Loading...
HomeMy WebLinkAbout20030065 Ver 2_Stormwater Info_2013011403- ooL,S l)a. Preliminary Stormwater Management Plan Highways 70/581 Project Goldsboro, NC SUC Project No. 7325.D2 January 2013 \ \0\\1CA/i /, poi 0 SEAL 9 = 'a 025525 r: _ Patrick K. Smith, PE CK K: NC License No. 25525 D JAN 1 4 2013 wA n, Soil & Environmental Consultants, PA 11010 Raven Ridge Road • Raleigh, North Carolina 27614 • Phone: (919) 846 -5900 • Fax: (919) 846 -9467 www.SandEC.com Preliminary Stormwater Management Plan Highways 70/581 Project Goldsboro, NC S &EC Project No. 7325.D2 January 2013 ��Ogt1! €;II�Ila � p ®r ®s �r \�oo� S- E,AL��' ®25525 ___ � - 'C/.1 ...PPM �'•` Patrick K. Smith, PE NC License No. 25525 / /c�a 1 Soil & Environmental Consultants, PA 11010 Raven Ridge Road • Raleigh, North Carolina 27614 + Phone: (919) 846 -5900 • Fax: (919) 846 -9467 www.SandEC.com Table of Contents Tableof Contents ................................................................... ............................... i Listof Figures ........................................................................... .............................ii Listof Appendices .................................................................... .............................ii Project Location, Background & Description ........................ ............................... 1 Stormwater Treatment & Peak Discharge Attenuation .......... ............................... 2 Total Suspended Solids (TSS) and Total Nitrogen (TN) Removal Efficiency ....... 2 Preliminary Stormwater Wetland Planning & Design ............. ............................... 2 Nitrogen Export Calculations ................................................. ............................... 3 BMP Inspection & Maintenance ...... : ................. ................................................... 4 Limitations............................................................................. ............................... 4 i List of Figures Figure 1— Vicinity Map Figure 2 — USGS Topographic Map (NW Goldsboro Quadrangle) Figure 3 — Soil Survey Map Figure 4 — Preliminary Wetland Stormwater Footprint (overlain on Aerial Photo) List of Appendices Appendix A— Email Correspondence (defining BM design criteria) Appendix B — Preliminary Supporting Stormwater Calculations Appendix C —Preliminary Stormwater Wetland Plant Selection Appendix D — Preliminary Nitrogen Export Calculations Appendix E — Draft Stormwater Wetland Operations & Maintenance Agreement ii Project Location, Background & Description This report represents a Preliminary Stormwater Management Plan for the Highway 70/581 Project in Wayne County, NC. The property described in this report consists of approximately 1.63 acres and is located south and east of the intersection of NC Highway 70 and NC Highway 581, west of the City of Goldsboro, NC. See Figures 1 and 2. The property is currently owned by Mr. David Weil of HWB of North Carolina, LLC. We understand that the property is proposed for development, however no specific site plan has been proposed at this time. Current plans call for the existing ditch (which crosses the northwest corner of the site) to be backfilled. A bypass pipe (designed by others) is proposed for installation. We understand the pipe will be installed as part of the development of the parcel immediately to the west of the site (the Sheetz Project). This pipe will provide a hydraulic connection for flow from under NC Highway 581 to US Highway 70 which the ditch currently provides. In December 2002 a Preliminary Stormwater Study was prepared by Soil & Environmental Consultants, PA (S &EC) for the overall property owned by Mr. Weil which consists of approximately 3.4 acres. This study described a conceptual stormwater design which included the construction of an extended detention stormwater wetland to provide stormwater treatment on site. This study was required as part of a buffer variance process (associated with a NC Division of Water Quality 401 Certification for stream and buffer impacts) and to comply with the Neuse Basin Nutrient Removal Strategy. The conceptual design described in limited detail the preliminary sizing of the wetland, described its basic function and overall design intent, and provided preliminary nitrogen export rate calculations along with various planning recommendations. It was understood at that time that a final Stormwater Management Plan and engineered design (based on the final development plan) would eventually need to be prepared and submitted to the North Carolina Department of Environment and Natural Resources (NCDENR) Division of Water Quality (DWQ) for approval before the proposed impacts could take place. Based on the project location this Stormwater Management Plan will also be submitted for review by the local authorities (the City of Goldsboro, NC). At the present time only a portion of the overall property site is currently proposed for construction of the Sheetz project (approximately 2.35 acres). The remainder of the property to which this report applies will remain in its current condition for the foreseeable future. Mr. Kevin Martin, LSS of S &EC previously discussed this phased approach to development with Ms. Cindy Karoly of DWQ and she indicated that it was acceptable to move forward in this manner. 1 The final Stormwater Management Plan for the Sheetz Project will be submitted to DWQ for review under a separate cover as previously agreed upon with DWQ. This report and the attached design documents are specific to the remaining portion of the overall property only (approximately 1.63 acres) and should be reviewed accordingly. We understand that once a detailed site plan is prepared for this portion of the property a final Stormwater Management Plan will need to be prepared and submitted to DWQ for review and approval. Stormwater Treatment & Peak Discharge Attenuation As agreed upon by DWQ the September 2007 NCDENR -DWQ Best Management Practices (BMP) Stormwater Manual was used for the development of the stormwater wetland design requirements (see copies of Emails dated June 8, 2011 and May 4, 2012 in Appendix A). Treatment of stormwater runoff for the project including the removal of Total Suspended Solids (TSS) and Total Nitrogen (TN) is required by the Division of Water Quality (DWQ) as part of the project's permitting requirements. Stormwater treatment, as well as post - development peak discharge attenuation is required by the City of Goldsboro, NC. A single extended detention stormwater wetland is proposed to provide treatment of stormwater including the removal of TSS and TN from site stormwater runoff. The wetland will also serve to meet the City's requirement that the post - development peak discharge from the site for the 1 -Year 24 -Hour storm does not exceed the pre - development peak discharge. The City will not be reviewing this preliminary report but will review the final Stormwater Management Plan at such time as site development is proposed. Total Suspended Solids (TSS) and Total Nitrogen (TN) Removal Efficiency Based the I stormwater al _J t designed on he orvlr manual a wetland, iI designed properly, Has a 133 removal efficiency of 85 percent. According to the BMP manual a stormwater wetland will also contribute significantly to the removal of TN from stormwater inflow. The manual cites stormwater wetlands with a removal efficiency of 40 percent for TN if designed and maintained properly. Additionally, while not required for evaluation stormwater wetlands are cited with removal efficiencies of 40 percent for Total Phosphorus (TP). Preliminary Stormwater Wetland Planning & Design Preliminary calculations for the sizing of the proposed stormwater wetland for the BMP were performed by S &EC. Preliminary stormwater design calculations and supporting documentation are included in Appendix B. Because no specific site plan has been prepared for the property certain assumptions were made regarding future development. These included the general assumption that the site would be developed 2 with a similar land usage to the adjacent Sheetz Project. In this case we assumed a site impervious percentage of 70 percent, which we deem reasonable based on the expected development, and in our opinion is suitable for preliminary design purposes. The drainage area shown for the BMP was delineated based on similar understanding of a likely stormwater collection /conveyance network and proposed final grading associated with the site development plan. We have assumed that in -situ soil characteristics will be similar to those observed on the adjacent property. The evaluation of both the existing and proposed site conditions land usage /cover and associated impervious percentages was based on aerial photographs, site survey data, the proposed site plan for the Sheetz Project (by others), our site observations, and experience on similar projects. Design of the stormwater wetland included but was not limited to the calculation of the wetland treatment volume and the temporary water quality pool depth, wetland zone distributions, overflow spillway weir sizing, and preliminary recommendation