HomeMy WebLinkAbout20030037 Ver 2_Compliance Inspection Comments_20131015Burdette, Jennifer a
From: Karoly, Cyndi
Sent: Tuesday, October 15, 2013 11:07 AM
To: Burdette, Jennifer a
Subject: FW: Palisades (Timberlake) Golf Course
Attachments: Pal Golf Course Compl Letter 10- 2013 -b.pdf
From: Ceccarelli, Don [ mailto: Don.Ceccarelli@mecklenburocount nc.aov]
Sent: Tuesday, October 15, 2013 9:50 AM
To: Jack Blythe
Cc: Mike Andert; Rozzelle, Rusty; Davis, Heather; Marc Houle; Robertson, Kelly; Ferguson, Tom; Karoly, Cyndi
Subject: Palisades (Timberlake) Golf Course
Jack,
Attached is a letter approving the proposed SWIM buffer mitigation areas and the re- design of the
BMP on Hole #15 of the Palisades Golf Course. Please conact me with a schedule for completion
and call me with any questions.
Thanks,
Don Ceccarelli, PE
Project Manager
Charlotte - Mecklenburg Storm Water Services
County Water Quality
700 North Tryon Street
Charlotte, NC 28202
ph: (704)- 432 -4216
fx: (704)- 336 -4391
A Consider the environment before printing this email or the attachment
Charlalie- ecklenbur
STORM
#, WATER
Services
October 15, 2013
Mr. Jack Blythe
Timberlake Golf Club LLC
1415 East Westinghouse Boulevard
Charlotte, North Carolina 28273
RE: Comments on Timberlake Golf Course
Table 6 -9 and Tree Mitigation Plan Submittal
Dear Mr. Blythe:
700 North Tryolt Street
Charlotte, NC 25202
Fax: 704 ))6 4)91
Charlotte - Mecklenburg Storm Water Services ( CMSWS) has completed its review of the
submitted Tree Mitigation Areas and the updated Table 6 -9 for compliance with the
Palisades Water Quality Management Plan (WQMP) and for SWIM buffer re- vegetation
requirements.
The following comments are provided for your consideration:
Buffer Mitigation - GolfHole #6, #7, and #I8:
a. The preliminary buffer mitigation plan shows a 2 to 1 mitigation for the buffer
disturbances proposed along Timberlake Golf Course holes 6, 7, and 18,
which total 0.828 acres. The proposed location and area (1.66 acres) for this
mitigation is approved.
b. A copy of the updated Tree Save plans and updated tracking table have been
sent to Kelly Robertson at the City of Charlotte and a final electronic copy has
been received by this office.
2. Table 6 -9 — TSS Efficiencies:
a. The acreage- weighted TSS efficiency (71 %) and the Table 6 -9 efficiency
exceed the high density TSS removal requirement of 70% for this sub -basin
which is in compliance with the WQMP requirements.
As part of the provisions of the bond, CMSWS will need to inspect and approve all water
quality BMPs after receipt of final as -built surveys and engineering certification. Please
be aware that CMSWS will not release the Surety Bond (dated November 9, 2006) until
all the provisions have been completed by Timberlake. CMSWS requests a schedule for
completion of the BMP on Hole #15 by October 22, 2013.
•
�m To report pollution or drainage problems call: 311
0�.� http: �stormwater.charmeck.org a.
Mr. Jack BIN-the
Comments on Timberlake Golf Course
Page 2 of 2
Once the BMP on Hole 415 is constricted, contact me to perform a final inspection of all
golf course BMPs. Timberlake should allow 2 weeks for CMSWS to complete the final
inspection of the BMPs once the final report is received.
Please call me at (704) 432 -4216, if you have any questions.
Cc: Mike Andert, Timberlake Golf Club
Rusty Rozzelle, Heather Davis and David Caldwell, MCWQP
Marc Houle, Yarbrough - Williams & Houle
Mike MacIntyre, Kelly Robertson, and Tom Ferguson, City of Charlotte
Cindy Karoly, NCDENR - DWQ