Loading...
HomeMy WebLinkAbout20080511 Ver 3_Easement Boundary issue_BPDP_20140423 Merritt, Katie From:Merritt, Katie Sent:Wednesday, April 23, 2014 10:50 AM To:'jrbecker@bellsouth.net' Cc:'David Knowles' Subject:RE: Draft of Conservation Easement Attachments:DOC042314-001.pdf Jeff, Please see the attached figure showing the GES proposed easement boundary for LaGrange Phase II. I have drawn out in red the additional area you will need to include in your easement boundary. I am still reviewing the BPDP, but figured I'd give you a heads up, that this will need be added to the acreage covered under your easement. You will not get credit for this additional area, unless it's included as part of the mitigation plan and is planted (must be at least 50 feet from top of bank of the canal). The entire length of the canal that runs South of your proposed Phase II Bank has to be protected within the easement in order to guarantee that the hydrologic connection of that canal to the Intermittent stream (UT to MHB) remains contiguous. This canal is your only source to carry nutrients from the ditch you are mitigating on the eastern side of your Phase II bank to the UT. Therefore, since it's the only connection from your mitigation ditch to the intermittent stream (UT to MHB), it has be protected under the easement. Please call me if you have any questions. Thanks, Katie -----Original Message----- From: Jeff Becker \[mailto:jrbecker@bellsouth.net\] Sent: Wednesday, April 23, 2014 9:51 AM To: Merritt, Katie Subject: RE: Draft of Conservation Easement Thanks.. No big deal.. I know your plate is full as you prepare for the little one and your maternity leave -------------------------------------------- On Wed, 4/23/14, Merritt, Katie <katie.merritt@ncdenr.gov> wrote: Subject: RE: Draft of Conservation Easement To: "Jeff Becker" <jrbecker@bellsouth.net> Date: Wednesday, April 23, 2014, 9:36 AM Jeff, I just received a packet this morning in the mail from David. That packet included the Revised BPDP. I should be able to review it today. I’ll get back to 1 you. Thanks, Katie From: Jeff Becker \[mailto:jrbecker@bellsouth.net\] Sent: Tuesday, April 22, 2014 2:24 PM To: Merritt, Katie Subject: Re: Draft of Conservation Easement Katie..when do you anticipate approval of the BPDP ? We can wait to record .. That is the best option.. THANKS From: "Merritt, Katie" <katie.merritt@ncdenr.gov> To: "kforghani@beamanlaw.com" <kforghani@beamanlaw.com> Cc: 'Jeff Becker' <jrbecker@bellsouth.net> Sent: Tuesday, April 22, 2014 12:00 PM Subject: RE: Draft of Conservation Easement Hey Kelly, Thank you for incorporating some of my changes. However, it appears that all of the changes/edits I submitted for Article III and below have not been incorporated into 2 the document you sent via email below. These changes need to be made prior to recordation of the easement, see attached document with DWR edits. Additionally, per your questions for Article II and VII (L), there are two options for GES to consider: · one option is to wait for DWR approval and document the date of approval prior to executing and recording the easement · second option is to execute and record the easement as shown below in Yellow, then edit the recorded easement after approval to include the dates. If the easement can’t be edited afterwards to include the dates, then DWR would request that GES pursue the first option. …and the “La Grange Phase II Expansion Bank Parcel Development Package (approved by the Division of Water Resources on _____) Let me know if you have any other questions. At this time, the current version of the GES easement sent to me is not accepted by DWR to be executed and recorded. Thank You, Katie From: Kelly D. Forghani \[mailto:kforghani@beamanlaw.com\] Sent: Tuesday, April 22, 2014 11:25 AM To: Merritt, Katie Cc: 'Jeff Becker' Subject: Draft of Conservation Easement 3 Katie, Please see the attached revised easement. If you will recall, you had a few changes that you emailed to Mr. Becker on April 14. I have made those changes but you also had comments about approval in section. I have attached your version, then a revised final version that accepted all of your changes. We are ready to have this executed and record, but I was wondering how to handle your comments that were in section III and section VII (L). Kelly D. Forghani, Esq. STEPHEN L. BEAMAN, PLLC 304 Nash Street NE Wilson, NC 27894 Phone: (252) 237-9020 Fax: (252) 243-5174 4 5