of wetland plant species (per the current BMP Manual). An overflow weir (riser /barrel structure) was designed to safely pass the 10 -year event (in accordance with guidance received from the City of Goldsboro) by routing this event through the spillway system (see the attached calculations). A preliminary wetland design sketch is provided in Figure 4. This sketch shows the general location, footprint and spillway system for the proposed stormwater wetland. The exact location and dimensions of the wetland may change during final design. Representative photos of the recommended wetland plant species are provided in Appendix C. Based on our previous discussions with DWQ, we understand that once treated for TSS and nutrient removal, discharge from a stormwater wetland can be discharged directly into the receiving watercourse. In this project the proposed BMP will be designed to discharge directly into the proposed 60 -inch reinforced concrete pipe (at Junction Box 2) proposed for installation along the alignment shown on the proposed site plan shown on Figure 4. Nitrogen Export Calculations We estimated Nitrogen Export rates associated with the existing site conditions and proposed development using methods outlined in the Neuse River Basin: Model Stormwater Program for Nitrogen Control guidelines. For the purposes of our calculations we considered the drainage area contributing to the stormwater wetland at approximately 1.63 acres. For comparison purposes we evaluated both the existing site conditions and the proposed site conditions when calculating nitrogen export. Our evaluation revealed a nitrogen export coefficient of 13.01 pounds per acre per year (Ibs. /ac. /yr.) for the site in its existing condition. This relatively high export rate is primarily due to the high imperviousness of the site in its current condition. Our evaluation revealed a pre - treatment nitrogen export rate of 15.20 Ibs. /ac. /yr. for the proposed development and a post- treatment export rate of 9.12 Ibs. /ac. /yr. considering 3 a 40 percent removal efficiency. Preliminary nitrogen export calculations are provided in Appendix D. As described in the cited program literature, for commercial and residential development, the rules require that nitrogen export of 3.6 lbs. /ac. /yr. or less be achieved. In this case since the post- treatment export rate is less than 10.0 lbs. /ac. /yr. and we anticipate that there will be no space available on site for supplemental BMP's to further reduce the TN export. As such we anticipate that the Owner will elect to pay a one -time offset payment (to the NC Ecosystem Enhancement Program, NCEEP) of $20.29/lb. (NCEEP Fee Schedule dated June 2012) to bring the nitrogen down to a rate of 3.6 lbs. /ac. /yr. For planning purposes we have estimated the offset payment at 1.63 acres times 5.52 Ibs /ac /yr (9.12 -3.60) times $20.29/lb. times 30 years or $5,476.84. This value will likely change during final design and will vary depending on offset payment rates at the time the project goes to final design. NOTE: Based on our discussions with the City of Goldsboro we understand that the City does allow the pre - development (existing) site condition to be considered on redevelopment projects such as this when calculating nitrogen offset fees. In such cases we understand that the fee may be waived if the post - development (post - treatment) export rate is calculated to be at or below the pre- development export rate. In the case of this project the post - development (with stormwater treatment) export rate is 9.12 lbs. /ac./yr. which is below the calculated pre - development (existing conditions) export rate of 13.01 Ibs. /ac./yr. As such the City of Goldsboro would not ordinarily require an offset payment be made to NCEEP to buy down to an export rate of 3.6 lb. /ac./yr. We ask that NCDENR- DWQ give consideration to waiving the offset payment if similar circumstances exist at the time of final design. BMP Inspection & Maintenance A permanent maintenance access easement will be proposed and recorded following site construction to allow access to the stormwater wetland including the forebay (for sediment removal and disposal). We understand this easement will need to be accessible from the access road between this property and the adjacent Sheetz property (to the west) which has public access to Highway 70. A draft Inspection and Maintenance Agreement (uses the available on -line agreement standard) for the proposed stormwater wetland is provided in Appendix E. Limitations Our analyses, evaluations, conclusions, and