Loading...
HomeMy WebLinkAbout20061804 Ver 42_Views at Flowers apartments_Complete Set_5-9-22_20220516SIT D -v - LOPV \T PLA\S CONTRACTOR GENERAL NOTES: 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL ILLUSTRATED KNOWN UNDERGROUND ELEMENTS. ADDITIONALLY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR EXERCISING REASONABLE EFFORTS TO PROTECT ANY UNKNOWN UNDERGROUND ELEMENTS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF UNKNOWN ELEMENTS ARE DISCOVERED THAT WOULD NECESSITATE MODIFICATION TO THE ILLUSTRATED DESIGN. 2. PROTECT ALL ADJACENT PROPERTIES, THE GENERAL PUBLIC, AND ALL OF THE OWNER'S FACILITIES. SHOULD DAMAGES OCCUR, CONTRACTOR SHALL REPAIR IMMEDIATELY AS DIRECTED BY THE ENGINEER. 3. CONTRACTOR SHALL HOLD HARMLESS THE OWNER AND THE ENGINEER FOR DAMAGES, INJURIES OR OTHER ACCIDENTS WHICH OCCUR DURING THESE CONSTRUCTION ACTIVITIES. 4. TREES AND EXISTING LANDSCAPING NOT DESIGNATED FOR REMOVAL SHALL BE PROTECTED DURING CONSTRUCTION. 5. CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING AND COORDINATION OF ALL ILLUSTRATED CONSTRUCTION ACTIVITIES AT THE JOB SITE. 6. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE RULES AND REGULATIONS GOVERNING THE CONSTRUCTION INDUSTRY. 7. CONTRACTOR IS RESPONSIBLE FOR ALL DAMAGES DURING CONSTRUCTION AND SHALL MAKE REPAIRS AT HIS EXPENSE. 8. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATION ADJUSTMENTS OF ALL EXISTING VAULTS (REGARDLESS OF FUNCTION), METER BOXES, FIRE HYDRANTS, CLEAN OUTS, MANHOLES ETC. TO MATCH FINISHED GRADES AND SITE PLAN. ALL SUCH WORK SHALL BE COORDINATED WITH THE ENGINEER. 9. UTILIZE SIGNS, BARRICADES, FLAGMEN, OR GUARDS AS REQUIRED TO ENSURE THE SAFETY OF ALL VEHICULAR AND PEDESTRIAN TRAFFIC DURING ALL CONSTRUCTION ACTIVITIES PER NCDOT STANDARDS. 10. UNDER ABSOLUTELY NO CIRCUMSTANCES SHALL ANY UNMANNED EXCAVATION BE LEFT OPEN OR UNPROTECTED DURING NON -WORKING HOURS. UTILIZE SIGNS, BARRICADES, ETC. TO ENSURE THE SAFETY OF THE GENERAL PUBLIC. 11. VERIFY ALL DIMENSIONS AND GRADES AT THE JOB SITE. IF DIFFERENCES ARE FOUND, NOTIFY ENGINEER SO THAT MODIFICATIONS TO THESE DRAWINGS CAN BE MADE. 12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT OF ALL WORK AS ILLUSTRATED ON PLANS. IF EXISTING CONDITIONS DIFFER FROM THOSE ILLUSTRATED ON PLANS, NOTIFY ENGINEER PRIOR TO CONSTRUCTION. 13. ALL WORK IN OPERATIONAL ROADWAYS WHETHER FOR LOADING, UNLOADING, OR ACTUAL CONSTRUCTION SHALL TAKE PLACE ONLY WITH THE USE OF FLAG MEN DEDICATED TO THE PURPOSE OF DIRECTING TRAFFIC ONLY. THESE FLAGMEN SHALL BE POSITIONED AT THE FRONT AND REAR OF SUCH WORK PER NCDOT STANDARDS. 14. ALL WORK SHALL CONFORM WITH CURRENT REQUIREMENTS OF THE FLOWERS PLANTATION, JOHNSTON COUNTY„ NCDENR, AND NCDOT STANDARDS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIRED INSPECTIONS WITH THE AUTHORITIES HAVING JURISDICTION. 15. CONTRACTOR SHALL STORE MATERIALS ONLY IN AREAS DESIGNATED AND APPROVED BY THE ENGINEER AND OWNER. MATERIALS SHOULD BE CONSOLIDATED PERIODICALLY WITHIN THE STORAGE AREA TO MINIMIZE THE IMPACT ON EXISTING OPERATIONS. 16. ALL EXISTING DIRECTIONAL AND TRAFFIC CONTROL SIGNAGE SHALL BE MAINTAINED THROUGHOUT. ALL TEMPORARY TRAFFIC SIGNS SHALL CONFORM WITH NCDOT STANDARDS. EXISTING DIRECTIONAL SIGNS REMOVED DURING CONSTRUCTION SHALL BE PROTECTED AND STORED ON SITE AS DIRECTED BY THE OWNER. THE VIEWS AT FLOWERS APARTMENTS ss 20' SEWER EASEMENT PB 66 PG 40 20MaTEMENT 0P 2 67797 SF 1.556 AC NE FLOWERS PARKWAY JOHNSTON COUNTY, NC 27576 DEVELOPER: THE VIEWS AT FLOWERS, LLC 1400 W NORTHWOOD ST GREENSBORO NC 27408 336-383-5926 \ \ - A \ -A BE - FLOW \ / VARIABLE WIDTH R/W (PUBLIC) NC NW( 42 SE FLOWERS PARKWAY N. T..S ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL FLOWERS PLANTATION PUD (JOHNSTON COUNTY) STANDARDS AND SPECIFICATIONS �r HAGEN ENGINEERING, PA 3859 BATTLEGROUND AVE SUITE 300 GREENSBORO, NC 27415 PHONE (336) 286-3350 www.hagen-eng.com C-0 C-1.0 C-2.0 C-2.1 C-2.2 C-3.0 C-3.1 C-4.0 C-5.0 C-5.1 C-5.2 C-5.3 C-6.0 C-7.0 C-8.0 C-9.0 C-10.0 C-11.0 C-12.0 C-13.0 C-14.0 L-1 L-2 SHEET INDEX COVER SURVEY OVERALL DEMO/EROS PH 1 OVERALL SITE PLAN OVERALL UTILITY PLAN SEWER PROFILE 1 SEWER PROFILE 2 OVERALL GRADING PLAN ROOF DRAIN PLAN OVERALL EROSION CONTROL PH 2 STORMWATER PRE DEV DRAINAGE DELINEATION PLAN STORMWATER POST DEV DRAINAGE DELINEATION PLAN STORMWATER DRAINAGE AREA PLAN STORMWATER PIPE CHART POND 1 PLAN CONSTRUCTION DETAILS (ROAD) 1 CONSTRUCTION DETAILS (WATER) 2 CONSTRUCTION DETAILS (WATER) 3 CONSTRUCTION DETAILS (SEWER) 4 CONSTRUCTION DETAILS (ES&C) 5 CONSTRUCTION DETAILS (E&SC) 6 CONSTRUCTION DETAILS (E&SC) 7 CONSTRUCTION DETAILS (E&SC) 8 LANDSCAPE PLAN 1 LANDSCAPE PLAN 2 Shy 0 HWY 42 C -57 0 -33 SOUTHWICK AVE VICINITY MAP 1 "=2000' REVISIONS NO. BY DESCRIPTION DATE i \ \ NN \ \ \ \\ N \ N \ N N \ \ \ \ N N \ \ / / / / // / / i j / / / / / / / / / / \ \ \ \ \ \ \ \ \ \\ \ \ \ \ \ / 41WITATAT4W orolv Air.7\\ \SSMH \ TO -2 DIP.,11 NV IN (12"RCP)INC/4N NV OUT / \ \ \ \ \ \ \ \� )- \\\ \\__ \\ \‘C \ \\ \ \ \\ \ \ \\ \--- \ \\\ \ \ \\ \ \ C�\\ \\\\\\\\\:\ \\ _ \ \ \ \ \ \ --\ \\\\\\ \\\\ ____\_ \ \ ` \\ \ \ \ \ \ \ \ \ \ - - - - - \\ \ \ \ \ \ \ \\ \ \ \ \ \ \ \ \ \\ \ \ \ \ \ \ \ \ \ \ \\ \\ \ \ \\ \ --- \\ \ \ \ \ \ \ \ \�� // \\\\ \\\ \\\\\\\ \ \ \\\ \ \ \ \�_// s/ \\\ \\ \ \ \\ \ \\ \ \\ --// / \\ \\ �\ \\ \\ --\\ \\\\�,; - _- \ Z --_ __ \ \ \\\-`\ \� \ \ \\ \\ \\ \ N , N \ \ x x \ \ \ \ \ \ \ \ N \ \ \ N \ \ \ N N \ \ \ \ \ \ \\\ \ \ \ \ \ \ \ \ \ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ I \ \ \ \ \ \ \ \ \ \ \ \ \ \ \\ \ \ \ \ \ \ \ \ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \N \ \ \ \ \ \ 1 \ \ \ \ \ \ \ \ \ \ N. is, N \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \. \ \ \ \ \ \ \ \ \ \\ \ N \ \ \ \ \ 1 1 1 1 \ \ \ I I 1 / / / Y 42 \ ss TO v \V \V 0 p,RIAB \ \ \ 25L .33 \ 240.07 ,T 239.98 \ \N IDT \ \ \ /\N (PUB BEFORE YOU DIG! CONTACT ONE -CALL CENTER 1-800-632-4949 LIMITS OF DISTURBANCE CONSTRUCTION ENTRANCE SILT FENCE DIVERSION BERM INLET PROTECTION POROUS BAFFLES SKIMMER RIP -RAP PAD SILT SINCE OUTLET/CHECK DAM BORROW PIT AREA LEGEND mmmm n n n TDD 0 glue CONSTRUCT DAM WITH IMPERMEABLE SOILS COMPACTED TO 98% STD. PROCTOR DENSITY W/ A MOISTURE CONTENT OF -1% TO +3% OF OPTIMUM. SOILS SHALL BE UNIFORM IN CHARACTER AND INSTALLED IN 8" MAXIMUM LIFTS. SOILS SHALL BE FREE OF ORGANICS AND PARTICLES OF 2" OR GREATER CENTIPEDE TURF GRASS TO BE UTILIZED ON ALL POND SLOPES. CORE OUTLET 258.0' GEOTECHNICAL ENGINEER TO BE ON SITE DURING INSTALLATION OF POND OUTLETS TO ENSURE COMPACTION AROUND PIPES 72" X 72" ANTI -SEEP PLATES SANDWICHED BETWEEN FLANGED GASKET IN FLANGED JOINTS DISTURBED AREA: ±13.80 AC 48" DIAMETER ALUMINUM RISER WITH TRASH RACK. TOP OF RISER ELEV 263.0. SHOP DRAWING TO BE REVIEWED BY ENGINEER PRIOR TO FABRICATION. 10.00' DAM EL 265.55. KEY NOTES: SILT FENCE OUTLET (SEE DETAIL ON C-11.0) CONSTRUCTION ENTRANCE (SEE DETAIL ON C-11.0) 52 LF 24" ALUMINUM 0 1.0% SLOPE CUT-OFF TRENCH BACKFILL W/ IMPERMEABLE SOILS COMPACTED TO 98% STD PROCTOR DENSITY 4" ORIFICE AT 261.5 TO BE PLUGGED' DURING CONSTRUCTION 4" SKIMMER W/ 2.25" ORIFICE WITH RETRIEVAL ROPE BOTTOM 258.5 VICINITY MAP CENTIPEDE TURF GRASS TO BE UTILIZED ON ALL POND SLOPES. '\\ 3000 PSI CONCRETE PAD ANTI FLOTATION DEVICE WATER LEVEL DURING STORM EVENT SEDIMENT STORAGE AREA BAFFLES 4'x4'xr STONE PAD UNDER SKIMMER (CLASS B STONE) 2.5" ORIFICE AT 258.5 TO BE PLUGGED DURING CONSTRUCTION. FLANGED STUB WITH GATE AND HANDLE W/ ADAPTER PLATE FOR SKIMMER INSTALL 4'' SKIMMER WITH 2.25" ORIFICE FOR SKIMMER BASIN #1. SKIMMER WILL ATTACH TO RISER WHICH WILL REMAIN IN PERMANENT POND. BED OF STONE SHALL BE LOCATED UNDER THE SKIMMER TO PREVENT SINKING. SEE SEE BASIN CROSS SECTION AND SIZING CALCS SHEET C-12. PROVIDE STONE PAD UNDER SKIMMER. SEE CROSS SECTION FOR ADDITIONAL SIZING INFORMATION. ® TEMPORARY DIVERSION BERM TO DIRECT WATER TO RESPECTIVE SKIMMER BASIN. DS75 REINFORCEMENT MATTING TO BE UTILIZED FOR PORTIONS DRAINING TO SKIMMER BASIN 1. SEE DETAIL AND CALCULATIONS ON SHEET C-12 7'x12' RIP RAP PAD TO BE INSTALLED AT THE OUTLET POINT OF BASINS TO ENSURE WATER DISCHARGE IS DIFFUSED BEFORE LEAVING SITE. SEE RIP RAP DETAIL AND CALCULATIONS ON C-7 AND C-11. POROUS BAFFLES TO BE INSTALLED WITHIN EACH SKIMMER BASIN. SEE DETAIL ON SHEET C-11.0 60 GRAPHIC SCALE 0 30 60 120 240 1 inch = 60 ft. N.T.S. LWAY EL: 263.50' 1.0' THICK CLASS B STONE OVER NON WOVEN FABRIC EROSION AND SEDIMENTATION CONTROL CONSTRUCTION SEQUENCE: 1. OBTAIN NECESSARY PERMITS AND APPROVALS THROUGH JOHNSTON COUNTY AND SCHEDULE A PRECONSTRUCTION MEETING PRIOR TO BEGINNING ANY LAND DISTURBING ACTIVITIES. 2. FLAG THE LIMITS OF DISTURBANCE AND INSTALL PERIMETER EROSION CONTROL MEASURES (SILT FENCE, TREE PROTECTION FENCING, TEMPORARY CONSTRUCTION ENTRANCE, SILT FENCE OUTLETS). SEE DEMO/PHASE 1 EROSION CONTROL PLAN FOR INITIAL EROSION CONTROL PHASE. 3. INSTALL TEMPORARY SKIMMER BASINS 1 PER NCDEQ SPECIFICATIONS AS SHOWN ON DETAIL SHEET C-11.0. 4. INSTALL ALL TEMPORARY DIVERSION BERMS AND CORRESPONDING RIP RAP OUTLET PROTECTION AS SHOWN IN THE EROSION CONTROL PH 1 PLAN. STABILIZE. 4. CALL JOHNSTON COUNTY EROSION CONTROL INSPECTOR AFTER PERIMETER MEASURE INSTALLATION AND BASIN 5. PROCEED WITH DEMOLITION, CLEARING AND GRUBBING OF SITE. 6. INSTALL AND MAINTAIN TEMPORARY STABILIZATION OF ALL DISTURBED AREAS THROUGHOUT REMAINDER OF PROJECT. NO PORTION OF THE SITE SHALL REMAIN OPEN/BARE MORE THAN 14 DAYS. 7. BEGIN INSTALLING REMAINING UTILITIES. 8. AS SITE EARTHWORK PROGRESSES AND SITE HAS BEEN RAISED AS SHOWN ON EROSION CONTROL PHASE 2 PLAN, FINISH GRADING THE SEDIMENT BASINS TO THEIR FINAL STATE AS SHOWN IN EROSION CONTROL PHASE 2 PLAN. 8. FINE GRADE PADS AND PROCEED WITH VERTICAL CONSTRUCTION 9. INSTALL OUTLET PROTECTION AS SOON AS PIPES ARE INSTALLED AND STABILIZE SLOPES AS SOON AS THEY REACH FINAL GRADE. 10. SCHEDULE PRECON WITH STORMWATER INSPECTOR TO INSPECT SITE PRIOR TO CONVERTING SEDIMENT BASIN TO FINAL BMP. ONCE APPROVED, REMOVE BAFFLES, AND ENSURE FINAL BMP GRADING IS FINALIZED. 11. CONTACT THE JOHNSTON COUNTY INSPECTOR AND FLUSH ALL STORM SEWER PRIOR TO JOB CLOSEOUT. CLEAN OUT PERMANENT POND IF SEDIMENT COLLECTS IN IT DUE TO STORM SEWER FLUSH 12. COMPLETE BUILDING, ALL UTILITIES, AND STONE PARKING LOT. 13. PAVE THE PARKING LOT AND STABILIZE ANY AREAS THAT REMAIN UNSTABLE (SEE PHASE II EROSION CONTROL PLAN SHEET C-4.0). 14. EROSION CONTROL MEASURES SHALL BE MAINTAINED THROUGHOUT THE LIFE OF THE PROJECT AND REPAIRED AFTER EACH RAIN EVENT. 15. INSPECTIONS TO BE EVERY 7 CALENDAR DAYS AND WITHIN 24 HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES 1 /2-INCHES OR MORE OF PRECIPITATION. 16. STABILIZATION OF CONVEYANCE CHANNELS IS TO BE COMPLETED WITHIN 7 DAYS OF CHANNEL CONSTRUCTION. 17. AFTER COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND PERMANENT EROSION CONTROL MEASURES ARE IN PLACE AND UPON APPROVAL BY THE EROSION CONTROL INSPECTOR. A. REMOVE ALL TEMPORARY MEASURES AND INSTALL PERMANENT EROSION AND VELOCITY CONTROL MEASURES. B. PROVIDE SUFFICIENT GROUND COVER TO ASSURE ADEQUATE SURFACE STABILIZATION. ALL OF THE NECESSARY APPROVALS FROM THE STATE OF NORTH CAROLINA AND THE ARMY CORPS OF ENGINEERS FOR ANY STREAM CROSSING/WETLAND DISTURBANCE ASSOCIATED WITH THE OVERALL FLOWERS PLANTATION DEVELOPMENT WERE PROVIDED BY STOCKS ENGINEERING. 401 CERTIFICATIONS ARE PROVIDED UNDER SELF -INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS 113A-54.1 Phase of Approved Erosion & Sediment Control Plan: Date Signature (landowner, financially responsible party, or agent) Installation of erosion control Devices and Seeding Fill and slopes completed (fine grades established) Installation of site utilities Stabilization of building pad and parking areas Final grades achieved; obtained building c/o Vegetation established; removal of erosion control measures Closing of permit, final inspection NEW STABILIZATION TIMEFRAMES SITE AREA DESCRIPTION STABILIZATION TIME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES AND SLOPES 7 DAYS NONE HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE, EXCEPT FOR PERIMETER AND HQW ZONES 0 a. o 121, NE FLOWERS PARKWAY JOHNSTON COUNTY, NC JOB NUMBER 2021-30 (71 0 REVISIONS DESCRIPTION ci C 0 SWQ TRIO OP 2 67/9/ at6 AC BW: 271.0' i OP 1 39257 SF 0.901 AC BW: 273.0' TO TIE INTO EXISTING SIDEWALK LOCATED ON NE FLOWERS PARKWAY - EXISTING SIDEWALK TO BE PROVIDED BY OTHERS BW: 268.0' TW: 274.0' BW: 272.0' TW: 280.0' BW: 280.0' TO TIE INTO EXISTIN SIDEWALK LOCATED 0 NE FLOWERS PARKWAY - EXISTING SIDEWALK TO BE PROVIDED BY OTHERS TW: 289.0' W: 286.0' BW: 293.0' WETLANDS 78 UNIT 4 STORY BUILDING BW: 288.5' THREE 4' TALL LANDSCApE TIERED WALLS TW: 276.0' BW: 272.0' TW: 280.0' BW: 291.5' 0 TW: 291.5' THREE 3' TALL LANDSCAPE TIERED WALLS TW: 297.5' BW: 294.5' BW: 291.5' 15 BW: 294.5' BW: 272.0' BW: 275.0' 278.0' CONSTRUCTION STAKING: THE CONTRACTOR SHALL COODINATE WITH THE ENGINEER OF RECORD FOR A DIGITAL STAKING PLAN TO ESTABLISH COMPLETE HORIZONTAL AND VERTICAL CONTROL. THE CONTRACTOR IS RESPONSIBLE FOR SURVEY STAKEOUT OF ALL IMPROVEMENTS. DISCREPANCIES BETWEEN THE PLANS, CONSTRUCTION STAKES, AND FIELD CONDITIONS SHALL BE REPORTED TO THE ENGINEER OF RECORD IMMEDIATELY FOR RESOLUTION PRIOR TO INSTALLATION OF PROPOSED GENERAL NOTES: 1. BOUNDARY AND EXISTING TOPOGRAPHICAL INFORMATION WAS PROVIDED BY TRUE LINE SURVEYING ON DECEMBER 9, 2021 2. CONTRACTOR TO VERIFY ALL DIMENSIONS AND EXISTING FEATURES PRIOR TO CONSTRUCTION. 3. INVERTS FOR EXISTING UTILITIES SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. 4. MATERIALS AND WORKMANSHIP TO CONFORM WITH STANDARDS AND SPECIFICATIONS OF LOCAL JURISDICTIONAL AUTHORITIES. 5. POWER, PHONE, CABLE AND GAS SERVICE INSTALLATIONS SHALL BE COORDINATED WITH LOCAL UTILITY PROVIDERS 6. ALL WATER INSTALLATIONS AND MATERIALS SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF GREENSBORO UTILITIES AND NCDENR. 7. FIRE HYDRANTS MUST BE IN PLACE AND FUNCTIONAL BEFORE COMBUSTIBLE CONSTRUCTION BEGINS ON SITE. NC I-I\V 42 \/ARIABLE WID-TH VON (PUBLIC) BEDFC FLOWERE PHAS PB 86 SOUTHWICK AVE VICINITY MAP 1 "=2000' TOTAL SITE SUMMARY SITE ACREAGE - ±16.2 AC PIN: 16K05161D JURISDICTION - JOHNSTON COUNTY CURRENT ZONING - FLOWERS PLANTATION PUD CURRENT LANDUSE - VACANT OVERALL PROPOSED UNITS - 312 UNITS UNIT TYPE 1 BEDROOM 2 BEDROOM 3 BEDROOM PARKING SUMMARY NUMBER OF UNITS 100 180 32 TOTAL REQUIRED = 150+270+64 = MIN. REQUIRED 1.5 SPACES/UNIT 1.5 SPACES/UNIT 2 SPACES/UNIT 484 SPACES PARKING PROVIDED GARAGES TOTAL PARKING PROVIDED 517 SPACES 14 SPACES 531 SPACES KEY NOTES: SEGMENTAL BLOCK RETAINING WALL. TO BE DESIGNED BY OTHERS HC RAMPS REQUIRED AT ALL HC PARKING AND WHERE A RUNNING SIDEWALK MEETS THE CURB. (TYP) BLACK VINYL -COATED CHAINLINK FENCE (MIN. 4' TALL, MAX 6' TALL) HEAVY DUTY PAVEMENT (SEE PAVEMENT SECTION ON C-7.0) 24" STANDARD CURB AND GUTTER TYP (SEE DETAIL ON C-7.0) ENTRANCE SIGN 2' WIDE CONCRETE FLUME COMPACTOR/RECYCLING CENTER SHOWN FOR GENERAL PURPOSES ONLY. OWNER/CONTRACTOR SHALL COORDINATE ELECTRICAL SERVICE AND SIZE OF ENCLOSURE WITH ARCHITECT AND COMPACTOR MANUFACTURER COVERED CAR WASH AND MAINTENANCE BUILDING ADA COMPLIANT STAIRS WITH HANDRAILS ON EACH SIDE. SIDEWALK WITH HANDRAILS. WITH HANDRAILS, MAX SLOPE OF 8.33% (30" OF VERTICAL GAIN OVER 30' BEFORE 5' WIDE 2% SLOPE LANDING REQUIRED) FLOWERS PARKWAY NE ROAD PLANS AS SHOWN ON THIS PLAN SHEET WERE PROVIDED BY STOCKS ENGINEERING. THESE PLANS ARE STILL IN THE PROCESS OF APPROVALS. BEFORE ANY CONSTRUCTION OCCURS ON THIS SITE, COORDINATION BETWEEN CONTRACTOR AND ENGINEER SHALL OCCUR TO ENSURE THE DESIGN REFLECTED MATCHES WHAT WAS ACTUALLY INSTALLED. ROLL CURB TO BE PROVIDED TO POND ACCESS POINT. CURB TURN DOWN ON EACH END OF HATCHED AREA. 60 GRAPHIC SCALE 0 30 60 120 240 0 00 cn ct P. 124 FLOWERS PLANTATION WILDERS, NORTH CAROLINA JOB NUMBER 2020-39 Date 10/21/2020 REVISIONS DESCRIPTION ci 1.0 1 inch = 60 ft. SS INV IN = 262.71' 8" PVC SSMH 1—A STA = 1+14.03 RIM = 276.25' INV IN = 264.39' 8" PVC INV OUT = 264.29' 8" PVC SSMH 1—C STA = 3+96.78 RIM = 286.60' INV IN = 277.18' 8" PVC INV OUT = 277.08' 8" PVC 3,1 0 OP 1 39257 SF 0.901 AC TO INTO EXISTNG SIDEW LK LOCATED ON NE FL WERS PARKWAY TO BE ROVIDED BY OTHERS DI C-1 SSMH 2—A STA = 0+84.66 RIM = 272.79' INV IN = 265.37' 8" DIP INV OUT = 265.27' 8" PVC SSMH 1—B STA = 1+86.27 RIM = 277.57' INV IN = 270.13' 8" PVC INV IN = 264.85' 8" PVC SSMH 1—D STA = 5+82.40 INV IN = 278.21' 8" PVC DI 8-3 SSMH 2—B RIM = 270.50' & CAR WASH BLDG 300 78 UNIT 4 STORY BUILDING STA = 7+45.93 RIM = 287.00' • &DEW LK LOCATED ON NE FL WERS PARKWAY - EXISTING SIDEWALK TO BE PROVIDED BY SSMH 1—E STA = 6+66.98 RIM = 290.60' STA = 9+92.65 RIM = 287.69' A-8 CI H-3 0 SSIvIH TOP 25 30 DI M-4 DI F-3 RIM = 287.80' INV IN = 281.48' 8" PVC 11 CI K-3 P-1 SS TO TiN \D-T /\N 60 BucN TYPICAL WATER LINE SERVICE RPZ 4" FIRE SERVICE W/ VALVE 8" WATER MAIN SERVICE W/ VALVE SEE ARCHITECTURAL PLANS FOR EXACT LOCATIONS OF WATER AND SEWER SERVICES AT THE BUILDING. BFP TO BE LOCATED INSIDE BUILDING. UTILITY CONTRACTOR IS RESPONSIBLE FOR RUNNING FIRE SERVICE INTO THE RISER ROOM. UTILITY CONTRACTOR SHALL COORDINATE THIS WITH THE BUILDING CONTRACTOR. ALL 6" SEWER SERVICES SHALL HAVE A MINIMUM SLOPE OF 1.0% SEPARATION REQUIREMENTS SEWER LINES CROSSING WATER MAINS AND/OR STORM SEWER SHALL MAINTAIN A MINIMUM SEPARATION OF 18" VERTICALLY. WHERE IT IS IMPOSSIBLE TO MAINTAIN THE PRESCRIBED 18 INCHES OF VERTICAL SEPARATION, THE WATER LINE SHALL BE CONSTRUCTED OF DUCTILE IRON PIPE. AQUA REQUIREMENTS: ALL UTILITIES THAT CONNECT TO THE AQUA WATER AND/OR SEWER SYSTEM SHALL BE IN ACCORDANCE WITH AQUA STANDARDS AND AQUA SHALL BE NOTIFIED AT LEAST 48 BUSINESS DAY HOURS PRIOR TO AN EXPLORATORY OR ACTUAL CONNECTIONS AROUND OR TO THE AQUA WATER OR SEWER FACILITIES. GRAPHIC SCALE 0 30 60 1 inch = 60 ft. KEY NOTES: 0000 0000 8" DIP SEWER MAIN 8" SDR 35 SEWER MAIN SOUTHWICK AVE VICINITY MAP DOGHOUSE SEWER MANHOLE OVER EXISTING 12" SEWER LINE. SEE DETAIL 6'' SDR-35 SEWER SERVICE AT A MINIMUM SLOPE OF 1.0% WITH 4" CLEANOUT (TYP). CLEANOUTS IN PAVED AREAS OR SIDEWALK SHALL BE JOSAM 55000 ON 8" PVC WATER LINE 6" MASTER METER WITH 6" ABOVE GROUND RPZ 2" DOMESTIC WATER SERVICE. 