Loading...
HomeMy WebLinkAbout20071155 Ver 1_Approval Letter_20070803F WATE ~o ~~•° Rp Michael F. Easley, Governor ~ William G. Ross Jr., Secretary > t_" North Carolina Department of Environment and Natural Resources Q ~ Coleen H. Sullins, Director ~. Division of Water Quality August 3, 2007 DWQ Project # 07 1155 County Vanguard properties, LLC c/o Stuart Smith 8-A Marina Street Wrightsville Beach, NC 28480 ! ~~~~ Subject Property: Middle Sound Marina Approval of 401 Water Quality Certification with Additional Conditions Dear Mr. Smith: You have our approval, in accordance with the attached conditions and those listed below, to redevelop the upland portion of a commercial marina facility with a marina clubhouse, associated parking area, new bulkhead, retaining walls, three residential units, replace an existing boat ramp, maintenance dredge and existing basin and boat ramp area and the replacement of a 30-slip mazina at the subject property, as described within your CAMA application dated June 27, 2007. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number 3642 (GC 3642). This Certification can also be found on line at: http://h2o.enr.state.nc.us/ncwetlands/certs.html. The Certification allows you to use the CAMA Major Permit when issued by the Division of Coastal Management. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge, and stormwater regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in I SA NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are a roved includin incidental im acts: Amount A roved Units Plan Location or Reference 404 Wetlands N/A (acres) Coastal Wetlands N/A acres Open Water (dredging) (540' X l 35') acres 61' X 15' Sheet I of 1 North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Internet: www.ncwaterauality~ Location: 512 N. Salisbruy St Raleigh, NC 27604 Fir (919) 733-2496 N~omN` rCarolina ~Natura!!y Customer Service I-877-623.6748 An Equal OpportunitylAffimtative Actlon Employer - 50% Recycled/10% Post Consumer Paper Page Two Vanguard properties, LLC c/o Stuart Smith DWQ Project # 07 1155 August 3, 2007 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the CAMA Major application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 /Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permit. Page Three Vanguard properties, LLC c/o Stuart Smith DWQ Project # 07 1155 August 3, 2007 Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire-upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Ian McMillan in the Central Office in Raleigh at 919- 715-4631 or Joanne Steenhuis in the DWQ Wilmington Regional Office at 910-796-7215. ' cerely, Coleen H. Sullins, Director Division of Water Quality Enclosures: GC 3642 Certificate of Completion cc: Dana Lutheran - SEGi David Timpy - USACE Wilmington Regulatory Field Office Ian McMillan -DWQ 401 Unit Doug Huggett -DCM Morehead City Robb Mairs -DCM Wilmington Central Files W iR0 WQC #3642 CAMA PERMIT CERTIFICATION This General Cert~cation is issued in conformity with requirement of Section 401, Public Laws 92-500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality Regulations in 15 NCAC 2H, Section .0500 and 15 NCAC 2B .0200 for the discharge of fill material as described in General Permit 198000291 and for the Riparian Area Protection Rules (Buffer Rules) in 15A NCAC 2B .0200. This Cert~cation replaces Water Quality Certification Number 3025 issued on September 6, 1995, Water Quality Certification Number 3112 issued on February 11, 1997, Water Quality Certification Number 3274 issued June 1, 2000 and Water Quality Certification Number 3371 issued March 18, 2002 and WQC Number 3400 issued March 18, 2002. This WQC is rescinded when the Corps of Engineers re-authorizes any of these Nationwide or Regional General Permits or when deemed appropriate by the Director of DWQ. The State of North Carolina certifies that the specked category of activity will not violate applicable portions of Sections 301, 302, 303, 306 and 307 of the Public Laws 92-500 and 95-217 if conducted in accordance with conditions hereinafter set forth. Conditions of Certification: 1. Activities authorized by CAMA major permits require written concurrence from the Division of Water Quality as well as compliance with all conditions of this General Certification; 2. Activities authorized by Coastal Area Management Act (CAMA) Minor or General Permits do not require written authorization from the Division of Water Quality as long as they comply with all other conditions of this General Certification; 3. In accordance with North Carolina General Statute Section 143-215.3D(e), any request for written concurrence fora 401 Water Quality Certification must include the appropriate fee. If a project also requires a CAMA Permit, one payment to both agencies shall be submitted and will be the higher of the two fees. The fee shall be collected and distributed between the two agencies in accordance with agreements reached between the Division of Water Quality and the Division of Coastal Management; In accordance with 15A NCAC 2H .0506 (h) compensatory mitigation may be required for impacts to 150 linear feet or more of streams and/or one acre or more of wetlands. In addition, buffer mitigation may be required for any project with Buffer Rules in effect at the time of application for buffer impacts resulting from activities classified as "allowable with mitigation" within the 'Table of Uses" section of the Buffer Rules or require a variance under the Buffer Rules. A determination of buffer, wetland and stream mitigation requirements shalt be made for any Certification for this Nationwide Permit. The most current design and monitoring protocols from DWQ shall be followed and written plans submitted for DWQ approval as required in those protocols. When compensatory mitigation is required for a project, the mitigation plans must be approved by DWQ in writing before the impacts approved by the Cert~cation occur. The mitigation plan must be implemented and/or constructed before any permanent building or structure on site is occupied. In the case of public WQC #3642 road projects, the mitigation plan must be implemented before the road is opened to the travelling public; 5. Compensatory stream mitigation shall be required at a 1:1 ratio for not only perennial but also intermittent stream impacts that require application to DWQ in watersheds classified as ORW, HQW, Tr, WS-I and WS-II unless the project is a linear, publicly- funded transportation project, which has a 150-foot per-stream impact allowance; 6. Impacts to any stream length in the Neuse and Tar-Pamlico River Basins (vr any other major river basins with Riparian Area Protection Rules [Buffer Rulesj in effect at the time of application) requires written concurrence from DWQ in accordance with 15A NCAC 26.0200. New development activities located in the protected 50-foot wide riparian areas (whether jurisdictional wetlands or not) within the Neuse and Tar- Pamlico River Basins shall be limited to "uses" identified within and constructed in accordance with 15A NCAC 2B .0200. All new development shall be located, designed, constructed, and maintained to have minimal disturbance to protect water quality to the maximum extent practicable through the use of best management practices. Activities listed as "exempt" from these rules do not need to apply for written concurrence under this Certification; 7. All sediment and erosion control measures placed in wetlands or waters shall be removed and the original grade restored after the Division of Land Resources has released the project; 8. If an environmental document is required, this Certification is not valid until a Finding of No Significant Impact (FONSI) or Record of Decision (ROD) is issued by the State Clearinghouse; 9. That appropriate sediment and erosion control practices which equal or exceed those outlined in the most recent version of the "North Carolina Sediment and Erosion Control Planning and besign Manual" or the "North Carolina Surface Mining Manual" whichever is more appropriate (available from the Division of Land Resources (DLR) in the DENR Regional or Central Offices) shall be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to assure compliance with the appropriate turbidity water quality standard; 10. Measures shall be taken to prevent live or fresh concrete from coming into contact with freshwaters of the state until the concrete has hardened; 11. Additional site-specific conditions may be added to projects which have applied for CAMA major permits which are proposed under this Certification in order to ensure compliance with all applicable water quality and effluent standards; 12. When written concurrence is required, the applicant is required to use the most recent version of the Certification of Completion form to notify DWQ when all work included in the 401 Certification has been completed; 13. Concurrence from DWQ that this Certification applies to an individual project shall expire three years from the date of the cover letter from DWQ or on the same day as the expiration date of the corresponding General Permit 198000291, whichever is sooner. Non-compliance with or violation of the conditions herein set forth by a specific fill project shall result in revocation of this Certification for the project and may result in criminal and/or civil penalties. WQC #3642 The Director of the North Carolina Division of Water Quality may require submission of a formal application for individual certification for any project in this category of activity that requires written concurrence under this certification, if it is determined that the project is likely to have a significant adverse effect upon water quality or degrade the waters so that existing uses of the wetland or downstream waters are precluded. Public hearings may be held for specific applications or group of applications prior to a Certification decision if deemed in the public's best interest by the Director of the North Carolina Division of Water Quality. Effective date: 19 March 2007 DIVISION OF WATER QUALITY By ~~~- Alan W. Klimek Director WQC # 3642