Loading...
HomeMy WebLinkAbout20061804 Ver 6_Stormwater Info_20130829Strickland, Bev From: Lucas, Annette Sent: Thursday, August 2O.201312:55PM To: Strickland, Bov� Dennison, Laurie Cc: Dovano.Boyd Subject: 00'1804v? Flowers Plantation Pod 7B Attachments: Final SMP Submittal—POD 7B-07-10-13.pdf Debbiejust submitted this phase of Flowers Plantation for SVV plan review. She and | have already chatted about this so ifno one minds, | will do the review. Bev—will you please ATF? Laurie —when you get the hard copy processed, will you please send ittome? I think it will be version 8 but you all will want to verify that. From: Deborah Shirley Sent: Thursday, August 29, 2013 10:07 AM To: Lucas, Annette Subject: RE: O6-18O4v6 Flowers Plantation Pod 713 Annette, Here isan the electronic copy ofPOD 7B/vve will send a hard copy for your review. reTalm FINITIM Deborah Edwards Shirley Soil & Environmental Consultants, PA 919-846-S900 (office) 919-673-8793 (mobile) ATHINK BEFORE YOU PRINT Soil & Environmental Consultants, PA 11010 Raven Ridge Road • Raleigh, North Carolina 27614 • Phone: (919) 846 -5900 • Pax: (919) 846 -9467 www.SandEC.com July 10, 2013 S &EC Project # 6658.P6 To: N.C. Division of Water Quality WEBSCAPE Unit Attn: Karen Higgins /Annette Lucas 512 N. Salisbury Street -9th floor Raleigh, NC 27603 Re: The Village at Flowers Plantation Stormwater ,Management Plan -POD 7B DWQ Project #20061804, Ver.3 /Certification No. 3766 Johnston County, NC On behalf of Mrs. Rebecca Flowers, please find the attached Stormwater Management Plan for POD 7B. According to the Individual 401 Water Quality Certification Approval Certification No. 3766, Condition No. 9, "a final, written stormwater management plan for each phase of this project shall be submitted to the DWQ 401 Oversight/Express Permitting Unit for review and approval'. Therefore, please see attached Stormwater Management Plan for your review and anticipated Approval. Please contact me at Sirley (,5eSn.com or (919) 846 -5900 if you have any questions. Attachments: 1) Flowers Plantation Pod 7B Sitework Calculations 2) Overall POD map (east side of Buffalo Rd.) 3) POD 7B Overall Site Plan -C -1 4) POD 7B Street Plan & Profiles -C -2 & C -3 5) POD 7B Wet pond Details -C -4 6) POD 76 Erosion & Sediment Control Plan-C-5, C -6 & C -7 7) POD 7B Utilities Details -D -01 & D -02 pq I! Nk Eva Pml- Owner/Dqyel2per�, F 4vt �;'Afqp. Al b y % STn.-.-("-.IKS, ENGINEERINTGa P.A. 9 1100 Eastern avenue Phone: 252.459,8196 PO Box 1108 Fax: 252.459.8197 Nashville, NC 27856 Mobile: 252.903.6891 Email: mstocks@stocksengineering.com Stocks Engineering, P.A. 1100 Eastem Avenue PO Brno 1108 NashVhie, NC 27856 Project: Flowers - Pod 713 Date: June 3, 2013 Page: 1 of 1 Post - Development Pmt- nevelonment �,Tc .. -�►rea jj]. rea.11���� ` _' '� : ... .1�� � _ . ��2� ���s 5 la 3.63 0.54 7.38 14.47 5 Ila 0.12 0.95 