4" BUILDING FIRE SERVICE WITH VALVE PRIOR TO BUILDING. 1" DOMESTIC WATER SERVICE 6'' VALVE AND FIRE HYDRANT ASSEMBLY PER COG STANDARDS APPROXIMATE RISER ROOM. SEE ARCHITECTURAL PLANS FOR EXACT LOCATION 4" SEWER SERVICE. FOR THE MAINTENANCE/CARSWASH, SEWER SERVICE SHALL HAVE 1000GAL CAPACITY OIL/WATER SEPARATOR WITH SAND/GRIT TRAP (DETAIL ON C-10) WITHIN THE CAR WASH. CAR WASH IS TO BE COVERED AND HAVE A BERM SUCH THAT NO RAINWATER IS ALLOWED IN TO SANITARY SYSTEM. NO FLOOR DRAINS WITHIN MAINTENANCE BUILDING SHALL CONNECT TO THE SANITARY SEWER SYSTEM. 6" SEWER SERVICE FOR POOL BACKWASH TO TIE IN TO STORM SYSTEM. 20' PUBLIC UTILITY EASEMENT AROUND MASTER METER. ALL WATER PAST THIS IS PRIVATE. REMOTE FDC WITH 5" STORZ CONNECTION. 4" DIP LINE EXTENDED FROM RISER ROOM TO REMOTE FDC. (SEE DETAIL ON C-9.0) 4" PVC SEWER SERVICE AT MINIMUM 1.0% SLOPE. CLEANOUTS IN PAVED AREAS OR SIDEWALK SHALL BE JOSAM 55000 NO DRAINS FROM THE TRASH COMPACTORS MUST BE PIPED TO THE SANITARY SEWER 4' MANHOLE FOR FDC PER DETAIL ON SHEET C-9.0. 2'' IRRIGATION METER WITH 2'' RPZ. STUB BEFORE MASTER METER. 8" STUB OUT TO RIGHT OF WAY LINE TO BE INSTALLED PRIOR TO THIS PROJECTS TIE IN. PER PLANS PROVIDED BY STOCKS ENGINEERING 1-25-22. CONTRACTOR TO COORDINATE ON OBTAINING AS BUILT ROAD DRAWINGS PRIOR TO ANY UTILITY TIE INS. GENERAL NOTES: 1. BOUNDARY AND EXISTING TOPOGRAPHICAL INFORMATION WAS PROVIDED BY TRUE LINE SURVEYING ON DECEMBER 9, 2021 2. CONTRACTOR TO VERIFY ALL DIMENSIONS AND EXISTING FEATURES PRIOR TO CONSTRUCTION. 3. INVERTS FOR EXISTING UTILITIES SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. 4. MATERIALS AND WORKMANSHIP TO CONFORM WITH STANDARDS AND SPECIFICATIONS OF LOCAL JURISDICTIONAL AUTHORITIES. 5. POWER, PHONE, CABLE AND GAS SERVICE INSTALLATIONS SHALL BE COORDINATED WITH LOCAL UTILITY PROVIDERS 6. ALL WATER INSTALLATIONS AND MATERIALS SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF GREENSBORO UTILITIES AND NCDENR. 7. FIRE HYDRANTS MUST BE IN PLACE AND FUNCTIONAL BEFORE COMBUSTIBLE CONSTRUCTION BEGINS ON SITE. 0 co cn P. OVERALL H FT-1 1-1 cn NE FLOWERS PARKWAY JOHNSTON COUNTY, NC JOB NUMBER 2021-30 Date 11/1/2021 co REVISIONS DESCRIPTION ci C 2. 0 290 280 270 260 L 9 / \ \ \ EX SSMH STA = 0+00.47 tR = 267.43' I VIN=262.81'8"PVC INV IN = 262.71' 8" PVC INV OUT = 262.71' 8" PVC SS` SS U SSMH 2-A STA = 0+84.66 RIM = 272.79' INV IN = 265.37' 8" DIP INV OUT = 265.27' 8" PVC is 2+00 I SS SSMH 1-B STA = 1+86.27 RIM = 277.57' -INV IN = 27013' 8" PVC INV IN = 264 85' 8" PVC °INV OUT = 264.75' 8" PVC $S SSMH 1-A STA = 1+14.03 RIM = 276.25' INV IN = 264.39' 8" PVC INV OUT = 264.29' 8" PVC W 3+00 SS 0 W 4+00 -�- SS 3 0 SS SSMH 1-C STA = 3+96.78 RIM = 286.60' -'INV IN = 277.18' 8" PVC INV OUT = 277.08' 8" PVC tow umf, W SS CD 0 2 3 J L-frym W 5+00 -► SS SSMH 1-F STA = 7+45.93 RIM = 287.00' INV IN = 279.76' 8" PVC INV OUT = 279.66' 8" PVC SSI N c o W SSMH 1-H STA = 9+92.65 RIM = 287.69' INV OUT = 282.08' 8" PVC---- SSMH 1-G STA = 8+94.85 RIM = 287.80' INV IN = 281.48' 8" PVC INV OUT = 281.38' 8" PVC ss SSMH 1-E STA = 6+66.98 RIM = 290.60' INV IN = 278.74' 8" PVC INV OUT = 278.64' 8" PVC SSMH 1-D STA = 5+82.40 RIM = 290.06' INV IN = 278.21' 8" PVC -- INV OUT = 278.11' 8" PVC Vd W OS (D2� 0 2 '''Cy �0ao� o C9 0 oowWmm SOUTHWICK AVE 7 VICINITY MAP 1 "=2000' PROPERTY LINE WATER LINE SANITARY SEWER STORM SEWER LEGEND SS 40 GRAPHIC SCALE 0 20 40 80 160 U > CD CD > > n U CD > 0 .SMH 1-C ' v= i..•• V IN=277.18' 8" PVC V OUT=277.08' 8" PVC 1 \ SSMH 1-D\ RIM=290.06'7 INV IN=278121' 8" P\d INV OUT=278.11' 8" 1 1 1 SSMH 1 LE RIM=2970.60' INV IN=278.74' 8" INV UT=278.64' 8' / SSMH 1-F R,M=287.00' I1(V IN=279.76' 8" PVC I/NV OUT=279.66' 8" P\ SSMH 1-G nik d—no7 on' f\IIVI —LU / .UU INV IN=281.48' 8" F \ INV OUT=281.38' 8" SSMH 1-H RIM=7 7 RQ' INV OUT=282.08' 8 C.)> > ao '''co 1-A '76.25' =264.39' 8" PVC 1UT=264.29' 8" PVC •'H 1-B = 77.57' D\/r IN 6\4.85' 8" PVC OUT=264.75' 8" PVC \ \ v-r-1-0 PROPOSED 0.--'8” Rl P/ WATER 18" VCVC 1.16ro 149LF 8'' PVC @ 1.09% - 97LF 8" PVC @ 0.62% EX SSMH RIM=267.43' INV IN=262.81' INV IN=262.71' INV OUT=262.7 ��» II _ � cn�zzz z z - `Ir 21��F8 @ �\ �15" RCP 30% 186LF 8" PVC 85LF 8PVC © �50%7L @ 0.50% / 114LF 8„ PVC @ 1 30% i 2 LF 8" PVC © 0.5 % INSIDE DROP MANHOLE SEE DETAIL C-10 ( IN FEET ) 1 inch = 40 ft. 300 290 280 270 260 O z 0- 0 C7 r 1 N0 NE FLOWERS PARKWAY JOHNSTON COUNTY, NC JOB NUMBER 2021-30 C1 0 CD A 0 A x A REVISIONS 0 DESCRIPTION r d z 0+00 1 +00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 C-2.1 t 6R N u) co o/ SSMH 2-A STA = 0+84.66 RIM = 272.79' INV IN = 265.37' 8" DIP INV OUT = 265.27' 8" PVC SSMH 2-B STA = ??? RIM = 270.50' INV OUT = 266.67' 8" DIP C/ L_2 & CgRNCE �< W'Sh, P D ikewv tifZer woo- M � bi 8; 1 "I\ SSMH 1-B STA = 1+86.27 RIM = 277.57' INV IN = 270.13' 8" PVC INV IN = 264.85' 8" PVC INV OUT = 264.75' 8" PVC 2S 4 Sl0,v s RY 45 SOU TH WI CK AVE 7 VICINITY MAP 1 "=2000' PROPERTY LINE WATER LINE SANITARY SEWER STORM SEWER LEGEND SS 290 270 260 250 2402+00 290 280 270 260 250 m = 277.57' IN=270.13' 8" PVC IN=264.85' 8" PVC OUT=264.75' 8" PVC A 79' F5.37' 8" PIP =265.27' 8" PVC m o__ � (0 0 (.0280 1 r, N i I ZZ N \ _ .___, z__ (4 BRIM=272 / INV IN=i :O > Z — _ Ek/ \NG , 1 I SSMH 2-f RIM=270.. INV OUT= PROPOSED " WATFRI 260LF 8" 36" RCP DIP C� 0.50% _ 84LF8"PVC©0.50io SEWER 2 -1 +00 0+00 1+00 2+00 3+00 4+00 5+00 6+0v40 40 GRAPHIC SCALE 0 20 40 80 160 ( IN FEET ) 1 inch = 40 ft. SEWER PROFILE NE FLOWERS PARKWAY JOHNSTON COUNTY, NC JOB NUMBER 2021-30 0 w A 0 ca REVISIONS DESCRIPTION >- co 0 Z C-2.2 1 f(f(s4I , su s 1 I I2�0 SE�E•f�EASE E\T / U III' PIBC 66 P�4 \ \ 67 / II �\ \ \ N 7.59 I N \ N Ill \ \ \ N A 1201V-vrikAONEINT\\ N\ N \\ 9111111�N \\\\\\ \\ 1.6191 �N \\ \ \ \ \\ \ \ \ \ \ \ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ N \ \ \ \ \ \ \ N \ \ : 276.0' W: 272.0' TW: 280.0' BW: 276.0' TW: 284.0' BW: 26w 0' ss INTO DOSING 81LOCATED ON NE FL S PARKWAY - EXISTING SIDEWALK TO BE PROVIDED BY OTHERST -2 \ BW: 288.5' TW: 297.0' W: 291.0' FFE 270,5 CIte,_ inNANCE aLqG & CAR WASH THREE 4' TALL LANDSCAPE TIERED = WALLS a - • TW: 297.5' BW: 294.5' TW: 294.5' BW: 291.5' -----,SSMH \ T0�2 30 4"DL�INV IN 24.EL85\ \ 2' RCP)INV4N 242.0C'\1 INV� T\24<9O \ \\V \ \ \ 1\`1 \ I I L\\ IL I I I L �\I\ \i1 III 7 \ I �s\' Y /\ V, S / A \� � 2 \ JB K-1 � � _11 TW:: \ SW2276.072.0' TW: 280.0' 8W: 276.0' TW: 284.0' BW': 280.0' / K-2 . 270.0' BW: 285.0' \ 2267.0'7,.0' \BIM: 273.0' BW: 268.5' \CI K-4 X / - TW: 275.5' BM 271.5' K-6 TO D 25L.33 \V \ 240.07 \V 0,T 239.98 1 278.0' 274.0' / ^ \ / \ / \ q K-7 r \ /\ / / \ TW 283.0' O„ BW:Q 279.0' \ = \ \ IDTH RPW (V) BE FLOW PB I Buc) J O LLI az MUST C L I T Y p'`O O O z -A D m n BEFORE YOU DIG! CONTACT ONE -CALL CENTER 1-800-632-4949 SOUTHWICK AVE 7 VI CINI T Y MAP 1 "=2000' ALL SPOT GRADES ARE LABELED AT BOTTOM OF CURB AND OR ASPHALT GRADE UNLESS OTHERWISE NOTED. ALL SPOT GRADES SHOWN ON STORM STRUCTURES ARE AT GRATE ELEVATION GRADING LEGEND EXISTING GRADE EXISTING STORM SEWER PROPOSED GRADE PROPOSED SPOT GRADE YARD INLET OR DROP INLET CURB INLET JUNCTION BOX STORM SEWER 2240 676 + 2154.75 PEDESTRIAN WALKWAY GRADING NOTES: FOR STANDARD SIDEWALK WITH NO HANDRAILS, THE LONGITUDINAL SLOPE SHALL NOT EXCEED 5%, AND THE CROSS SLOPE SHALL NOT EXCEED 2%. FOR SIDEWALK WITH HANDRAILS, THE MAXIMUM ALLOWABLE SLOPE IS 8.33% FOR 30 LINEAR FEET, THEN A 5' WIDE 2% MAX SLOPE PAD IS REQUIRED. MAX CROSS SLOPE IS STILL 2%. FOR SIDEWALK WHERE STAIRS ARE SHOWN, HANDRAILS SHALL BE PROVIDED ON BOTH SIDES OF THE SIDEWALK AND THE SLOPE OF THE STAIRS MUST COMPLY WITH ADA REQUIREMENTS. ALL STAIR TREADS MUST BE MINIMUM 11" WIDE, AND ALL STEPS MUST HAVE UNIFORM RISER HEIGHTS (BETWEEN 4" TO 7" TALL) AND UNIFORM TREAD WIDTHS. LANDINGS MUST BE PROVIDED AT THE TOP AND BOTTOM OF THE STAIRS. REFER TO ADA COMPLIANCE GUIDELINES FOR FULL LIST OF REQUIREMENTS. GENERAL NOTES: 1. BOUNDARY AND EXISTING TOPOGRAPHICAL INFORMATION WAS PROVIDED BY TRUE LINE SURVEYING ON DECEMBER 9, 2021 2. CONTRACTOR TO VERIFY ALL DIMENSIONS AND EXISTING FEATURES PRIOR TO CONSTRUCTION. 3. INVERTS FOR EXISTING UTILITIES SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. 4. MATERIALS AND WORKMANSHIP TO CONFORM WITH STANDARDS AND SPECIFICATIONS OF LOCAL JURISDICTIONAL AUTHORITIES. 5. POWER, PHONE, CABLE AND GAS SERVICE INSTALLATIONS SHALL BE COORDINATED WITH LOCAL UTILITY PROVIDERS 6. ALL WATER INSTALLATIONS AND MATERIALS SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF GREENSBORO UTILITIES AND NCDENR. 7. FIRE HYDRANTS MUST BE IN PLACE AND FUNCTIONAL BEFORE COMBUSTIBLE CONSTRUCTION BEGINS ON SITE. 60 GRAPHIC SCALE 0 30 60 120 240 ( IN FEET ) 1 inch = 60 ft. ►I 7";v_susuil011,1,17/.1"% R'i,iz▪ t SEAL 050770 �% FNGINE�� Ti SH,i° 5 ei22 Cr) M i 00 N 0 U � I ctzto w • O L_ z GRADING OVERALL NE FLOWERS PARKWAY JOHNSTON COUNTY, NC JOB NUMBER 2021-30 Date 11/1/2021 REVISIONS DESCRIPTION m 0 Z C-3.O BLDG 200 78 UNIT 4 STORY BUILD \G 25-1 s & L5— 2s & 8— 3s BLDG 100 78 UN T L STORY BUILDING 25-1 s & 45-2s & 8-3s BLDG 300 78 UNIT 4 STORY BUILDING 25-1 s & 45-2s & 8— 3s 40 SSOOUTHWICK AVE VICINITY MAP 1 "=2000' LEGEND YARD INLET OR DROP INLET DOWNSPOUT CURB INLET JUNCTION BOX STORM SEWER ROOF LEADER ❑❑ o PIM ALL ROOF DRAIN SIZING SHOWN ON THIS SHEET ASSUME MINIMUM SLOPE OF 1.0% (PVC) 0 20 -\SON MUST C� ��G�� \CITYp/D Q,, —o z-4 D M n 'i BEFORE YOU DIG! CONTACT ONE —CALL CENTER 1-800-632-4949 GRAPHIC SCALE 40 80 160 ( IN FEET ) 1 inch = 80 ft. X z <4 W 4-1 0 X JOHNSTON COUNTY, NC 0 M 0 N Cc w CO M D z CO 0 Date 11 /1 /2021 a m A 0 _ a m wi A = a m A REVISIONS DESCRIPTION >- m 0 z C-3.1 i / / / \ / \ \ \ \ \ \ \ \ \ \ \ / / / / / / / / / / j/// // // / / / / / / / / / 7 / // / 1 /// / TW: 276.0' BW: 272.0' TW: 280.0' BW: 276.0' TW: 284.0' BW: 28w 0' - /1 INTO EXISTING W LK LOCATED ON E FLOWERS PARKWAY XIS 1NG SIDEWALK BE PROVIDED BY THREE 4' TALL LANDSCAPE TIERED ns = WALLS " p my, f_f_.1-0 Mr0:41V \\\ -�G \SSMH \ \ TOP" -IN 2 5.30 "Gl�INV 12485\ \\\\ (12 RCP)INCl4N 242.O \\ INV OU 9u \ \ \\\\ \ \ \\\ \ \ 1I\\\ \ \IiI\\I \ \//j� 71 \ I em* / /\ \ ,C/ 2 \ c-1 -1 285.0' BW: 265.0' \ \ 276.0' 272.0' TW: 280.0' BW: 276.0' N / / 2267,071.0' \BW ' Tw: BW: CI K-4 42 273.0' 268.5' \ \ / / 1 275.5' BW: 271.5' / SS TO I\ / �TV 278.0' BW: 274.0' \ CI K-6 V 25L.33 ✓ \ 2L0,07 ✓ O,T 239.98 \ \ \ CI K-7 / \ \ / / >\ / / / \ \ / / TW: 283.0' O BW: 279.0' \ \ I2 A I `9Jvj� \ \ \ \ \ \ LE W IDT ARIAS • 0 \ \ B 278.0' \ \ \ N 29L3 � E -" w BLIP. 60 GRAPHIC SCALE 0 30 60 120 240 ( IN FEET ) 1 inch = 60 ft. DISTURBED AREA: ±13.80 AC \�N MUST co \G \ L I T Y p,``'' -0 0 FTl BEFORE YOU DIG! CONTACT ONE -CALL CENTER 1-800-632-4949 VICINITY MAP 1 "=2000' LEGEND LIMITS OF DISTURBANCE CONSTRUCTION ENTRANCE SILT FENCE DIVERSION BERM INLET PROTECTION POROUS BAFFLES SKIMMER RIP -RAP PAD SILT FENCE OUTLET/CHECK DAM n TDD 0 wogs EROSION AND SEDIMENTATION CONTROL CONSTRUCTION SEQUENCE: 1. OBTAIN NECESSARY PERMITS AND APPROVALS THROUGH JOHNSTON COUNTY AND SCHEDULE A PRECONSTRUCTION MEETING PRIOR TO BEGINNING ANY LAND DISTURBING ACTIVITIES. 2. FLAG THE LIMITS OF DISTURBANCE AND INSTALL PERIMETER EROSION CONTROL MEASURES (SILT FENCE, TREE PROTECTION FENCING, TEMPORARY CONSTRUCTION ENTRANCE, SILT FENCE OUTLETS). SEE DEMO/PHASE 1 EROSION CONTROL PLAN FOR INITIAL EROSION CONTROL PHASE. 3. INSTALL TEMPORARY SKIMMER BASINS 1 PER NCDEQ SPECIFICATIONS AS SHOWN ON DETAIL SHEET C-11.0. 4. INSTALL ALL TEMPORARY DIVERSION BERMS AND CORRESPONDING RIP RAP OUTLET PROTECTION AS SHOWN IN THE EROSION CONTROL PH 1 PLAN. STABILIZE. 4. CALL JOHNSTON COUNTY EROSION CONTROL INSPECTOR AFTER PERIMETER MEASURE INSTALLATION AND BASIN INSTALLATION. 5. PROCEED WITH DEMOLITION, CLEARING AND GRUBBING OF SITE. 6. INSTALL AND MAINTAIN TEMPORARY STABILIZATION OF ALL DISTURBED AREAS THROUGHOUT REMAINDER OF PROJECT. NO PORTION OF THE SITE SHALL REMAIN OPEN/BARE MORE THAN 14 DAYS. 7. BEGIN INSTALLING REMAINING UTILITIES. 8. AS SITE EARTHWORK PROGRESSES AND SITE HAS BEEN RAISED AS SHOWN ON EROSION CONTROL PHASE 2 PLAN, FINISH GRADING THE SEDIMENT BASINS TO THEIR FINAL STATE AS SHOWN IN EROSION CONTROL PHASE 2 PLAN. 8. FINE GRADE PADS AND PROCEED WITH VERTICAL CONSTRUCTION 9. INSTALL OUTLET PROTECTION AS SOON AS PIPES ARE INSTALLED AND STABILIZE SLOPES AS SOON AS THEY REACH FINAL GRADE. 10. SCHEDULE PRECON WITH STORMWATER INSPECTOR TO INSPECT SITE PRIOR TO CONVERTING SEDIMENT BASIN TO FINAL BMP. ONCE APPROVED, REMOVE BAFFLES, AND ENSURE FINAL BMP GRADING IS FINALIZED. 11. CONTACT THE JOHNSTON COUNTY INSPECTOR AND FLUSH ALL STORM SEWER PRIOR TO JOB CLOSEOUT. CLEAN OUT PERMANENT POND IF SEDIMENT COLLECTS IN IT DUE TO STORM SEWER FLUSH 12. COMPLETE BUILDING, ALL UTILITIES, AND STONE PARKING LOT. 13. PAVE THE PARKING LOT AND STABILIZE ANY AREAS THAT REMAIN UNSTABLE (SEE PHASE II EROSION CONTROL PLAN SHEET C-4.0). 14. EROSION CONTROL MEASURES SHALL BE MAINTAINED THROUGHOUT THE LIFE OF THE PROJECT AND REPAIRED AFTER EACH RAIN EVENT. 15. INSPECTIONS TO BE EVERY 7 CALENDAR DAYS AND WITHIN 24 HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES 1/2-INCHES OR MORE OF PRECIPITATION. 16. STABILIZATION OF CONVEYANCE CHANNELS IS TO BE COMPLETED WITHIN 7 DAYS OF CHANNEL CONSTRUCTION. 17. AFTER COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND PERMANENT EROSION CONTROL MEASURES ARE IN PLACE AND UPON APPROVAL BY THE EROSION CONTROL INSPECTOR. A. REMOVE ALL TEMPORARY MEASURES AND INSTALL PERMANENT EROSION AND VELOCITY CONTROL MEASURES. B. PROVIDE SUFFICIENT GROUND COVER TO ASSURE ADEQUATE SURFACE STABILIZATION. ALL OF THE NECESSARY APPROVALS FROM THE STATE OF NORTH CAROLINA AND THE ARMY CORPS OF ENGINEERS FOR ANY STREAM CROSSING/WETLAND DISTURBANCE ASSOCIATED WITH THE OVERALL FLOWERS PLANTATION DEVELOPMENT WERE PROVIDED BY STOCKS ENGINEERING. 401 CERTIFICATIONS ARE PROVIDED UNDER SELF -INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS 113A-54.1 Phase of Approved Erosion Sc Sediment Control Plan: Date Signature (landowner, financially responsible party, or agent) Installation of erosion control Devices and Seeding Fill and slopes completed (fine grades established) Installation of site utilities Stabilization of building pad and parking areas Final grades achieved; obtained building c/o Vegetation established; removal of erosion control measures Closing of permit, final inspection NEW STABILIZATION TIMEFRAMES SITE AREA DESCRIPTION STABILIZATION TIME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES AND SLOPES 7 DAYS NONE HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE, EXCEPT FOR PERIMETER AND HOW ZONES • • • • • • • 5 4-1 4,z z4 44 ao 44 1-4 7.7 00 oo 0 cn 12-1 NE FLOWERS PARKWAY JOHNSTON COUNTY, NC JOB NUMBER 2021-30 Date 11 /1 /2021 REVISIONS DESCRIPTION ci C 4. 0 NN 10. IS 40. 46 Alt vOi iii '\, .-* N \ N \ \ \ \ \ N \ / // / / // / / / / / // f/ ((7/ j/ j/ , /// / /// // ///,//i .. OP 1 - n257 �0.901 SE AC DA '\DOS 1 +10.65 AC / / 7 / �C / i ....../ / / 1 — % / / \ ss TO I\ \ VH 254.33 ✓ \ 240.07 ✓ O,T 239.98 1 \ + P 0 S 2 n /\nI (PvB1-1C) SOU TH WI CK AVE VI CINI T Y MAP 1 "=2000' PRE DEVELOPMENT SITE DRAINAGE TO POS 1 DRAINAGE AREA SIZE (AC) % OF TOTAL DRAINAGE AREA CURVE NUMBER FAIR CONDITION WOODS COMBO (TYPE B SOILS) 4.07 AC 38.2% 65 FAIR CONDITION WOODS COMBO (TYPE A SOILS) 4.95 AC 46.5% 43 GOOD CONDITION FALLOW (TYPE B SOILS) 1.63 AC 15.3% 83 WEIGHTED CURVE NUMBER 58 PRE DEVELOPMENT SITE DRAINAGE TO POS 2 DRAINAGE AREA SIZE (AC) % OF TOTAL DRAINAGE AREA CURVE NUMBER GOOD CONDITION FALLOW (TYPE B SOILS) 3.67 AC 68.0% 83 FAIR CONDITION WOODS COMBO (TYPE B SOILS) 0.43 AC 8.0% 65 FAIR CONDITION WOODS COMBO (TYPE A SOILS) 1.30 AC 24.0% 43 WEIGHTED CURVE NUMBER 72 60 0 30 �0 MUST c IL I T Y pro ,�`0 C.)D o J w z = m BEFORE YOU DIG! CONTACT ONE -CALL CENTER 1-800-632-4949 GRAPHIC SCALE 60 120 240 ( IN FEET ) 1 inch = 60 ft. 0011111111/41/4 O• FESS/p� y 050770 ,-,% • FNGINE�� • Ti M M 00 NE FLOWERS PARKWAY JOHNSTON COUNTY, NC JOB NUMBER 2021-30 Date 11/1/2021 REVISIONS DESCRIPTION >- m 0 Z C 5.0 \ N \ \ \ \ \ \ N N N _ 11/11/%, ///;// ///// //,r // / /81/ a // // ; / / /// // /./// //� / // / / / i /// -(///�-// / / / r / / / OP 1 — 39257 c C iii0.901 AC_ 'I INTO EXISTING W LK LOCATED ON OWERS PARKWAY TING SIDEWALK ROVIDED BY J // + POS 1 A �SSMH T0P"- 2 "DLEINV IN 2"RCP)INd4N NV OUT 4�9 \\\ (PQ k \ 30 4.