Loading...
HomeMy WebLinkAbout20130066 Ver 1_Application_20130123t I 19� AT qQG -4/4 /V 2 �`� 201 Q fY��•i J q7a - ?W�F 20130066 Office Use Only: Corps action ID no. DWQ project no. Form Version 1 3 Dec 10 2008 Page 1 of 10 PCN Form — Version 1.3 December 10, 200�/ersion Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ® Section 404 Permit ❑Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes N No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No,, 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. N Yes ❑ No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Bridge #177 on SR 1137 2b. County: Watauga 2c. Nearest municipality 1 town: Foscoe 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 17BP.11.R26 3. Owner Information 3a. Name(s) on Recorded Deed: NCDOT 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 801 Statesville Road 3e. City, state, zip: North Wilkesboro, NC 28659 3f. Telephone no.: 336- 903 -9202 3g. Fax no.: 336 - 667 -4549 3h. Email address: hslaughter@ncdot.gov Page 1 of 10 PCN Form — Version 1.3 December 10, 200�/ersion 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: �- 5f. Fax no.: 5g. Email address: Page 2 of 10 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1 b. Site coordinates (in decimal degrees): Latitude: 36.17926 Longitude: - 81.78128 (DD DDDDDD) ( -DD DDDDDD) 1c. Property size: 0.1 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: UT to Clark Creek 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: Watauga 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Substandard bridge to be replaced in a rural area 3b. List the total estimated acreage of all existing wetlands on the property: 0 acres 3c. List the total estimatetl linear feet of all existing streams (intermittent and perennial) on the property: 100 linear feet 3d. Explain the purpose of the proposed project: Upgrade substandard stream crossing 3e. Describe the overall project in detail, including the type of equipment to be used: See attached cover letter. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) inthe past? Comments: ❑ Yes'- ® No ❑ Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency /Consultant Company: Other. 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ® Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T W-1 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ ❑ Yes ❑ Corps W3 ❑ P ❑ T ❑ No ❑ DWQ W4 ❑ P ❑ T ❑'Yes ❑ No ❑ Corps ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f, 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ®P ®T Pipe, Riprap & Dewatering UT to Clark Creek ® PER ❑ INT ® Corps ® DWQ 3 - g 115 ❑ PER ❑ Corps S2 ❑ P ❑ T ❑ INT ❑ DWQ ❑ PER ❑ Corps S3 ❑ P ❑ T ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ INT ❑ Corps ❑ DWQ ❑ PER ❑ Corps S5 ❑ P ❑ T ❑ INT ❑ DWQ ❑ PER ❑ Corps S6 ❑ P ❑ T ❑ INT ❑ DWQ 3h. Total stream and tributary impact's 3i. Comments: 40 linear feet of the impacts are temporary Page 4 of 10 PCN Form — Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water impact number — Name of waterbody (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑P ❑T 02 ❑P ❑T 03 ❑P ❑T 04 ❑P ❑T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. 5b. 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland Pond ID Proposed use or purpose (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded 4 number of pond P1 P2__t 5f. Total 5g. Comments: N/A 5h. Is a dam high hazard permit required? ❑ Yes ®No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse ❑ Tar - Pamlico ❑ Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f• 6g' Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact re uired? ❑Yes B1 ❑P ❑T ❑ No ❑ Yes B2 ❑P ❑T ❑ No ❑ Yes B3 ❑ P ❑ T ❑ No 6h. Total buffer impacts 6i. Comments: Page 5 of 10 PCN Form — Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The culvert length is the minimum needed to improve safety at this location. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. All appropriate BMPs will be used'during construction 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ® Yes ❑ No ❑ DWQ ® Corps 2b. If yes, mitigation is required by (check all that apply): ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this ® Payment to in -lieu fee program project? ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ® Yes 4b. Stream mitigation requested: 4c. If using stream mitigation, stream temperature: 50 linear feet ❑ warm ❑ cool ®cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres acres 4g. Coastal (tidal) wetland mitigation requested: 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form —Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes Z No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d Total impact Multiplier 6e. Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 PCN Form — Version 1.3 December 10, 2008 Version E. Stormwater Management and Diff use Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program - ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase II ❑ NSW 3b. Which of the following locally - implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a. Which of the following state - implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006 -246 l ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal /state /local) funds or the ® Yes ❑ No use of public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after - the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short-narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 9 of 10 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 51b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? GIS and visual observation 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? W RC will comment 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Project was submitted to OHE. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ❑Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? ncfloodmaps J. Heath Slaughter 1123/13 Applicant/Agent's Printed Name s Sre r Applicant/AgentJPA ( Agent's s nature is valid only if an authori tter from the applicant Date is provide d. Page 10 of 10 PCN Form — Version 1.3 December 10, 2008 Version U� 1 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAT McCRORY P. O. Box 25201, Raleigh, NC 27611-5202 TONY TATA GOVERNOR PHONE: 919- 733 -2520 SECRETARY January 23, 2013 Mr. Monte Matthews U. S. Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Subject: Nationwide Permit #14 Replace Bridge #177 on SR 1137 with Pipe Watauga County, North Carolina Project Number: 17BP.11.R.26 (DWQ Permit Fee: $240) Dear Mr. Matthews: The North Carolina Department of Transportation is scheduled to replace existing Bridge #177 with 2 lines of 60" pipe at the same location. The existing bridge is 16.5 feet long. The pipe option is not ideal but our right -of -way limitations along with this being a dead end road appear to make our proposal the best option available. Stream slope is about 9 %. Flow will be isolated to one barrel. Mitigation will be provided through EEP. No on -site detour is proposed. Stream impacts are tabulated below. Stream Impacts: CIA •� �,` ,° - =rtt;. z�,-",: -+ "'s Y.4 _ i` �', ng_ :.:€�i'" ;. P ": c.�s. '3"=i - ,Pro 'osed::,.- p�. . aTem ora :Bi a :,. A Total =Im acts:at ry,;;,Exist u.�.;_... ?kF35'i .. "d:m ...T. :�,3� .kAMS.tr,Y",<a��"" -;;a3" `.:r�. ?r?u�,t�'2"%. �. =;T d:�>dl l :rsS%� T= ai.,.:= -`•'- ..,+„L:. _ .�_ "ewaterin .i. �`�4�c, - fii3��i Im (feet)S I M;' i�ra: �...,,�. ..i�?:^' - <-{. Station ) I Structure Size;, ?Struc'ture'Size, D acts . nthisz -(ft 16.5' long (2) @ 60" x Bridge #177 bridge 50' CSPs w/ 40 25 115 HWs Perm. Fill/Riprap Impacts = 75 feet Total Project Impacts =115 feet The replacement of the existing bridge with the proposed new pipes will require temporary dewatering. An impervious sandbag dike will be constructed approximately 20 feet upstream of the existing structure to create a small pool. Clean water will temporarily be pumped around or P. 0. Box 250, N. WILKESBORO, NC 28659 PHONE (336) 667 -9111 FAX (336) 667 -4549 Mr. Monte Matthews Bridge #177 on SR 1137 Page 2 January 23, 2013 piped through the construction area and will be discharged downstream. Any dirty water located inside the construction area will be pumped into a silt bag if necessary. Once the new structure is in place, the impervious dike will be removed and preconstruction streambed elevations will be restored. Construction of this project will require impacts to waters of the United States in the Watauga River Basin. The existing bridge crosses a UT to Clark Creek (Class: C). This