7.38 0.84 5 Ilb 0.63 0.58 7.38 2.70 5 IIC 1.58 0.55 7.38 6.41 5 Ild 0.08 0.95 7.38 0.56 5 Ile 3.51 0.54 7.38 13.99 5 Ilia 0.97 0.72 7.38 5.15 - Total 10.52 - 7.38 44.12 Pmt- nevelonment �,Tc .. -�►rea jj]. rea.11���� ` _' '� : ... .1�� � _ . ��2� ���s 5 la 3.63 0.54 8.21 16.09 5 Ila 0.12 0.95 8.21 0.94 5 11b 0.63 0.58 8.21 3.00 5 IIC 1.58 0.55 8.21 7.13 5 lid 0.08 0.95 8.21 0.62 5 Ile 3.51 0.54 8.21 15.56 5 Ilia 0.97 0.72 8.21 5.73 - Total 10.52 1 8.21 1 49.08 • • 25 -Year Storm ! �r a 2 0 N N O b v A T qr0T M, 113 �illill Page 1 Line Line ID Flow Line Line Invert Invert Line HGL HGL Minor HGL Dns No. rate size length EL Dn EL Up slope down up loss Junct line (cfs) (in) (ft) (ft) (ft) N (ft) (ft) (ft) (ft) No. 1 FES 1 to J131A 5.15 18 c 24.0 241.50 242.94 6.000 242.37 243.81 n/a 244.33 i End 2 JB1A to CB 2 5.15 18 c 116.0 243.70 248.92 4.500 244.33 249.79 n/a 250.31 i 1 Project File: New.stm Number of lines: 2 Run bate: 06 -03 2013 NOTES: c = cir; e = ellip; b = box; Known Qs only ; i - Inlet control. Hydraf aw Storm Sewers 2005 IL � � O � cc � � � E 0 � � .j � � � � CD : 75 cc � � � 00 2 f n0 �S a / 0 w ° k U w�£ \ \ �k § § * E .B / CL k � (0 (D k z � § § J 2E � Cl) § a>_ $ g Jam£ ■ - C14 04 \ £ \ ? w \ \ � m �k£ § k . 0 E # k K e ) . 3 k § § 0 E § § j \ w � t »_ $ « §)s � k E � CY \ § } z d t ` co e L / � ( � z ] _ 04 ( § 2 { k E yN 7 z 4i LJ s 0 O CD O C> O O O O N cc N I N N v N M N O }n0 Z6'917Z '13 'nul 9L'£9Z '13 LUW Z :ul - 00'Ob +L BIS cq 0 N O 0 O O O O J v O 0 tD O ul OL'£tZ '13 'nUI M Ino b6'Z -VZ -13 'nul 00'9t?Z '13 W11:1 L :ul - 00'bZ +O e3S 0 N ul 05' LVZ '13 'AUI 00'917Z '13 'AUIJ jIG gno ' UU UU'rU e+.5 O °a °o °o °a c`o N N LO N � v ci N N N W u to 0 0 N N N N 0 W 0 w T s F t 8 N 0 LO _9 2 • •• Page 1 Line Line ID Flow Line Line Invert Invert Line HGL HGL Minor HGL Dns No. rate size length EL Din EL Up slope down up loss Junct line (cfs) (in) (ft) (ft) (ft) 1%) (ft) (ft) (ft) (ft) No. 1 FES 3 to JB 4 24.50 30 c 18.0 241.50 242.94 8.000 243.15 244.59 We 245.81 i End 2 JB 4 to CB 5 24.50 30 c 45.0 243.04 254.29 25.000 245.81 255.94 n/a 257.16 i 1 3 CB 5 to CB 6 2.70 24 c 70.0 254.39 255.09 1.000 257.16" 257.17* 0.01 257.18 2 4 CB 5 to CB 7 20.96 24 c 75.0 254.39 255.89 2.000 257.16 257.69 We 258.80 i 2 5 CB 7 to CB 8 14.55 24 c 313.0 255.99 276.34 6.502 258.80 277.69 n/a 278.69 i 4 6 CB 8 to CB 9 13.99 24 c 79.0 276.44 278.81 3 -000 278.69 280.13 We 281.101 5 Flowers Pod 7B Number of lines: 6 Run Date: 06-03 -2013 NOTES: c = cir; e = ellip; b = box; Known Qs only ; *Surcharged (HGL above crown). ; i - Inlet control. Hydraftow Storm Sewers 2005 d m CL U) c O CL E V C J V w V 75 L C� — c O 'c c c J m n V� O n Iq O r Efl O O N C 0' W c W 'c O c Q N N p Li3 — c c t � to 4Na W W O W W W o N C ,L C O Z J ! mg M Or tZ liJ Of VO LO LO L co h .00 N N N N N N 61 fl- N O fO0 lN0 d: vr- fQ iii � 4t} C7 M m W c W v r� n: ci h cif cci - .o � c Q y� V Chi N N L d ei pi M N N N E Z _ Lo to N Gl r N r r r J Iq kq N N N N N N tg N O 00 CO C i >n N lhA m N N N N N J Or IV N A M n c c C c 0 N N N N N N t iK t M d tOo M tO O o O O O O tll .