�85\ \ ss TO \ \ s-- (PUBL\C� TH R� BLE WID n O vARIA VH 254.33 V \ 240.07 V OJT 239.98 \ \ \ \ P0S 2 \ \ / FL( SOUTHWICK AVE VI CINI T Y MAP 1 "=2000' POST DEVELOPMENT SITE DRAINAGE TO POND DRAINAGE AREA SIZE (AC) % OF TOTAL DRAINAGE AREA CURVE NUMBER IMPERVIOUS AREA 8.35 AC 64.7% 98 GRASSED AREA 4.56 AC 35.3% 61 WEIGHTED CURVE NUMBER 88 POST DEVELOPMENT BYPASS DRAINAGE TO POS 1 DRAINAGE AREA SIZE (AC) % OF TOTAL DRAINAGE AREA CURVE NUMBER FAIR CONDITION WOODS COMBO (TYPE B SOILS) 1.76 AC 73.6% 65 FAIR CONDITION WOODS COMBO (TYPE A SOILS) 0.63 AC 26.4% 43 WEIGHTED CURVE NUMBER 59 POST DEVELOPMENT BYPASS DRAINAGE TO POS 2 DRAINAGE AREA SIZE (AC) % OF TOTAL DRAINAGE AREA CURVE NUMBER FAIR CONDITION WOODS COMBO (TYPE B SOILS) 1.41 AC 87.0% 65 FAIR CONDITION WOODS COMBO (TYPE A SOILS) 0.21 AC 13.0% 43 WEIGHTED CURVE NUMBER 62 60 SON MUST CO ,� \ � I T Y pro ,`0 -0 0 D n BEFORE YOU DIG! CONTACT ONE -CALL CENTER 1-800-632-4949 GRAPHIC SCALE 0 30 60 120 240 1 inch = 60 ft. 44 10 00 (CCri rao 0 czt LLI cn JOHNSTON COUNTY, NC JOB NUMBER 2021-30 0 REVISIONS DESCRIPTION >- co 5.1 / i / / / R -\ \ \ \ N N N N \ \ N \ \ N \ \ \ N \ \ N N N \ \ N N \ N N \ \ N \ \ N \ \ \ \ \ \ \ \ \ \ \ \ \ \ //' / 1/ // // / 0.13 ACRES / SI O L TW K 7NE FL WE - EXISTING TO BE PROV OTHERS' EXISTING CATED ON PARKWAY EWALK 1 BY *41IWAgnefollw-1-4,- �SSMH TON 2 "D1EjNV IN 12"RCP) I NC4N INV OUT \a K-4 X / / / a K-6 7- / SSY TO3 254.33 \V \ 240.07 \V O�T 239.98 \ A A \ NC vp,RIAB HWY 42 \ \ \ Da U-1 \1\11D-VH RPN (P BLIC 60 30 SOUTHWICK AVE VICINITY MAP o cp BEFORE YOU DIG! CONTACT ONE —CALL CENTER 1-800-632-4949 GRAPHIC SCALE 60 120 240 1 inch = a., L. E-H'' Z 9) 'Z' c) kr) 44 c\I tn E P4 u cr) 0 , CN1C4 g 4 , a) Z 0 C czt C*) w ,- Z 1— R E<-'H' '2i- in oo rn 124 0 cn 0 JOHNSTON COUNTY, NC 0 0 COLI ZD CO 0 Date 11/1/2021 Des. BAH I Chk. BAH REVISIONS DESCRIPTION >- co ci 5. 2 ,. = o`��N1CIAI ROl/ oFEssio,� Q� < SEAL 050770 `''C-- l NGINE �, - S\ 5 22 ,, y - Views at Flowers Apartments � FROM"C" 25 Yr. "i" Area To Inlet 25 Yr. Q, Cumm. QPipe Length Pipe Diameter(FROM) PipeMaterial Pipe Slope Inlet Elevation Lower Invert (TO) Upper InvertPipe (FROM)(FROM)(TO) Inlet Cover Inlet Cover Pipe DiameterCoefficientCapacityoRSlir Area HydraulicTO Radius Roughness Velocity FuI/Actual Full FlowPipe Flow Jo�oP (in/hr) (acres) (ft3/sec) (ft3/sec) (ft) (inches) (%) (ft) (ft) (ft) (ft) (ft) (feet) (ft2) (ft) (ft/sec) (ft3/sec) (ft3/sec) 0,0 L m W HWY 42 FES A-0 CIA 1 0.95 8.30 0.39 3.08 34.85 46 42 RCP 0.50 268.70 260.00 260.23 4.97 3.50 9.62 0.88 0.013 7.41 71.30 34.85 z CI A-1 CIA 2 0.95 8.30 0.24 1.89 31.78 128 36 RCP 0.50 275.50 260.83 261.47 11.03 4.87 3.00 7.07 0.75 0.013 6.69 47.27 31.78 CI A-2 CIA 3 0.95 8.30 0.16 1.26 26.08 99 24 RCP 5.00 280.00 266.00 270.95 7.05 7.50 2.00 3.14 0.50 0.013 16.15 50.70 26.08 S Ski, CI A-3 CIA 4 0.95 8.30 0.30 2.37 22.13 143 24 RCP 5.00 284.10 271.05 278.20 3.90 6.95 2.00 3.14 0.50 0.013 16.15 50.70 22.13 CI A-4 CIA 5 0.95 8.30 0.40 3.15 12.85 64 24 RCP 3.00 285.30 278.30 280.22 3.08 3.80 2.00 3.14 0.50 0.013 12.51 39.27 12.85 'QS A�� CI A-5 CIA 6 0.95 8.30 0.10 0.79 8.59 140 18 RCP 3.00 290.90 280.82 285.02 4.38 2.98 1.50 1.77 0.38 0.013 10.32 18.23 8.59 Y CI A-6 CIA 7 0.95 8.30 0.20 1.58 7.81 50 18 RCP 3.00 292.30 285.12 286.62 4.18 4.28 1.50 1.77 0.38 0.013 10.32 18.23 7.81 CI A-7 CIA 8 0.95 8.30 0.29 2.29 6.23 155 15 RCP 3.00 296.30 286.97 291.62 3.43 4.08 1.25 1.23 0.31 0.013 9.14 11.21 6.23 CIA 8 DI A-9 0.95 8.30 0.13 1.03 1.03 150 15 RCP 1.00 296.30 291.72 293.22 1.83 3.33 1.25 1.23 0.31 0.013 5.28 6.47 1.03 SOUTHWICK AVE 7 CI A-2 DI B 1 0.95 8.30 0.02 0.16 3.81 26 15 RCP 2.00 271.70 267.22 267.74 2.71 1.25 1.23 0.31 0.013 7.46 9.16 3.81 DI B-1 DI B 2 0.95 8.30 0.13 1.03 3.15 83 15 RCP 1. 00 271.70 267.84 268.67 1.78 2.61 1.25 1.23 0.31 0.013 5.28 6.47 3.15 Ill CINI ,, MAP "=2000' DI B-2 DI B 3 0.95 8.30 0.27 2.13 2.13 88 15 RCP 1.00 271.70 268.77 269.65 0.80 1.68 1.25 1.23 0.31 0.013 5.28 6.47 2.13 1 DI B 1 DI C 1 0.95 8.30 0.02 0.18 0.50 22 15 RCP 2.00 271.70 267.22 267.66 2.79 1.25 1.23 0.31 0.013 7.46 9.16 0.50 DI C 1 DI C 2 0.95 8.30 0.04 0.32 0.32 33 15 RCP 1.00 271.70 267.76 268.09 2.36 2.69 1.25 1.23 0.31 0.013 5.28 6.47 0.32 I A C 3 DID 1 7 0 0 8 30 0.14 0.81 1.9855 15 C P 5 00 2 20 85 27 .7 6 0 279.454. 50 1.25 1.23 0.31 0.013 11.80 14.48 1.98 DI D-1 DI D-2 0.70 8.30 0.20 1.16 1.16 70 15 RCP 3.00 285.20 279.55 281.65 2.30 4.40 1.25 1.23 0.31 0.013 9.14 11.21 1.16 CI A-3 CI E-1 0.95 8.30 0.03 0.24 0.71 100 15 RCP 5.00 286.90 276.70 281.70 3.95 1.25 1.23 0.31 0.013 11.80 14.48 0.71 CI CI E-1 CI E-2 0.95 8.30 0.06 0.47 0.47 29 15 RCP 1.00 286.90 281.80 282.09 3.56 3.85 1.25 1.23 0.31 0.013 5.28 6.47 0.47 CI A-4 DI F-1 0.70 8.30 0.39 2.27 6.91 44 18 RCP 1.00 285.20 278.80 279.24 4.46 1.50 1.77 0.38 0.013 5.96 10.53 6.91 DI F-1 DI F-2 0.70 8.30 0.44 2.56 4.65 89 15 RCP 1.00 285.20 279.59 280.48 3.47 4.36 1.25 1.23 0.31 0.013 5.28 6.47 4.65 DI F-2 DI F-3 0.70 8.30 0.36 2.09 2.09 163 15 RCP 1.00 284.50 280.58 282.21 1.04 3.37 1.25 1.23 0.31 0.013 5.28 6.47 2.09 CI A-5 DI G-1 0.95 8.30 0.05 0.39 1.10 23 15 RCP 0.50 284.50 281.07 281.19 2.06 1.25 1.23 0.31 0.013 3.73 4.58 1.10 DI G-1 DI G-2 0.95 8.30 0.05 0.39 0.71 75 15 RCP 0.50 284.50 281.29 281.66 1.59 1.96 1.25 1.23 0.31 0.013 3.73 4.58 0.71 DI G-2 DI G-3 0.95 8.30 0.02 0.16 0.32 44 15 RCP 1.00 284.50 281.76 282.20 1.05 1.49 1.25 1.23 0.31 0.013 5.28 6.47 0.32 DI G-3 DI G-4 0.95 8.30 0.02 0.16 0.16 35 15 RCP 1.00 284.50 282.30 282.65 0.60 0.95 1.25 1.23 0.31 0.013 5.28 6.47 0.16 CI A-8 CI H-1 0.95 8.30 0.13 1.03 2.92 65 15 RCP 0.50 299.10 291.72 292.05 5.80 1.25 1.23 0.31 0.013 3.73 4.58 2.92 CI H-1 CI H-2 0.95 8.30 0.08 0.63 1.26 110 15 RCP 0.50 298.30 292.15 292.70 4.35 5.70 1.25 1.23 0.31 0.013 3.73 4.58 1.26 HE] ND N 6) 28 n-eng CI H-2 CI H-3 0.95 8.30 0.08 0.63 0.63 67 15 RCP 0.50 296.40 292.80 293.13 2.02 4.25 1.25 1.23 0.31 0.013 3.73 4.58 0.63 CI H-1 CI J-1 0.95 8.30 0.04 0.32 0.63 71 15 RCP 2.00 301.10 295.55 296.97 2.88 1.25 1.23 0.31 0.013 7.46 9.16 0.63 CI J-1 CI J-2 0.95 8.30 0.04 0.32 0.32 21 15 RCP 1.00 301.10 297.07 297.28 2.57 2.78 1.25 1.23 0.31 0.013 5.28 6.47 0.32 FES K-0 CI K-1 0.95 8.30 0.01 0.08 42.53 28 42 RCP 0.50 265.50 260.00 260.14 1.86 3.50 9.62 0.88 0.013 7.41 71.30 42.53 CI K-1 CI K-2 0.95 8.30 0.21 1.66 42.45 26 30 RCP 4.50 268.65 261.24 262.41 3.74 1.76 2.50 4.91 0.63 0.013 17.77 87.20 42.45 inc.)--, co CI K-2 CI K-3 0.95 8.30 0.08 0.63 38.83 64 30 RCP 3.00 271.00 262.51 264.43 4.07 3.64 2.50 4.91 0.63 0.013 14.51 71.20 38.83 rn CI K-3 CI K-4 0.95 8.30 0.18 1.42 31.89 112 30 RCP 3.00 274.30 264.53 267.89 3.91 3.97 2.50 4.91 0.63 0.013 14.51 71.20 31.89 CI K-4 CI K-5 0.95 8.30 0.25 1.97 30.47 124 30 RCP 4.00 280.90 267.99 272.95 5.45 3.81 2.50 4.91 0.63 0.013 16.76 82.21 30.47 CI K-5 CI K-6 0.95 8.30 0.36 2.84 17.19 72 30 RCP 0.50 280.50 273.05 273.41 4.59 5.35 2.50 4.91 0.63 0.013 5.92 29.07 17.19 CI K-6 CI K-7 0.95 8.30 0.21 1.66 14.35 140 30 RCP 0.50 282.15 273.51 274.21 5.44 4.49 2.50 4.91 0.63 0.013 5.92 29.07 14.35 STORMWATER PIPE CHART THE VIEWS AT FLOWERS APARTMENTS NE FLOWERS PARKWAY JOHNSTON COUNTY, NC Drn. BAH Des. BAH Chk. BAH Date 11/1/2021 JOB NUMBER 2021-30 CI K-7 CI K-8 0.95 8.30 0.02 0.16 12.69 126 30 RCP 0.50 285.10 274.31 274.94 7.66 5.34 2.50 4.91 0.63 0.013 5.92 29.07 12.69 CI K-8 CI K-9 0.95 8.30 0.07 0.55 12.54 118 30 RCP 0.50 282.40 275.04 275.63 4.27 7.56 2.50 4.91 0.63 0.013 5.92 29.07 12.54 CI K-9 CI K-10 0.95 8.30 0.25 1.97 8.59 84 24 RCP 0.50 282.10 276.23 276.65 3.45 4.17 2.00 3.14 0.50 0.013 5.11 16.03 8.59 CI K-10 CI K-11 0.95 8.30 0.06 0.47 3.94 91 15 RCP 4.00 285.60 277.50 281.14 3.21 3.35 1.25 1.23 0.31 0.013 10.56 12.95 3.94 CI K-11 CI K-12 0.95 8.30 0.19 1.50 3.47 85 15 RCP 2.50 287.65 281.24 283.37 3.03 3.11 1.25 1.23 0.31 0.013 8.35 10.24 3.47 CI K-12 CI K-13 0.95 8.30 0.10 0.79 0.79 144 15 RCP 4.50 294.10 283.47 289.95 2.90 2.93 1.25 1.23 0.31 0.013 11.20 13.73 0.79 CI K-2 CI L-1 0.95 8.30 0.10 0.79 1.97 119 15 RCP 1.00 269.80 263.76 264.95 3.60 1.25 1.23 0.31 0.013 5.28 6.47 1.97 CI L-1 CI L-2 0.95 8.30 0.15 1.18 1.18 55 15 RCP 0.50 269.80 265.05 265.33 3.22 3.50 1.25 1.23 0.31 0.013 3.73 4.58 1.18 CI K-3 DI M-1 0.95 8.30 0.03 0.24 4.49 20 15 RCP 1.00 271.70 265.78 265.98 4.47 1.25 1.23 0.31 0.013 5.28 6.47 4.49 DI M-1 DI M-2 0.95 8.30 0.03 0.24 3.94 71 15 RCP 1.00 271.70 266.08 266.79 3.66 4.37 1.25 1.23 0.31 0.013 5.28 6.47 3.94 DI M-2 DI M-3 0.95 8.30 0.17 1.34 3.71 30 15 RCP 1.00 272.90 266.89 267.19 4.46 3.56 1.25 1.23 0.31 0.013 5.28 6.47 3.71 DI M-3 DI M-4 0.95 8.30 0.02 0.16 2.37 53 15 RCP 1.00 271.70 267.29 267.82 2.63 4.36 1.25 1.23 0.31 0.013 5.28 6.47 2.37 DI M-4 DI M-5 0.95 8.30 0.28 2.21 2.21 62 15 RCP 1.00 271.70 267.92 268.54 1.91 2.53 1.25 1.23 0.31 0.013 5.28 6.47 2.21 DI M-1 DI N-1 0.95 8.30 0.04 0.32 0.32 20 15 RCP 5.00 271.70 266.08 267.08 3.37 1.25 1.23 0.31 0.013 11.80 14.48 0.32 CI K-3 CI P-1 0.95 8.30 0.07 0.55 1.81 24 15 RCP 2.00 271.00 265.78 266.26 3.49 1.25 1.23 0.31 0.013 7.46 9.16 1.81 REVISIONS w 1- Q 0 CI K-5 CI Q-1 0.95 8.30 0.18 1.42 3.39 185 15 RCP 3.00 284.00 274.30 279.85 2.90 1.25 1.23 0.31 0.013 9.14 11.21 3.39 CI Q-1 CI Q-2 0.95 8.30 0.25 1.97 1.97 82 15 RCP 1.00 284.50 279.95 280.77 2.48 2.80 1.25 1.23 0.31 0.013 5.28 6.47 1.97 0 a 0 w 0 CI K-5 CI R-1 0.95 8.30 0.08 0.63 7.92 100 15 RCP 6.00 284.30 274.30 280.30 2.75 1.25 1.23 0.31 0.013 12.93 15.86 7.92 CI R-1 DI R-2 0.60 8.30 0.47 2.34 7.29 105 15 RCP 3.00 287.90 280.40 283.55 3.10 2.65 1.25 1.23 0.31 0.013 9.14 11.21 7.29 DI R-2 DI R-3 0.60 8.30 0.55 2.74 4.95 109 15 RCP 1.00 287.90 283.65 284.74 1.91 3.00 1.25 1.23 0.31 0.013 5.28 6.47 4.95 DI R-3 DI R-4 0.70 8.30 0.38 2.21 2.21 108 15 RCP 1.00 287.90 284.84 285.92 0.73 1.81 1.25 1.23 0.31 0.013 5.28 6.47 2.21 DI R-2 DI S-1 0.80 8.30 0.92 6.11 6.11 96 15 RCP 2.50 288.30 283.65 286.05 1.00 1.25 1.23 0.31 0.013 8.35 10.24 6.11 CI K-9 DCI U-1 0.95 8.30 0.43 3.39 3.39 48 24 RCP 0.75 281.30 276.23 276.59 2.71 2.00 3.14 0.50 0.013 6.25 19.63 3.39 r m CI K-10 CI V-1 0.95 8.30 0.12 0.95 0.95 30 15 RCP 0.75 281.50 277.50 277.73 2.52 1.25 1.23 0.31 0.013 4.57 5.61 0.95 ci z CI K-10 CI W-1 0.95 8.30 0.22 1.73 1.73 34 15 RCP 0.75 281.50 277.50 277.76 2.49 1.25 1.23 0.31 0.013 4.57 5.61 1.73 C - 5.3 CI K-12 DI X 1 0.95 8.30 0.15 1.18 1.18 40 15 RCP 3.00 287.85 283.47 284.67 1.93 1.25 1.23 0.31 0.013 9.14 11.21 1.18 // / / / / / / / / // / / /// // / / / / / / / / / / i / / f / / CONSTRUCT DAM WITH IMPERMEABLE SOILS COMPACTED TO 98% STD. PROCTOR DENSITY W/ A MOISTURE CONTENT OF —1% TO +3% OF OPTIMUM. SOILS SHALL BE UNIFORM IN CHARACTER AND INSTALLED IN 8" MAXIMUM LIFTS. SOILS SHALL BE FREE OF ORGANICS AND PARTICLES OF 2" OR GREATER CENTIPEDE TURF GRASS TO BE UTILIZED ON ALL POND SLOPES. CORE OUTLET 258.0' GEOTECHNICAL ENGINEER TO BE ON SITE DURING INSTALLATION OF POND OUTLETS TO ENSURE COMPACTION AROUND PIPES 72" X 72" ANTI —SEEP PLATES SANDWICHED BETWEEN FLANGED GASKET IN FLANGED JOINTS / 275.5 6' WIDE VEGETATED SHELF AT 1:6 SLOPE. BOTTOM ELEVATION: 258.0 TOP ELEVATION: 259.0. 10.00' DAM EL 265.55' 1 1 / 2 52 LF 24" ALUMINUM 1.0% SLOPE CUT—OFF TRENCH BACKFILL W/ IMPERMEABLE SOILS COMPACTED TO 98% STD PROCTOR DENSITY 271.60 48" DIAMETER ALUMINUM RISER WITH TRASH RACK. TOP OF RISER ELEV 263.0. SHOP DRAWING TO BE REVIEWED BY ENGINEER PRIOR TO FABRICATION. 4" ORIFICE AT 261.5' BOTTOM 253 6'X6'X2' 3000 PSI CONCRETE PAD ANTI FLOTATION DEVICE 2.5" ORIFICE AT 258.5 SUBMERGED ORIFICE OUTLET DESIGN SEE DETAIL THIS SHEET PERMANENT POOL SEDIMENT STO! AGE RIP RAP BAFFLE CLASS B STONE OVER NON WOVEN FABRIC. FROM ELEVATION 253.00 TO 258.0. SIDE SLOPES TO BE 2:1. TOP 5' WIDE. O\D 1 DETAIL N.T.S. / DGE ® /WET V TC CR)I -ANDS (1"R \VIIL �2 \V 0 „T 271.4 \ CENTIPEDE TURF GRASS TO BE UTILIZED ON ALL POND SLOPES. 0' WIDE SPILLWAY EL: 263.50' 1.0' THICK CLASS B STONE OVER NON WOVEN FABRIC 100YR STORM MAX ELEV. 264.5' WATER QUALITY MAX ELEVATION 261.50 PERMANENT POOL ELEVATION 258.5 - CLAY LINER TO BE INSTALLED. SEE CLAY LINER NOTES ON THIS SHEET DEPTH OF FOREBAY AT ENTRANCE TO BE 12" BELOW EXIT OF FOREBAY 30 \ 1� L 85 \ L2.0 \I N II II \ I I l Io,i H I <5\\ \CC 265.5 0� N JB K-1NS -60,\ 210 \ K-2 CI K— \\ 271.0 30 0 15 GRAPHIC SCALE 30 VI CINI T Y MAP 1 "=2000' 60 120 POND SLOPES AND DAM OUTSIDE OF PERMANENT POOL ARE TO BE 3:1. SLOPED AREA IN POND BELOW PERMANENT POOL IS 2:1 SLOPE ( IN FEET ) 1 inch = 30 ft. Figure 10-4 Typical Submerged Orifice Outlet Configuration 4" PVC Screw type plug outlet box 4" PVC stubbed into box PVC tee Temporary pool 12" p Permanent pool 4` 2.5" ORIFICE DRILLED THROUGH CAP 4" PVC cap tvith hole di Weil Note: Consider 6" piping if the control orifice is larger don 2". Pond bottom Durable materials, such as reinforced concrete, are preferable to corrugated metal in most instances. The riser should be placed in or at the face of the embankment. By placing the riser close to the embankment, maintenance access is facilitated and flotation forces are reduced. The design engineer must present flotation force calculations for any outlet design subject to flotation forces. Outlets are described in greater detail in Section 5.0, Common BMP Design Elements. A CLAY LINER SHOULD BE INSTALLED IN POND BASIN PER THE FOLLOWING SPECIFICATIONS: -MINIMUM THICKNESS OF 12 INCHES WITH AN ADDITIONAL 12 INCH LAYER OF COMPACTED SOIL ABOVE IT -PERMEABILITY = 1 X 10-6 CM/SEC -PLASTICITY INDEX OF CLAY = NOT LESS THAN 15% -LIQUID LIMIT OF CLAY = NOT LESS THAN 30% -CLAY PARTICLES PASSING = NOT LESS THAN 30% -CLAY COMPACTION = 95% OF STANDARD PROCTOR DENSITYSOURCE: DCR (1999) Anti -Flotation Device 1: The Views Riser Height: Riser Diameter: Riser Area: Weight of Water: Weight of Conc. Min Weight Req. 4.5 48 feet in 56.52 cf 62.4 Ibs/ft^2 150 I bs/ft^3 3527 Ibs Anti -Flotation Dimemstions Length (ft) Width (ft) Height (ft) 6 6 2 Weight Provided 10800 Ibs Min Factor of Safety 1.5 Factor of Safety Provided 3.06 Okay 1.5' CLASS B RIP RAP 20' SPILLWAY DETAIL NOT TO SCALE DAM EL 265.55 PUMPING PLAN (POND MAINTENANCE) IN THE EVENT OF POND MAINTENANCE THAT REQUIRES DRAINING OF THE POND: 1) FIRST UTILIZE THE 6" DRAIN VALVE TO DRAIN ALL WATER ABOVE THE PERMANENT POOL ELEVATION. 2) USE A HONDA KTH-50X TRASH PUMP OR SIMILAR TYPE PUMP TO PUMP THE REMAINING PERMANENT POOL VOLUME 3) ENSURE THERE IS A DIRTBAG ON THE END OF THE PUMP DISCHARGE TO HELP FILTER THE DISCHARGED POND WATER. cip-- O w N Moo O O re) ry Z Z • P. c 00 z n0 cn z l/) a w124 0 NE FLOWERS PARKWAY JOHNSTON COUNTY, NC JOB NUMBER 2021-30 N 0 CD CCI m 0 REVISIONS 0 DESCRIPTION r d z C-6.0 SKIMMER BASIN -4" SKIMMER WITH 2.5" ORIFICE SKIMMER TO BE ATTACHED TO POND OUTLET PIPE CONSTRUCTION SPECIFICATIONS: 1. CLEAR, GRUB, AND STRIP THE AREA UNDER THE EMBANKMENT OF ALL VEGETATION AND ROOT MAT. REMOVE ALL SURFACE SOIL CONTAINING HIGH AMOUNTS OF ORGANIC MATTER AND STOCKPILE OR DISPOSE OF IT PROPERLY. HAUL ALL OBJECTIONABLE MATERIAL TO THE DESIGNATED DISPOSAL AREA. PLACE TEMPORARY SEDIMENT CONTROL MEASURES BELOW BASIN AS NEEDED. 2. ENSURE THAT FILL MATERIAL FOR THE EMBANKMENT IS FREE OF ROOTS, WOODY VEGETATION, ORGANIC MATTER, AND OTHER OBJECTIONABLE MATERIAL. PLACE THE FILL IN THE LIFTS NOT TO EXCEED 9 INCHES, AND MACHINE COMPACT IT. OVER FILL THE EMBANKMENT 6 INCHES TO ALLOW FOR SETTLEMENT. 3. SHAPE THE BASIN TO THE SPECIFIED DIMENSIONS. PREVENT THE SKIMMING DEVICE FROM SETTLING INTO THE MUD BY EXCAVATING A SHALLOW PIT UNDER THE SKIMMER OR PROVIDING A LOW SUPPORT UNDER THE SKIMMER OF STONE OR TIMBER. 4. PLACE THE BARREL (TYPICALLY 4-INCH SCHEDULE 40 PVC PIPE) ON A FIRM, SMOOTH FOUNDATION OF IMPERVIOUS SOIL. DO NOT USE PERVIOUS MATERIAL SUCH AS SAND, GRAVE, OR CRUSHED STONE AS BACKFILL AROUND THE PIPE. PLACE THE FILL MATERIAL AROUND THE PIPE SPILLWAY IN 4-INCH LAYERS AND COMPACT IT UNDER AND AROUND THE PIPE TO AT LEAST THE SAME DENSITY AS THE ADJACENT EMBANKMENT. CARE MUST BE TAKEN NOT TO RAISE THE PIPE FROM THE FIRM CONTACT WITH ITS FOUNDATION WHEN COMPACTING UNDER THE PIPE HAUNCHES. PLACE A MINIMUM DEPTH OF 2 FEET OF COMPACTED BACKFILL OVER THE PIPE SPILLWAY BEFORE CROSSING IT WITH CONSTRUCTION EQUIPMENT. IN NO CASE SHOULD THE PIPE CONDUIT BE INSTALLED BY CUTTING A TRENCH THROUGH THE DAM AFTER THE EMBANKMENT IS COMPLETE. 5. ASSEMBLE THE SKIMMER FOLLOWING THE MANUFACTURERS INSTRUCTIONS, OR AS DESIGNED. 