Loading...
HomeMy WebLinkAbout20001195 Ver 17_More Info Received_20211215Strickland, Bev From: Thames, Kelly <Kelly.Thames@hdrinc.com> Sent: Wednesday, December 15, 2021 4:32 PM To: Homewood, Sue Cc: Rysdon, Eric; Roden Reynolds, Bryan K CIV USARMY CESAW (USA) Subject: RE: [External] FW: SAW-2019-01071 and DWR# 20001195 Ver 17 - Charlotte Douglas Int'I. Airport Attachments: ImperviousDikeSanSew.pdf Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Sue, Sorry for the delay in getting back to you. Attached are the plan sheets showing the two sewer crossings of Ticer Branch as noted in the IP Update Memo. These sheets are now showing the installation of the sewer using an impervious dike in stages at each crossing location, as requested, including detail sheets of said impervious dike usage. The Applicant has ok'd this install methodology. I hope this alleviates your concerns? Let me know if any further questions. Thanks! Kelly Kelly Thames, PWS, TN-QHP Sr. Environmental Project Manager, Associate D 704.338.6710 M 704.996.9986 hdrinc.com/follow-us From: Homewood, Sue <sue.homewood@ncdenr.gov> Sent: Wednesday, November 17, 2021 2:08 PM To: Thames, Kelly <Kelly.Thames@hdrinc.com> Cc: Rysdon, Eric <Eric.Rysdon@hdrinc.com> Subject: RE: [External] FW: SAW-2019-01071 and DWR# 20001195 Ver 17 - Charlotte Douglas Intl. Airport CAUTION: [EXTERNAL] This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi Kelly, I'm concerned with the proposal to use a standard coffer dam dewatering specification to completely dewater Ticer Branch (20 feet wide) while installing the sewer line using an open cut trench. My experience with utility installation projects trying to open cut and dewater a channel of that size, especially in an urban setting, is not positive. Is it feasible to propose a dewatering system that would only dewater % the channel at a time? Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue.Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 From: Thames, Kelly <Kelly.Thames@hdrinc.com> Sent: Tuesday, November 16, 2021 4:56 PM To: Roden Reynolds, Bryan K CIV (US) <Bryan.K.RodenReynolds@usace.army.mil>; Homewood, Sue <sue.homewood@ncdenr.gov> Cc: Rysdon, Eric <Eric.Rysdon@hdrinc.com> Subject: [External] FW: SAW-2019-01071 and DWR# 20001195 Ver 17 - Charlotte Douglas Intl. Airport CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Bryan and Sue, Just wanted to drop a note that I will be going on parental leave somewhere around December 19tn I'd love to be able to take care of this update modification prior to that and/or help with a request for additional information or need for complicated discussion, if warranted. Of course, I do respect the time you both need to review and that Thanksgiving is only next week!! Let me know what I can do to facilitate anything you many need! Thanks, Kelly Kelly Thames, PWS, TN-QHP Sr. Environmental Project Manager D 704.338.6710 M 704.996.9986 hdrinc.com/follow-us From: Roden Reynolds, Bryan K CIV USARMY CESAW (USA) <Bryan.K.RodenReynolds@usace.army.mil> Sent: Friday, November 5, 2021 12:08 PM To: Thames, Kelly <Kelly.Thames@hdrinc.com>; Homewood, Sue <sue.homewood@ncdenr.gov> Cc: Leathers, Amber <amber.leathers@cltairport.com>; Rysdon, Eric <Eric.Rysdon@hdrinc.com>; Wilson, Jason C. <jason.wilson@hdrinc.com>; Jay Trimble <jtrimble@tbeclt.com>; Erin Ryland <eryland@tbeclt.com>; Thomas Greiter <TGreiter@HNTB.com>; daniel.bridges@WSP.com Subject: RE: SAW-2019-01071 and DWR# 20001195 Ver 17 - Charlotte Douglas Intl. Airport 2 CAUTION: [EXTERNAL] This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Ms. Thames, If the Water Quality Certification was issued prior to June 2020 and either revises the existing Water Quality Certification or leaves the existing as is (no modification required), then the Corps can move forward with the Standard Permit modification request. However, should NCDWR have to issue a new Water Quality Certification for the Standard Permit modification, then the Corps would have to hold on issuing a modification to the Standard Permit based on recent guidance from headquarters. Thanks, Bryan Roden -Reynolds, PWS Regulatory Project Manager U.S. Army Corps of Engineers Wilmington District Charlotte Regulatory Field Office 8430 University Executive Park Drive Charlotte, NC 28262 Office: (704)510-1440 From: Thames, Kelly <Kelly.Thames@hdrinc.com> Sent: Friday, November 5, 2021 11:48 AM To: Roden Reynolds, Bryan K CIV USARMY CESAW (USA) <Bryan.K.RodenReynolds@usace.army.mil>; Homewood, Sue <sue.homewood@ncdenr.gov> Cc: Leathers, Amber <amber.leathers@cltairport.com>; Rysdon, Eric <Eric.Rysdon@hdrinc.com>; Wilson, Jason C. <jason.wilson@hdrinc.com>; Jay Trimble <jtrimble@tbeclt.com>; Erin Ryland <eryland@tbeclt.com>; Thomas Greiter <TGreiter@HNTB.com>; daniel.bridges@WSP.com Subject: [Non-DoD Source] SAW-2019-01071 and DWR# 20001195 Ver 17 - Charlotte Douglas Intl. Airport Good Morning Bryan and Sue, I hope you are both well! Apologies if this came through to anyone and it's a duplicate email — I received many non - deliverable emails the first time around. Below is a link to a modification request to SAW-2019-01071 and DWR# 20001195 Ver 17 Individual Permit approvals for the Charlotte Douglas International Airport. 2CLT IP Update Memo 2021.11.05 (SAW-2018-01071).pdf In summary, there is a reduction of permanent impacts, an increase in temporary impacts, and the bringing forward of an approved impact from a future phase to the current Phase I. For the reduction of permanent impacts, CLT would like to request a mitigation refund (Charlotte Umbrella Bank said they could do this upon agency approvals). Please let me know if any questions and/or if any issues with access. Thanks! Kelly Kelly Thames, PWS, TN-QHP 3 Sr. Environmental Project Manager HDR 440 S. Church Street, Suite 1000 Charlotte, NC 28202-2075 D 704.338.6710 M 704.996.9986 kelly.thameshdrinc.com hdrinc.com/follow-us 4 zOz 1NOMV IVN011MBINl „,Sn ono0 3lloiuvR3 r NV�d ]0211NO3 NOIS02J3 � a - �� N011V.. w z 021 OMOG 00 M O�0 W� _Fo s V, a.d v m i i 00+OZ III P w \ � y¢ Sad W co LLJ 0 0 p r .w — r U Al — ODs� . i f k ss\ odd l m l��� 1 - - 65 i 1 yoo \ I > N ��s zozIE'l, G]nss, 1NOMVIVNOI1VNtl31NI „'Sn ono0 3lloiuvR3 N r ST'd130 ]0211 N00 NOIS 0213 z N01=V.00]30 u SNOISIIII 021 OM00 M0 W s � K o„ wad x 5= z Eu - an�a DID j Q z �e vv vai LL ffry — z �w =o �i FU) QZ �a w mOf LL d'= UZ Ua ICI 1F �N = J a O U $ Q a 0 - � Q n x -- cn � O Z O ` = a W J � � 4T �G