- 01 C9 h M C ►W, C O� r r r r to CL Q s E LO ° a o 0 0 °o �^ D v r N N cV CV tV � c W c W N N N N N N U C3 Im 4m m W c G d UY U, 0 tD N ••-' -• N I .0 w CY U° to O w a N N N h N r r m h �p U CD o U in M M N N N N �+- 3 w � c ° 0 LL Z S 12 2 E v C6 M N Q1 Q a ai EL N • 0 0 N 07 �F C II!dlppuppl�� IIIINI�IR�IIII 1111111 WNIII�I�fl�11� �I�IIIIIIIIIIIII,�. I Illlllll I� �IIIIIIIII�II�� II IIIIIIIN! 1.111. A�IIII AAI�III Mill �III�I�II!!lII�III IV 0 0 N 07 �F C E N m d M �J d W .o CL Lo RIB � INIII 0 a N H 0 a 2 CD d O O d CD O O C14 0 CD N to M N N N N d O O InCE 9:u o LO v u In °d sz*oez,13 WIN v 9:U-1 ch d a CO V C) L N d O N d u a d In VA C1 LO In An,00+091,19 In 0 a N co N N CD m N LU Lo RIB � INIII 0 a N H 0 a 2 0 a N H 0 a 2 Permit No. (to be provided by DWQ) STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be tilled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, rifled out and submitted along with all of the required information. I. PROJECT INFOKA'ATION Project name Flowers - Pod 713 Contact person Kevin Vamell Phone number 252.459.8196 Date 3- Jun -13 Drainage area number 1 VI m�0kA ,c II. DESIG iI INFORMATION Site Characteristics Drainage area 458,251 fe Impervious area, post - development 138,956 ft2 % impervious 30.32 % Design rainfall depth 1.0 in Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre - development 1 -yr, 24 -hr runoff Post - development 1 -yr, 24 -hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the prelpost control of the lyr 24hr stone peak flow required? 1 -yr, 24 -hr rainfall depth Rational C, pre-development Rational C, post - development Rainfall intensity, 1 -yr, 24 -hr storm Pre - development 1 -yr, 24-hr peak flow Post - development 1 -yr, 24 -hr peak flow Pre/Post 1 -yr, 24 -hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm, pool elevation) Top of 1Oft vegetated shelf elevation schom. of !Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the stale - required temp. pool? Elevation of the lop of the additional volume 12,220 ft3 12'802 ft" OK, volume provided is equal to or in excess of volume required, ft3 ft3 113 ft to Y (Y or N) 2.9 in 0.35 (unilless) 0.57 (unilless) 0.13 in/hr OK 1.13 fl3tsec 0.79 ft3lsec -0.34 ft3lsec 242.50 fmsi 241.5U fmsi 239.00 fmsl 242.00 fmsl MI An fm¢I flala nnl needed for oaloL.latinn onfinn $1 h. it ill( if prnvv_lad, 235.W fist 234.00 fmsi Data not needed for calculation option #1, but OK if provided. 