Loading...
HomeMy WebLinkAbout19990231 Ver 2_Certification of Completion_20140220A,0-1KaWA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Resources Water Quality Programs Pat McCrory Thomas A Reeder John E Skvarla, III Governor Director Secretary DWR Project No 99 -0231 County. Hertford Applicant Nucor Steel Project Name Nucor Steel Raw Water Intake, Chowan River [Cho01 25, B, NSW] 401 Water Quality Certification Issued Date: March 18, 2011 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the DWR 401 & Buffer Permitting Unit, 1650 Mail Service Center, Raleigh, NC, 27699 -1650 This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer It is not necessary to send certificates from all of these Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials Signature Agent's Certification Date I, Terry H Hairston Jr , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials Signature % % Date February 14, 2014 if this project was designedly a Certified Professional I, , as a duly registered Professional (i e Engineer, Landscape Architect, Surveyor, etc ) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials D (g@ IN nw1 I Signature Date l�iUU 11 FEB 2 0 2014 401 & Buffer Permitting Unit 1650 Mad Service Center, Raleigh, North Carolina 27699 -1650 Location 512 N Salisbury St Raleigh, North Carolina 27604 Phone 919 - 807 -6300 \ FAX 919 -807 -6494 Internet www ncwatemuality org An Equal Opportunity \ Affirmative Action Employer