Loading...
HomeMy WebLinkAbout20080102 Ver 2_Inspection_20130618NCDEN '�Fr� , ,� 10/'? � North Carolina Department of Environment and Natural Resoikco§�v���TY Division of Water Quality rFRB Pat McCrory Thomas A. Reeder JoY'..�Wkvarla, III Governor Acting Director Secretary June 18, 2013 Mr. J. J. Swain, Jr., P.E. Division 13 Engineer N.C. Department of Transportation Post Office Box 3279 Asheville, North Carolina 28802 Subject: Inspection TIP No. B -4182 DWQ Project 20080102V.2 NCSR 1503 (Upper Laurel Road) Madison County Dear Mr. Swain: On June 4, 2013, I inspected the construction work on TIP Project No. B -4182, over Big Laurel Creek, on NCSR 1503 (Upper Laurel Road), in Madison County. The inspection included a review of the construction and compliance with the 401 Water Quality Certification. Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are performed as required to protect State surface waters. Also, please refer to the attached inspection report for any specific items noted during the inspection. If you have questions, please call me at 828 - 296 -4500. Sincerely, PA-t-1— i� Michael R. Parker Environmental Senior Specialist Attachment cc: Randy McKinney, PE Roger Bryan, Division 13, DEO Ben DeWit, Roadside Environmental Transportation Permitting Unit Mike Parker, Asheville Regional Office TIP No. B -4182 NCSR 1503 June 2013 Inspection Letter SURFACE WATER PROTECTION SECTION — Asheville Regional Office 2090 U.S. 70 Highway, Swannanoa. NC 28778 -8211 Phone. 828- 2964500 l FAX - 828 - 299 -7043 One Internet: www.ncwatercluality orq NorthCarolina An Equal Opportunity 1 Affirmative Action Employer NaturalltY Wetland Inspection Report Project Num: 20080102 Project Name: NCDOT- Bridge No. 246 on SR 1503 County: Madison Location: NCDOT- Bridge No. 246 on SR 1503 Latitude: SW Plan Location: Site Owner Name: NC DOT Division 13 Inspection Date: 06/04/2013 Reason for Inspection: Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On -Site Representative(s): Primary Inspector: Michael R Parker Secondary Inspector(s): Facility compliance Status: U Compliant Program Area: 401 (includes isolated /non -404) Version: 2 Status: Issued Project Type: Replace bridge with bridge Region: Asheville Title: Longitude: n Not Compliant Phone: Phone: 828 -296 -4500 Question Areas: 0 Permit (401 WQC) Inspection Summary: Contractor had removed old bridge and was in process of excavating foundation for culvert bottom. Sediment and erosion control measures appeared to be operating properly. Seed and mulch all bare areas as required and continue to maintain sediment and erosion control measures. Permit (401 WQC) Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and /or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: ■Q❑❑ ■nnn ■nnn Page: 1