1.00 ft N (Y or N) 242.5 fmsl OK Form SW401 -Wet Detention Basin Rev.9- 4118112 Parts I. ✓f II. Design Summary, Page 1 of 2 Ill. DESIGN INFORMATION Surface Areas Area, temporary pool 15,900 ft' Area REQUIRED, permanent pool 8,707 fe SAIDA ratio 1.90 (unitless) Area PROVIDED, permanent pool, A,„y,a 12,247 fe OK Area, bottom of 1Oft vegetated shelf, An.L�ndi 10,583 ft Area, sediment deanout, top elevation (bottom of pond), Ae„_,m 2,053 ft` Volumes OK Volume, temporary pool 12,802 ft3 Volume, permanent pool, Vp„_pd 39.405 ft3 _ Volume, forebay (sum of forebays if more than one forebay) 7,752 ft3 Forebay % of permanent pool volume 19.7% % SAIDA Table Data OK Design TSS removal 90 % Coastal SAIDA Table Used? N (Y or N) Mountain/Piedmont SAIDA Table Used? Y (Y or N) SAIDA ratio 1.90 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Y (Y or N) Volume, permanent pool, Vce,m_,d 39,405 ns _ Area provided, permanent pool, APH„_pw 12,247 ft` _ Average depth calculated 3.10 It Average depth used in SAIDA, d,,,, (Round to nearest 0,51t) 3.0 ft Calculation option 2 used? (See Figure 10 -2b) — N (Y or N) Area provided, permanent pool, A,,,,& 12,247 fe Area, bottom of 10ft vegetated shelf, A�„ �„n 10,583 ft` Area, sediment cleanoul, top elevation (bottom of pond), A�,,pv13 2,053 ftz "Depth' (distance blw bottom of 1 Oft shelf and top of sediment) 6.00 It Average depth calculated It Average depth used in SAIDA, d„„ (Round to down to nearest 0.5ft) ft Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (ff- non - circular) Coefficient of discharge (Cp) Driving head (H,) Drawdown through weir? Weir type Coefficient of discharge (C„,) Length of weir (L) Driving head (H) Pre - development 1 -yr, 24 -hr peak flow Post - development 1 -yr. 24 -hr peak flow Storage volume discharge rate (through discharge odfice or weir) Storage volume drawdown time Additional information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: Y (Y or N) 1.50 in it? 0.50 (unifless) 1.00 it N (Y or N) (unitless) (unitless) ft _ H 113 ft3 /sec 0.79 ft3 /sec 0.06 ff3 /sec 2.40 days a OK OK OK OK, draws down in 2 -5 days. Permit No. (to be provided by DWC) 3 :1 OK 10 :1 OK 10.0 ft OK 3 :1 OK 3.0 :1 OK Y (Y or N) OK 1.0 It OK N (Y or N) OK Y (Y or N) OK Y (Y or N) OK Inlet Pipe with Valve Form SW401 -Wel Delenton Basin- Rev.9- 4!18112 Paris i. & II. Design Summary, Page 2 of 2 Permit No. (to be provided by DWO) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. R a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), -Basin dimensions, - Pretreatment system, High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROME, Overflow device, and - Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross - section, - Vegetation specification for planting shelf, and - Filter strip, 3. Section view of the wet detention basin (1' = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0 &M) agreement. 9. A copy of the deed restrictions (if required). 