project was reviewed for the-presence of threatened and endangered species in September 2012. The subject project will have no effect on any federally listed endangered plant or animal species. Cultural resources review is complete with no surveys required. The project impacts are not significant in nature and should not alter the best usage for this stream. All appropriate BMPs will be used during construction. Attached is a Preconstruction Notification Form, plan sheets, a marked county map and a marked topography map. By copy of this electronic letter, it is requested that Mrs. Marla Chambers with the North Carolina Wildlife Resources Commission comment directly to you concerning the 404 Nationwide Permit application with a copy sent to me. By copy of this electronic letter, it is requested that the Division of Water Quality, 401/Wetlands Unit, issue the appropriate permit for construction of this project. It is requested that any comments related to the 401 certification be forwarded directly to me with a copy sent to the US Army Corps of Engineers. We would like to begin construction as soon as possible. If further information is required, please let me know. Your early review and consideration will be appreciated. Sincerely, Heath Slaughter Division Environmental Officer Enclosures cc: Monte Matthews, US Army Corps of Engineers Marla Chambers, NCWRC Amy Chapman, Division of Water Quality Amy Euliss, Division of Water Quality Mike Pettyjohn, PE, Division Engineer David Wayne, PE, Bridge Maintenance Engineer Jami Guyrm, Division Bridge Program Manager Heath Slaughter, Division Environmental Officer Neil Trivette, Roadside Environmental Field Operations Engineer d 0 os III .... IIIIIIIIIIIIIII .. IT III 1101M 11 .... .... ....... ........ ....... ...... ... ...... ....... ....... ......... .... case eels Ic] 1110 a saa .... .... .... ........ .. .... ......... ........ ....... .. .... t O N o ..... ...... . ... ....... ........ .... .. ... .. ....... ........ ........ .... ....... .... .. ...... ... ........ ........ ''I . ........ .. ..... ........ . .. ...... . . ..... . , . ...... .. ..... ......... .. ....... . .... ... ........ ..... ....... ... ...... ........ ......... ... ..... ........ .. .. ..... ........ ........ ........ ........ ri4 J . \ �o ",� Z dbJ S6 1�00 .. ........ ...... ... .. .. ..... ........ ........ ........ ........ ........ ........ ... . ..... .. ..... .... ...... .... .... . .. ... ........ ........ ........ ........ ........ .... .. ......... ........ ........ .... ... ......... ... .... ........ . . .... ......... .... ........ .... .... . . .... ......... ........ ........ 1� ....... ...... ... . . .... .. ... ..... ... ; ........ ...... ... . . .... ....... ... ........ ... . . . . . . . . . . . . ....... 21i All .. .. .. ........ . ... .. ........ ........ . .... ..... .... ........ .. ..... . . . . . . . . . . . .� ,fit �s'% `° I ........ ........ ...... . ...... . ...... ....... ........ ........ .... . ........ ...... . . .. ........ ........ ........ .... . ........ .... ........ ...... ....... . ...... ........ ........ ........ ........ ........ . .... ........ ........ ........ ........ ........ ........ ........ ........ ........ ........ .... ........ ..... ....... ........ ... I .... ........ ........ ........ ........ ......... ...... ....... ........ ........ ........ ......... ......... ......... ......... ......... ......... ......... ......... ......... ... ..... ... ..... ......... ......... .... ......... ... ........ ........ ........ ........ ........ ......... ......... ... ..... ......... ........ ..... .. ........ .... I ... ... .... ........ - ...... ........ ........ ... .... ..... I .. ........ ... .... ........ ... ... .... ........ ........ ....... ..... I .. ......... ..... ........ ... .... ........ ... .... ........ ....... ........ . ........ ... .. ........... �;ja,�,3 % 0 0 g W g W� tp -o fp 00 .. ........ .... ........ ...... .. ........ ........ .. ...... ..... ... .......... ... ...... .. ....... ........ ........ ........ WHIR flUtwu 0111 IFIIIIIIII ... .... ......... ILU ..... 1 3. 1) Bridge #177 on SR 1137, Watauga. 2) Downstream view from bridge. 3) Upstream view from bridge. 2. A" � • � fI d t V, �1 70 • �a U, 7D �r IN. W 0 y . 1 l `o �\