/9/08 including the att'd workplan drawings (10), Sheets 1 -6 dated revised 12/3108 & (3) dated reed 10 /17 /08 This pen-nit, issued on may ,2(1[l9 - _ , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Excavation 1) In order to protect juvenile finfish resources, no excavation shall be permitted between April I and September 30 of any year without prior approval of the North Carolina Division of Coastal Management and the Division of Marine Fisheries. 2) No excavation shall take place outside the area indicated on the attached workplan drawings. 3) Excavation shall not exceed -5 feet below the normal low water level. In no case shall the deptYi of excavation exceed the depth of the connecting waters. 4) The temporary. placement of double handling of excavated materials within waters or vegetated wetlands is not authorized. (See attached sheets for of Conditions) This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Divisi6n approval. All work must cease when the permit expires on December 31, 2012 � /t+ In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. James H. Gregson, Director Division of Coastal Management This permit and its conditions e}ehy oeptod " a MAY 9- 6 2009 igna €tta tyf Pit ifitee