Loading...
HomeMy WebLinkAbout20081268 Ver 3_Mitigation Information_20210922fires July 23, 2021 Kyle Barnes U.S. Army Corps of Engineers Regulatory Division 69 Darlington Ave Wilmington, NC 28403 Subject: NeuCon UMBI Tull Wooten III (SAW-2017-00847) As -Built Baseline Report Submittal Mr. Barnes: 360o Glenwood Avenue, Suite ioo Raleigh, NC 27612 Corporate Headquarters 6575 West Loop South, Suite 300 Bellaire, TX 77401 Main: 713.520.5400 On behalf of EBX Neuse I, LLC, a wholly owned subsidiary of Resource Environmental Solutions (RES), I am pleased to submit the NeuCon UMBI Tull Wooten III As -Built Baseline Report. Construction and planting for this project were completed in March 2021 and invasives treatment was completed in July 2021. The site was built to design and guidelines with only minor adjustments. RES set up cross sections, vegetation plots, and stream monitoring devices in March 2021. Monitoring data of the vegetation indicates that all plots are exceeding the interim success criteria of 320 planted stems per acre. The average stem height in the plots was 1.5 feet. Per the approved mitigation plan and as referenced in the as -built report, RES is requesting to perform supplemental planting and livestaking on TW1 and TW4 to fulfill the adaptive crediting strategy in the upcoming dormant season of winter 2021/spring 2022. The livestaking would include shade tolerant species (buttonbush and silky dogwood) and occur every four feet along the bottom of both banks on both reaches. The supplemental planting would be performed in areas of low stem density/heavy invasive treatment and include shade tolerant species such as flowering dogwood, eastern redbud, persimmon, blackgum, sugarberry, and laurel oak. The additional work would take place during this upcoming dormant season and would change the credit ratios for TW1 and TW4 from 10:1 to 5:1. Upon approval of this as -built report and the adaptive crediting strategy, RES is requesting a 15% stream credit release based on the approved mitigation plan. This is a total as -built release of 531 SMUs. All wetland credits for this bank are preservation and were released in the initial Task 1 release. Please see the enclosed credit release timeline and updated credit ledgers. Thank you for all of your time and consideration and we look forward to continuing to work with you all as this Project progresses. Please contact me if you have any questions or require any additional information. Thank you, Katie Webber, Project Manager kwebber@res.us 1 (984) 275-3483 res.us From: Davis. Erin B To: Baker, Caroline D Subject: FW: [External] Notice of As -Built Review/ RES Neu -Con UMBI - Tull Wooten III Mitigation Site/ SAW-2017-00847/ Lenoir County Date: Monday, November 1, 2021 2:06:39 PM Attachments: Cover Letter TWIII MYO.odf Laserfiche Upload: Email & Attachment DWR#: 20081268 v.3 Doc Type: Mitigation Information From: Browning, Kimberly D CIV USARMY CESAW (USA) [mailto: Kimberly. D.Browning@usace.army.mil] Sent: Wednesday, September 22, 20214:38 PM To: Tugwell, Todd J CIV USARMY CESAW (US)<Todd.J.Tugwell@usace.army.mil>; Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Merritt, Katie <katie.merritt@ncdenr.gov>; kathryn_matthews@fws.gov; Bowers, Todd <bowers.todd@epa.gov> Cc: Barnes, Kyle W CIV USARMY CESAW (USA) <Kyle.W.Barnes@usace.army.mil>; Katie Webber <kwebber@res.us>; Lekson, David M CIV USARMY CESAW (USA) <David.M.Lekson@usace.army.mil>; Lastinger, James C CIV USARMY CESAW (USA) <James.C.Lastinger@usace.army.mil>; Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley2@usace.army.mil> Subject: [External] Notice of As -Built Review/ RES Neu -Con UMBI - Tull Wooten III Mitigation Site/ SAW-2017-00847/ Lenoir County CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hello IRT, The FINAL As -Built Report review has been requested by RES for the Tull Wooten III Mitigation Bank Site. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on October 8, 2021. Comments provided after the 15-day comment deadline may not be considered. The As-Built/MYO Report and associated credit ledgers can be found on RIBITS: https://ribits.ops.usace.army.mil/ords/f?p=107:278:14858358587016:::RP.278:P278_BANK_ID:5913 RES provided linked drone footage, in -lieu of an IRT site visit. We will plan to visit the site in 2022. TW2-A https://vimeo.com/610440910/e3dO922a4e <Blockedhttps:Hvimeo.com/610440910/e3dO922a4e> TW3 https:,//vimeo.com/610517675/22d6503d75 <Blockedhttps://vimeo.com/610517675/22d6503d75> Site Overview httr)s://vimeo.com/610530374/9bdO698bce <Blockedhttps:Hvimeo.com/610530374/9bdO698bce> 15-Day Comment Start Date: September 22, 2021 15-Day Comment End Date: October 8, 2021 45 Day DE Decision: November 7, 2021 At the conclusion of this comment period, a copy of all comments will be provided to RES and the NCIRT along with District Engineer's intent to approve or disapprove this Final As -Built and 2nd credit release. Kyle Barnes is the bank manager for this project. Please copy Kyle on all correspondence. Regards, Kim Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers