HomeMy WebLinkAbout19940351 Ver 3_USACE Permit_20220923DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 September 23, 2022 Regulatory Division Action ID No. SAW 2017-00179 Petroleum Fuel and Terminal Company Attn: Mr. Jamie Mealy 3314 River Road Wilmington, NC 28412 Dear Mr. Mealy: Reference your application for a Department of the Army permit to renew a permit to perform dredging at an existing shipping dock berth at the Petroleum Terminal located at 3314 River Road, Wilmington, New Hanover County, North Carolina. This verification authorizes "agitation", and/or mechanical or "bucket to barge", and/or hydraulic dredging in 88,000 square feet of shallow bottom of the Cape Fear River. Dredging depth will not exceed -42 feet (plus 2 feet over dredge) below the mean low water elevations. Your proposal has been reviewed and found to be consistent with the provisions and objectives of the CAMA-Corps Programmatic Permit process, via Regional General Permit 291 (copy attached), for construction activities that receive authorization from the State of North Carolina. Therefore, you may commence construction activity in strict accordance with the applicable State authorization, attached Federal special conditions, RGP-291 conditions and the approved plan. Failure to comply with the State authorization or conditions of the Federal permit could result in civil and/or administrative penalties. If any change in your work is required because of unforeseen or altered conditions or for any other reason, plans revised to show the change must be sent promptly to this office and the North Carolina Division of Coastal Management prior to performing any such change or alteration. Such action is necessary as revised plans must be reviewed and the authorization modified. -2- Questions or comments may be addressed to Greg Currey, Wilmington Field Office, Regulatory Branch, telephone 910-523-1151 or email Gregory.e.currey@usace.army.mil. Sincerely, Digitally signed by Gregory Currey Gregory Currey Date: 2022.09.23 15:35:42 -04'00' Greg Currey, Project Manager Wilmington Regulatory Field Office Enclosures: Plans Manatee Guidelines GP 291 conditions Copies Furnished by Email (with enclosures): NOAA/NMFS; Mr. Fritz Rhode/Ms. Twyla Cheatwood NOAA/NMFS; Dr. Pace Wilber NCDEQ/DCM; Mr. Jonathan Howell NCDEQ/DCM; Ms. Tara McPherson NCDEQ/DWR; Ms. Holley Snider NCDEQ/DCM; Mr. Cameron Luck NCDEQ/DCM; Ms. Amanda Cannon USFWS; Mr. Pete Benjamin/Mrs. Kathy Matthews USEPA; Mr. Todd Allen Bowers USCG; BOSN3 Mr. Paul Bertram Gary Greene Engineers; Mr. Gary Greene -2- Special Conditions 1. All work authorized by this permit must be performed in strict compliance with the attached plans, dated November 21, 2016, which are a part of this permit. Any modification to these plans must be approved by the US Army Corps of Engineers (USA CE) prior to implementation. 2. The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the U.S. Army Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal, relocation, or alteration. The permittee shall notify NOAA/NATIONAL OCEAN SERVICE Chief Source Data Unit N CS261, 1315 E West HWY-RM 7316, Silver Spring, MD 20910-3282 at least two weeks prior to beginning work and upon completion of work. 3. Approval of the work is based on determinations that there would be no obstruction to navigation. Issuance of this permit should not be construed as relieving the permittee of taking proper steps to insure that structures and moored boats will not be damaged by wave wash. 4. Except as specified in the plans attached to this permit, no excavation, fill or mechanized land clearing activities shall take place at any time in the construction or maintenance of this project, in such a manner as to impair normal flows and circulation patterns within waters or wetlands or to reduce the reach of waters or wetlands. 5. Except as authorized by this permit or any USACE approved modification to this permit, no excavation, fill or mechanized land -clearing activities shall take place at any time in the construction or maintenance of this project, within waters or wetlands. This permit does not authorize temporary placement or double handling of excavated or fill material within waters or wetlands outside the permitted area. This prohibition applies to all borrow and fill activities connected with this project. 6. All mechanized equipment will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids, or other -3- toxic materials. In the event of a spill of petroleum products or any other hazardous waste, the permittee shall immediately report it to the N.C. Division of Water Quality at (919) 733-5083, Ext. 526 or (800) 662-7956 and provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act will be followed. 7. The authorized activity must not interfere with the public's right to free navigation on all navigable waters of the United States. No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work for reason other than safety. 8. The permittee must install and maintain, at his expense, any signal lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, on authorized facilities. For further information, the permittee should contact the U.S. Coast Guard Marine Safety Office at (910) 772-2191. 9. If the permittee discovers any previously unknown historic or archeological remains while accomplishing the authorized work, he will immediately notify the Wilmington District Engineer who will initiate the required coordination procedures. 10. The permittee shall require its contractors and/or agents to comply with the terms and conditions of this permit in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this permit. A copy of this permit, including all conditions, shall be available at the project site during construction and maintenance of this project. 11. The activity will be conducted in such a manner as to prevent a significant increase in turbidity outside the area of construction or construction -related discharge. Increases such that the turbidity in the waterbody is 50 NTU's or less in all rivers not designated as trout waters by the North Carolina Division of Environmental Management (NCDEM), 25 NTU's or less in all saltwater classes and in all lakes and reservoirs, and 10 NTU's or less in trout waters, are not considered significant. 12. The permittee, upon receipt of a notice of revocation of this permit or upon its expiration before completion of the work will, without expense to the United States and in such time and manner as the Secretary of the Army or his authorized representative may direct, restore the water or wetland to its pre -project condition. -4- 13. Violations of these conditions or violations of Section 404 of the Clean Water Act or Section 10 of the Rivers and Harbors Act must be reported in writing to the Wilmington District U.S. Army Corps of Engineers within 24 hours of the permittee's discovery of the violation. 14. Utilization of "agitation" dredging requires that all dredging occur during ebb tide. 15. At least 7 days in advance of a planned maintenance dredging event, the permittee shall provide the Corps Regulatory POC (Greg Currey) with copies of the before dredging surveys/maps of the berth/slip and adjacent Federal channel(s) in order to obtain Corps approval. The permittee will be informed whether the proposed dredging can be conducted as scheduled and that proposed dredging events may be subject to postponement or modification. The permittee shall be responsible for resolving scheduling conflicts. 16. The following harbor conditions will be considered by the Corps Regulatory POC when scheduling a dredging event, and may result in event postponement and/or modification: a. An approved or ongoing dredging event is within 3000' upstream or downstream of a berth where an agitation dredging event is proposed. b. Agitation dredging in any berth that is located within 2000' upstream or downstream of a shoal in the Federal channel c. Ongoing or scheduled dredging in the Federal channel within 5000' upstream or downstream of a berth where an agitation dredging event is proposed. 17. The permittee shall perform required hydrographic surveys in accordance with criteria and procedures contained in the "US Army Corps of Engineers Hydrographic Surveying Manual," EM 1110-2-1003. Required hydrographic surveys shall be provided to the Corps Regulatory POC as plan views and shall include the shoreline and berthing facilities, stationed to match the Corps' conducted surveys. 18. The permittee shall conduct a hydrographic survey of the berth/slip no more than 15 days before and no more than 7 days after each maintenance dredging event. 19. The permittee shall also conduct a hydrographic survey of the Federal channel before and after every agitation event. Channel surveys shall be performed no more than 15 days before and within 7 days of completing the dredging event. Surveys are required of the Federal -5- channel for a distance of approximately 2000' downstream and 1000' upstream of the point where dredging occurred. The permittee is only required to survey 50% of the Federal channel, as measured from the channel centerline to the edge of the channel adjacent to the dredging event. 20. To obtain approval from the Corps Regulatory POC to conduct a maintenance dredging event, the permittee must be in compliance with all permit conditions including the reporting requirements listed in Special Condition 22. Failure by the permittee to maintain accurate maintenance dredging documentation, to submit accurate and timely dredging information will result in disapproval by the Corps Regulatory POC of a request to conduct a maintenance dredging event. If the permittee is found to be non -compliant with reporting requirements, the Corps Regulatory POC will not grant approval for a requested maintenance dredging until after the permittee has posted delinquent reporting requirements and is found to be compliant with all permit conditions. 21. Any accumulated sediment in the federal channel caused by the agitation dredging activities shall be removed by the permittee if the accumulated sediments are determined to interfere with navigation. EFH Conditions 22. Agitation dredging shall not be allowed within a berth when agitation dredging is concurrently ongoing within another berth that is less than 5,000 feet away. 23. All requests for dredging outside the period October 1 to January 31 shall be coordinated with NMFS and shall include an explanation as to why the dredging could not be conducted within the sturgeon and anadromous fish work windows (October 1 to January 31), and shall provide additional measures that will be taken to ensure impacts to fishery resources are minimal. 24. Agitation dredging shall only be conducted during outgoing/falling tides. ESA Conditions 25. All in -water work must be conducted outside the Atlantic and Shortnose sturgeon moratoria dates from February 1 to September 30. 26. In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S. Fish and Wildlife Service's Manatee Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at https ://www.fws.govinc-es/mammal/manatee.html. -6- Permit Conditions for 2020 SARBO Project Design Criteria (PDC) For all activities: (ED1) All personnel associated with this project shall be instructed about the potential presence of species protected under the ESA and MMPA and the appropriate protocols if they are encountered. (ED2) All on -site project personnel are responsible for observing water -related activities for the presence of ESA -listed species. (ED3) All on -site project personnel will be informed of all ESA -listed species that may be present in the area and advised that there are civil and criminal penalties for harming, harassing, or killing ESA -listed species or marine mammals. (ED4) All on -site project personnel will be briefed that the disposal of waste materials into the marine environment is prohibited. All crew will attempt to remove and properly dispose of all marine debris discovered during dredging operations, to the maximum extent possible. All In -water Activities: (1NWATER1) All work, including equipment, staging areas, and placement of materials, will be done in a manner that does not block access of ESA -listed species from moving around or past construction. (INWATER2) Equipment will be staged, placed, and moved in areas and ways that minimize effects to species and resources in the area, to the maximum extent possible. Specifically: • All vessels will preferentially follow deep -water routes (e.g., marked channels) to avoid potential groundings or damaging bottom resources whenever possible and practicable. • Barges, scows, and other similar support equipment will be positioned away from areas with sensitive bottom resources such as non -ESA -listed seagrasses, corals, and hardbottom, to the maximum extent possible. • Pipelines will be placed in areas away from bottom resources and of sufficient size or weight to prevent movement or anchored to prevent movement or the pipeline will be floated over sensitive areas. -7- (INWATER3) All work that may generate turbidity will be completed in a way that minimizes the risk of turbidity and sedimentation to non -ESA -listed non -mobile species (e.g., non -ESA - listed corals, sponges, and other natural resources) to the maximum extent practicable. This may include selecting equipment types that minimize turbidity and positioning equipment away or downstream of non -mobile species. (INWATER4) If turbidity curtains are used, barriers will be positioned in a way that does not block species' entry to or exit from designated critical habitat and does not entrap species within the construction area or block access for them to navigate around the construction area. Project personnel must