6. LAY THE ASSEMBLED SKIMMER ON THE BOTTOM OF THE BASIN WITH THE FLEXIBLE JOINT AT THE INLET OF THE BARREL PIPE. ATTACH THE FLEXIBLE JOINT TO THE BARREL PIPE AND POSITION THE SKIMMER OVER THE EXCAVATED PIT OR SUPPORT. BE SURE TO ATTACH A ROPE TO THE SKIMMER AND ANCHOR IT TO THE SIDE OF THE BASIN. THIS WILL BE USED TO PULL THE SKIMMER TO THE SIDE FOR MAINTENANCE. 7. EARTHEN SPILLWAYS -INSTALL THE SPILLWAY IN THE UNDISTURBED SOIL TO THE GREATEST EXTENT POSSIBLE. THE ACHIEVEMENT OF PLANNED ELEVATIONS, GRADE, DESIGN WIDTH, AND ENTRANCE AND EXIT CHANNEL SLOPED ARE CRITICAL TO THE SUCCESSFUL OPERATION OF THE SPILLWAY. THE SPILLWAY SHOULD BE LINED WITH LAMINATED PLASTIC OR IMPERMEABLE GEOTEXTILE FABRIC. THE FABRIC MUST BE WIDE AND LONG ENOUGH TO COVER THE BOTTOM AND SIDES AND EXTEND ONTO THE TOP OF THE DAM FOR ANCHORING IN A TRENCH. THE EDGES MAY BE SECURED WITH 8-INCH STAPLES OR PINS. THE FABRIC MUST BE LONG ENOUGH TO EXTEND DOWN THE SLOPE AND EXIT ONTO STABLE GROUND. THE WIDTH OF THE FABRIC MUST BE ONE PIECE, NOT JOINED OR SPLICED; OTHERWISE WATER CAN GET UNDER THE FABRIC. IF THE LENGTH OF THE FABRIC IS INSUFFICIENT FOR THE ENTIRE LENGTH OF THE SPILLWAY, MULTIPLE SECTIONS, SPANNING THE COMPLETE WIDTH MAY BE USED. THE UPPER SECTION(S) SHOULD OVERLAP THE LOWER SECTION(S) SO THAT WATER CANNOT FLOW UNDER THE FABRIC. SECURE THE UPPER EDGE AND SIDES OF THE FABRIC IN A TRENCH WITH STAPLES OR PINS. (ADAPTED FROM "A MANUAL FOR DESIGNING, INSTALLING AND MAINTAINING SKIMMER SEDIMENT BASINS." FEBRUARY, 1999.J. W. FAIRCLOTH & SON.) 8. INLETS -DISCHARGE WATER INTO THE BASIN IN A MANNER TO PREVENT EROSION. USE TEMPORARY SLOPE DRAINS OR DIVERSIONS WITH OUTLET PROTECTION TO DIVERT SEDIMENT-LADDEN WATER TO THE UPPER END OF THE POOL AREA TO IMPROVE BASIN TRAP EFFICIENCY (REFERENCES: RUNOFF CONTROL MEASURES AND OUTLET PROTECTION). 9. EROSION CONTROL-CONTRUCT THE STRUCTURE SO THAT THE DISTURBED AREA IS MINIMIZED. DIVERT SURFACE WATER AWAY FROM BARE AREAS. COMPLETE THE EMBANKMENT BEFORE THE AREA IS CLEARED. STABILIZE THE EMERGENCY SPILLWAY EMBANKMENT AND ALL OTHER DISTURBED AREA ABOVE THE CREST OF THE PRINCIPAL SPILLWAY IMMEDIATELY AFTER CONSTRUCTION (REFERENCES: SURFACE STABILIZATION). 10. INSTALL SILT FENCE BAFFLES WITH MINIMUM 10' SPACING. 11. AFTER ALL THE SEDIMENT -PRODUCING AREA HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND STABILIZE PROPERLY (REFERENCES: SURFACE STABILIZATION). MAINTENANCE: INSPECT SKIMMER SEDIMENT BASINS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (ONE-HALF INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL DIMENSIONS WHEN SEDIMENT ACCUMULATES TO ONE-HALF THE HEIGHT OF THE FIRST BAFFLE. PULL THE SKIMMER TO ONE SIDE SO THAT THE SEDIMENT UNDERNEATH IT CAN BE EXCAVATED. EXCAVATE THE SEDIMENT FROM THE ENTIRE BASIN, NOT JUST AROUND THE SKIMMER OR THE FIRST CELL. MAKE SURE VEGETATION GROWING IN THE BOTTOM OF THE BASIN DOES NOT HOLD DOWN THE SKIMMER. REPAIR THE BAFFLES IF THEY ARE DAMAGED. RE -ANCHOR THE BAFFLES IF WATER IS FLOWING UNDERNEATH OR AROUND THEM. IF THE SKIMMER ARM OR BARREL PIPE IS CLOGGED, THE ORIFICE CAN BE REMOVED AND THE OBSTRUCTION CLEARED WITH A PLUMBER'S SNAKE OR BY FLUSHING WITH WATER. BE SURE AND REPLACE THE ORIFICE BEFORE REPOSITIONING THE SKIMMER. IF THE SKIMMER IS CLOGGED WITH TRASH AND THERE IS WATER IN THE BASIN, USUALLY JERKING ON THE ROPE WILL MAKE THE SKIMMER BOB UP AND DOWN AND DISLODGE THE DEBRIS AND RESTORE FLOW. IF THIS DOES NOT WORK, PULL THE SKIMMER OVER TO THE SIDE OF THE BASIN AND REMOVE THE DEBRIS. ALSO CHECK THE ORIFICE INSIDE THE SKIMMER TO SEE IF IT IS CLOGGED; IF SO REMOVE THE DEBRIS. CHECK THE FABRIC LINED SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED REPAIRS WITH FABRIC THAT SPANS THE FULL WIDTH OF SPILLWAY. CHECK THE EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION DAMAGE, AND INSPECT THE OTHER DEBRIS FROM THE SKIMMER AND POOL AREAS. FREEZING WEATHER CAN RESULT IN ICE FORMING IN THE BASIN. SOME SPECIAL PRECAUTIONS SHOULD BE TAKEN IN THE WINTER TO PREVENT THE SKIMMER FROM PLUGGING WITH ICE. ZONE APRON MATERIAL CLASS OF STONE SIZE OF STONE LENGTH OF APRON • MINIMUM THICKNESS OF STONE 25 1 STONE FINE 3" 4 X D 9" VELOCITY IN FEET PER SECOND o cn o 2 STONE LIGHT 6" 6 X D 12" 3 STONE MEDIUM 13" 8 X D 18" ZONE 6 4 STONE HEAVY 23" 8 X D 30" 5 STONE HEAVY 23" 10 X D 30" 6 STONE HEAVY 23" 12 X D 30" ZONE 7 REQUIRES LARGER STONE OR ANOTHER TYPE OF 7 DEVICE. DESIGN IS BEYOND THE SCOPE OF THIS PROCEDURE. ZONE 5 WIDTH = DIAMETER + 0.4 (LENGTH) : 6' MINIMUM * LENGTH TO PREVENT SCOUR HOLE NAME WEIGHT SIZE SPECIFICATIONS ZONE (Les.) 5 ZONE RIP -RAP ZONFAT 2 IGH LEAST 100 SHAH. 3 LBS NOLL MORE THAN 10% CLASS 1 5 - 200 SHALL WEIGH LESS THAN 15 LBS. ZONE 1 EACH. HALL WEI AT LEAST 100 E 0 0 5 10 15 20 25 CLASS 2 25 - 250 CH.. NO60% MGH ORE THAN 5% LBS SHALL WEIGH LESS THAN 50 LBS EACH. DIAMETER OF PIPE IN FEET EROSION CONTROL STONE © CLASS A 2• - 6• 10% TOP & BOTTOM SIZES NO GRADAT70N SPECIFIED. CLASS B 15 - 300 NO GRADA770N SPECIFIED. STRUCTURE DIAMETER OF OUTLET DEPTH ZONE APRON APRON APRON STONE REMARKS 0-FLOW PIPE VELOCITY OF FLOW LENGTH WIDTH THICKNESS CLASS (CFS) (/N.) (FPS.) (FT.) (FT.) (FT.) (ON.) OND OUTLET 31.08 24 9.97 1.9 2 12 7 12" 1 SOURCE: BANK & CHANNEL LINING PROCEDURES', NEW YORK DEPARTMENT OF 7RANSPORTA770N, DIV/S/ON OF DESIGN AND CONS7RUC770N, 1971. RIP -RAP PAD SIZING LA SIDEWALK ABUTTING PARKING AREA N.T.S. 6"I 6.0 -1 1 1-1 I I -I 1 I=1 1=1 1=1 1=1 1 I I I-1 I I-1 I I-1 I I-1 I I-1 I I-1 I I-1 11- 24" SIDEWALK TO BE MINIMUM 6' WHEN ADJACENT TO CURB WITH PERPENDICULAR PARKING STALLS. ALL OTHER SIDEWALKS ARE 5' MINIMUM WIDTH. PAVEMENT SECTION III III HEAVY DUTY (TRUCK TRAFFIC) 01 1.5" SURFACE COURSE S9.5C SUPERPAVE 0 2.5" BINDER COURSE 1190.00 SUPERPAVE N.T.S. KEYED NOTES O3 8" (MIN.) ABC STONE COMPACTED & PROOF ROLLED. STANDARD DUTY (CAR TRAFFIC/PARKING SPACES) 4 WELL -DRAINED SUB -GRADE (SUB -GRADE TO MODIFIED 98 PROCTOR MIN. COMPACTION). O 6" (MIN.) ABC STONE COMPACTED & PROOF ROLLED. 0 2" SURFACE COURSE S9.5C SUPERPAVE 1 1/2" R VAN ACCESSIBLE USDOT STANDARD R7-8 SIGN MINIMUM FINE $250 SEE NOTE BELOW NOTE (R7-8 SIGN): THIS IS A STANDARD SIGN AND MAY BE ORDERED FROM ANY TRAFFIC SIGN SUPPLIER BY NUMBER. THE SIGN MUST BE SUPPLEMENTED WITH A "VAN ACCESSIBLE" SIGN AS APPLICABLE AND/OR AMOUNT OF THE FINE FOR ILLEGALLY PARKING IN THE RESERVED SPACE(S) A MUNICIPALITY MAY IMPOSE. CONFIRM WITH LOCAL REGULATIONS. ACCESSIBILITY SIGNAGE t OF PARKING STALL I CYN 1 N❑11❑a N❑IS) 1108 1 I I° I I L__J III „ 4, ACCESSIBLE PARKING ( TABLE 1 H L HUMBER 0 TO 4' 4.5000 2147483647 4' TO 8' 7.5000 2147483847 8' TO 8' 9.5000 2147483847 CAP UNIT ADHERE TO TOP UNIT WITH CONC. ADHESIVE 1 H = VARIES } TAN SPLIT -FACE MODULAR CONC. FACING UNITS 12" MIN. 12" MIN. 12" MIN. 42"-45" HIGH BLACK CHAIN LINK FENCE WHEN WALL HEIGHT EXCEEDS 30". POST SPACING LESS THAN OR EQUAL TO 8' MPERVIOUS FILL REINFORCEMENT GEO-GRID LENGTH AND NUMBER AS PER TABLE 1 AND APPROVED DESIGN III -I I;��IIL�II_ STAINED SOIL APPROX. EXCAVATION LINE 4" 0 PERFORATED DRAIN PIPE WRAPPED W/ FILTER FABRIC OUTLET 0 END OF WALL OR 0 40' CENTERS MAX. SLOPE TO DRAIN (1/8": 1') GRANULAR LEVELING PAD MIN. 3' WIDE TYPICAL SECTION - SEGMENTAL RETAINING WALL N.T.S GENERAL NOTES - WALLS 1. THE DETAILS SHOWN ARE THE MIN. ALLOWED AND SHALL BE VERIFIED BY A PROFESSIONAL ENGINEER REGISTERED IN THE STATE OF NORTH CAROLINA. 2. ALL DIMENSIONS AND MATERIAL TYPES AND ACTUAL FIELD CONDITIONS SHALL BE VERIFIED BY THE WALL DESIGNER. 3. RETAINING WALL SCREENING SHALL BE PROVIDED IN ACCORDANCE WITH THE LOCAL ORDINANCE. NOTE: FOR COVERED SPACES, LENGTH OF SHELTER STRUCTURE TO EXTEND 3' MIN. BEYOND LAST INVERTED "U" ON EACH END. BIKE PARKING SHELTER APPROXIMATE ROOFLINE & SUPPORT POSTS 10' TYP. BETWEEN ROW CENTERLINES INVERTED "U" SHOWING APPROXIMATE FOOTINGS 4' MIN. AISLE BETWEEN ROWS PLAN VIEW SCALE 1" = 5' EXISTING CONCRETE SURFACE MAY BE CORE DRILLED YNTH A 3"-4" HOLE SAW AND FILLED WITH QUIKCRETE OR A CONSTRUCTION ADHESIVE. CONCRETE, ASPHALT, OR BRICK PAVERS (SEE PLAN) 1-1/2" SCHEDULE 40 PIPE YN1H 12-20 MILS THICK PLASTISOL COATING .0.\\\ 1CIAI R4����''% Q SEAL 050770 r-1 V L cn 1�1 NE FLOWERS PARKWAY JOHNSTON COUNTY, NC JOB NUMBER 2021-30 Date 11/1/2021 x 10 A x REVISIONS 0 DESCRIPTION O Z BLACK BIKE RACK DETAIL C-7.O NOTES: 1. METER AS PR❑VIDED OR APPROVED BY AQUA, 2. METER SETTERS SHALL HAVE COMPRESSION OR DUAL PURPOSE FITTINGS ON BOTH THE INLET AND OUTLET SIDES. 3. BACKFILL TAMPED IN 6' LIFTS. 4, 4' MIN. AND 12' MAX. VERTICAL CLEARANCE FROM TOP OF METER TO BOTTOM OF METER BOX COVER 4° OF 67 STONE IN BOTTOM OF METER B❑X, 5, FOR 1 1/2' AND 2' WATER METER BOX INSTALLATI❑NS, USE CB-SO-4 FRAME AND COVER. 6. ❑PENING SIZES: 1 1/2' TO HAVE 13 1/4" FLANGE, 2' SERVICE TO HAVE 17 1/4" FLANGE. 7. COMPARABLE YOKES WITH HIGH RISE BYPASS AS MANUFACTURED MUELLER, AND A.Y. MCD❑NALD MUST BE USED. 8. METER BOX FOR 1 1/2" AND 2' METER TO BE CBSOS FRAME AND LID. 2' CURB STOP 'BRASS' OR 2' SQUARE NUT FIRE VALVE TOP OF GROUND DOUBLE CHECK VALVES ON BYPASS AND BEHIND THE METER. _-METER STOPS, 2 REQUIRED 11 FORD DIM. A 1 1/2" - 13 1/4" 2" - 17 1/4" H-15535 S❑LID COPPER DISCS 2 REQUIRED, MUELLER OR EQUAL ANCHOR RING TYP, COPPER SETTER ALL COPPER PIPE, TYPE K-IN LENGTHS DRAWIG W-7A DA1E 11 /2018 TYPICAL 1.5 AND 2 INCH WATER SERVICE AQUA Aquo North Carolina, Inc. MAX 6° 4,6 2' 6" MIN MINIMUM 5' HORIZONTAL CLEARANCE FROM ANY OBJECT. HYDRANT, PUMPER NOZZLE TO BE PERPENDICULAR TO STREET. 18' MIN CLEARANCE 3'-6" MIN CONC. THRUST BLOCKING, DO NOT PLUG DRAIN 30 MIL HDPE COATED COMPACTED BACKFILL \LOCATING WIRE (TAMPED IN 6" LIFTS) 6° MIN. BRANCH i 3/4" BRIDLE ROD 1/3 CU. YD. #57 STONE MIN. UNDISTURBED SOIL 24° X 24° X 4° THICK CONCRETE PAD OR 24' BROOKS VALVE BOX RING. NOTES: 1. ALL HYDRANTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH AWWA STANDARD C503-82. 2. HYDRANTS WILL BE INSTALLED IN TRUE VERTICAL POSITIONS. 3. ALL BENDS, TEES, VALVES AND BLOW -OFFS SHALL BE BLOCKED IN ACCORDANCE WITH AWWA STANDARDS. 4. HYDRANTS SHALL HAVE NATIONAL STANDARD THREADS. 6" GATE VALVE CONC. THRUST BLOCK 6" MAIN, MIN - 1 -0" BLOCKING AS REQUIRED DRAwHG NO. W-11 WAMM DAZE 01/2017 HYDRANT DETAIL AQUA Aqua North Corolina, Inc. STANDARD VALVE BOX TOP SECTION 2'x2'x4" CONCRETE PAD OR CONCRETE COLLAR REQUIRED ON ALL VALVES. PAVEMENT 5" HEAVY WEIGHT CAST IRON SOIL PIPE FOR EXTENSIONS STAB -IN SOIL PIPE CASKET TAMPED BACKFILL STANDARD VALVE BOX BOTTOM SECTION 2" 2" SQ. NUT TAMPED BACKFILL NOTES: 1. GATE VALVES SHALL COMPLY WITH AWWA C-500 AND BE IRON BODY, PARALLEL SEAT TYPE, BRONZE FITTED W/ RESILIENT SEAT. LEFT HAND OPEN (CCw). 2. BROOKS 24" VALVE BOX COLLAR MAY BE USED. GRADE VALVE BOX NOT TO CONTACT WATER MAIN NOR VALVE 36" MIN DRAWING NO. S-13 REMON DAIS 05/2012 GATE/PLUG VALVE AND EXTENSION AQUA Aquo North Corolina, Inc. CLASS 350 DIP FLANGED FITTING CLASS 1, ASSE 1060 HEATED & INSULATED WEATHERPROOF ENCLOSURE ANCHORED TO CONCRETE PAD --191E11 6' 3000 PSI CONCRETE SLAB. DIMENSIONS PER ENCLOSURE MANUFACTURER SPECIFICATION DIP, MJ FITTING (ROD BACK TO MAIN LINE VALVE AND PROVIDE REACTION BLOCKING OR INSTALL LOCKING RETAINER GLAND) WATTS 909 RPDA OR EQUIVALENT MAINTAIN 2' ANNULAR AREA AROUND DIP APPROVED CLASS 350 DIP RESTRAINED OR RODDED WEDGE ACTION RETAINER GLAND APPROVED CLASS 350 DIP, RESTRAINED OR RODDED TO MAIN LINE VALVE Notes: 1. ALL PIPES, VALVES AND FITTINGS 2° AND SMALLER SHALL BE AS SPECIFIED IN DIVISION 3, SECTION 13.4 2. ACCEPTABLE MODELS: WATTS 090 • FEBCO 825Y (D) • WILKINS 975 XL • CONBRACO 400 • OR APPROVED EQUAL 4° MIN. CLEARANCE rWITH VALVE OPEN w 0 COMPACTED SUBGRADE 3. THIS DETAIL IS REPRESENTATIVE OF ACCEPTABLE REDUCED PRESSURE ZONE BACKFLOW DEVICES FOR SERVICES 2° IN DIAMETER OR SMALLER THAT ARE INSTALLED WITHIN AQUA NORTH CAROLINA'S SYSTEMS. M CC f-1" CLEAR DRANwO NG. W-17 REN9GN DAZE 12/2011 REDUCED PRESSURE BACKFLOW PREVENTER AQUA Aqua North Corolina, Inc. NOTES: EARLY WARNING TAPE WITH METALLIC DETECTOR STRIP AND/OR WIRE FINISHED GRADE FINISHED GRADE PVC FORCE MAIN EARLY WARNING TAPE 1. ALL MAINS INSTALLED BY OPEN CUT SHALL HAVE A "EARLY WARNING" PROTECTION TAPE INSTALLED CONTINUOUSLY ALONG THE ALIGNMENT. THE PROTECTION TAPE SHALL BE TERRA -TAPE OR EQUAL. TAPE SHALL BE INSTALLED DURING BACKFILLING 6"-12" BELOW FINISHED GRADE DIRECTLY OVER THE PIPE AND SHALL BE CONTINUOUSLY MARKED FOR THE TYPE OF PIPE (EXAMPLE: "CAUTION, WATER MAIN BURIED BELOW"). THE TAPE SHALL HAVE A METALLIC DETECTABLE STRIP INCLUDED AND COLOR CODED AS FOLLOWS: GREEN - SANITARY FORCE MAIN 2. ALL DUCTILE IRON MAINS SHALL BE WRAPPED WITH GREEN BAGS. 3. DO NOT SPLICE TRACER WIRE UNDERGROUND. GROUND LEVEL 6"-12" METALLIC OR VINYL CONTINUOUS IDENTIFICATION/WARNING TAPE 3 WIRE TO BE PLACED INSIDE PIPE WITH A MIN. OF 12" OF EXCESS WIRE - COILED (TYP.) TYPICAL UTILITY PIPE \J PVC PIPE (TYP.) DEAD VALVE BOX \ END O� Aqua North Carolina, Inc. UTILITY PIPE LOCATION MATERIALS 1.0 A (IF TEE IS PLUGGED) PLUG �J DENDA END) -I B BEND NOTES: 1. RESTRAINED JOINTS SHALL BE PROVIDED AT ALL BENDS, TEES AND DEAD ENDS AS INDICATED IN THESE TABLES, OR AS SHOWN ON THE DRAWINGS FOR OTHER SPECIFIC CONDITIONS. THE USE OF CONCRETE THRUST BLOCKING IS PROHIBITED, UNLESS OTHERWISE INDICATED ON THE DRAWINGS. 2. MAXIMUM LENGTHS OF PIPE SHALL BE USED WITHIN RESTRAINED SECTIONS. 3. LENGTH OF PIPE WITH RESTRAINED JOINTS IS BASED ON INSTALLATION IN SP SOILS. IF OTHER SOIL CONDITIONS ARE ENCOUNTERED, LENGTH OF RESTRAINED PIPE SHALL BE ADJUSTED ACCORDINGLY. ENGINEER SHALL SUPPLY CALCULATIONS TO AQUA NORTH CAROLINA, INC. FOR REVIEW. 4. PIPE TRENCH AND INSTALLATION SHALL BE DIPRA TYPE 4 AS SHOWN ON DETAILS SHEET. LENGTH IN FEET REQUIRED FOR DIP RESTRAINED JOINTS A A B B B B SIZE DEAEND TEE & PLUG 90' BEND 45' BEND 22 Y2' BEND gEND 4" 37' (55') 37' (55') 21' (26') 18' (18') 18' (18') 18' (18') 6" 52' (78') 52' (78') 30" (36') 18' (18') 18' (18') 18' (18') 8" 67' (100') 67' (100') 36' (45') 18' (18') 18' (18') 18' (18') 10" 81' (122') 81' (122') 44' (54') 18' (22') 18' (18') 18' (18') 12" 94' (141') 94' (141') 50' (63') 21' (26') 18' (18') 18' (18') 14" 107' (160') 107' (160') 60' (72') 23' (30') 18' (18') 18' (18') 16" 120' (180') 120' (180') 64' (80') 27' (33') 18' (18') 18' (18') 20" 144' (216') 144' (216') 80' (94') 32' (39') 18' (18') 18' (18') 24" 167' (250') 167' (250') 88' (108') 37' (45') 18' (18') 18' (18') TABLE APPLIES TO DUCTILE IRON FOR FOLLOWING CONDITIONS: 1. TEST PRESSURE: 150 PSIG 2. SOIL TYPE: SP 3. DEPTH OF COVER: 30" 4. SAFETY FACTOR: 1.5 5. COMPACTION: AS SHOWN ON DETAIL DRAWINGS VALUES IN PARENTHESIS ARE FOR PIPE ENCASED IN POLYETHYLENE B LENGTH IN FEET REQUIRED FOR PVC RESTRAINED JOINTS A A B B B B SIZE DEAD ND TEE & PLUG 90' BEND 45' BEND 22 Y2' BEND gEND 4" 45' 45' 20' 18' 18' 18' 6" 63' 63' 28' 18' 18' 18' 8" 82' 82' 36' 18' 18' 18' 10" 98' 98' 44' 18' 18' 18' 12" 116' 116' 51' 20' 18' 18' 16" 148' 148' 63' 26' 18' 18' 20" 179' 179' 75' 31' 18' 18' 24" 208' 208' 87' 36' 18' 18' TABLE APPLIES TO PVC PIPE FOR FOLLOWING CONDITIONS: 1. TEST PRESSURE: 150 PSIG 2. SOIL TYPE: SP 3. DEPTH OF COVER: 30" 4. SAFETY FACTOR: 1.5 5. COMPACTION: AS SHOWN ON DETAIL DRAWINGS O� Aqua North Carolina, Inc. RESTRAINED JOINT DETAIL N 0 L o0 0 m 5 SANITARY GRAVITY, FORCE MAIN, REUSE MAIN, STORM SEWER, & POTABLE WATER MAIN SEPARATION NOTES & SOLUTIONS 1. A MINIMUM HORIZONTAL SEPARATION OF TEN (10) FEET OUTSIDE TO OUTSIDE SHALL BE MAINTAINED BETWEEN WATER MAINS AND SANITARY GRAVITY SEWER OR STORM SEWER LINES. 2. A MINIMUM HORIZONTAL SEPARATION OF THREE (3) FEET OUTSIDE TO OUTSIDE SHALL BE MAINTAINED BETWEEN WATER MAINS AND RECLAIMED WATER LINES CARRYING UNRESTRICTED PUBLIC ACCESS REUSE WATER. 3. IN AREAS WHERE IT IS NOT PRACTICAL TO MAINTAIN THE REQUIRED SEPARATION, THE WATER MAIN MUST BE LAID IN A SEPARATE TRENCH OR ON AN UNDISTURBED EARTH SHELF LOCATED ON ONE SIDE OF THE SANITARY GRAVITY SEWER, STORM SEWER OR RECLAIMED WATER LINE AT SUCH AN ELEVATION THAT THE BOTTOM OF THE WATER MAIN IS AT LEAST EIGHTEEN (18) INCHES ABOVE THE TOP OF THE OTHER LINE. 4. IF THE MINIMUM ALLOWABLE TEN (10) FOOT HORIZONTAL SEPARATION OR EIGHTEEN (18) INCH VERTICAL SEPARATION IN A SEPARATE TRENCH CANNOT BE MAINTAINED, UPGRADE THE WATER MAIN TO DUCTILE IRON, IF THE OTHER LINE IS A STORM SEWER. 5. IF THE NON -CONFORMING LINE IS A GRAVITY SANITARY SEWER, AND TEN (10) FEET OF HORIZONTAL SEPARATION OR EIGHTEEN (18) INCHES VERTICAL SEPARATION IN A SEPARATE TRENCH CANNOT BE MAINTAINED. UPGRADE THE GRAVITY SANITARY SEWER (IF BEING NEWLY INSTALLED) TO AWWA C-900, D.R. 18 PVC AND HYDROSTATICALLY TEST IT TO 150psi. 6. IF THE OTHER LINE IS A RECLAIMED WATER LINE AND THE ABOVE SEPARATION REQUIREMENTS ARE NOT MET, UPGRADE THE RECLAIMED WATER LINE MATERIAL TO DUCTILE IRON. 7. DEVIATIONS AND OTHER ALTERNATIVES SHALL BE CONSIDERED ON CASE -BY -CASE BASIS AND MUST RECEIVE SPECIFIC APPROVAL BY AQUA NORTH CAROLINA, INC. AND NCDENR PRIOR TO IMPLEMENTATION. 