Loading...
HomeMy WebLinkAbout20060829 Ver 4_CAMA Application_20221214gem NP4 APPLICRION for Major Development Permit (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Bridge Pointe Harbour Owners Hoa Project Name (if applicable) 12 Slip Dock Applicant 1: First Name Richard MI Last Name Daniels Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address 104 Bridge Pointe Drive PO Box City New Bern State NC ZIP 28562 Country USA Phone No. 252 - 626 - 7204 ext. FAX No. Street Address (if different from above) City State ZIP Email danielsartglass@hotmail.com 2. Agent/Contractor Information Business Name Riverfront Docks, Llc Agent/ Contractor 1: First Name MI Last Name John Gudaitis Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State 3614 Fort Road New Bern NC ZIP Phone No. 1 Phone No. 2 28560 252 - 675 - 8210 ext. ext. FAX No. Contractor # 62543 Street Address (if different from above) City State ZIP Email sales@riverfrontdocks.com <Form continues on back> 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Craven 104 Bridge Pointe Drive Subdivision Name City State Zip Bridge Pointe Harbour New Bern NC 28562 - Phone No. Lot No.(s) (if many, attach additional page with list) 252 - 626 - 7204 ext. , , , , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Neuse River Basin Trent River c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown Trent River e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ❑Yes ®No work falls within. 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 105 15,844 c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) (If many lot sizes, please attach additional page with a list) 3 ft ❑NHW or ®NWL e. Vegetation on tract grass f. Man-made features and uses now on tract paved parking, cul-de-sac, boat ramp and small wood dock g. Identify and describe the existing land uses adjacent to the proposed project site. residential home, Alfred A Cunningham Bridge h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? vacant residential (Attach zoning compliance certificate, if applicable) ❑Yes ❑No ®NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ❑Yes ®No (ii) Are there coastal wetlands on the site? ❑Yes ®No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes ❑No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. none o. Describe existing drinking water supply source. none p. Describe existing storm water management or treatment systems. drainage & utility easement at property boundary 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Government ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. dock with 12 boat slips and/or boat lifts for use by residential residents only c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. dock pilings will be installed by an excavator mounted on a barge, stored off the shoreline when not in use d. List all development activities you propose. install a dock with 12 boat slips and/or boat lifts e. Are the proposed activities maintenance of an existing project, new work, or both? new (replacing wood dock at adjacent property f. What is the approximate total disturbed land area resulting from the proposed project? 1,675 ®Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. none i. Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ®NA j. Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal. <Form continues on back> 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Duc & Yun Nguyen Phone No. (252) 626-2048 Address 100 Bridge Pointe Drive New Bern, NC 28562 Name NC DOT Robby Taylor, Engineer Phone No. (252) 649-6500 Address 209 S Glenburnie Road New Bern, NC 28560 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date 12/13/22 Print Name John Gudaiti Signature Please indicate application attachments pertaining to your propose project. ❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development ®DCM MP-4 Structures Information 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMAMajorPermit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS ❑ This section not applicable a. (i) Is the docking facility/marina: b.(i) Will the facilitybe open to the general public? ❑Commercial ❑Public/Government ER Pri vate/Com m unity ❑Yes ®No c. (i) Dock(s) and/or p ier(s) d. (i) Are Finger Piers included? ®Yes ❑No (ii) Number 1 If yes: (iii) Length 130' (ii) Number 4 (iv) Width 5_8" (iii) Length 28'6" (v)Floating ❑Yes [RNo (iv)Width 3' (v) Floating ❑Yes [RNo e. (i) Are Platforms included? ®Yes ❑ No f. (i) Are Boatlifts included? ®Yes ❑ No If yes: If yes: (ii) Number 1 (ii) Number 10 (iii) Length 51'8" (iii) Length 14' (iv) Width 9'8" (iv) Width 14' (v) Floating ❑Yes ERNo Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed h. Check all the typesof servicesto be provided. 