10. A soils report that is based upon an actual field investigation, soil borings, and Infiltration tests. County soil maps are not an acceptable source of soils information. Form 5W401 -Wet Detention Basin- Rev.9- 4118112 Part Ill. Required Items Checklist, Page 1 of 1 Iz cl�lk 11:5 of 41 hx z I - CN z, ! k, 4"1 C', J oft Is Iz cl�lk 11:5 of 41 hx z I - CN z, ! k, 4"1 111,15 WE W-,F lz J FOREBAY/POND VOLUME COMPARISON 614/2013 POND 1 - FLOWERS POD 7A FOREBAY VOLUME ELEVATION SURFACE AREA INCREMENTAL VOLUME 238.0 1,458.0 235.0 2,053.0 1,661.5 239.0 1,865.0 236.0 2,924.0 2,081.0 240.0 2,297.0 237.0 3,747.0 2,526.0 241.01 2,755.0 238.0 5,820.0 1,483.5 241.51 3,179.0 239.0 ISUM= 7,752.0 Forebay Is 20% of Pond. Average Depth = Pond Volume Below Permanent Pool 39.405 CF Surface Area @ Permanent Pool 12,802 SF Average Depth - 3.1 FT POND VOLUME ELEVATION SURFACE AREA INCREMENTAL VOLUME 235.0 2,053.0 2,488.5 236.0 2,924.0 3,335.5 237.0 3,747.0 4,783.5 238.0 5,820.0 6,142.5 239.0 6,465.0 6,799.5 240.0 7,134.0 3,740.5 241.0 7,828.0 4,362.8 241.0 9,623.0 SUM= 31,653 Average Depth = Pond Volume Below Permanent Pool 39.405 CF Surface Area @ Permanent Pool 12,802 SF Average Depth - 3.1 FT Watershed Hydraflow Hydrographs by Intelisolve v9.22 1 - Pre Development 2 - Post Development 3 - Outflow Project: Pond Calcs.gpw Tuesday, Jun 4, 2013 Hydrograph Return Period Recap HydraflowHydrographs by IntelisDIvev9.22 Hyd. Hydrograph Inflow Peak Outflow (efs) Hydrograph No. type Hyd(s) description (origin) 1 Yr 2 -Yr 3 -Yr 5 -Yr 10-Yr 25 -Yr 50 -Yr 100 -Yr i SCS Runoff - -- 1.131 -- - --- ____ _..— _ _ — _ ____. Pre Development 2 SCS Runoff - -- 19.02 - -• - - - -- - --- -- •-- -- – -- - - --- Post Development 3 Reservoir 2 0.787 Outflow Proj. file: Pond Calcs.gpw Tuesday, Jun 4, 2013 Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time Interval (min) Time to peak (min) Hyd. volume (tuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 1.131 1 719 5,963 — -- -- - -- Pre Development 2 SCS Runoff 19.02 1 716 33,147 - - -- ---- -- -- Post Development 3 Reservoir 0.787 1 809 20,564 2 142.74 18,453 Outflow Pond Ca)cs.gpw Return Period: 1 Year Tuesday, Jun 4, 2013 Hydrograph Repoill HydraflowHydrographs by Intelisolve v9.22 Hyd. No. 1 Hyd. volume = Pre Development Curve number = Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 10.520 ac Basin Slope = 8.0% Tc method = KIRPICH Total precip. = 2.89 in Storm duration = 24 hrs Q (cfs) 2.00 1.00 0.00 A 0 2 4 -- Hyd No. 1 4 Tuesday, Jun 4, 2013 Peak discharge = 1.131 cfs Time to peak = 11.98 hrs Hyd. volume = 5,963 cuft Curve number = 55 Hydraulic length = 380 ft Time of conc. (Tc) = 2.00 min Distribution = Type 11 Shape factor = 484 Pre Development Hyd. No. 1 — 1 Year 6 8 10 12 14 16 18 20 22 24 Q (cfs) 2.00 1.00 -d-- 0.00 26 Time (hrs) Q (cfs) 21.00 15.00 12.00 • "I 6.00 OKIJ 0.00 0 2 4 —® Hyd No. 2 6 8 Post Development Hyd. No. 2 — 1 Year Q (cfs) 21.00 1 8.00 15.00 12.00 111M M 11 3.00 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 5 Hydrograph Report