8. THERE SHALL BE AT LEAST A TEN (10) FOOT SEPARATION BETWEEN WATER MAINS AND SANITARY SEWER FORCE MAINS WITHOUT EXCEPTION. FIELD PROBLEMS SHALL BE REPORTED TO NCDENR/ENGINEER. SPECIAL SOLUTIONS MUST BE ACCEPTED BY NCDENR PRIOR TO IMPLEMENTATION. 9. NO WATER PIPE SHALL PASS THROUGH OR COME IN CONTACT WITH ANY PART OF A SANITARY SEWER MANHOLE OR STORM SEWER STRUCTURE. FINISHED GRADE II "REUSE WATER MAIN" SHALL BE BURIED TO 6' AT INTERSECTIONS OR WHERE CROSSING WITH POTABLE WATER LINE AND WILL MAINTAIN EIGHTEEN (18) INCH CLEARANCE -III-III-III-III-� 111=1 11=1 11=111=1 1_ -r1 11111111111111 llr WATER MAIN II JIII= U i 18" MIN HAZARD 10. A MINIMUM OF VERTICAL SEPARATION OF EIGHTEEN (18) INCHES OUTSIDE TO OUTSIDE SHALL BE MAINTAINED BETWEEN WATER MAIN, SANITARY GRAVITY SEWER, STORM SEWER OR RECLAIMED WATER LINES. 11. WHEN THERE IS LESS THAN TWENTY FOUR (24) INCHES VERTICAL CLEARANCE BETWEEN THE WATER MAIN AND STORM SEWER, THE WATER MAIN SHALL BE UPGRADED TO DUCTILE IRON. ONE FULL LENGTH OF PIPE SHALL BE CENTERED AT THE POINT OF CROSSING. 12. IF THE NON -CONFORMING IS A SANITARY GRAVITY SEWER WHERE THERE IS LESS THAN EIGHTEEN (18) INCHES VERTICAL CLEARANCE FROM THE WATER MAIN, UPGRADE THE SANITARY GRAVITY SEWER TO DIP PVC AND HYDROSTATICALLY TEST IT TO WATER MAIN STANDARDS. PIPES SHALL BE LOCATED SO THAT JOINTS ARE AS FAR AS POSSIBLE FROM EACH OTHER. 13. IF THE OTHER LINE IS A RECLAIMED WATER LINE AND THE ABOVE MINIMUM SEPARATION IS NOT MET, UPGRADE THE RECLAIMED WATER LINE MATERIAL TO DUCTILE IRON. 14. SPECIAL STRUCTURAL SUPPORT OR CONCRETE SADDLES MAY BE NECESSARY AT THE CROSSING LOCATION. 15. IT IS PREFERABLE TO LAY THE WATER MAIN ABOVE THE CROSSING HAZARD. FINISHED GRADE =1 I I -I -I I -I 11 -1 I I-1 1=1 1=1 1=1 = 1-1-111-1 I I- I I-1 1=11111 =111 11- 10.00' MIN POTABLE WATER MAIN , I"�� 11 II III. -I 11-L11_ 3' MIN SANITARY GRAVITY MAIN OR STORM SEWER FINISHED GRADE 1111111111-111-I 1111111111111111111 11=111-_111=11' III-III-II1=11= 11=1111=' 11_111 18" MIN 11IEHIL SANITARY GRAVITY MAIN OR STORM SEWER 3' MIN POTABLE WATER MAIN 16. DEVIATIONS AND OTHER ALTERNATIVES SHALL BE CONSIDERED ON CASE -BY -CASE BASIS AND MUST RECEIVE SPECIFIC APPROVAL BY NCDENR PRIOR TO IMPLEMENTATION 17. THERE SHALL BE AN EIGHTEEN (18) INCH VERTICAL SEPARATION BETWEEN WATER MAINS AND SANITARY SEWER FORCE MAINS AT CROSSINGS WITHOUT EXCEPTION. CONFLICTS WITH EXISTING LINES, WHERE IT IS NOT POSSIBLE TO MAINTAIN THE REQUIRED SEPARATION, IT SHALL BE REPORTED TO AQUA NORTH CAROLINA, INC./ENGINEER. SPECIAL SOLUTIONS MUST BE ACCEPTED BY NCDENR PRIOR TO IMPLEMENTATION. O� Aqua North Carolina, Inc. UTILITY SEPARATION DETAILS 0\ \\\�N11111111/////// = SEAL = 050770 r. LNG I NE�� NE FLOWERS PARKWAY 0 FT� JOHNSTON COUNTY, NC 0 M C1 0 w w CO z CO 0 N 0 w A 4 0 m w d A m REVISIONS 0 DESCRIPTION O Z C-8.O ELBOW �l MIN. BEARING AREA EACH DIRECTION OF THRUST IN SQUARE FEET (based on soil supporting value of 2000 psf @ 200 psig test pressure) PIPE SIZE TEES & DEAD ENDS 90' ELBOWS 45' ELBOW & CROSSES 22-1/2' ELBOWS 6" 4 6 3 2 8" 7 10 5 3 12" 15 21 11 6 HORIZONTAL BEND SIDE EXCAVATIONS (TYP) �11�111�' ,11_11 111 TEE ALL BEARING SURFACES SHALL BE AGAINST UNDISTURBED GROUND (TYP) UNDISTURBED SOIL AREA OF BEARING 1 M.J. PLUG DEAD END CONCRETE SHALL BE KEPT CLEAR OF PIPE JOINTS (TYP) CROSS CONCRETE THRUST BLOCK (TYP) NOTES: 1. THRUST BLOCKS SHALL BE INSTALLED ON DIP FORCE MAINS 6" THRU 12" DIA. IN THE MANNER SHOWN. 2. PIPE GREATER THAN 12 INCH DIAMETER SHALL REQUIRE RESTRAINT JOINT PIPE FOR THE PROPER LENGTH. 3. COMPACT FITTINGS ARE NOT ACCEPTABLE. STANDARD FITTINGS SHALL BE USED WITH CONCRETE THRUST BLOCKING. 4. THRUST BLOCKS SHALL BE INSTALLED ON FORCE MAIN IN THE MANNER SHOWN. 5. IF SAC-CRETE IS USED, MIXING MUST BE ON SITE UTILIZING A MECHANICAL MIXER AND THE MIX APPROVED BY AN ACI LEVEL II OPERATOR. 6. NO CONCRETE SHALL BE PLACED ON BOLTS. WRAP JOINT FITTINGS WITH PLASTIC. 7. CONCRETE SHALL BE A MINIMUM 3,000 psi AND THE TICKETS TURNED INTO THE UTILITY. 8. ALL BEARING SURFACES SHALL BE AGAINST UNDISTURBED SOIL AND SHALL BE APPROVED BY AQUA PROJECT COORDINATOR PRIOR TO PLACEMENT OF CONCRETE. 9. USE OF RESTRAINED JOINT DUCTILE IRON WILL BE REQUIRED IF SOIL CONDITIONS DO NOT ALLOW THE USE OF THRUST BLOCKS. 10. ALL VERTICAL BENDS SHALL BE RESTRAINED USING RESTRAINED JOINT DUCTILE IRON PIPE. OKAYING NO. 12 S- REVISION DATE 05/2012 TYPICAL THRUST BLOCK AQUA Aqua North Carolina, Inc. COMPOUND METER GATE VALVES (OS&Y) COMPOUND METER GATE VALVE (OS&Y) H 1' (TYP) F TEE REDUCED PRESSURE BACKFLOW PREVENTER GATE VALVE (OS&Y) NOTES: 1. ALL FITTINGS ABOVE GRADE SHALL BE FLANGED. 2. ALL FITTINGS BELOW GRADE SHALL BE MECHANICAL JOINT W/ LOCKING GLANDS. 3. ALL PIPE SUPPORTS SHALL BE ADJUSTABLE. 4. CONCRETE SLAB SHALL BE 4"THICK (2" ABOVE GRADE) AND EXTEND 1' OUTSIDE INSTALLATION ALL DIRECTIONS. 5. ALL VALVES SHALL BE OS&Y. 6. METER BY-PASS MUST HAVE AN ADJUSTABLE PIPE SUPPORT. 7. ALL ABOVE GROUND PIPE SHALL BE PROTECTED FROM FREEZING. CONCRETE SLAB 1 OKAYING NO. W-19 REVISION DATE 05/2021 SERVICE CONNECTIONS FOR COMPOUND METERS AND BACKFLOW PREVENTOR WHERE BOTH ARE ABOVE GROUND: ASSEMBLY 3 inch through 12 inch AQUA Aqua North Carolina, Inc. CLASS 350 DIP FLANGED FITTING CLASS 1, ASSE 1060 HEATED & INSULATED WEATHERPROOF ENCLOSURE ANCHORED TO CONCRETE PAD CLEAR -n=1lElI 6" 3000 PSI CONCRETE SLAB. DIMENSIONS PER ENCLOSURE MANUFACTURER SPECIFICATION DIP, MJ FITTING (ROD BACK TO MAIN LINE VALVE AND PROVIDE REACTION BLOCKING OR INSTALL LOCKING RETAINER GLAND) APPROVED CLASS 350 DIP, RESTRAINED OR RODDED TO MAIN LINE VALVE WATTS 909 RPDA OR EQUIVALENT APPROVED OS & Y GATE VALVE ADJUSTABLE PIPE SUPPORT MAINTAIN 2" ANNULAR AREA AROUND DIP APPROVED CLASS 350 DIP RESTRAINED OR RODDED WEDGE ACTION RETAINER GLAND CLEAR :11=.u=ii-11=1 11=11=11.=1=11' 1 :11=11= =11=1 Notes: 1. ALL PIPES, VALVES AND FITTINGS 2" AND SMALLER SHALL BE AS SPECIFIED IN DIVISION 3, SECTION 13.4 2. ACCEPTABLE MODELS: • WATTS 090 • FEBCO 825Y (D) • WILKINS 975 XL • CONBRACO 400 • OR APPROVED EQUAL COMPACTED SUBGRADE 3. THIS DETAIL IS REPRESENTATIVE OF ACCEPTABLE REDUCED PRESSURE ZONE BACKFLOW DEVICES FOR SERVICES 2" IN DIAMETER OR SMALLER THAT ARE INSTALLED WITHIN AQUA NORTH CAROLINA'S SYSTEMS. 4" MIN. CLEARANCE WITH VALVE OPEN FLOW2. EE MANUFACTURER) 1" CLEAR DRANING Na W-17 REVISION DATE 12/2011 REDUCED PRESSURE BACKFLOW PREVENTER AQUA Aqua North Carolina, Inc. ROADWAY trrr 3'-0" MIN. TYP. METER BOX SEE SPECIFICATIONS 36" MIN BACKFILL, TAMPED IN 6" LIFTS 1 30 MIL HDPE COATED LOCATING WIRE CTS, 200 psi 1" FOR SERVICE WATER MAIN MUELLER, A Y McDonald, OR EQUAL SINGLE STRAP SADDLE WITH COMPRESSION CORPORATION STOPS NOTES: 1. LOCATING WIRE SHALL TERMINATE AT MAIN AND METER BOX. UNDISTURBED SOIL - METER PROVIDED BY UTILITY DUAL BACKFLOW PREVENTION t a MUELLER MODELj/1404-2 METER YOKE OR AY MCDONALD METER YOKE MUELLER, AY McDonald, OR EQUAL COMPRESSION CORPORATION STOPS BEFORE METER YOKE; ACCESSIBLE FROM INSIDE THE METER BOX 2. ALL FITTINGS SHALL BE BRASS MUELLER COMPRESSION TYPE OR STAINLESS STEEL. A PLASTIC INSERT SHALL BE INSTALLED AT ALL TERMINATIONS WHERE POLYETHYLENE PIPE IS USED. 3. ALL SERVICE PIPES UNDER ROADS OR DRIVEWAYS SHALL BE SLEEVED WITH SCH 40 PVC A MINIMUM 1 FOOT OUTSIDE OF PAVEMENT EDGE. DRAWNG NO. W-7 RE% ON DATE 11/2018 SERVICE CONNECTION AQUA Aqua North Carolina, Inc. 90° BENDS TO HAVE BL❑CKING APPR❑PRIATE BACKFLOW PREVENTI❑N DEVICE CJ1 Iy 0 z 0 td EI -0 z L7 0 (� H Z D vj 0 D F- F'l D H 0 El zZ - < H F- W nJ P- 1 70 F9 F9 713 D n METER 3/4" STEEL RODS (TYP.) TO BE HOT DIPPED GALVANIZED 5.0' D.I. PIPE TO BE SPECIFIED NIPPLE NO FLANGE ON HOUSE SIDE, MIN. 9" OF PIPE INSIDE METER BOX D.I. TEE GATE VALVE " A " GATE VALVE NIPPLE - GATE VALVE C) FL.x FL,x FL.x TEE BY AQUA NC, INSTALLED BY THE CONTRACTOR UNDER DIRECT SUPERVISI❑N OF AQUA NC CONTACT AQUA NC STAFF PRI❑R TO INSTALLATI❑N _ o 0 0 D o oOo D.I. 963 BEND ALL BELL BYPASS TO BE RODDED FROM TEE TO TEE BYPASS SHALL BE SAME SIZE AS SUPPLY LINE. STRAINER FROM 3" TO 6" ARE TO BE BRONZE U.L. APPROVED IF FIRE LINE 0 'A' D DEPE NE A\ D.I. TEE WATER MAIN STA\CE WILL VARY \DI\G 0\ THE TYPE OF TR USED D THE N ETR SIZE TYPICAL CONFLICT RESOLUTION DETAIL BY DEFLECTION AQUA Aqua North Carolina, Inc. ± 140'-0" 3'-0" VARIES TYPICAL UTILITY 3'-0" O.D. (TYP. UTILITY) - NOTES: 4 1. THIS DETAIL SHALL BE USED TO t 20'-0" AVOID EXISTING UTILITIES THAT - CENTERED ON ARE SHOWN ON THE DRAWINGS. UTILITY 2. PIPE DEFLECTION MUST NOT TYPICAL CONFLICT RESOLUTION BY PROPOSED UTILITY DEFLECTION EXCEED MANUFACTURER'S SEE NOTES RECOMMENDATION. M z 0 E 0 bA 0 bA c0 , 4t rn .11 O gcn r� O 0 0 W NE FLOWERS PARKWAY JOHNSTON COUNTY, NC N 0 A 0 _ ai A co m REVISIONS DESCRIPTION >co - O z c-9.o 4" MIN. 1 1 8.5" MIN 4" MIN. NOTES: 1. MANHOLE FRAME PREVENT INFLO CALLED FOR ON 2. SEAL MANHOLE F ENCAPSULATION HEAT SHRINK MANHOLE ENCAPSULATION SYSTEM - SEE NOTE #2 CAST IRON FRAME AND COVER. SEE NOTE #1 CONICAL MANHOLE TOP HEAT SHRINK MANHOLE ENCAPSULATION SYSTEM - SEE NOTE #2 2' 6" FLAT MANHOLE TOP CONCRETE ADJUSTING RINGS (AS REQ'D) CAST IRON FRAME AND COVER. SEE NOTE #1 W AND COVER SHALL INCLUDE 0-RING TYPE GASKET TO . PICK HOLES SHALL NOT PENETRATE COVER UNLESS THE PLAN. RAME AND GRADE RINGS WITH WRAPIDSEAL HEAT SHRINK SYSTEM BY CANUSA-CPS, INC. CONCRETE ADJUSTING RINGS (AS REQ'D) 4'' MIN DAMAO NO. S-24 RE MON DAZE 05/2012 STANDARD MANHOLE FRAMES AND COVERS AQUA Aqua North Carolina, Inc. RAISED 1-i" LETTERS FLUSHED WITH TOP OF COVER LABELED SANITARY SANITARY 23 " NOTES: 1. ARTERIAL ROADWAYS - USF RING AND COVER SERIES 170-BJ. HEAVY DUTY LOAD RA11NG. COVER WEIGHT 217#, TOTAL WEIGHT 372#. \ 2. ALL OTHER APPLICATIONS - USF RING AND COVER SERIES 170-J. HEAVY DUTY LOAD RA11NG. COVER WEIGHT 150#, TOTAL WEIGHT 305#. 3. CITY IDENTIFIER SHALL BE USED FOR CITY OWNED STRUCTURES ONLY. PRIVATE FACILITIES SHALL ONLY BE IDENTIFIED AS TO / USE. 4. AQUA NORTH CAROLINA MAY REQUIRE LOCKING MANHOLES AT CERTAIN LOCATIONS. MANHOLE COVER TYPE BJ MANHOLE COVER TYPE J 22" 24i" 30)" USF 170 MANHOLE RING DRANING NO. S-23 REYI90N DATE 05/2012 MANHOLE FRAME AND COVER DETAILS AQUA Aqua North Carolina, Inc. FRAME AND COVER "SANITARY" RUBBER CHIMNEY SEAL 2 COATS (8 MIL EA) EXTERIOR AND 3 COATS (10 MILS EACH) INTERIOR COAL TAR EPDXY, INTERIOR & JOINTS A-LOK OR LINK SEAL GASKET CONC. FILL BENCHING #89 CRUSHED STONE FINISH GRADE CONC. ADJUSTING RUNGS (5 MAX) ECCENTRIC CONICAL SECTION STRIP JOINT SEALANT PRE -CAST CONC. MH DEPTH AB CD E F UP TO 12' 48" 8" 24.5" 15" AS REQ'D 8" 12' TO 18' 60" 8" 24.5" 15" AS REQ'D 10" 18' AND DEEPER 72" 8" 24.5" 15" AS REQ'D 14" MANHOLE SIZE UP TO 24" PIPE: UP TO 36" PIPE: OVER 36" PIPE: 48" MANHOLE 60" MANHOLE 72" MANHOLE NOTE: FORCE MAIN RECEIVING MANHOLE TO BE LINED SEE SPECIFICATIONS AND STANDARD DETAIL.. NOTES: 1. PRE -CAST CONCRETE SHALL BE TYPE 2 CEMENT (4,000 PSI). 2. LIFT HOLES NOT PERMITTED THROUGH PRE -CAST SECTIONS. 3. ALL OPENINGS SHALL BE SEALED WITH NON -SHRINK GROUT. 4. INSTALL FLOW CHANNEL INSIDE MANHOLES. 5. SERVICE LATERALS SHALL GENERALLY NOT BE PERMITTED DIRECTLY INTO MANHOLES. 6. PLACE TWO HALF-MOON SHAPED PLYWOOD (3/8" TH. MIN.) IN BOTTOM OF MANHOLE AFTER PIPES HAVE BEEN CONNECTED TO KEEP DEBRIS FROM ENTERING SEWER. 7. REINFORCING STEEL PER ASTM C478-88A. 8. PROVIDE 5' X 5' X 12" CONCRETE COLLAR AROUND COVER FRAME, WITH 4 - #4 REBAR E.W. IN UNPAVED AREAS. 9. PROVIDE PIPE TO MANHOLE SEAL: A-LOK GASKET PER ASTM C-433 SPECIFICATION CAST INTEGRALLY IN MANHOLE WALL AND LOCATED AS DIRECTED. GASKET DESIGNED TO MEET TEST AND PERFORMANCE REQUIREMENT OF ASTM C-425 SPECIFICATION. JOINT SHALL ALLOW 10' OMNIDIRECTIONAL DIRECTION. 10. JOINT SEALANT SHALL BE BUTYL RUBBER OR BITUMINOUS MASTIC GASKET PER ASTM C-990 SPECIFICATION. PROVIDE BUTYL-LOK BY A-LOK PRODUCTS, INC. 11. MANHOLE STEPS SHALL BE INCH GRADE 60 STEEL ENCAPSULATED IN POLYPROPYLENE CONFORMING TO ASTM C478. 12. MANHOLE FRAME AND GASKETED COVER SHALL BE NEENAH MODEL R-1743 OR AN APPROVED EQUAL 13. SEAL MANHOLE FRAME AND GRADE RINGS WITH WRAPIDSEAL HEAT SHRINK ENCAPSULATION SYSTEM BY CANUSA-CPS, INC. 14. MANHOLES GREATER THAN 15' SHALL HAVE AN INTERMEDIATE LANDING CONSTRUCTED OF PRECAST CONCRETE. 15. MANHOLE UPSTREAM OF WW PLANT SHALL BE A GRIT TRAP TYPE WITH 2" SUMP. DRAWING NO. S-16 REVISION DATE 05/2012 STANDARD MANHOLE DETAIL AQUA Aqua North Carolina, Inc. 2 COATS (8 MIL EA) EXTERIOR AND 3 COATS (10 MILS EACH) INTERIOR COAL TAR EPDXY, INTERIOR & JOINTS NEW SANITARY SEWER A 1"X1/8" STAINLESS STEEL STRAP PLAN SDR 35 PVC SW TEE WITH OPEN END ON SPIGOT SIDE FLEXIBLE BOOT CONNECTED TO MH WITH SS EXP. RING NON -SHRINK GROUT SEAL SDR 26 PVC 6" MIN 12" MAX FOR TRANSITION FROM D.I. TO PVC. USE A C900 BELL X SDR 26 SPIGOT ADAPTOR. COMPACTED NO. 57 OR NO. 5 STONE FROM UNDISTURBED SOIL TO SPRING -LINE OF PIPE AS DIRECTED BY PWC PROJECT COORDINATOR. 1"x 1/8" STAINLESS STEEL STRAPS CONFORMING TO THE PIPE ANCHORED WITH STAINLESS STEEL ANCHOR BOLTS AND WEDGE ANCHORS. 2 STRAPS MINIMUM, STRAPS SHALL BE 3' 0.C. MAX. PLACE STRAPS WITHIN 1' OF TEE AND WITHIN 1' OF i BEND. ALL OTHER STRAPS SHALL BE 3' 0.C. SDR 35 SW PVC 1/4 BEND TOWARD INVERT OUT. BEND SHALL BE PLACED ON TOP OF SHELF. CONSTRUCT TROUGH ON TOP OF SHELF TO DIRECT DISCHARGE IN THE DIRECTION OF FLOW. NOTES 1. MANHOLE SHALL BE IN ACCORDANCE WITH AQUA NORTH CAROLINA STANDARDS, SEE MANHOLE DETAIL FOR ADDITIONAL INFORMATION 2. ALL PVC FITTINGS FOR DROP STRUCTURE SHALL BE SDR 35 PVC WITH SOLVENT WELD JOINTS 3. MANHOLES GREATER THAN 12' IN DEPTH SHALL HAVE MIN. 6" EXTENDED BASE. 4. DROP STRUCTURE SHALL BE PLACED A WHERE SEWER MAIN OR LATERAL VERTICAL DROP BETWEEN INVERTS EXCEEDS 2.00'. 5' MIN. - •: SDR 26 PVC G •:. 5. DROP STRUCTURE MH. SHALL BE A MIN. OF 5' DIAMETER TO 12" ABOVE TEE. DROP STRUCTURE SHALL BE INSTALLED AGAINST WALL OF MANHOLE AS SHOWN. IF THE GRADE DOES NOT ALLOW, THEN INSTALL AS CLOSE TO WALL AS POSSIBLE. 6. DROP STRUCTURES REQUIRED FOR ALL DROPS 6" AND GREATER IN DIAMETER, AND WHEN 3 OR MORE 4" LATERALS ENTER MANHOLES WITH 4" INTERIOR DROPS. NO MORE THAN FOUR 4" INTERIOR DROPS ARE ALLOWED IN A 5' MANHOLE. 7. NO MORE THAN 4, FOUR INCH LATERALS OR 3, SIX INCH LATERALS SHALL ENTER A 4' DIAMETER TERMINAL MANHOLE. NO MORE THAN 2 LATERALS (REGARDLESS OF SIZE) SHALL ENTER ALL OTHER 4' DIAMETER MANHOLES. ALL LATERALS SHALL HAVE AN INDIVIDUAL TROUGH. 5' DIAMETER MANHOLES SHALL BE USED IF THE ABOVE CONDITIONS ARE NOT MET. THE LATERAL INVERT SHALL BE AT THE TOP OF THE SHELF. 8. NO MORE THAN 5 LATERALS SHALL ENTER A 10. CONNECTIONS TO EXISTING 5' DIAMETER TERMINAL MANHOLE. MANHOLES SHALL HAVE CORE AND 9. FLEX. BOOT SHALL BE CONNECTED TO MH. "BOOT" ONLY UNLESS APPROVED WITH STAINLESS STEEL EXPANSION RING. OTHERWISE BY PWC PROJECT FLEXIBLE BOOT CONNECTORS SHALL CONFORM COORDINATOR. TO ASTM C-923 SPEC. 11. ALL MANHOLES SHALL BE VACUUM TESTED IN ACCORDANCE W/ AQUA NORTH CAROLINA STANDARDS. PORTION OF TEE TO BE REMOVED FOR MAINTENANCE PURPOSES SW TEE SDR 35 GROUT SEALED FOR TRANSITION FROM D.I. TO PVC USE A C900 BELL X SDR 26 SPIGOT ADAPTOR. FLEXIBLE BOOT SDR 26 PVC SS STRAPS SW BEND SDR 35 SECTION "A -A" Aqua North Carolina, Inc. INSIDE DROP MANHOLE DETAILS ao oN N 0 o0 0 8 s SIZI\G CHAT CAP (GAL.) DIM "A" DIM B DIM C IM ''D'' CIM "E" 600 7'0" 4'8" 7'0" 3'6" 3'2" 750 7'0" 4'8" 7'0" 4'3" 3'11" 1000 9'0" 5'0" 7'2" 4'2" 3'10" 1250 9'0" 5'0" 7'2" 5'2" 4'10" 1500 11'2" 5'8" 7'2" 4'4" 4'O" 1750 11'2" 5'8" 7'2" 4'11 " 4'7" 2000 12'8" 6'8" 8'O" 4'7" 3'10" 2,500 12'8" 6'8" 8'0„ 5'6„ 4'9" 2750 12'8" 6'8" 8'0" 6'0„ 5'3" 3000 15'7" 9'7" 8'6.5" 5'0" 3'9" 4000 15'7" 9'7" 8'6.5" 6'3" 5'O" 5000 19'11" 9'11" 8'11" 6'2" 4'9" 6000 19'11" 9'11" 10'5" 7'2" 5'9" NOTES: 1. CONCRETE: 28 DAY fc=4500 psi 2. REBAR: ASTM A-615 GRADE 60 3. MESH: ASTM A-185 GRADE 65 4. DESIGN: AC1318-83 BUILDING CODE ASTM C-857 MINIMUM STRUCTURAL DESIGN LOADING FOR UNDERGROUND PRECAST CONCRETE UTILITY STRUCTURES 5. LOADS: H-20 TRUCK WHEEL WITH 30% IMPACT PER AASHTO 6. FILL WITH CLEAN WATER PRIOR TO START UP OF SYSTEM 7. CONTRACTOR TO SUPPLY AND INSTALL ALL PIPING AND SANITARY TEEs, 4 CLEAN OUTS FOR CLEANING TOWARD TRAP, AND FOR CLEANING AWAY FROM TRAP ON BOTH THE INLET AND OUTLET/ALT. DUAL SWEEP CLEAN OUTS. 8. GRAY WATER ONLY, BLACK WATER SHALL BE CARRIED BY SEPARATE SEWER. Aqua North Carolina, Inc. 0 0 C) C%) 0 0 0 up 0 CD 0 0 CD 0 8 LC) r7 ( DIM "A" DIM "B" b Lter $r GROUT BOTHtl SIDES / PRECAST BAFFLE 4" THICK • tf/WYf:'.