take measures to monitor for entrapped species in areas contained by turbidity curtains and allow access for them to escape if spotted. (INWATER5) If lines or cables are used (e.g., to mark floating buoys, lines connecting pickup buoy lines, or for turbidity curtains): * In -water lines (rope, chain, and cable) will be stiff, taut, non -looping. Examples of such lines are heavy metal chains or heavy cables that do not readily loop and tangle. Flexible in -water lines, such as nylon rope or any lines that could loop or tangle, will be enclosed in a plastic or rubber sleeve/tube to add rigidity and to prevent the line from looping or tangling. In all instances, no excess line is allowed in the water. • All lines or cables will be immediately removed upon project completion. • All in -water lines and materials will be monitored regularly to ensure nothing has become entangled. • Cables or lines with loops used to move pipelines or buoys will not be left in the water unattended. All Dredging: (STURGEON2) Dredging operations, including related equipment, and projects conducted by other entities in the vicinity will not block more than 50% of the sturgeon river width to allow safe passage of sturgeon. Cutterhead Dredge: (CUTTER1): The cutterhead will not be engaged/turned on when not embedded in the sediment, to the maximum extent possible. -8- Dredge Plant Conditions 1. Reporting requirements: a. Pre -Construction Notification: At least 2 weeks prior initiating the work authorized by this permit, the Permittee shall submit a completed "SARBO Pre -Construction Notification" form (see form below) to the following emails: RD.SARBO.GRBO@usace.army.mil and SERODredge@noaa.gov. The checklist must be completed using the form function (i.e. do not handwrite or create text boxes). Upon receipt of the notification form, you will receive a list of the Corps primary points of contact for reporting turtle take/incidents. If the permit authorizes multiple work events, the Permittee must submit the SARBO Pre -Construction Notification prior to each event. b. Take Reporting: All lethal and nonlethal take associated with a project covered under SARBO will be reported within 48 hours. Project details related to take that will be reported by completing "SARBO Take Reporting" form (see form below) and sent to the following emails: RD.SARBO.GRBO@usace.army.mil and SERODredge@noaa.gov. The checklist must be completed using the form function (i.e. do not handwrite or create text boxes). c. Post -Construction Reporting: Within 30 days of completing the work authorized by this permit, the Permittee shall submit a completed "SARBO Post -Construction Notification" form (see form below) to the following emails: RD.SARBO.GRBO@usace.army.mil and SERODredge@noaa.gov. The checklist must be completed using the form function (i.e. do not handwrite or create text boxes). BERTH DREDGE LIMITS NC STATE PORT RIPARI�N N 1a �i ALTAMAR ift tj PURPOSE: DREDGE PERMIT MODIFICATION 1"=150' BERTH DREDGE LIMITS DREDGE PERMIT MODIFICATION GARY GREENE ENGINEERS PO BOX 99213 RALEIGH, NC 27624 DATUM: MLLW ADJACENT PROPERTY OWNERS: 1. NC STATE PORT 2. ALTAMAR APPLICANT: PETROLEUM FUEL & TERMINAL 3314 RIVER ROAD WILMINGTON, NC IN: CAPE FEAR RIVER RIVER MILE: — COUNTY OF:WILMINGTON / NEW HMAd VNE DATE: 11/21/2016 SHEET P1 OF 2 PURPOSE: DREDGE PERMIT MODIFICATION 1"=3000' CORPS. OF ENGRS EAGLE ISLAND NORTH CELL ORPS. OF N RS AGLE ISLA D SOUTH CE L I DREDGE DISPOSAL SITE DREDGE PERMIT MODIFICATION DREDGE SITE N RECEIVED DCM WILMINGTON, NC GARY GREENE ENGINEERS '90 B0% 99213 RALEIGH, NC 27624 DATUM: MLLW ADJACENT PROPERTY OWNERS: 1. NC STATE PORT 2. ALTAMAR 3. . APPLICANT: PETROLEUM FUEL & TERMINAL 3314 RIVER ROAD WILMINGTON, NC IN: CAPE FEAR RIVER RIVER MILE: - COUNTY OF:WILMINGTON / NEW HAMNE C DATE: 11/21/2016 SHEET P2 OF 2 South Atlantic Regional Biological Opinion (March 2020) Pre -Construction Notification Form This form is used by the U.S. Army Corps of Engineers to document compliance with Section 2.9.3.5 of the South Atlantic Regional Biological Opinion (SARBO). You are required to complete this form and submit it via email to the email addresses listed in the special condition in the USACE permit TWO WEEKS prior to commencing work. The form must be completed electronically using the form feature (i.e. do not handwrite or create text boxes). 1) USACE Project Manager (point of contact and contact information): 2) Protected Species Observer (PSO) a) Will a PSO be used? O Yes O No b) Provide the observer company, if a PSO was used, and contact information: 3) List all federal action agenc /s associated with project (Select all that apply): USACE: SAD SAC SAJ SAS SAW FEMA BOEM U.S. Air Force Other: 4) All federal action agency project tracking numbers associated with the project, if applicable (e.g., USACE Regulatory tracking number, e.g., SAW-2018-xxxxx): 5) Biological Opinion(s) used to authorize the work: SARBO JAXBO (SAJ) SARBO 2020 PCN Form Page 1 of 4 Form date 24 June 2020 6) Estimated project start date: 7) Estimated project complete date: 8) Project name (Typically projects are referred to by the name of the area. If the area has more than one common name, all common names should be provided): 9) Project location: a) Project location for dredging'. For regularly occurring projects with an easily referenced named location, a central location may be sufficient (e.g., latitude and longitude in decimal degree format [xx.xxxx, -xx.xxxx]). b) Project location for placement. For regularly occurring projects with an easily referenced named location, a central location may be sufficient (e.g., latitude and longitude in decimal degree format [xx.xxxx, -xx.xxxx]). 10) Is the project occurring in an area identified in this Opinion that requires additional protection (select all that apply)? ESA -listed coral (Appendix C) Sturgeon rivers (Appendix E) Johnson's seagrass (Appendix D) nWhen and where North Atlantic right whales may be present (Appendix F) 1 Project spatiolocation (i.e., shapefile/.kmz) to show the complete action area is needed if this information has not been previously provided to NMFS. SARBO 2020 PCN Form Page 2 of 4 Form date 24 June 2020 11) and 12) Is the project occurring within the geographic limits of a designated critical habitat, even if features are not impacted? Total area of the project that occurs within the geographic area of one or more critical habitat units, if applicable. Critical habitat Unit Additional unit (if applicable) Total area (Square feet) Green sea turtle Select one N/A Leatherback sea turtle Select One N/A Loggerhead sea turtle Select One Select One Hawksbill sea turtle Select One Select One Atlantic sturgeon Select One Select One Acropora (Elkhorn and staghorn coral) Select One N/A Johnson's seagrass Select One Select One North Atlantic right whale Select One N/A 13)Project type/s (Check all that apply): Maintenance Dredging Minor channel modification/realignment Borrow site Muck dredging nBeach nourishment Nearshore placement ODMDS G&G survey New placement location Other 14)Pre-project proposed dredge and placement total volume in cubic yards. Dredge: Placement: 15)Previous dredge templates: a) Does dredging exceed the previously federally -approved or federally -authorized dredge template including previously considered overdepth and/or advanced maintenance? 0 Yes 3No b) If you selected yes to question 16a, provide an explanation (e.g., approved through supersede, unintentional/unusual event and lesson learned). SARBO 2020 PCN Form Page 3 of 4 Form date 24 June 2020 16)Select all of the vessels and specific equipment used on project. A single project may include more than 1 category of equipment listed below for a portion or all of a project. The equipment types expected to be used and listed with the pre - construction notification will be updated at the end of the project if modifications were necessary. Hopper dredge Modified hopper Non -hopper dredging equipment (e.g., bucket, clamshell, cutterhead, water - injection, bed -leveling to complete project) Bed -leveling (used as the sole form of material movement or just during clean-up phase of hopper dredging). Geophysical survey Relocation trawling New Equipment or construction method approved through the SARBO Supersede 2 process outlined in Section 2.9.5.2 of this Opinion. 17)The Corps regulatory project manager confirms that all applicable PDCs have been reviewed and will be requirements of the permit, as noted in the decision document? OYes O No 18) Date Pre -Construction Form completed and emailed: SARBO 2020 PCN Form Page 4 of 4 Form date 24 June 2020 DEPARTMENT OF THE ARMY Wilmington District, Corps of Engineers 69 Darlington Avenue Wilmington, North Carolina 28403-1343 http://www.saw.usace. army.mil/Missions/RegulatoryPermitProgram.aspx General Permit No. 198000291 Name of Peiiiiittee: General Public Effective Date: January 01, 2022 Expiration Date: December 31, 2026 DEPARTMENT OF THE ARMY REGIONAL GENERAL PERMIT (RGP) A RGP to do work in or affecting navigable waters of the U.S. and waters of the recommendation of the Chief of Engineers, pursuant to Section 10 of the Rivers of March 3, 1899 (U.S.C. 403), and Section 404 of the Clean Water Act (33 U.S hereby issued by authority of the Secretary of the Army by District Engineer U.S. Army Engineer District, Wilmington Corps of Engineers 69 Darlington Avenue Wilmington, North Carolina 28403-1343 U.S., upon and Harbors Act .C. 1344), is TO AUTHORIZE THOSE CONSTRUCTION ACTIVITIES IN THE 20 COASTAL COUNTIES RECEIVING PRIOR APPROVAL FROM THE STATE OF NORTH CAROLINA IN THE FORM OF A COASTAL AREA MANAGEMENT ACT (CAMA) PERMIT, AND/OR A STATE DREDGE AND FILL PERMIT, AND IF REQUIRED, A WATER QUALITY CERTIFICATION, THAT ARE OTHERWISE NOT ELIGIBLE FOR FEDERAL AUTHORIZATION IN THE FORM OF A NATIONWIDE PERMIT OR ANOTHER RGP. Operating Procedures a. Applications for joint state and federal authorization under this programmatic RGP will be accepted through the North Carolina Division of Coastal Management (NCDCM). Receipt of a complete application by the NCDCM will initiate the State's field review that will include a site visit and preparation of a Field Investigation Report and a state Bio-Report. The NCDCM will forward a copy of the complete application, its Field Investigation Report, and its Bio-Report, to the appropriate Corps of Engineers field office, thereby initiating federal review of the project. The Corps, upon receipt of an application, will immediately assign an action identification number, acknowledge receipt thereof, and examine the application to assure that it can be processed pursuant to this programmatic RGP. The applicant and the NCDCM will be furnished written notification of the Corps' determination. Notification to the applicant will include a brief description of the administrative process. b. For those proposals that may result in a discharge into waters of the U.S., including wetlands, the North Carolina Division of Water Resources (NCDWR) and the applicant will be infoiuied regarding the applicant's need to obtain a Water Quality Certification in accordance with section 401 of the Clean Water Act. c. If, at any time, the Corps determines that a proposed activity is eligible for authorization under another regional RGP or a nationwide permit (NWP), this procedure may be terminated and the activity authorized pursuant to the terms and conditions of the appropriate RGP or NWP. d. The permit review process conducted by the NCDCM is a public process involving publication of public notices in local newspapers, public hearings, and various public appeal procedures. The Corps may issue a separate public notice for a specific proposal if it is deemed necessary for compliance with appropriate laws, regulation, and guidance. e. This RGP does not, in any way, alter established procedures or responsibilities, as required by federal laws, memoranda of agreements (MOA's) or administrative regulations, with respect to the Corps' coordination with appropriate review agencies. The applicant will continue to have the opportunity to rebut any objections to a proposal. f. The Corps will provide copies of the application and plans, the NCDCM's Field Investigation Report, and the state Bio-Report, to the U.S. Fish and Wildlife Service (USFWS), the National Marine Fisheries Service (NMFS) the U.S. Environmental Protection Agency (EPA), and any other federal agency that the Corps determines to be a necessary review agency (collectively, the "Federal Agencies"). Receipt of this material will initiate the Federal Agencies' review. The Federal Agencies will be allowed sufficient time, normally thirty (30) days, to provide the Corps with their comments and recommendations, including any proposed permit special conditions and recommendations of denial. The Corps may grant extensions of time for Federal Agency review if justified by unusual circumstances. If an extension is granted that would substantially delay an NCDCM decision, the application may be removed from this RGP process. g. The Corps will receive and review all Federal Agency comments as well as any applicant rebuttal. Provided all Federal Agencies and the Corps are in agreement, the Corps will prepare a coordinated federal position incorporating all Federal Agency comments, including proposed permit special conditions and any recommendations for denial. The Corps will typically furnish this coordinated federal position to the NCDCM within 45 days of its receipt of the complete application, and copies of the Field Investigation Report and Bio-Report. h. If the Corps does not concur with a Federal Agency's comments or recommendations, the Corps will contact the Federal Agency and advise it of the Corps' position. Attempts to resolve the issue