HomeMy WebLinkAbout20060829 Ver 4_WRC Comments_20221229Staff Review Form
NORTH CAROLINA
Ertrlmnmertlrtl Quality
Updated September 4, 2020
Staff Review
Does this application have all the attachments needed to accept it into the review process?*
Yes No
ID# *
20060829
Version* 4
Is this project a public transportation project?*
Yes
No
Reviewer List: * Robert Tankard:eads\rbtankard
Select Reviewing Office: *
Washington Regional Office - (252) 946-6481
Does this project require a request for payment to be sent?*
Yes
No
Project Submittal Form
Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Type: *
For the Record Only (Courtesy Copy)
New Project
Modification/New Project with Existing ID
More Information Response
Other Agency Comments
Pre -Application Submittal
Re-Issuance\Renewal Request
Stream or Buffer Appeal
Pre -Filing Meeting Date Request was submitted on:
Is this supplemental information that needs to be sent to the Corps?*
Yes No
Please choose the commenting agency. *
DCM Comments DCM Permit
DFM Comments USFWS Comments
WRC Comments Other
Project Contact Information
Name: Maria Dunn
Who is submitting the information?
Email Address: maria.dunn@ncwildlife.org
Project Information
Existing ID #:
20060829
20170001 (no dashes)
Existing Version:
4
Project Name: Bridge Pointe Harbour 12 Slip Dock
Is this a public transportation project?
Yes
No
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
Yes No Unknown
County (ies)
Craven
Please upload all files that need to be submited.
Click the upload button or drag and drop files here to attach document
CMDF_Bridge Pointe Harbor_NCWRCA.pdf 803.7KB
Only pdf or kmz files are accepted.
Describe the attachments or
comments:
Sign and Submit
By checking the box and signing box below, I certify that:
• I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the
best of my knowledge and belief.
• I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
• I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a
written signature; AND
• I intend to electronically sign and submit the online form.
Signature:
Submittal Date: 12/22/2022
Is filled in automatically.
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BItAXTON DAVIS
Director
November 2, 2022
MEMORANDUM:
NORTH CAROLINA
Environmental Quality
11 .02.4:>1
E'ROM: Gregg Bodnar, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
400 Commerce Avenue, Morehead City, NC 28557
Office: 252-515-5416 (Courier 11-12-09)
greg bodnar NCDENR. ov
SUBJECT: CAMA Application Review
Applicant: Bridge Point Harbor HOA
Project Location: 98 Bridge Pointe Dr, Craven County
1�- �e:�+�2- 5�1Ps fro 1Z.���k�2L
Proposed Project: slip community docking facility
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Gregg Bodnar at the address above by November 23, 2022. if you have any
questions regarding the proposed project, contact Brad Connell 252-515-5415.
when appropriate, in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
*'`Additional comments may be attached**
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
PRINT NAME 6\11cri i .�1xn+fi
AGENCY !
SIGNATURE
DATE
K I E Q
wpw'naantm F'1ai®�N\ /��
North Carolina Department of Environmental Quality I Division o€Coastal Management
Morehead City Office 1 400 Commerce Avenue I Moorehead City, North Carolina 28557
252,8082808
— North Carolina Wildlife Resources Commission �
Cameron Ingram, Executive Director
MEMORANDUM
TO: Gregg Bodnar
Division of Coastal Management
North Carolina Department. of Environmental Quality
M���
FROM: Maria T. Dunn, Coastal Coordinator
Habitat Conservation Division
DATE: December 20, 2022
SUBJECT: CAMA Dredge/Fill Permit Application for Bridge Point Harbor HOA, Craven
County, North Carolina.
Biologists with the North Carolina Wildlife Resources Commission (NCWRC) reviewed the
permit application with regard to impacts on fish and wildlife resources. The project site is
located at 98 Bridge Pointe Dr adjacent the Trent River near New Bern, NC. Our comments are
provided in accordance with provisions of the Coastal Area Management Act (G.S. 113A-100
through 113A-128), as amended, Sections 401 and 404 of the Clean Water Act, as amended, the
Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.), the Fish and Wildlife
Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661 et seq.), the Magnuson -Stevens
Fishery Conservation and Management Act (FCMA), as amended (16 U.S.C. 1801 et seq.), and
the Migratory Bird Treaty Act (16 U.S. 703-712 et seq.).
The applicant proposes to relocate an existing 10-slip facility that serves the Bridge Pointe
Harbor subdivision. The facility will be relocated approximately 80' northeast of the current
location. To better facilitate the subdivision, two additional slips will be designated at the
terminal end of the 10' by 52' T-head. The 12 slips will have boat lifts and would be positioned
in water depths at and greater than -3.6' NWL. Submerged aquatic vegetation (SAV) has been
detected in the vicinity. The previous facility was a non -conforming structure. The new structure
will conform to NCDCM rule. The Trent River at this location is classified SB Sw NSW and is
subject to the NC Division of Water Resources Neuse Basin Rules.
Mailing Address: Habitat Conservation - 1721 Mai! Service Center • Raleigh, NC 27699-1721
Telephone: (919) 707-0220 • Fax: (919) 707-0028
Page 2
The NCWRC has reviewed the permit application and does not object to permit issuance.
However, the addition of two slips now classifies the structure as a marina. Therefore, a Marina
Plan should be designed for the site. This plan would address emergency action toward spills,
location of spill and safety equipment, presence of a dockmaster, docking rules, and other
contact information. It is recommended spill equipment is maintained on site in the case of fuel
spills from the fuel dispenser or other vessel incidents.
We appreciate the opportunity to review and comment on this permit application. If you need
further assistance or additional information, please contact me at (252) 948-3916 or at
maria.dunn ncwildlife.or