�..w><5%nX.erT:A:�+`C`5.1,:n%,T It+ Yr 4 I Y SS 'R -`ter VENT PIPES OPTIONAL INLET 1'0" SLOT BOTH SIDES ADJUST TO GRADE / 4 4 4 1'0" a DIM "E" PRECAST BAFFLE 4" THICK 2f 1'0" DETAIL S-35 CONTAINS THE SIZING CHART FOR THE OIL/GREASE TRAP LOCKING FRAME & COVER, AIR & GAS TIGHT OUTLET Y� D" 4 4' 4 4 35 LENGTH J`s LENGTH DIM "C" DIM "D" Aqua North Carolina, Inc. In —Ground Grease 0 0 0 F-- Pry "DOWNSTREAM" LOT LINE I 5' MIN REMOVABLE STOPPER SET IN JOINT COMPOUND CLEANOUT AFTER CAST IRON COVER INSTALLED BY PLUMBER Cast Iron Clean out cover as manufactured by Bingham & Taylor, US Foundry or equal 6" PVC RISER (SINGLE PIECE) TERMINAL DEPTH AS REQUIRED FOR HOUSE SERVICE (18" MIN, 5'-0" MAX) COMBINATION WYE MIN w AS REQUIRED CLEANOUT BEFORE CI COVER INSTALLED "Y" FITTING 30' BEND SEWER MAIN SIZE VARIES ELDER VALVE PLAN AQUA NORTH CAROLINA RESPONSIBILITY PROVIDE BRASS RING & PLUG IN TRAFFIC AREAS BY LICENSED UNDERGROUND UTILITY CONTRACTOR ELDER VALVE ROTATE 30' (TYP) SEWER MAIN45' MAX SIZE VARIES PROFILE 2% MIN. 45' BEND 6" MINIMUM NOTE: 1. THE SITE DEVELOPER SHALL LEAVE THE CLEANOUT RISER 3'-4' ABOVE GRADE AND IT SHALL REMAIN SO UNTIL LOT BUILD OUT. THE RISER SHALL THEN BE CUT AND CAPPED WITH A CAST IRON CLEANOUT COVER INSTALLED AT FINISHED GRADE WITH A CONCRETE PAD. CAST IRON COVER LID SHALL HAVE "SEWER" OR "CO" CAST INTO IT. 2. ALL CLEANOUTS TO BE FLUSH WITH FINISH GRADE. 3. UTILITY CONTRACTOR TO INSTALL & PRESSURE TEST WYE AND INSTALL PLUG. PLUMBER TO REMOVE PLUG, INSTALL CLEANOUT AND CONCRETE PAD. 4. MARK CURB WITH "S" WHERE LATERAL CROSSES UNDER CURB. 5. ALL COMMERCIAL AND RESIDENTIAL SINGLE LATERALS SHALL HAVE 4" CLEANOUTS. 6. MAINTAIN A MINIMUM OF 3' CLEARANCE FREE OF ALL PLANTINGS & STRUCTURES AROUND CLEANOUT. 7. CLEANOUT CAPS SHALL BE SLOTTED OR HAVE A RECESSED NUT. 8. CLEAN - OUT (AS SHOWN TO THE DASHED LINE) SHALL BE INSTALLED BY THE UTILITY CONTRACTOR TO FINAL CONFIGURATION IN ACCORDANCE WITH STANDARD PLUMBING CODE. 9. DOUBLE LATERALS ARE TO BE AVOIDED WHENEVER POSSIBLE. LOCATE DOUBLE LATERAL AS CLOSE TO LOT LINE AS POSSIBLE, 5' MAXIMUM. 10. INVERT OF SERVICE LATERAL SHALL NOT ENTER SEWER MAIN BELOW SPRING LINE. 11. DOUBLE SERVICE LATERAL TO BE USED ONLY WHEN WHEN BOTH BUILDING SLABS ARE NOT GREATER THAN 4"-INCHES ELEVATION DIFFERENCE. 12. SERVICE LATERAL, PIPING AND FITTINGS TO BE MINIMUM OF 4" SDR35 PVC UNLESS OTHERWISE NOTED. (GASKETED ONLY - NO GLUE JOINTS) 13. INSTALL 4"X4" (TOP ONE -FOOT PAINTED GREEN) AND 3M MAGNETIC MARKER TO IDENTIFY LOCATION OF CLEANOUT(s) AT THE PROPERTY LINE 14. ALL LATERALS SHALL HAVE C.O. SET 0 2-FT BACK OF CURB OR 2-FT BACK OF SIDEWALK. IF SIDEWALK IS IMMEDIATELY ADJACENT TO CURB, DO NOT PLACE C.O. IN SIDEWALK. 15. AQUA NORTH CAROLINA, INC. REPAIR/MAINTENANCE RESPONSIBILITY FOR SANITARY LATERALS IS FROM THE MAINLINE TO THE C.O. DESCRIBED IN THE NOT ABOVE. THE PROPERTY OWNER IS RESPONSIBLE UPSTREAM OF C.O. Aqua North Carolina, Inc. TYPICAL SERVICE LATERAL DETAIL u) i N A UNDISTURBED SOIL BACKFILL SHALL BE PLACED IN 6" LAYERS AND COMPACTED TO 90% MAXIMUM DENSITY AS DETERMINED BY ASTM D698 TO 12" ABOVE TOP OF PIPE SELECT BEDDING MATERIAL NO OVERAGE ALLOWED SEE NOTE 4. SEE DIVISION 3, SECTION 3.7.3.2 SUBBASE SHALL BE UNDISTURBED SOIL. WHERE SOIL IS DEEMED UNSUITABLE BY THE PWC PROJ. REP. AUTHORIZED AREA SHALL BE UNDERCUT AND BACKFILLED WITH SELECT BEDDING MATERIAL. AREAS NOT AUTHORIZED AS UNDERCUT SHALL BE BACKFILLED AT CONTRACTORS EXPENSE WITH SELECT BEDDING MATERIAL. SEE STANDARD ROADWAY OPEN -CUT DETAIL FOR LAST 3' OF FILL IN PAVED AREAS COMPACTED TO 95% MAX. DENSITY AS DETERMINED BY ASTM D698 -f (MIN 4") MAX (DIA/2) NOTES: 1. BEDDING MATERIAL QUANTITIES ARE CALCULATED BASED ON THE FOLLOWING TRENCH WIDTHS. BEDDING MATERIAL SHALL BE INSTALLED REGARDLESS OF PIPE MATERIAL. FOR 48" RCP/DI B=6', D=6' FOR 42" RCP/DI B=6', D=5'-6" FOR 30" RCP/DI B=4'-6", D=4'-6" FOR 24" RCP/DI B=4', D=4'-0" FOR 18" PVC/DI B=3', D=3' FOR 15" PVC/DI B=3', D=3' FOR 12" PVC/DI B=2', D=3'-0" FOR 8" PVC/DI B=2', D=3'-0" 2. THE BEDDING MATERIAL SHALL BE GRANULAR, CLEAN, COARSE PEA GRAVEL, OR WELL GRADED CRUSHED ROCK PLACED IN LAYERS NOT TO EXCEED 6" LOOSE LIFTS FOR THE FULL WIDTH OF THE TRENCH. 3. BEDDING MATERIAL SHALL EXTEND TO UNDISTURBED TRENCH WALLS AND TRENCH BOTTOM. OVERAGE OF BEDDING MATERIAL WILL NOT BE PAID FOR UNLESS SPECIFICALLY APPROVED BY THE PROJECT REPRESENTATIVE AND SHALL ONLY BE PAID FOR IN THE AMOUNT OF THE AUTHORIZED QUANTITY. 4. BEDDING MATERIAL SHALL BE PROPERLY RODDED AROUND THE PIPE HAUNCHES. w Aqua North Carolina, Inc. TRENCH DETAIL 5 O N 00 0 5 NE FLOWERS PARKWAY JOHNSTON COUNTY, NC 0 0 N w m D z CO 0 Date 11/1/2021 0 m REVISIONS DESCRIPTION >- m 0 z c-10.o Practice Standards and Specifications Baffles need to be installed correctly in order to fully provide their benefits. Refer to Figure 6.65b and the following key points: • The baffle material needs to be secured at the bottom and sides using staples. • Most of the sediment will accumulate in the first bay, so this should be readily accessible for maintenance. Drape baffle material over wire strand and secure with plastic ties at posts and on wire every 12" 9 Gauge Min High �� Tension Wire Strand Shall Be Secured To Post To Support Baffle Material Baffle Material " If the temporary sediment basin will be converted to a permanent stormwater basin of greater depth, the baffle height should be based on the pool depth during use as a temporary sediment basin. Note: Install three (3) coir fiber baffles in basins at drainage outlets with a spacing of 1 /4 the basin Iength.Two (2) coirfiber baffles can be installed in the basins less than 20 ft in length with a spacing of 1/3 the basin length. Rev. 5/13 Extend 9 gauge wire to basin side or install T-post to anchor baffle to side of basin and secure to vertical post Variable Depth Secure bottom of baffle to ground with 12"staplesat 12"maximum spacing. 11 Gauge Landscaping Staple Baffle Material mum Steel Post 2'-0" Depth Baffle Material should be secured to the bottom and sides of basin using 12" landscape staples Figure 6.65b Coir Fiber Baffle Detail Cross section of a porous baffle in a sediment basin. 6.65.3 Practice Standards and Specifications Wire fence 24" 24" 8' max. standard stren th fabric with wire fence 6' max. extra strength fabric without wire fence 18 24" Steel post Wire fence Figure 6.62a Installation detail of a sediment fence. Rev. 5/13 8"down&4" forward along the trench Filter fabric •m••minm• 0�. . Plastic or wire ties Filter fabric Cross -Section View Backfilltrench and compact thoroughly 8„ min Ups Natural ground Natural ground 6.62.5 6.06 Practice Standards and Specifications TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT Definition A graveled area or pad located at points where vehicles enter and leave a construction site. Purpose To provide a buffer area where vehicles can drop their mud and sediment to avoid transporting it onto public roads, to control erosion from surface runoff, and to help control dust. Conditions Where Wherever traffic will be leaving a construction site and moving directly onto a public road or other paved off -site area. Construction plans should limit traffic P ra ct i ce Applies to properly constructed entrances. Design Criteria Aggregate Size —Use 2-3 inch washed stone. Dimensions of gravel pad — Thickness: 6 inches minimum Width: 12-feet minimum or full width at all points of the vehicular entrance and exit area, whichever is greater Length: 50-feet minimum Location —Locate construction entrances and exits to limit sediment from leaving the site and to provide for maximum utility by all construction vehicles (Figure 6.06a). Avoid steep grades, and entrances at curves in public roads. 2-3 coarse aggregate Figure 6.06a Gravel entrance/exit keeps sediment from leaving the construction site (modified from Va SWCC). 6.06.1 6.50 Practice Standards and Specifications EXCAVATED DROP INLET PROTECTION (Temporary) Definition An excavated area in the approach to a storm drain drop inlet or curb inlet. Purpose To trap sediment at the approach to the storm drainage systems. This practice allows use of permanent stormwater conveyance at an early stage of site development. Conditions Where Practice Applies Side slope 2:1 _Illll III II11 Excavated depth, - II min 1—max 2' Ill below top of inlet =11(tl Where storm drain drop inlets are to be made operational before permanent stabilization of the disturbed drainage area. This method of inlet protection is applicable where relatively heavy flows are expected, and overflow capability is needed (Figure 6.50a). Frequent maintenance is required and temporary flooding in the excavated area will occur. This practice can be used in combination with other temporary inlet protection devices such as Practice 6.51, Hardware Cloth, and Gravel Inlet Protection and Practice 6.52, Block and Gravel Inlet Protection. Excavated area (as required) LI I Weep holes for dewatering v oak inHi --- 1i_, '1I�Illu• 4111= mi. Gravel —supported by (illllll� hardware cloth to allow lll drainage and restrict sediment movement. =11 Flow• \ll�%;� — Flow \ . /��/i• i \ "\ ,y j : •\\" Flow Flow /� i Figure 6.50a Excavated drop inlet protection. Accumulated sediment 6.50.1 6 Pipe Outlet to Flat Area — No WeII-defined Channel Plan Section AA Pipe Outlet to WeII-defined Channel III II li(I lilt= ll La Section AA I1 IIItlll *Filter blanket III Ad -II• I \Ihli- lIllr� Filter blanket Figure 6.41c Riprap outlet protection (modified from Va SWCC). 6.41.4 Notes 1. La is the length of the riprap apron. 2. d =1.5 times the maximum stone diameter but not less than 6". 3. In a well-defined channel ex- tend the apron up the channel banks to an elevation of 6" above the maximum tailwater depth or to the top of the bank, whichever is Tess. 4. A filter blanket or filter fabric should be installed between the riprap and soil foundation. Rev. 6/06 4• MAX WIRE FENCING III J RIP —RAP WITH i (F APPLICABLE) is• INCHES OF WASHED STONE ON UPSTREAM FACE GENERAL. NOTES: 1. SEDIMENT FILTER OUTLET SHALL BE 16 INCHES HIGH BUT NO TALLER THAN 18 INCHES. 2. CLASS 1 OR 2 RIP -RAP SHALL BE USED AND COVERED WITH `INCHES OF NCDOT /5 OR /57 WASHED STONE ON THE UPSLOPE SIDE. 3. POSTS SHALL BE NO MORE THAN 4 FEET APART. 4. SITE OUTLETS AT ANY POINT SMALL CONCENTRATED FLOWS ARE ANTICIPATED AND AT THE DIRECTION Of THE INSPECTOR. 5. ONE ACRE MAXIMUM DRAINAGE AREA PER OUTLET. CLASS 1 OR 2 RIP -RAP SILLL POST WASHED STONE /-(NCDOT /5 OR #57) _p-TisnsN!i= MAINTENANCE NOTES: 1. FILTER OUTLETS SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. 2. THE STONE SHALL BE REPLACED PROMPTLY AFTER ANY EVENT THAT HAS CLOGGED OR REMOVED R. 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSrS REMAIMNG IN PLACE AFTER THE SILT FENCE OUTLET IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE. PREPARED AND SEEDED. Practice Standards and Specifications Plan View Inflow structure Average = Area * Width W L * Area of basin water surface at top of principal spillway elevation Inflow structure Dewatering Sediment storage zone • Dewatering—Allow the maximum reasonable detention period before the basin is completely dewatered (at least 48 hours). • Inflow rate —Reduce the inflow velocity and divert all sediment -free runoff. Zaufil Baffles Cross-Section View 1' Freeboard 6" min. inver emergenc Embankment Emergency spillway Embankment Figure 6.64c Example of a sediment basin with a skimmer outlet and emergency spillway. From Pennsylvania Erosion and Sediment Pollution Control Manual, March, 2000. Rev. 5/13 Emergency pillway 6.64.7 L ✓ Cf) <4 — l/) 4(4 WP O cki 1-1 1-1 l/ 1 O 0 NE FLOWERS PARKWAY JOHNSTON COUNTY, NC JOB NUMBER 2021-30 Date 11/1/2021 x m REVISIONS 0 DESCRIPTION O Z c-11.o STEEL POSTS (QUANTITY VAR.) PLASTIC SLOPE DRAIN PIPE (PRACTICE STANDARD 6.32) OR GEOTEXTILE LINING TEMPORARY OR PERMANENT DITCH COIR FIBER BAFFLES (PRACTICE STANDARD 6.65) RISER STRUCTURE SKIMMER (SIZE VAR.) RISER STRUCTURE SKIMMER 14 1' CLASS B STONE PAD (4' X 4' X 1' MIN.) PLAN VIEW TRASH RACK STONE PAD (below skimmer) WOOD STAKE OR METAL POST TOP OF EMBANKMENT v 1MIN. EMBANKMENT STONE ENERGY DISSIPATOR EMERGENCY SPILLWAY 4-EMERGENCYSPILLWAYFREEBOARD- ' Thi--11I1--1OI-Ji hll(1 r MIN. II-IIII-IIII-IIII-IIII-IIII-IIII- z Sv-C3 1 II1I 1U1111 -11I ll11111 lU1I1111-1111 1111I1I IUI IIII1U11I1I =11111-�s�OPFM ti5`-1111=1111=(1(1=1111=1111�1111=1111=1111=1111=1111=1111.=1111-11 ak =IIII-iul-lilt=lilt=lilt=lilt=all-1lll=alli�=lilt=lilt=lilt=lilt ///////////////ll/lUlll!//./ /,v\//,v\////,y ANTIFLOTATION BLOCK SECTIONAL VIEW BARREL PIPE LU1d1 ll//./ll//1lL///1llU /llL/ lLCUT-OFF TRENCH 2' DEEP 1.1 ANTI -SEEP COLLAR NOTES 1. SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 2. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH PRACTICE STANDARD 6.65. 3. INSTALL SKIMMER AND COUPLING TO RISER STRUCTURE OR DIRECTLY INTO EMBANKMENT 1 FT. FROM BOTTOM OF BASIN. 4. THE ARM PIPE SHALL HAVE A MINIMUM LENGTH OF 6 FT. BETWEEN THE SKIMMER AND COUPLING. Figure 6.61d Sediment Basin (with Riser Barrel Pipe) STABILIZED OUTLET NOT TO SCALE Practice Standards and Specifications Skimmer Basin 1 13.33 31.7254 23994 13801 117 117 100 350 5 150067 18898 10 1 26 4 0.33 2.25 3.56 Drainage Area (Acres) Peak Flow from 10-year Storm (cfs) Required Volume ft3 Required Surface Area ft2 Suggested Width ft Suggested Length ft Provided Width ft Provided Length ft Provided Depth ft (Disturbed Area x 1800) (Q10 x 435) (SQRT(Surface Area)) Actual Volume ft3 Actual Volume>Required Volume Actual Surface Area ft2 Actual SA>Required SA Trial Weir Length ft Trial Depth of Flow ft Spillway Capacity cfs Skimmer Size (inches) Head on Skimmer (feet) Orifice Size (1/4 inch increments) Dewatering Time (days) Suggest about 3 days Drainage Area C I for 10 year storm Tc 10 min Q=CIA 13.331 0.41 5.951 31.731 (C*L*H^(3/2)) Too Small! Acres in/hr cfs Skimmer S (Inches) 1.5 2 2.5 3 4 5 6 8 ize 2/21/22, 1:38 PM NORTH AMERICAN GREEN CHANNEL ANALYSIS >>>TDD Name Discharge Channel Slope Channel Bottom Width Left Side Slope Right Side Slope Low Flow Liner Retardence Class Vegetation Type Vegetation Density Soil Type SC150BN TDD 31.72 0.02 3 3 3 D 2-6 in Mix (Sod and Bunch) Good 65-79% Silt Loam (SM) ECMDS 7.0 North American Green 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 Phase Reach Discharge Velocity Normal Depth Mannings N Permissible Shear Stress Calculated Shear Stress Safety Factor Remarks Staple Pattern SC150BN Unvegetated Underlying Straight 31.72 cfs Substrate Straight Unreinforced Vegetation 31.72 cfs 4.65 ft/s 1.09 ft 4.65 ft/s 1.09 ft 0.035 2 lbs/ft2 0.035 1.47 Ibs/ft2 1.36 Ibs/ft2 1.47 STABLE D 0.86 lbs/ft2 1.7 STABLE D Phase Reach Discharge Velocity Normal Depth Mannings N Permissible Shear Stress Calculated Shear Stress Safety Factor Remarks Staple Pattern Unreinforced Vegetation Underlying Straight 31.72 cfs Substrate Straight https://ecmds.com/project/151254/channel-analysis/219080/show 31.72 cfs 4.83 ft/s 1.06 ft 4.83 ft/s 1.06 ft 0.034 4 lbs/ft2 1.32 Ibs/ft2 3.02 STABLE 0.034 1.23 Ibs/ft2 0.84 Ibs/ft2 1.46 STABLE 1/1 2/21/22, 1:39 PM NORTH AMERICAN GREEN ANALYSIS COMPUTATIONS > >> > View Computation Inputs Channel Discharge (Q): 31.72 cfs Peak Flow Period (H): hours Channel Slope (S0): 0.02 ft/ft Bottom Width (B): 3 ft Left Side Slope (ZL): 3 (H : V) Right Side Slope (ZR): 3 (H : V) Existing Channel Bend: No Bend Coefficient (Kb): 1 Channel Bend Radius: Retardance Class of Vegetation: D 2-6 in Vegetation Type: Mix (Sod and Bunch) Vegetation Density: Good 65-79% Soil Type: Silt Loam (SM) Channel Lining Options SC150BN Protection Type Temporary Basic Relationships A = Cross sectional area, ft2 (m2) = (B * D) + (ZL/ 2 * D2) + (ZR/ 2 * D2) Where: B = Base width of channel, ft (m) D = Flow depth, ft (m) ZL= Left side bank slope (H : 1 V) ZR = Right side bank slope (H : 1 V) P = Wetted perimeter, ft (m) = B + ZL* D + ZR* D R = Hydraulic radius, ft (m) = A / P V = Flow velocity, ft/s (m/s) = Q / A Where: Q = Channel discharge, cfs (cms) Taua Average bed shear stress, psf (Pa) = 62.4 * R * SO Where: SO = Gradient of channel, ft/ft (m/m) Tauo= Maximum bed shear stress, psf (Pa) = 62.4 * D * So Unvegetated Conditions Computations: n = Manning's n = a * Tauab and (iteratively solved) n = 1.486 / Q * A * R(2/3)So0"5 Where: n = Manning's n a = Product specific coefficient from performance testing b = Product specific coefficient from performance testing SFr= Product factor of safety = TauT/ Tauo Where: TauT = Permissible shear stress from testing, psf (Pa) https://ecmds. com/project/151254/channel-analysis/219080/calculation s ECMDS 7.0 North American Green 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 1/2 2/21/22, 1:39 PM TauP= In place permissible shear, psf (Pa) = TauT/ alpha * (Taus+ alpha / 4.3) Where: alpha = unit conversion constant, 0.14 English, 6.5 Metric Taus = Permissible shear stress of soil SFL = Factor of safety of installed liner = Taup / Taua ECMDS 7.0 Vegetated Computations: n = Manning's n = alpha * Cn* Taua-0.4 and (iteratively solved) n = 1.486 / Q * A * R(2/3)So05 Where: alpha = Unit conversion constant, 0.213 English, 1.0 Metric Cn = Vegetation retardance coefficient SFr= Product factor of safety = Taurv/ Tauo Where: Taurv= Permissible shear stress from testing, psf (Pa) TauP= In place permissible shear, psf (Pa) = Taus/ (1 - CFTRM) * (n / ns)2 Where: CFTRM = Coefficient of TRM performance derived from testing Taus= Permissible shear stress of soil ns= Manning's of soil bed if left unprotected SFL= Factor of safety of installed liner = Taup/ Taua SC150BN Phase Mannings N Predicted flow depth (D) Cross sectional area (A) Wetted perimeter (P) Hydraulic radius (R) Flow velocity (V) Froude number (FR) Calculated Shear Stress SFP/SFL SC150BN Unvegetated Underlying 0.035 Substrate 0.035 Unreinforced Vegetation 1.09 ft 1.09 ft 6.83 ft2 6.83 ft2 9.89 ft 0.69 ft 9.89 ft 0.69 ft 4.65 ft/s 0.99 4.65 ft/s 0.99 1.36 lbs/ft2 1.47 (SFP) 0.86 lbs/ft2 1.7 (SFL) Phase Mannings N Predicted flow depth (D) Cross sectional area (A) Wetted perimeter (P) Hydraulic radius (R) Flow velocity (V) Froude number (FR) Calculated Shear Stress SFP/SFL Unreinforced Vegetation Underlying 0.034 Substrate 0.034 1.06 ft 1.06 ft 6.56 ft2 6.56 ft2 https://ecmds. com/project/151254/channel-analysis/219080/calculation s 9.71 ft 0.68 ft 9.71 ft 0.68 ft 4.83 ft/s 1.03 4.83 ft/s 1.03 1.32 lbs/ft2 3.02 (SFL) 0.84 lbs/ft2 1.46 (SFL) 2/2 O M M 00 E U bA 0 NE FLOWERS PARKWAY JOHNSTON COUNTY, NC 0 N 0 w m z 0 N 0 a) A 0 x A m REVISIONS 0 DESCRIPTION O Z C-12.O �``��s), \� = = ',., _. CAR�i% Essi ct.. c�q� SEAL 050770 F �ciNE�- Ti,, ,, �. s' 0 5 22 ' '-., 9 = GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH EQUIPMENT AND VEHICLE MAINTENANCE ONSITE CONCRETE WASHOUT THE NCGO1 CONSTRUCTION GENERAL PERMIT 1. Maintain vehicles and equipment to prevent discharge of fluids. STRUCTURE WITH LINER Implementing the details and specifications on this plan sheet will result in the construction;•�� 2. Provide drip , CTTPJ pans under any stored equipment. �Ti�Ti• •i�l�� am :,,• � I: V��i� .