Hydraflow Hydrographs by Intelisolve 0.22 Tuesday, Jun 4, 2013 Hyd. No. 2 Post Development Hydrograph type = SCS Runoff Peak discharge = 19.02 cfs Storm frequency = 1 yrs Time to peak = 11.93 hrs Time interval = 1 min Hyd. volume = 33,147 cuft Drainage area = 10.520 ac Curve number = 75.7 Basin Slope = 8.0% Hydraulic length = 350 ft Tc method = KIRPICH Time of cone. (Tc) = 1.88 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 21.00 15.00 12.00 • "I 6.00 OKIJ 0.00 0 2 4 —® Hyd No. 2 6 8 Post Development Hyd. No. 2 — 1 Year Q (cfs) 21.00 1 8.00 15.00 12.00 111M M 11 3.00 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 6 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.22 Tuesday, Jun 4, 2013 Hyd. No. 3 Outflow Hydrograph type = Reservoir Peak discharge = 0.787 cfs Storm frequency = 1 yrs Time to peak = 13.48 hrs Time interval = 1 min Hyd. volume = 20,564 cuft Inflow hyd. No. = 2 -Post Development Max. Elevation = 142.74 ft Reservoir name = Wet Pond Max. Storage = 18,453 cuft Storage Indication method used. Outflow Fond Report ' Hydraflow Hydrographs by Inteiisolve v9.22 Tuesday, Jun 4, 2013 Pond No. 9 - Wet Pond Pond Data Contours - User - defined contour areas. Average end area method used for volume calculation. Begining Elevation = 141.50 ft Stage ! Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0,00 141.50 12,802 0 0 0.50 142.00 14,785 6,897 6,897 2.20 142.70 16,299 26,421 33,318 Culvert 1 Orifice Structures Weir Structures [A] 1131 [C] [PrfRsr] [A] [B] [C] 1D] Rise (In) = 24.00 1.50 0.00 0.00 Crest Len (ft) = 10.00 20.00 0.00 0.00 Span (in) - 24.00 1.50 0.00 0.00 Crest El. (ft) = 142.70 143.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 141.50 141.50 0.00 0.00 Weir Type = Riser Broad --- -- Length (ft) = 40.00 1.00 0.00 0.00 Multi -Stage = Yes Yes No No Slope (%) = 20.00 1.00 0.00 n/a N -Value = .013 .013 .013 We Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(Infhr) = 0.000 (by Contour) Multi -Stage = n1a No No No TW Elev. (ft) = 0,00 Note: CuWrf/Orff" ouBlows are analyzed under inlet (lo) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s) Stage (ft) 3.00 2.00 1.00 0.00 1 ' 0.00 2.00 4.00 6.00 Total Q Stage 1 Discharge 8.00 10.00 12.00 14.00 Elev (ft) 144.50 143.50 142.50 ---�- 141.50 16.00 Discharge (cfs) 0- 4's S.kknmer Svotdiment Basin NTiforksheet (Drainage Area Must be Less Than 10 Acres) Area Disturbed Acres Runoff Area = wo Acres Qio = C x I x A = x lr, f t x -1 . UP = z I 1 60 Cfs Volume of Sediment = ( Ac.) x (1800 cf sed./year) x (1 year) cf Assume . foot of basin depth, therefore area of the pit Square Feet Try (_ wide) x (_ long) x (_ foot deep) Sediment Basin Eturface PLrea Calculation: Surface Area (SF) = Qj() x 325 sf/cfs I-f3,o x 325 sf/cfs -Z of�.'s sf Surface Area-. C"�Ac Use (_ wide) x long) x (_ foot deep) Sediment Basin Surface Area - Y' it De -icon and Veloci!y