12 ❑ Full service, including travel lift and/or rail, repairor (ii) Number of slips existing maintenance service 0 ❑ Dockage, fuel, and marine supplies ® Dockage ("wet slips") only, number of slips: 12 ❑ Dry storage; numberof boats: ® Boat ramp (s); n umber of boat ramps: 1 (existing) ❑ Other, please describe: i. Check the proposed type of siting: ❑ Land cutand accesschannel ❑ Open water; dredging for basin and/or channel Open water; nod redging required ❑ Other; please describe: k. Typical boat length: 20'-28' m.(i) Wil I the facility have tie pilings? ®Yes ❑ No (ii) If yes number oftie pilings? 12 j. Describe the typical boatsto be served (e.g., open runabout, charter boats, sailboats, mixed types). open runabout, mixed types I.(i) Will the facilitybe open to the general public? ❑Yes [RNo 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS ❑ This section not applicable a. Check each of the followingsanitaryfacilitiesthat will beincluded inthe proposedproject. ❑ Office Toilets ❑ Toiletsforpatrons; Number: ; Location: n/a ❑ Showers ❑ Boatholding tank pumpout; Give type and location: n/a b. Describe treatment type and disposal location fo rall sanitarywastewater. n/a C. Describe the disposal of solid waste, fish offal and trash. n/a d. How will overboard discharge of sewage from boats be controlled? n/a e.(i) Give the location and number of "No Sewage Discharge" signs proposed. n/a (ii) Give the location and numberof Tumpout Available"signs proposed. n/a f. Describe the special design, if applicable, forcontaining industrialtype pollutants, such as paint, sandblasting waste and petroleum products. n/a g. Where will residue from vessel maintenance bed isposed of? n/a h. Give the number of channel markers and"No Wake"signs proposed. i. Give the locationof fuel-handli ng facilities, and d escri be the safety measures planned to protect area water quality. n/a j. Whatwill be the marina policyo n overnight and I ive-aboard dockage? no overnight or live -aboard dockage k. Describe design measuresthat promote boat basin flushing? n/a I. If this projectis an expansion ofan existing marina, whattypes of services are currently provided? n/a m. Is the marina/docking facility proposed within a primaryor secondary nursery area? ❑Yes ®No 252-808-2808 :: 1-888-4RCOAST:: wwv... revised: 12/27/06 Form DCM MP-4 (Structures, Page 3 of 4) Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes 0No o. Is the marina/d ocking facility proposed within oradjacentto coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV) , shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide then umber ofsq uare feet affected. ❑CW ❑SAV ❑SB ❑WL ®None p. Is the proposed marina/docking facility located within or within close proximityto anyshellfish leases? ❑Yes ®No If yes, give the nameand address of the leaseholder(s), and give the proximityto the lease. n/a 3. BOATHOUSE (including coveredlifts) ® This section not applicable a. (i) Is the boathousestructure(s): ❑Commercial ❑Public/Government ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ® This section not applicable a. (i) Number (ii) Length (i ii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ® This section not applicable a. Length b. Average distancefrom NHW, NWL, orwetlands c. Maximum distance beyond NHW,NWLorwetlands 6. MOORING PILINGS and BUOYS ® This section not applicable a. Is the structure(s): b. Number ❑Commercial ❑Public/Government ❑Private/Community c. Distance to be placed beyond shoreline d. Description ofbuoy (color, inscription, size, anchor, etc.) Note: This should be measured from marsh edge, if present. e. Arcoftheswing 7. GENERAL 252-808-2808 :: 1-888-4RCOAST:: www.nccoastalman. Form DCM MP-4 (Structures, Page 4 of 4) a. Proximityof structure(s) to adjacent riparian property lines b. Proximityofstructure(s)toadjacentdockingfacilities. 16', -4' 239' Note: For buoy or mooring piling, use arc of s wing including length of vessel. c. Width of water body 2,064' e. (i) Will navigational aids be required as a result ofthe project? ❑ Yes N No ❑ NA (ii) If yes, explain whattype and how theywill be implemented. d. Water depth atwaterward end of structure at NLWor NWL 10, 8. OTHER ® This section not applicable a. Give complete description: 12/13/22 Date Bridge Pointe Habour Dock Project Name John Gudaitis, Riverfront Docks, LLC Applicant Name Appvnature 252-808-2808 :: 1-888-4RCOAST:: www.nccoastaimanagement.net revised: 12/27/06 Bridge Pointe Harbour Owners 104 Bridge Pointe Drive New Bern, NC 28562 CAMA Major Permit Application Narrative October 12, 2022 The Bridge Pointe Harbour Owners (HOA) represents a small 20 home subdivision along the Trent River in Township 7 in Craven County, North Carolina. Ten properties are waterfront properties, and as such are able to enjoy all the beauty, natural resources and recreation afforded to waterfront living. The remaining 10 properties do not have waterfront views or access. The HOA owns and maintains several common areas in the subdivision to ensure resident safety and maintain the landscaping. In addition, the HOA owns a waterfront property (parcel # 7-002-042) which is adjacent to the Alfred Cunningham Bridge and currently has a paved driveway, cul-du-sac, small parking area, boat ramp and small wood dock for use by the non -waterfront property owners. There is an easement from the HOA waterfront property to an adjacent community wood dock that was built by the original subdivision developer in front of, and within the riparian zone, of the adjacent private residence. The wood dock has fallen in disrepair and needs to be replaced. The HOA desires to replace the existing dock, but the current property owner does not wish, and will not approve installing a new community dock within his riparian area. The HOA and adjacent property owner have reached an agreement to remove the existing dock from his riparian area, and remove the easement across his property for the existing dock. In exchange the HOA has decided to build a new community dock within the property and riparian area owned by the HOA, and the adjacent property owner will approve and allow the dock to be built without objection. We therefore respectfully request approval for a new, replacement dock to be built on our property and within our riparian zone. The existing boat ramp and seawall will remain, but the existing small wood dock will be removed. Additionally, the existing large community dock located in front of the adjacent property will also be removed. The net effect of these changes will be little to no long-term environmental impact due to removing, relocating and building a similarly sized structure. There is also less impact on navigational channels and recreational boating due to the shorter length dock and being located closer to the bridge. This change would also bring an existing non -conforming dock into compliance with the new dock, not to mention improving community relations with the adjacent property owners. This new 12 slip dock with boat lifts will allow all subdivision residents equal opportunities to enjoy all the beauty, natural resources and recreation of Eastern North Carolina. Respectfully, Bridge Pointe Harbour Owners The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. I ---------------- ------------------ Boat Slip 11 I Boat Slip 12 TRENT RIVER (transient docking space) I i (transient docking space) I , I ckn I I 0. I I 14 I 61'8" x 9'8" Platform Illl srdPth, 9/21/22 Boat Slip 9 I I+ I I Boat Slip 10 Boat Lift lJ + Boat Lift I (permanent docking) if 1 (permanent docking) I Boat Slip 7 Boat Slip 8 I + Boat Lift 1I I C1 + Boat Lift I — (permanent docking) - ...... ll!_I,J, (permanent docking) I.11ll 28'6"x3' r} 28'6"x3' Finger Pier 111' Finger Pier I Boat Slip 5 Ll+i�l- Boat Slip 6 I + Boat Lift + Boat Lift , �=(permanent docking) {permanent docking) I I lllf :C. _ I _ Boat Slip 3 I����I BoatSlip4 + Boat Lift + Boat Lift I (permanent docking) (permanent docking) I Boat Slip 1 Boat Slip 2 , + Boat Lift + Boat Lift (permanent docking) (permanent docking) 9121122 Mooring Pilings I II I Z 130' x 5'8" Walkway — I.CL �+1�� a � a I I a I 12 �I L= ;IIIfi1: :a; I LIIJ a Y 2 _ boat ramp (existing) seawall (existing) a s 10 seawall (existing) = g) �� Bridge Pointe Harbour Owners Scale 1" = 10' �IRIRON 3614 Old Cherry Point Road 104 Bridge Pointe Drive Drawing # 22-12, page 1 VTcNew Bern, NC 28560 New Bern, NC 28562 Prepared: 12/13/2022OCKS (252) 349-0797 f x It V) -0 71— L om �� E -r- Ov 00 vi avC) LLO� o Zo�O L i M C V a)N O Lw 5 3� L O N N Z d' iA M w_ w 0 V) 0 w_ 0 z w