may include initiating the referral procedures outlined by current memoranda of agreement (MOA's) between the Department of the Army and the agency. No coordinated federal position will be furnished to the NCDCM until and unless the Corps receives written agreement from the Federal Agency that all issues have been resolved to the satisfaction of that agency. i. If any of the recommendations and/or conditions included in the coordinated federal position are unacceptable to the NCDCM, the NCDCM will contact the Corps within ten (10) days of receipt of the coordinated federal position and attempt to resolve the conflict. If resolution of the conflict involves changes to the conditions or recommendations provided by the Federal Agencies, the provisions of paragraphs g. and h. (above) will apply. If the conflict is resolved to the satisfaction of the Corps and any affected Federal Agency, the NCDCM permit will be issued and the authority of this RGP will apply. j. If a Federal Agency conflict is not resolved within the time necessary for a decision by the NCDCM, the NCDCM may proceed, independently, to conclude the state action without inclusion of the federal position. In such case, the applicant and the NCDCM will be notified immediately, in writing, that the state peiinit does not satisfy the federal permit requirements and that the proposal in question may not proceed without federal authorization. k. If the coordinated federal position is not in conflict with state agencies' positions, law, regulation, or policy, and is acceptable to the NCDCM, a state permit will be developed by the NCDCM fully incorporating the state and federal positions. The NCDCM will furnish copies of the final permit to the applicant and the Corps. The NCDWR will furnish a copy of the Section 401 Water Quality Certification, if required, to the applicant and the Corps. The Corps will not confirm the authorization of a proposed project under this RGP until the issuance of the NCDCM permit and, if required, the Section 401 Water Quality Certification. 1. If the NCDCM permit or Section 401 Water Quality Certification is denied, the applicant will be informed that federal authorization is denied without prejudice. m. No work may proceed under this RGP until the Wilmington District Engineer or his representative provides written verification that the procedures and conditions of the RGP have been satisfied. n. The NCDCM and the Corps will monitor all permitted work and periodically inspect projects for compliance with permit conditions and applicable state and federal regulations. If any violation of the NCDCM permit is discovered which would also constitute a violation of the federal position, both the NCDCM and the Corps, in accordance with their respective regulations and policies, may take enforcement action. o. This RGP will not be used to authorize an activity when the Wilmington District Engineer determines that the proposed activity would significantly affect the quality of the human environment and therefore require preparation of an Environmental Impact Statement (EIS). General Conditions a. Authorized structures located on or adjacent to Federally authorized waterways will be constructed in accordance with the latest setback criteria established by the Wilmington District Engineer. You may review the setback policy at http://www.saw.usace.army.mil/Missions/Navigation/Setbacks.aspx. This RGP does not authorize the construction of hardened or permanently fixed structures within the Federally Authorized Channel Setback, unless the activity is approved by the Corps. The Permittee must obtain approval from the Corps prior to the construction of any structures within the Federally Authorized Channel Setback. b. Except as authorized by this RGP or any Corps approved modification to this RGP, no excavation, fill or mechanized land -clearing activities shall take place, at any time in the construction or maintenance of this project, within waters or wetlands. This peiinit does not authorize temporary placement or double handling of excavated or fill material within waters or wetlands outside the permitted area. This prohibition applies to all borrow and fill activities connected with this project. c. Authorization under this RGP does not obviate the need to obtain other federal, state, or local authorizations. d. All work authorized by this RGP must comply with the terms and conditions of the applicable Clean Water Act Section 401 Water Quality Certification for this RGP issued by the North Carolina Division of Water Resources. e. The Permittee shall employ all sedimentation and erosion control measures necessary to prevent an increase in sedimentation or turbidity within waters and wetlands outside the peiuiit area. This shall include, but is not limited to, the immediate installation of silt fencing or similar appropriate devices around all areas subject to soil disturbance or the movement of earthen fill, and the immediate stabilization of all disturbed areas. Additionally, the project must remain in full compliance with all aspects of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statutes Chapter 113A Article 4). f. The activities authorized by this RGP must not interfere with the public's right to free navigation on all navigable waters of the U.S. No attempt will be made by the Permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work for a reason other than safety. g. The Permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his/her authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the Permittee will be required, upon due notice from the Corps , to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration. h. The Permittee, upon receipt of a notice of revocation of the peewit for the verified individual activity, may apply for an individual permit, or will, without expense to the United States and in such time and manner as the Secretary of the Army or his/her authorized representative may direct, restore the affected water of the US to its former conditions. i. This RGP does not authorize any activity that would conflict with a federal project's congressionally authorized purposes, established limitations or restrictions, or limit an agency's ability to conduct necessary operation and maintenance functions. Per Section 14 of the Rivers and Harbors Act of 1899, as amended (33 U.S.C. 408), no project that has the potential to take possession of or make use of for any purpose, or build upon, alter, deface, destroy, move, injure, or obstruct a federally constructed work or project, including, but not limited to, levees, dams, jetties, navigation channels, borrow areas, dredged material disposal sites, flood control projects, etc., shall be permitted unless the project has been reviewed and approved by the appropriate Corps approval authority. j. The Permittee shall obtain a Consent to Cross Government Easement from the Wilmington District's Land Use Coordinator prior to any crossing of the Corps easement and/or prior to commencing construction of any structures, authorized dredging, or other work within the right-of-way of, or in proximity to, a federally designated disposal area. The Land Use Coordinator may be contacted at: CESAW-OP-N, 69 Darlington Avenue, Wilmington, North Carolina 28403-1343, email: SAWWeb-NAV@usace.army.mil. k. The Permittee will allow the Wilmington District Engineer or his/her representative to inspect the authorized activity at any time deemed necessary to assure that the activity is being performed or maintained in strict accordance with the Special and General Conditions of this permit. 