Check: Q10 = n cfs; Q = CLH 3/2; H = [Q/CL]213 Z LB-50 (2.68)( A!';_ )]213 0 el _/ feet Velocity Check -> ( 2-VAR )/( Zf-, ) ( ) = /, 64-4 - fps, OlKvl�r tc,", b, xm w.to geain Water Slaage Volume 013) Figure 2. Skimmer oriflce diameter as a function of the basin volume and basin dewatering time. Basin !Volume (From Worksheet: _, �`i,c►00 Basin Dewatering Time (1 -3 Days): Skimmer Orifice Diameter (From Chart), Skimmer Sediment Basin Worksheet (Drainage Area Must be Less Than 10 Acres) Area Disturbed = 1'. 2z") Acres Runoff Area 17' Acres Qjo = C x -1 x A f,x 4-J3, x*. °` bf s Basin Volume Calculation: o ' V lume of Sediment Ac.) x (1800 cf sed./year) x (1 year) Assume foot of basin depth, therefore area of the pit Square Feet Try wide) x (_ long) x foot dee . p) Sediment Basin Surface Area Gaicullation: Surface Area (SF) = Q'O x 325 sf/cfs !Aa x 325 sf/cfs s f Surface Area – dar c�it Use wide) x li-N long) x foot deep) Sediment Basin Surface Area – I Weir Design, G-49-IC14 Velocity Q10 j 2. A> cfs; Q = Cl-H312. H = [Q/CLI 113 12' , _ t (2.68)( )12/3 —0- q5 feet Velocity Check 4), 2- fps, OK Skimmer Orlffc6 Design. 2 O F 4 T U;WA WAIV SI..q. V.4.!.. ('17 Figure 2. Skimmer orifice dlanelw as a function of !h bISIR volun6 and bash davaleong Ifire. Basin Volume (From works'hoet' Basin- Dewa'tering Time (1-3 Days); - Skimmer Oriface Diameter- (Fr6m,Ch art): Channel Report Hydraflow Express by Intelisolve = 0.90 Temporary Diversion - Bare Soil Triangular Area (sgft) Side Slopes (z:1) = 2.00, 2.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 100.00 Slope ( %) = 8.00 N -Value = 0.200 Calculations Compute by: Known Q Known Q (cfs) = 1.81 Elev (ft) 102.00 101.50 101.00 100.50 100.00 41"t Friday, Jun 7 2013 Highlighted Depth (ft) = 0.90 Q (cfs) = 1.810 Area (sgft) = 1.62 Velocity (ft/s) = 1.12 Wetted Perim (ft) = 4.02 Crit Depth, Yc (ft) = 0.56 Top Width (ft) = 3.60 EGL. (ft) = 0.92 Section Depth (ft) Z.00 1 2 3 4 5 6 7 Reach (ft) 1.50 1.00 0.50 -0.50 Channel Report Flydraflow Express by lntelisolve Temporary Diversion - Vegetated Triangular = 1.810 Side Slopes (z:1) = 2.00, 2.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 100.00 Slope ( %) = 8.00 N -Value = 0.350 Calculations = 1.11 Compute by: Known Q Known Q (cfs) = 1.81 Elev (ft) 1a2.o0 101.50 101.00 100.50 100.00 Section Friday, Jun 7 2013 Highlighted Depth (ft) = 1.10 Q (cfs) = 1.810 Area (sqft) = 2.42 Velocity (ft/s) = 0.75 Wetted Perim (ft) = 4.92 Crit Depth, Yc (ft) = 0.56 Top Width (ft) = 4.40 EGL (ft) = 1.11 1 2 3 4 5 6 Reach (ft) O W 0. E w0 CO co (D M C: Z LU fro ILI to RV ti -M If? 2c l? U,5e C- aLikE3- zt, eir a a u5� F-(rsu P-a c"t> X- & �W& ( e " c Z�, 4 2s 2,c- HA i Ll f L o.- � P- C-� 214"Cis V � �, -fps -Aw�� L,c-,z.yyr CC_t-V.5 'D, il-W a- 0 / CL E ui 0 _Q CO CD -C 0) 6 z LU W I 41 1A PIZ Ll Rif � P- C-� 214"Cis V � �, -fps -Aw�� L,c-,z.yyr CC_t-V.5 'D, il-W