�atl activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the , iiiiva■► r�► "j0 ItE*+ i T �,�', ► � 1� rn5, project. �LpIlo 110IIIPo! kipermittee shall comply with the Erosion and Sediment Control plan approved by the - i r�,i,..� Collect fluids, in dispose , ; 4. all spent store separate containers and properly as jo,�,i,z,�11 CrfTinN B-11/4 delegated authority having jurisdiction. All details and specifications shown on this sheet ...I may not apply depending on site conditions and the delegated authority having jurisdiction. hazardous waste (recycle when possible). leaking from '"="'m' M""' D' 5. Remove vehicles and construction equipment service until the problemITY" . "` ` A1134 w"°'c°" wxiwiamlieu SECTION E: GROUND STABILIZATION has been corrected. R. TIC YAW lIRL'TiMEi �1ALL �'�'�` YllillCT!lAEi 711AL1 MMM�AIIEB MEN THE MUM MICIE ! ULM REACHER � THE 3T X1{M[ME wairAmm WHIMI ME MIA �i I I M ACAO 711M 1'r TIC ICALC71Tt Required Ground Stabilization Timeframes 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products e� u OF E WEIH MOM to disposal that handles these e� Stabilize within this a recycling or center materials. EWARIER TUE """ BELOW GRAD SHDUT STRUCTURE ABLIVE GRAD I4ASF1]UT STRUCTURE Site Area Description many calendar days after ceasing Timeframe variations LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE gf i�€� land disturbance 1. Never bury or burn waste. Place litter and debris in approved waste containers. (a) Perimeter dikes, 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash CONCRETE WASHOUTS-- swales, ditches, and perimeter slopes 7 _ None receptacle) on site to contain construction and domestic wastes. p }1. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface ❑❑ not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local fib} High Quality Water (HQW) Zones 7 None waters unless no other alternatives are reasonablyavailable. 4. Locate waste containers on areas that do not receive substantial amounts of runoff and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in (c) Slopes steeper than 3:1 r 7 If slopes are 10' or less in length and are es pg not steeper than 2:1, 14 days are allowed from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workdayand before storm events or provide secondary containment. Repair or replace damaged waste containers. addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an (d) Slopes 3:1 to 4:1 14 -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. S. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged drain -10 days for Falls Lake Watershed to the storm system or receiving surface waters. Liquid waste must l - be from -7 days for perimeter dikes, swales, PAINT AND OTHER LIQUID WASTE pumped out and removed project. rUND 1 )RO, N 336) 28 gen-enq (e) Areas with slopes flatter than 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed unless there is zero slope 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls maybe required by the approving authority. S. Install at least one sign directing concrete trucks to the washout within the project M surface stable against accelerated erosion until permanent ground stabilization is achieved. limits. Post itself identify location. PORTABLE TOILETS signage on the washout to this 9. Remove leavings from the washout when at approximately 75% capacity to limit GROUND STABILIZATION SPECIFICATION 1. Installportable toilets on levelground,at least 50 feet awayfrom storm drains,1- Stabilize the round sufficient) so that rain will not dislodge the soil. Use one of the g y g techniques in the table below: streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. CONSTRUCTION DETAILS 7 (E&sc) THE VIEWS AT FLOWERS APARTMENTS NE FLOWERS PARKWAY JOHNSTON COUNTY, NC Drn. BAH Des. BAH Chk. BAH Date 11/1/2021 I JOB NUMBER 2021-30 Temporary Stabilization Permanent Stabilization on a gravel pad and surround with sand bags. 10. At the completion of the concrete work, remove remaining leavings and dispose of • Temporary grass seed covered with straw or other mulches and tackifiers • Hydroseeding • Permanent grass seed covered with straw or other mulches and tackifiers • Geotextile fabrics such as permanent soil 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor toilets for leaking and dispose of any leaked material. in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. • Rolled erosion control products with or without temporary grass seed reinforcement matting • Hydroseeding portable properly Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace • Appropriately • Shrubs with properly operating unit. applied straw or other mulch or other permanent plantings covered - HERBICIDES, PESTICIDES AND RODENTICIDES • Plastic sheeting with mulch • Uniform and evenly distributed ground cover EARTHEN STOCKPILE MANAGEMENT 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is Z. Protect stockpile with silt fence installed along toe of slope with a minimum offset of POLYACRYLAMIDES (PAMS) AND FLOCCULANTS five feet from the toe of stockpile. possible or where they may spill or leak into wells, stormwater drains, ground water If immediately. 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes on this sheet and in accordance or surface water. a spill occurs, clean area 4. Do not stockpile these materials onsite. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. provided with the approved plan and any additional requirements. Soil stabilization is defined 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved as vegetative, physical or chemical coverage techniques that will restrain accelerated disturbed for temporary HAZARDOUS AND TOXIC WASTE PAMS/Flocculants and in accordance with the manufacturer's instructions. erosion on soils or permanent control needs. 1. Create designated hazardous waste collection areas on -site. REVISIONS w o 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover , __ ` �« , i ►� ' NORTH CAROLINA 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. Z 0 rY it U N W 0 or surrounded by secondary containment structures. �% . . Environmental Quality I NCGO1 GROUND STABTLTZATTON AND MATERIALS HANDLING EFFECTIVE: 04/01/19 >- m d z C-13.O ;, �`''o`� = �� ' — �e.\'\ CARD',%%, (4 oFEssiO4, e SEAL 9< 050770 4cIN0-`- �' ' ,,, �. SNy. 5 22 ', y -:-• •� ✓ �'' PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING SECTION B: RECORDKEEPING Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be injeopardy,the ins inspection maybe delayed until the next business dayon P Y which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be documented in the manner described: 1. Occurrences that must be reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, Item to Document Documentation Requirements ■ They are less than 25 gallons but cannot be cleaned up within 24 hours, i lnslr ct Frequency (during normal fauslr,ess hours] Inspection records must include: (a) Each E&SC Measure has been installed and toes not significantly deviate from the Initial and date each E&SC Measure on a copy : of the approved E&SC Plan or complete, date • They t rega me or cause sheen on surface waters r ess o volume), They are within 100 feet of surface waters(regardless of volume (t) hair} gauge maintained in good working order Daily Daily rainfall amounts. If no daily rain gauge observations amade duringweekend or holiday prr} periods, and no individual -day rainfall information is available, record the cumulative rain measurement for those ern attended days and this will determine if a site inspection is y � P needed). lays on which no rainfall occurred shall he recorded as ''zero." The permittee may use another rain -monitoring device locations, dimensions and reletive elevations shown on the approved E&SC Plan. and sign an inspection report that lists each E&SC Measure shown On the approved E&SC Nan. This ds�rrr ocentatiarr is required open the initial installation of the E&SC Measures or if the E&SC ll�ieasu res are modified after initial installation. (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4)or G.S. 143-215.85. all roved by the £Thd u n . (b) A phase of grading has been competed. i Initial and date a copy of the approved E&SC (b) Anticipated bypasses and unanticipated bypasses. (2j Er &5C Measures a- least once per 7 calendar days and within 24 hours of a rain event> 1..0 inch in 24 hours 1. Identification of The measures inspected, 2. Dare and time of the inspection, 3. Name of the ierSon performing the Inspection, 4. Indication of tivhethertlnemeasures were operating: properly, 5_ Description of maintenance needs for the measure, e_ Description, evidence, and date- of corrective actions taken. : (c) Gr'ounti cover is located and installed in accordance with the approved E&SC Plan. Plan or complete, date and sign an inspection report to indicate completion of the construction phase. ............................................................................................................................................_......... Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection to indicate (c) Noncompliance with the conditions of this permit that may endanger health or the environment. 1 (3) Stormwater At least once per 7 calendar drays. 1. Identification of the discharge out`:alls inspected,discharge Dateand timeof the inspec`ign, report corpliance with approved ground cover specifications. I outtalk (Saos) ___ ____ (4) Perimeter of site: and within 24 hours of a rain event> 1.0 inch in 24 hours __ ____ _ At least once per 7 calendar days and within 24 3. Name of eh€ person performing the inspection, rr� 4. Evidence of indicators of storwater pollution such as oil sheen, floating or suspended solids or discoloration, 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. If _visible sedimentation is found outside site limits, then a record of the following shall be node: 1, Actions taken to clean up or stabilize the sediment that has lett (d) The maintenance and repair requirements for all E&SC Measures nave been performed. __-__- - (e) Corrective actions have been taken to E&SC Measures. . . Complete, date and sign an inspection report, I . - . - - ---- --- - Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate the completion of the After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the ti mef names and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. rUND 1 )RO, N 336) 28 gen-enq hours of a rain the site limits, :Correct#ve action. Occurrence Reporting Timeframes (After Discovery} and Other Requirements event> 1.0 arch in 24 hours 2. Description, evidence, ant date of corrective actions taken, and 3. An explanation as to the actions taken to control future releases. 2. Additional Documentation (a) Visible sediment deposition in a • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the vi oo (Sl Streams or wetlands ansitc* or oftsite (where AT. least once per 7 calendar days and within 24 hogs of a rain if the stream or wetland has Increased visible sedimentation or a stream has visible increased turbidity from the construction activity, then a record of the following shall be made: i. oCscrip,lors, evidence arid date Of corrective action taken, and In addition to the E&SC Plan documents above, the followin items shall be ke ton the g P site and available far agency inspectors at all times during normal business hours, unless the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • lithe stream is named on the NC 303(d) list as impaired for sediment I— M • accessible) event> w.clinch ill 24 hours 2. Records of the required reports tothe appropriate Division Regional Office per Part III, Section C, Eton (2)(a) of this permit of this permit. Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff CONSTRUCTION DETAILS 8 (E&sc) THE VIEWS AT FLOWERS APARTMENTS NE FLOWERS PARKWAY JOHNSTON COUNTY, NC Drn. BAH Des. BAH Chk. BAH Date 11/1/2021 I JOB NUMBER 2021-30 1 (5) Ground stabilization Atter each phase of grading I. The phase of grading (installation: of perimeter E&SC measures, clearing and grubbing, instillation of storm (a) This general permit as well as the certificate of coverage, after it is received. determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. measures -drainage facilities, completion of ail land -disturbing activity, constructions or redevelopment, permanent ground cover), 2. Documentation that required d rend st:3bi izariun q g metISUres have been provided within the required (b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of in lieu the be if (b) Oil spills and release of hazardous substances per Item 1(b)-(c) above • Within 24 hours, an oral or electronic notification. The notification shall include information about the date, time, nature, volume and location of the spill or release_ ....................................................................................................................o.-.....-.... NOTE: The rain inspection resets timeframe or an assurance that they will be provided as soar as possible the required 7 calendar day inspection requirement. electronically -available records of required paper copies will allowed shown to provide equal access and utility as the hard -copy records. (c) Anticipated bypasses [40 CFR 122.41(m)(3)] • A report at least ten days before the date of the bypass, if possible. The report shall include an evaluation of the anticipated quality and effect of the bypass. (c) All data used to complete the Notice of Intent and older inspection records shall be (d) Unanticipated • Within 24 hours, an oral or electronic notification. maintained fora period of three years after project completion and made available upon request. [40 CFR 122.41] bypasses [40 CFR 122.41(m)(3)] • Within 7calendar days, a report that includes an evaluation of the quality and effect of the bypass. (e) Noncompliance with the conditions of this permit that may endanger health or the environment[40 CFR 122.41(1)(7)] • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time noncompliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance_ [40 CFR 122.41(1)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. REVISIONS H Q r.. _.. � (•71, , NORTH CAROLINA -- it.!' z 0 0 N W 0 Environmental Quality NCGO1 SELF -IN TSPECTIONEFFECTIVE: AND 04/01/19 >- d z C-14.O JOHNSTON COUNTY LANDSCAPING REQUIREMENTS: PER FLOWERS PLANTATION APPROVED REQUIREMENT ADJUSTMENT LANDSCAPE AREA ADJACENT TO STREET: REQUIRED: TYPE 'C' AREA ALONG NC I-11Gl-1NAY 42 a) 30' wide with min. of 3 large tree(s), 4 small trees, * 12 shrubs/100 l.f. b) Large Tree= 2"cal./8'ht. at planting Small Tree= 5'ht. at planting Shrubs= 18"ht. at planting PROPOSED: 650' Large Trees= 6.5x3= 20 (20 provided) Small Trees= 6.5x4= 26 (27 provided) Shrubs= 6.5x12= 78 (81 provided) REQUIRED: TYPE 'B' AREA ALONG NE FLOWERS PARKWAY a) 20' wide with min. of' 2 large tree(s), 3 small trees, $ 9 shrubs/100 l.f. b) Large Tree= 2"cal./8'ht. at planting Small Tree= 5'ht. at planting Shrubs= 18"ht. at planting PROPOSED: 865' Large Trees= 8.65x2= 17 (17 provided) Small Trees= 8.65x3= 26 (26 provided) Shrubs= 8.65xcl= 78 (78 provided) PARKING AREA SHADING: REQUIRED: 1 Large tree $ 4 Shrubs/2000 s.f. planted within 10' of parking area. PROPOSED: 84, 240sf of parking area Large Trees= 42.12x1= 42 (48 provided) Shrubs= 42.21x4= 168 (168+ provided) SCREENING: REQUIRED: All utility service areas, adjacent to, or affixed to buildings shall be screened from public right-of-ways. PARKING LOT PLANTING: EE ENLARGEMENT SHEETS SEE TYPICAL BUILDING PLANTING DETAIL FOR BUILDING LANDSCAPE 'rY\ g PRPNT�NG PARKING LOT PLANTING: SEE ENLARGEMENT SHEETS \Yc\\-\c BUILDING 200 SEE TYPICAL BUILDING PLANTING DETAIL FOR BUILDING LANDSCAPE PARKING LOT PLANTING: SEE ENLARGEMENT SHEETS BUILDING 400 SEE TYPICAL BUILDING PLANTING __-- DETAIL FOR BUILDING LANDSCAPE c D BUILDING 100 SEE TYPICAL BUILDING PLANTING DETAIL FOR BUILDING LANDSCAPE PARKING LOT PLANTING: SEE ENLARGEMENT SHEETS Know what's below. Call before you dig. 0 20 40 SCALE: 1 80 120 = 4 0' - 0 " 160 BRENT LANDSCAPE ARCHITECT SKELTON Brent Skelton Landscape Architect, PLLC w w w. s t u d i o b s l a. c o m b r e n t@ s t u d i o b s l a. c o m 3 3 6. 