1. This RGP does not grant any property rights or exclusive privileges. m. This RGP does not authorize any injury to the property or rights of others. n. This RGP does not authorize the interference with any existing or proposed federal project. o. In issuing this RGP, the Federal Government does not assume any liability for the following: (1) Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes. (2) Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest. (3) Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this RGP. (4) Design or construction deficiencies associated with the permitted work. (5) Damage claims associated with any future modification, suspension, or revocation of this RGP. p. Authorization provided by this RGP may be modified, suspended, or revoked in whole or in part if the Wilmington District Engineer, acting for the Secretary of the Army, determines that such action would be in the best public interest. The term of this RGP shall be five (5) years unless subject to modification, suspension, or revocation. Any modification, suspension or revocation of this authorization will not be the basis for any claim for damages against the United States Government. q. No activity may occur in a component of the National Wild and Scenic Rivers System, or in a river officially designated by Congress as a "study river" for possible inclusion in the system while the river is in an official study status, unless the appropriate Federal agency with direct management responsibility for such river, has determined in writing that the proposed activity will not adversely affect the Wild and Scenic designation or study status. Information on Wild and Scenic Rivers may be obtained from the appropriate Federal land management agency responsible for the designated Wild and Scenic River or "study river" (e.g., National Park Service, U.S. Forest Service, etc.) r. This RGP does not authorize any activity within, or directly affecting, a marine sanctuary established by the Secretary of Commerce under authority of Section 302 of the Marine Protection, Research and Sanctuaries Act of 1972, unless the applicant provides the Corps with a certification from the Secretary of Commerce that the proposed activity is consistent with the purposes of Title III of the Marine Protection, Research and Sanctuaries Act. Information on marine sanctuaries may be obtained at http://sanctuaries.noaa.gov/#MN. Permittees may not begin work until they provide the Corps with a written certification from the Department of Commerce. s. In cases where the Wilmington District Engineer deteiiiiines that the activity may affect properties listed, or eligible for listing, in the National Register of Historic Places and its codified regulations, the National Historic Preservation Amendment Acts of 1980 and 1992, the Abandoned Shipwreck Act of 1987 and the Native American Graves Protection and Repatriation Act, the activity is not authorized, until the requirements of Section 106 of the National Historic Preservation Act (NHPA) have been satisfied. Permittees may not begin work until notified by the Corps that the requirements of the NHPA have been satisfied and that the activity is authorized. t. If you discover any previously unknown historic, cultural, or archeological remains and artifacts while accomplishing the activity authorized by this RGP, you must immediately notify the Wilmington District Engineer of what you have found, and to the maximum extent practicable, avoid construction activities that may affect the remains and artifacts until the required coordination has been completed. The Wilmington District Engineer will initiate the Federal, tribal, and state coordination required to determine if the items or remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places. u. Endangered Species. (1) No activity is authorized under this RGP which is likely to jeopardize the continued existence of a threatened or endangered species directly or indirectly or a species proposed for such designation, as identified under the Federal Endangered Species Act (ESA), or which will directly or indirectly destroy or adversely modify the critical habitat of such species. No activity is authorized under this RGP which "may affect" a listed species or critical habitat, unless Section 7 consultation addressing the effects of the proposed activity has been completed. (2) Federal agencies should follow their own procedures for complying with the requirements of the ESA. Federal prospective Permittees (and when FHWA is the lead federal agency) must provide the District Engineer with the appropriate documentation to demonstrate compliance with those requirements. The District Engineer will review the documentation and deteiniine whether it is sufficient to address ESA compliance for the RGP activity, or whether additional ESA consultation is necessary. (3) As a result of formal or informal consultation with the U.S. Fish and Wildlife Service (USFWS) or NMFS, the District Engineer may add species -specific endangered species conditions to the RGP verification letter for a project. (4) Authorization of an activity by a RGP does not authorize the "take" of a threatened or endangered species as defined under the ESA. In the absence of separate authorization (e.g., an ESA Section 10 Permit, a Biological Opinion with "incidental take" provisions, etc.) from the USFWS or the NMFS, the ESA prohibits any person subject to the jurisdiction of the U.S. to take a listed species, where "take" means to harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect, or to attempt to engage in any such conduct. The word "harm" in the definition of "take" means an act which actually kills or injures wildlife. Such an act may include significant habitat modification or degradation where it actually kills or injures wildlife by significantly impairing essential behavioral patterns, including breeding, feeding, or sheltering. (5) Information on the location of threatened and endangered species and their critical habitat can be obtained directly from the USFWS in Raleigh, North Carolina at the address provided below, or from the USFWS and NMFS via