Loading...
HomeMy WebLinkAbout20030037 Ver 2_Compliance Inspection Comments_20131015Burdette, Jennifer a From: Karoly, Cyndi Sent: Tuesday, October 15, 2013 11:07 AM To: Burdette, Jennifer a Subject: FW: Palisades (Timberlake) Golf Course Attachments: Pal Golf Course Compl Letter 10- 2013 -b.pdf From: Ceccarelli, Don [ mailto: Don.Ceccarelli@mecklenburocount nc.aov] Sent: Tuesday, October 15, 2013 9:50 AM To: Jack Blythe Cc: Mike Andert; Rozzelle, Rusty; Davis, Heather; Marc Houle; Robertson, Kelly; Ferguson, Tom; Karoly, Cyndi Subject: Palisades (Timberlake) Golf Course Jack, Attached is a letter approving the proposed SWIM buffer mitigation areas and the re- design of the BMP on Hole #15 of the Palisades Golf Course. Please conact me with a schedule for completion and call me with any questions. Thanks, Don Ceccarelli, PE Project Manager Charlotte - Mecklenburg Storm Water Services County Water Quality 700 North Tryon Street Charlotte, NC 28202 ph: (704)- 432 -4216 fx: (704)- 336 -4391 A Consider the environment before printing this email or the attachment Charlalie- ecklenbur STORM #, WATER Services October 15, 2013 Mr. Jack Blythe Timberlake Golf Club LLC 1415 East Westinghouse Boulevard Charlotte, North Carolina 28273 RE: Comments on Timberlake Golf Course Table 6 -9 and Tree Mitigation Plan Submittal Dear Mr. Blythe: 700 North Tryolt Street Charlotte, NC 25202 Fax: 704 ))6 4)91 Charlotte - Mecklenburg Storm Water Services ( CMSWS) has completed its review of the submitted Tree Mitigation Areas and the updated Table 6 -9 for compliance with the Palisades Water Quality Management Plan (WQMP) and for SWIM buffer re- vegetation requirements. The following comments are provided for your consideration: Buffer Mitigation - GolfHole #6, #7, and #I8: a. The preliminary buffer mitigation plan shows a 2 to 1 mitigation for the buffer disturbances proposed along Timberlake Golf Course holes 6, 7, and 18, which total 0.828 acres. The proposed location and area (1.66 acres) for this mitigation is approved. b. A copy of the updated Tree Save plans and updated tracking table have been sent to Kelly Robertson at the City of Charlotte and a final electronic copy has been received by this office. 2. Table 6 -9 — TSS Efficiencies: a. The acreage- weighted TSS efficiency (71 %) and the Table 6 -9 efficiency exceed the high density TSS removal requirement of 70% for this sub -basin which is in compliance with the WQMP requirements. As part of the provisions of the bond, CMSWS will need to inspect and approve all water quality BMPs after receipt of final as -built surveys and engineering certification. Please be aware that CMSWS will not release the Surety Bond (dated November 9, 2006) until all the provisions have been completed by Timberlake. CMSWS requests a schedule for completion of the BMP on Hole #15 by October 22, 2013. • �m To report pollution or drainage problems call: 311 0�.� http: �stormwater.charmeck.org a. Mr. Jack BIN-the Comments on Timberlake Golf Course Page 2 of 2 Once the BMP on Hole 415 is constricted, contact me to perform a final inspection of all golf course BMPs. Timberlake should allow 2 weeks for CMSWS to complete the final inspection of the BMPs once the final report is received. Please call me at (704) 432 -4216, if you have any questions. Cc: Mike Andert, Timberlake Golf Club Rusty Rozzelle, Heather Davis and David Caldwell, MCWQP Marc Houle, Yarbrough - Williams & Houle Mike MacIntyre, Kelly Robertson, and Tom Ferguson, City of Charlotte Cindy Karoly, NCDENR - DWQ