4 0 4. 7 0 7 0 .sho5 =*ii 735 n**- 0 s. flttom 11klt. 4/22/22 FLOWERS PLANTATION WILDERS, NC REVISION DATE: APRIL 22, 2022 DATE: FEBRUARY 21, 2022 SCALE: 1 " = 4 0 ' — 0 " SHEET TITLE: LANDSCAPE PLAN: OVERALL SITE SHEET NUMBER: (11) S.P. LOROPETALUM (7) J.W. CATMINT (1) LACEBARK ELM/ (11) HODGENDORN HOLLY ca0 (33) B.C. DISTYLIUM (1) M.C. PLANE TREE (3) E.R. LOROPETALUM (1) CHINDD VIBURNUM (1) M. CRAPE MYRTLE (4) B.C. DISTYLIUM Wiwi, toe ri 'IkeNireiragaidevilitak. '4, 6/144011614*, (1) M. CRAPE MYRTLE (1) CHINDD VIBURNUM (3) E.R. LOROPETALUM (I) (1) M.C. PLANE TREE (5) NIKKO DEUTZIA-- r�\ (9) 5.B. NEIGELA (3) S.P. LOROPETALUM (5) S.B. NEIGELA (5) NIKKO DEUTZIA (9) HOOGENDORN HOLLY (1) LACEBARK ELM (5) S.B. NEIGELA (10) NIKKO DEUTZIA (3) S.P. LOROPETALUM (1) O.G. RED MAPLE (1) NUTALL OAK (34) B.C. DISTYLIUM BUILDING 300 SEE TYPICAL BUILDING PLANTING DETAIL FOR BUILDING LANDSCAPE I (3) SPIREA (6) LIMELIGHT HYDRANGEA (15) B.A. JUNCUS (3) HORNBEAM (4) JW. CATMINT (2) B.C. DISTYLIUM (6) MUHLY GRASS (3) H. HOLLY (2) O.G. RED MAPLE (3) YOSHINO CHERRY (10) S.B. NEIGELA (5) J.W. CATMINT (5) H. HOLLY (1) LACEBARK ELM \\ \ \ (1) LACEBARK ELM *14114 °' 0°4° 4110°-"- (10) NIKKO DEUZIA (6) H. HOLLY (11;' (16) MUHLY GRASS A \ (6) B.C. DISTYLIUM (3) NIKKO DEUTZIA __ _ - (14) M. GRASS (3) H. HOLLY (1) L.B. ELM 1 -- (3) H. HOLLY (5) MUHLY GRASS (1) M.C. PLANE TREE (5) S.B. NEIGELA (3) H. HOLLY (6) NIKKO DEUTZIA (2c1) RUSSIAN SAGE (9) S.P. LOROPETALUM / HOOGENDORN HOLLY COMPACTA HOLLY BUILDING 200 SEE TYPICAL BUILDING PLANTING DETAIL FOR BUILDING LANDSCAPE (3) SPIREA (15) B.A. JUNCUS (6) LIMELIGHT HYDRANGEA (4) HORNBEAM / \ nlL rFRll — , (11) E.H. DISTYLIUM (2) S.A. CAMELLIA (10) DNF. LOROPETALUM (2) P.G. GINKGO (7) H. HOLLY �' _ (3) J.W. CATMINT = (5) S.B. NEIGELA --�- (5) J.W. CATMINT (6) NIKKO DEUTZIA (3) S.P. LOROPETALUM (6) H. HOLLY "ATM I NT 1-; >s...11. � 1.11UFFE • i I i (1) LACEBARK ELM (1) M.C. PLANE TREE (5) H. HOLLY / (4) J.W. CATMINT (26) B.C. DISTYLIUM Know what's below. Call before you dig. 0 15 _'0 SCALE: 1 60 90 30'-0 11 120 BRENT LANDSCAPE ARCHITECT SKELTON Brent Skelton Landscape Architect, PLLC w w w. s t u d i o b s l a. c o m b r e n t@ s t u d i o b s l a. c o m 3 3 6. 4 0 4. 7 0 7 0 t ate, 1/11iIii MO 4/22/22 FLOWERS PLANTATION WILDERS, NC REVISION DATE: APRIL 22, 2022 DATE: FEBRUARY 21, 2022 SCALE: 1 " = 3 0 ' - 0 " SHEET TITLE: LANDSCAPE PLAN: AREA ENLARGEMENT SHEET NUMBER: 1.10 L (5) I-IOOGENDORN I -LOLLY ''� (3) J.W. CATMINT00100/-,1%. 111111 id 0 6-1 it54fr r+!•:�'' �'� tosoor (15) B.C. DISTYLIUM (5) HOOGENDORN HOLLY (2) J.W. CATMINT (5) 1-IOOGENDORN MOLLY (3) J.W. CATMINT (33) B.C. DISTYLIUM. (1) M. CRAPE (4) E.R. LORO (10) H. I -LOLLY (3) J.W. CATMINT !Il[ (1) NUTALL OAK (4) S.B. NEIGELA (10) H. HOLLY (5) S.B. NEIGELA (7) J.W. `< CATMINT (2) LACEBARK ELM 7(50) I -I. I -LOLLY (15) J.W. CATMINT (5) NUTALL OAK (20) S.B. NEIGELA (16) H. HOLLY (4) S.B. NEIGELA (3) J.W. CATMINT (18) MUHLY GRASS (6) S.B. NEIGELA MAT LINE L �20b MATCHL EL . .: 1 (2) LACEBARK ELM (I) M.C. PLANE TREE /J BUILDING 400 SEE TYPICAL BUILDING PLANTING DETAIL FOR BUILDING LANDSCAPE (6) NIKKO DEUTZIA (3) S.P. LOROPETALUM (8) J.W. CATMING (5) H. HOLLY (36) MUHLY GRASS (3) H. HOLLY (1) M.C. PLANE TREE (1) M.C. PLANE TREE (1) LACEBARK ELM (5) J.W. CATMINT (5) S.B. NEIGELA (3) S.P. LOROPETALUM (27) B.C. DISTYLIUM BUILDING 100 SEE TYPICAL / BUILDING PLANTING DETAIL FOR BUILDING LANDSCAPE (4) H. HOLLY ' \ (3) J.W. CATMINT (3) J.W. CATMINT (1) M.C. PLANE TREE (9) B.C. DISTYLIUM (7) J.W. CATMINT (6) H. HOLLY (6) NIKKO DEUTZIA (6) H. HOLLY 1-17 (6) B.C. DISTYLIUM--' --- i (1) M.C. PLANE TREE (2) LACEBARK ELM • • (1) LACEBARK ELM (1) M.C. PLANE TREE v • (1) M.C. PLANE TREE (3) J.W. CATMINT (30) B.C. DISTYLIUM (7) S.B. NEIGELA \\ (19) MUHLY GRASS (12)_J.N. CATMINT (12) H. HOLLY ELM (1) M. CRAPE MYRTLE (3) E.R. LOROPETALUM (12) CI-IINDO VIBURNUM (16) B.C. DISTYLIUM (1) M.G. PLANE TREE (1) LACEBARK ELM ) LACEBARK ELM /MATC Know what's below. CaII before you dig. 0 15 '0 60 90 SCALE: 1" = 30'-0 120 BRENT LANDSCAPE ARCHITECT SKELTON Brent Skelton Landscape Architect, PLLC w w w. s t u d i o b s l a. c o m b r e n t@ s t u d i o b s l a. c o m 3 3 6. 4 0 4. 7 0 7 0 }\�tl►lCA r11/rf`r � � r Om lito0 4/22/22 FLOWERS PLANTATION WILDERS, NC REVISION DATE: APRIL 22, 2022 DATE: FEBRUARY 21, 2022 SCALE: 1 " = 3 0 ' - 0 " SHEET TITLE: LANDSCAPE PLAN: AREA ENLARGEMENT SHEET NUMBER: (3) BLOOM-A-TI-ION AZALEA (7) DWF. GARDENIA (2) YOSI-LINO CHERRY (15) OTTO LUYKEN LAUREL (1) CHINDO VIBURNUM (2) CHINDO VIBURNUM (6) BLOOM-A-THON AZALEA (6) OTTO LUYKEN LAUREL O.G. RED MAPLE *SEE LOCATION ON SITE PLAN (1) CHINDO VIBURNUM (4) COMPACTA HOLLY (15) OTTO LUYKEN LAUREL (2) YOSHINO CHERRY (7) DWF. GARDENIA (8) BLOOM-A-THON AZALEA (4) COMPACTA HOLLY (4) OTTO LUYKEN LAUREL (13) BLOOM-A-THON AZALEA (2) OKLAHOMA REDBUD LAYOUT NOTE: REVIEW OVERALL LANDSCAPE PLAN FOR INDIVIDUAL BUILDING PLANTING NEEDS. ACTUAL LOCATIONS $ QUANTITIES MAY BE ADJUSTED TO ACCOMMODATE UTILITIES $ SIDEWALKS. TYPICAL PLANTING PLAN: BUILDING FOUNDATION (8) DWARF GARDENIA (15) CURLED LEAF LIGUSTRUM (4) FOREST PANSY REDBUD (2) KING PIN WILLOW OAK (1) TRIDENT MAPLE TYPICAL PLANTING PLAN: TYPE C STREET YARD/100' (c) INDIAN HAWTHORN (2) KING PIN WILLOW OAK (3) MUSKOGEE CRAPE MYRTLE TYPICAL PLANTING PLAN: TYPE B STREET YARD/100' 3" MIN. MULCH FINISHED GRADE OF PLANTING BED --FREELY DRAINING FINISHED GRADE (SOD, PAVEMENT, OR CURB) 4-6" (DEPTH) TRENCH AROUND ALL PLANTING BEDS r6" MIN. MULCHING DETAIL: a-7c (8) DWARF GARDENIA (2) OKLAHOMA REDBUD (11) BLOOM-A-THON AZALEA (11) OTTO LUYKEN LAUREL (4) COMPACTA HOLLY (8) HOOGENDORN HOLLY PLANT LIST: BUILDING FOUNDATIONS Key Quantity Botanical Name Common Names'' giant Size Notes, i j O.G. RED MAPLE 16 Acer rubrum 'October Glory' October Glory Red Maple 2"Cal. /8'ht. well -branched, matched, specimen UNDERSTORY TREE 16 Cercis canadensis 'Oklahoma' Oklahoma Redbud 3" Cal. well -branched, matched, specimen 32 Prunus x yedoendid Yoshino' Yoshino Cherry 3" Cal. Dense, well -branched, specimen SHRUB 184 Azalea x bloom-a-thon 'Lavender' Lavender Reblooming Azalea 24"ht. Dense, well -branched, matched 176 Gardenia jasminoides ' Radicans' Dwarf Gardenia 24"ht. Well -branched, dense, matched 64 Ilex crenata 'Compacts' Compacta Holly 24"ht. Dense, well -branched, matched 348 Prunus laurocerasus 'Otto Luyken' Otto Luyken Laurel 24"ht. Full, well -branched 32 Vibumum awabuki 'Chindo' Chindo Viburnum 6'ht. Well -branched, dense, matched NOTES: 1. All plant quantities to be confirmed by contractor, please contact L.A. with any discrepancies between plan and plant schedule. 2. Plant sizes are suggested only. Sizes are subject to change due to availability & pricing needs. 3. Plan is approximate in scale for reference only, all tree locations and dimensions to be confirmed on site. PLANT LIST: STREET YARDS Key Quantity Botanical Name CANOPY TREE 7 Acer buergeranum 32 Quercus phellos 'King Pin' UNDERSTORY TREE 1 Common Name Trident Maple Plant Sizeglii King Pin Willow Oak 2" Cat. /8'ht. SINGLE TRUNK, well -branched 2" Cal. /8'ht. Dense, well -branched, specimen 27 Cercis canadensis 'Forest Pansy' $9 Lagerstroemia indica 'Muskogee' SHRUB Forest Pansy Redbud Muskogee Lavender Crape Myrtle 81 Ligustrum japonicum 'Recurvifolium' 85 Raphiolepis indica NOTES: 1. All plant quantities to be confirmed by contractor, please contact L.A. with any discrepancies between plan and plant schedule. 2 Plant sizes are suggested only. Sizes are subject to change due to availability & pricing needs. 3. Plan is approximate in scale for reference only, all tree locations and dimensions to be confirmed on site. 5'ht. well -branched, matched, specimen 5'ht. Dense, well -branched, matched Curled -leaf Ligustrum 24"ht. Well -branched, matched Indian Hawthorn 0 0 o SET TOP OF ROOT BALL 3" MULCH o 1" ABOVE FINISH GRADE 0 FINISH GRAD AMENDED BACKFILL =IIIIIIIIIIIIII I,IIIIII 0 0 PLANT PIT SHALL BE 2X AS NIDE AS ROOT BALL AND A MINIMUM OF 4" DEEPER (ANGLE SIDES OF PIT) 111111E1 II=111=111- ROOT BALL PERENNIAL PLANTING DETAIL: INCORPORATE GRANULAR FERTILIZER IN BACKFILL 3" MULCH FINISH GRAD AMENDED BACKFILL IIIIIIIII '=111,�11111111 PLANT PIT SHALL BE 2X AS NIDE AS ROOT BALL AND A MINIMUM OF 4" DEEPER (ANGLE SIDES OF PIT) 24"ht. Dense, well -branched, matched SET TOP OF ROOT BALL 1" ABOVE FINISH GRADE WATER RETENTION BERM SHRUB PLANTING DETAIL: I11I1E1 i_I 1-1 I 1-1 11- FERTILIZER TABLET, OR INCORPORATE GRANULAR FERTILIZER IN BACKFILL ROOT BALL L r (3) BLOOM-A-TI-ION AZALEA (7) DNF. GARDENIA (2) YOSI-LINO CI -TERRY (15) OTTO LUYKEN LAUREL (1) CI-IINDO VIBURNUM (2) CHINDO VIBURNUM (6) BLOOM-A-THON AZALEA (6) OTTO LUYKEN LAUREL O.G. RED MAPLE *SEE LOCATION ON SITE PLAN (1) CHINDO VIBURNUM (4) COMPACTA HOLLY (15) OTTO LUYKEN LAUREL (2) YOSHINO CHERRY (7) DWF. GARDENIA (8) BLOOM-A-THON AZALEA PLANTI\ G OTES 1. Landscape Contractor to visit the site and accept the conditions prior- to bidding and plant material installation. 2. Landscape Contractor to obtain grading plan for- coordination of final grades. Contact owner's representative for any plan or grade changes prior to construction. 3. Landscape Contractor is responsible for all fine grading of lawn and planting areas disturbed during construction. Remove from site all temporary seeding/stabilization stones, gravel and all extraneous debris including roots and limbs. 4. Landscape Contractor to bring to the attention of the owner- any debris or- poor soils remaining in planting areas after general construction and prior to any planting. 5. Landscape Contractor to verify all underground utilities prior- to installation of any plant material. Utilities shown on plan are for reference only and may not be all inclusive. 6. Landscape Contractor to protect all existing structures (ie. curb and gutter, pavement, etc.) during installation of landscaping. 7. Landscape contractor to coordinate with G.C. for any irrigation/lighting sleeving prior to sub -grade preparation of paved areas. IF APPROPRIATE 8. Landscape Contractor is responsible for providing topsoil in any planted traffic islands so there is a slight constant rise to the center of each island. (refer to grading plan for final elevations. by others) 1. All plant beds to be tilled and amended to a depth of 8". Entire bed to be covered with 3" of shredded pine bark mulch. 10. All plant beds to consist of (1) part existing soil, (1) part friable topsoil and (1) part pine bark soil conditioner. 11. All beds to be tilled in their entirety. No pit planting will be accepted. 12. Landscape Contractor shall furnish all quantities necessary to complete plantings as shown on drawings. 13. Any plant material substitutions or adjustments are to be requested in writing to the owner's representative. No substitutions will be permitted without written notice by owner's representative. 14. Landscape Contractor to contact owner for approval/denial of all plant stock prior to installation. 15. All trees of the same variety to match in shape, form, and size where they are to be installed in groups, row's or as street trees. 16. All trees shall be specimen quality and well shaped. Large deciduous and evergreen trees shall have tall central leader. 17. All trees planted in grass areas shall have a 5' diameter mulch ring (typical.) 18. All strapping and top 3 of wire basket must be cut away and removed from root ball prior to backfilling planting pit. Remove top 3 of the burlap from root ball. 19. Edge of tree mulch ring to be a minimum 2' from any shrub bed edge or paved surface. 20. Minor shifting and adjusting of proposed tree locations may required due to exact location of underground utilities. Landscape Contractor to contact owner's representative and city landscape inspector prior to relocation. 21. All grass to plant bed borders to be neatly edged with a vertical edge (typical.) 22. Prior to sodding, Landscape Contractor is to contact General Contractor for verification that all land disturbing activity (ie. trenching, grading, etc.) has been completed. 23. SEED all disturbed areas within subject property and any areas within the right-of-way or an adjacent property disturbed during construction or of substandard turf condition. UNLESS OTHERWISE SPECIFIED 24. Landscape Contractor to guarantee all plant material and work for a period of one year from acceptance of' work by owner. 25. See this sheet for planting details. PLANT LIST: PARKING LOT & SITE Key CANOPY TREE M.C. PLANE TREE Quantity Botanical Name 26 Piatanus x acerfolia 'Morton Circle' _Common Name Plant Size Notes. Exclamation London Planetree 12"Cal./8'ht. Dense, well -branched, specimen 18 Quercus nutalli Nutall Oak 2"Cal./8'ht. Dense, well -branched, specimen L.B. ELM 22 Ulmus parviflora 'Lacebark' Lacebark Elm 2"Cal./8'ht. SINGLE -stem, well -formed, specimen UNDERSTORY TREE HORNBEAM Carpinus betulus 'Fastigiata' Fastigiata European Hornbeam M. CRAPE MYRTLE Lagerstroemia indica 'Muskogee' Muskogee Lavender Crape Myrtle SHRUB S.A. CAMELLIA 2 Camellia x 'Spring Awakening' B.C. DISTYLIUM E.H. DISTYLIUM H. HOLLY 66 2"-3" Cal. SINGLE -TRUNK, full, dense, LIMBED UP 4' MIN. 5'ht. Dense, well -branched, matched Spring Awakening Camellia 4'ht. Deutzia gracilis 'Nikko' 462 15 12 238 Dwarf Nikko Deutzia Distylium myricoides 'Blue Cascade Distylium myricoides Emerald Heights' Hydrangea paniculata 'Limelight Ilex crenata 'Hoogendorn' Blue Cascade Distylium Emerald Heights Distylium Limelight Hydrangea Hoogendorn Holly 24"ht. 24"ht. 24"ht. 24"ht. 24"ht. Dense, well -rooted, matched Dense, full, matched Dense, full, matched Well -branched, dense, matched Dense, well -branched, matched E.R. LOROPETALUM 14 Loropetalum chinense Ever -red' Ever -red Loropetalum 24"ht. Well -branched, dense, matched S.P. LOROPETALUM 27 Loropetalum chinense 'Sizzling Pink' Sizzling Pink Loropetalum 24"ht. Well -branched, dense, matched DWF. LOROPETALUM 10 Loropetalum chinense 'Sparkling Plum' Sparkling Loropetalum 24"ht. Well -branched, dense, matched J.W. CATMINT 127 Nepeta x faasenii 'Junior Walker' Junior Walker Catmint 1 gal. SPIREA 6 Spiraea japonica 'Neon Flash' Neon Flash Spirea 24"ht. Dense, well -branched, matched 18 Vibumum awabuki 'Chindo' Chindo Viburnum 6'ht. Well -branched, dense, matched S.B. WEIGELA 95 Weigela florida 'Sonic -bloom Pink' Sonic -bloom Pink Weigela 24"ht. Well -branched, dense, matched ORNAMENTAL GRASS/PERENNIAL B.A. JUNCUS 30 Juncus 'Blue Arrows' Blue Arrows Juncus 1 gal. M. GRASS 155 Muhlenbergia capillaris 'Lena' Pink Muhly Grass 29 Perovskia atriplicifolia Russian Sage 1 gal. Dense, well -rooted NOTES: 1. All plant quantities to be confirmed by contractor, please contact L.A. with any discrepancies between plan and plant schedule. 2. Plant sizes are suggested only. Sizes are subject to change due to availability & pricing needs. 3. Plan is approximate in scale for reference only, all tree locations and dimensions to be confirmed on site. NEN RUBBER HOSE SNUG AROUND TRUNK AT CROTCH TREE BASE PROTECTIO WATER BASIN ;%.4.44144 V4 :O4 PLANT PIT SHALL BE 2X AS NIDE +444y"''e',I�O T 4.,.., ��*+4.:IO i�� I AS ROOT BALL AND A MINIMUM OF ../ 4" DEEPER (ANGLE SIDES OF PIT �I, I'>`>`_° IN HEAVY CLAY SOILS OR WHERE THERE )11 IS A HARD PAN, AUGER AN 5" HOLE 6' DEEP OR THROUGH THE HARD PAN. (BACKFILL WITH 3/4" GRAVEL) TREE PLANTING DETAIL: SET TOP OF ROOT BALL 2" ABOVE FINISH GRADE FERTILIZER TABLET, OR INCORPORATE GRANULAR FERTILIZER IN BACKFILL FINISH GRADE AMENDED BACKFILL ROOT BALL PLACE ROOT BALL ON MOUND OF TAMPED FIRM AMENDED SOIL TURN BURLAP DONN 0 10 20 SCALE: 40 60 1 = 20'-0" 80 BRENT LANDSCAPE ARCHITECT 1 SKELTON j Brent Skelton Landscape Architect, PLLC w w w. s t u d i o b s l a. c o m b r e n t@ s t u d i o b s l a. c o m 3 3 6 . 4 0 4 . 7 0 7 0 .�allocq�, \\� tl,. C A r1162 � I" frf# is/ fC . No 4/22/22 r f f `r • FLOWERS PLANTATION WILDERS, NC REVISION DATE: APRIL 22, 2022 DATE: FEBRUARY 21, 2022 SCALE: 1 " = 2 0 ' - 0 & DETAILS " SHEET LANDSCAPE NOTES TITLE: PLAN: SHEET NUMBER: L2.00