their world wide web pages at http://www.fws.gov/ or http://www.fws.gov/ipac and http://www.noaa.gov/fisheries.html respectively. The Raleigh USFWS Office covers all NC counties east of, and including, Richmond, Montgomery, Randolph, Guilford, and Rockingham Counties. US Fish and Wildlife Service Raleigh Field Office Post Office Box 33726 Raleigh, NC 27636-3726 Telephone: (919) 856-4520 (6) The Wilmington District, USFWS, NCDOT, and the FHWA have conducted programmatic Section 7(a)(2) consultation for a number of federally listed species and habitat, and programmatic consultation concerning other federally listed species and/or habitat may occur in the future. The result of completed programmatic consultation is a Programmatic Biological Opinion (PBO) issued by the USFWS. These PBOs contain mandatory terms and conditions to implement the reasonable and prudent measures that are associated with "incidental take" of whichever species or critical habitat is covered by a specific PBO. Authorization under this RGP is conditional upon the Permittee's compliance with all the mandatory terms and conditions associated with incidental take of the applicable PBO (or PBOs), which are incorporated by reference in this RGP. Failure to comply with the terms and conditions associated with incidental take of an applicable PBO, where a take of the federally listed species occurs, would constitute an unauthorized take by the Permittee, and would also constitute Permittee non-compliance with the authorization under this RGP. If the terms and conditions of a specific PBO (or PBOs) apply to a project, the Corps will include this/these requirements in any RGP verification that may be issued for a project. The USFWS is the appropriate authority to determine compliance with the terms and conditions of its PBO, and with the ESA. (7) Northern long-eared bat (NLEB) (Myotis septentrionalis). Standard Local Operating Procedures for Endangered Species (SLOPES) for the NLEB have been approved by the Corps and the U.S. Fish and Wildlife Service. See http://www. saw.usace. army.mil/Missions/Regulatory-Permit-Program/Agency- Coordination/ESA/. This SLOPES details how the Corps will make determinations of effect to the NLEB when the Corps is the lead federal agency for an NCDOT project that is located in the western 41 counties of North Carolina. This SLOPES do not address NCDOT projects (either federal or state funded) in the eastern 59 counties in North Carolina. Note that if another federal agency is the lead federal agency for a project in the western 41 counties, procedures for satisfying the requirements of Section 7(a)(2) of the ESA will be dictated by that agency and will not be applicable for consideration under the SLOPES; however, information that demonstrates the lead federal agency's (if other than the Corps) compliance with Section 7(a)(2) / 4(d) Rule for the NLEB, will be required in the PCN. Note that at the time of issuance of this RGP, the federal listing status of the NLEB as "Threatened" is being litigated at the National level. If, as a result of litigation, the NLEB is federally listed as "Endangered", this general condition ("s") will no longer be applicable because the 4(d) Rule, and this NLEB SLOPES, will no longer apply/be valid. (8) In order to further protect the endangered West Indian Manatee, Trichechus manatus, the applicant must implement the U.S. Fish and Wildlife Service's Manatee Guidelines, and strictly adhere to all requirements therein. The guidelines can be found at https://wvvw.fws.gov/raleigh/pdfs/ManateeGuidelines20 1 7.pdf (9) If the Permittee discovers or observes any live, damaged, injured, or dead individual of an endangered or threatened species during construction, the Permittee shall immediately notify the Wilmington District Engineer so that required coordination can be initiated with the U.S. Fish and Wildlife Service and/or National Marine Fisheries Service. v. Permittees are advised that development activities in or near a floodway may be subject to the National Flood Insurance Program that prohibits any development, including fill, within a floodway that results in any increase in base flood elevations. This RGP does not authorize any activity prohibited by the National Flood Insurance Program. w. The Pennittee must install and maintain, at his/her expense, any signal lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, on authorized facilities. For further information, the Permittee should contact Coast Guard Sector North Carolina at (910) 772-2191 or email Coast Guard Fifth District at cgd5waterwaysAuscg.mil. x. If the display of lights and signals on the authorized structure is not otherwise provided for by law, such lights and signals as may be prescribed by the U.S. Coast Guard will be installed and maintained by and at the expense of the Permittee. y. It is possible that an authorized structure may be damaged by wave wash from passing vessels. The issuance of this RGP does not relieve the Permittee from taking all proper steps to ensure the integrity of the permitted structure and the safety of moored boats. The Permittee will not hold the United States liable for any such damage. z. Structures and their attendant utilities, authorized by this RGP, located on lands subject to an easement in favor of the United States for the operation, maintenance, improvement, and enlargement of the Atlantic Intracoastal Waterway (AIWW), will be removed at the expense of the Permittee, in the event that, in the judgment of the Corps acting on behalf of the United States, the lands are needed at any time for any purpose within the scope of the easement. Permanent buildings will not be constructed within the easement. aa. The Permittee must maintain any structure or work authorized by this RGP in good condition and in conformance with the terms and conditions of this RGP. The Permittee is not relieved of this requirement if the Permittee abandons the structure or work. Transfer in fee simple of the work authorized by this RGP will automatically transfer this RGP to the property's new owner, with all of the rights and responsibilities enumerated herein. The Permittee must inforrii any subsequent owner of all activities undertaken under the authority of this RGP and provide the subsequent owner with a copy of the terms and conditions of this RGP. bb. At his/her sole discretion, any time during the processing cycle, the Wilmington District Engineer may determine that this RGP will not be applicable to a specific proposal. In such case, the procedures for processing an individual permit in accordance with 33 CFR 325 will be available. cc. Except as authorized by this RGP or any Corps approved modification to this RGP, all fill material placed in waters or wetlands shall be generated from an upland source and will be clean and free of any pollutants except in trace quantities. dd Except as authorized by this RGP or any Corps approved modification to this RGP, all excavated material will be disposed of in approved upland disposal areas. ee. Activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon this RGP will remain authorized provided the activity is completed within twelve months of the date of the RGP's expiration, modification, or revocation. Activities completed under the authorization of this RGP that were in effect at the time the activity was completed continue to be authorized by the RGP. BY AUTHORITY OF THE SECRETARY OF THE ARMY: ami A. Bennett Colonel, U.S. Army District Commander United States Department of the Interior FISH AND WILDLIFE SERVICE Raleigh Field Office Post Office Box 33726 Raleigh, North Carolina 27636-3726 GUIDELINES FOR AVOIDING IMPACTS TO THE WEST INDIAN MANATEE Precautionary Measures for Construction Activities in North Carolina Waters The West Indian manatee (Trichechus manatus), also known as the Florida manatee, is a Federally -listed endangered aquatic mammal protected under the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.) and the Marine Mammal Protection Act of 1972, as amended (16 U.S.0 1461 et seq.). The manatee is also listed as endangered under the North Carolina Endangered Species Act of 1987 (Article 25 of Chapter 113 of the General Statutes). The U.S. Fish and Wildlife Service (Service) is the lead Federal agency responsible for the protection and recovery of the West Indian manatee under the provisions of the Endangered Species Act. Adult manatees average 10 feet long and weigh about 2,200 pounds, although some individuals have been recorded at lengths greater than 13 feet and weighing as much as 3,500 pounds. Manatees are commonly found in fresh, brackish, or marine water habitats, including shallow coastal bays, lagoons, estuaries, and inland rivers of varying salinity extremes. Manatees spend much of their time underwater or partly submerged, making them difficult to detect even in shallow water. While the manatee's principal stronghold in the United States is Florida, the species is considered a seasonal inhabitant of North Carolina with most occurrences reported from June through October. To protect manatees in North Carolina, the Service's Raleigh Field Office has prepared precautionary measures for general construction activities in waters used by the species. Implementation of these measures will allow in -water projects which do not require blasting to proceed without adverse impacts to manatees. In addition, inclusion of these guidelines as conservation measures in a Biological Assessment or Biological Evaluation, or as part of the determination of impacts on the manatee in an environmental document prepared pursuant to the National Environmental Policy Act, will expedite the Service's review of the document for the fulfillment of requirements under Section 7 of the Endangered Species Act. These measures include: 1 The project manager and/or contractor will inform all personnel associated with the project that manatees may be present in the project area, and the need to avoid any harm to these endangered mammals. The project manager will ensure that all construction personnel know the general appearance of the species and their habit of moving about completely or partially submerged in shallow water. All construction personnel will be informed that they are responsible for observing water -related activities for the presence of manatees. 2. The project manager and/or the contractor will advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing manatees which are protected under the Marine Mammal Protection Act and the Endangered Species Act. 3. If a manatee is seen within 100 yards of the active construction and/or dredging operation or vessel movement, all appropriate precautions will be implemented to ensure protection of the manatee. These precautions will include the immediate shutdown of moving equipment if a manatee comes within 50 feet of the operational area of the equipment. Activities will not resume until the manatee has departed the project area on its own volition (i.e., it may not be herded or harassed from the area). 4. Any collision with and/or injury to a manatee will be reported immediately. The report must be made to the U.S. Fish and Wildlife Service (ph. 919-856-4520), the National Marine Fisheries Service (ph. 252- 728-8762), and the North Carolina Wildlife Resources Commission (ph. 252-448-1546). 5. A sign will be posted in all vessels associated with the project where it is clearly visible to the vessel operator. The sign should state: CAUTION: The endangered manatee may occur in these waters during the warmer months, primarily from June through October. Idle speed is required if operating this vessel in shallow water during these months. All equipment must be shut down if a manatee comes within 50 feet of the vessel or operating equipment. A collision with and/or injury to the manatee must be reported immediately to the U.S. Fish and Wildlife Service (919-856-4520), the National Marine Fisheries Service (252-728-8762), and the North Carolina Wildlife Resources Commission (252- 448-1546). 6. The contractor will maintain a log detailing sightings, collisions, and/or injuries to manatees during project activities. Upon completion of the action, the project manager will prepare a report which summarizes all information on manatees encountered and submit the report to the Service's Raleigh Field Office. 7. All vessels associated with the construction project will operate at "no wake/idle" speeds at all times while in water where the draft of the vessel provides less than a four foot clearance from the bottom. All vessels will follow routes of deep water whenever possible. 8. If siltation barriers must be placed in shallow water, these barriers will be: (a) made of material in which manatees cannot become entangled; (b) secured in a manner that they cannot break free and entangle manatees; and, (c) regularly monitored to ensure that manatees have not become entangled. Barriers will be placed in a manner to allow manatees entry to or exit from essential habitat. Prepared by (rev. 02/2017): U.S. Fish and Wildlife Service Raleigh Field Office Post Office Box 33726 Raleigh, North Carolina 27636-3726 919/856-4520 2 Figure 1. The whole body of the West Indian manatee may be visible in clear water; but in the dark and muddy waters of coastal North Carolina, one normally sees only a small part of the head when the manatee raises its nose to breathe. Illustration used with the permission of the North Carolina State Museum of Natural Sciences. Source: Clark, M. K. 1987. Endangered, Threatened, and Rare Fauna of North Carolina: Part I. A re- evaluation of the mammals. Occasional Papers of the North Carolina Biological Survey 1987-3. North Carolina State Museum of Natural Sciences. Raleigh, NC. pp. 52. 3