recommendations are preliminary and are based on project and site information available to us at the time of this report and may require modification once a final site plan is prepared, existing site conditions change, or if additional data about the project or site becomes available in the future. This report 4 is intended for use by our client HWB of North Carolina, LLC on this project. These findings are not intended or recommended to be suitable for reuse on extensions of the project or on any other project. Reuse on extensions of this project or on any other project shall be done only after written verification or adaptation by SOIL & ENVIRONMENTAL CONSULTANTS, PA, for the specific purpose intended. Additionally, decisions regarding any outstanding permit issues or policies issued by governing regulatory agencies are beyond our control, and as such modifications to our evaluation, conclusions, and /or recommendations may be necessary. -' 5 FIGURES � `. --�,y i+ ��,- �.. �fk _- � � �. � ' �•f ,l/ v , ....✓^��- �,.x�Zi ~:.' ``�,r,. ' : - if' � • i ti y 1, ',%� ( \ `, ire q'u / . = j \�, tt Saar• t p` •''ri�i�6�1 .Yy''� n_ � � � t ^y � � 139,;' @,'i � • �/ ' � �'- ,� + ��, �L'—,;�1..y'°- ^ � . - y,✓ Project Site . ^ yt r 7 J k M s i q%SM 739 �l `� �1 �° \ �j.' ` ! + �4 ••. �j} ' �/ ] ` � , 6e, r A- 12 alt ...... !� %!4 . f t`l • "t`�•',`.� -_�_; _...�. .r 1. w' ....,r.�y\ ,' ��v'y.: -yt Y-• ParkeA Ueao Rnw7u�lh / f 16r j,L ice; 1 asb`! f t `� l i ✓ •. %yrl}kr Niti t'i UZ "ti'} ' il� N r P��,r,4 4� n. •�•1(Zr��..,•_� - _ .,i r !��„ i .�, ,' ,"�./'� :�t k °1 .•�`^ . `�� � \ \�:;i.' ;fir �` � .:�. , -: � r `� .,mss_ --=�: , w ! ,\ 1i s. `•�✓ \ .r ' "/ 1 L it •'`>. -iinP P } �i f .' `e,. Project No. 1:24,000 USGS 0 2,000 4,000 8,000 7325.D2 Topographic Map Feet Project Mgr.: gheetZ Project - Parcel B PKS Wayne County, Soil & Environmental Consultants, PA NC 11010 Raven Ridge Rd.- Raleigh, NC 27614 1" = 2,000' (919) 846 -3900 - (919) 846 -9467 � Web Page: www.SandEC.com 11/08/2012 NW Goldsboro Quadrangle No B II Go L LY R8� Tr ,,ipP I Nrfi , Ly Go 581 F I ds NoA ow Ra i _ NoA w it f Ki t • . ai'' Go Qsy � 5 f L L LY a_ NoA Go G , f! o to - Y /r• Dr 'r r L G p b r Project Site° Go NoA MAR MF 'a '. . Jrtc. C,4, #S.lY ` /.. . s `Y r`. e� i f ..,rh1'er'.it r S. �• ,. r *QLy Go Ly r� p'�/'+ ' Rao Ly a % NoA Go 70 Tr i Q . 1 G '• � 4�' •T �� t LY WaB NoA Ga Go NoA Go Go I � i Ly. G t WaB . r• 7 "' j,. Project No. 1:12,000 NRCS 0 1,000 2,000 4,000 7325.132 Soil Survey Map Feet Project Mgr.: Sheetz Project - Parcel B - PKS Soil & Environmental Consultants, PA Wayne County, NC 11010 Raven Ridge Rd.- Raleigh, NC 27614 Scale: 1" = 1,000' (919) 846 -5900 - (919) 846 -9467 1974 Printed Wayne Co. Web Page: www.SandEC.com 11/0812012 Soil Survey Sheet 13 Y_ 'OSED 60 -INCH PIPE NETWORK {5Y OTHERS ROP05ED JUNCTION # 2; TOP = 131.40 iMv - 1 h 1 sr EXI5TINGt 15UILDING R ir I—F b 4111-7� I! PROP05ED 5TORMWATER WETLAND FOOTPRINT ` Preliminary Stormwater 0 50 100 200 Project No. Wetland Footprint 7325.D2 Sheetz Project - Parcel B Feet Project Mgr.: Wayne County, NC PKS ; 2010 Aerial from NCOnelVlap.com Soil & Environmental Consultants, PA Scale: 11010 Raven Ridge Rd.- Raleigh, NC 27614 1" = 50' PRELIMINARY (919) 846 -5900 ■ (919) 846.9467 NOT FOR CONSTRUCTION Web Page: www,SandEC.com 12/03/2012 Stormwater Wetland Zone Distribution TOP OF EX15TING Percent of DITCH I3ANK5 Wetland Zone Area (ftz) -... SW Area n��MM Forebay 10% 410 a Deep Pools 10% 410 Shallow Water 40% 1640 Y� yy TOE OF FXI.rjT1Nfy °iI (7PF r Y_ 'OSED 60 -INCH PIPE NETWORK {5Y OTHERS ROP05ED JUNCTION # 2; TOP = 131.40 iMv - 1 h 1 sr EXI5TINGt 15UILDING R ir I—F b 4111-7� I! PROP05ED 5TORMWATER WETLAND FOOTPRINT ` Preliminary Stormwater 0 50 100 200 Project No. Wetland Footprint 7325.D2 Sheetz Project - Parcel B Feet Project Mgr.: Wayne County, NC PKS ; 2010 Aerial from NCOnelVlap.com Soil & Environmental Consultants, PA Scale: 11010 Raven Ridge Rd.- Raleigh, NC 27614 1" = 50' PRELIMINARY (919) 846 -5900 ■ (919) 846.9467 NOT FOR CONSTRUCTION Web Page: www,SandEC.com 12/03/2012 Appendix A Email Correspondence Patrick Smith From: Kevin Martin Sent: Wednesday, June 08, 2011 9:35 AM To: Patrick Smith Subject: FW: Constructed wetlands chapter of the BMP manual Attachments: Ch09 - Wetlands.pdf Patrick, looks like this will be the design criteria for the Goldsboro site, when you get time compare it to what you used in the past (2003 and 200^) and let me know if you think it will make a big difference. Thanks Kevin From: Chapman, Amy [ mai Ito: amy.chapmanCa@ncdenr.govl Sent: Wed 6/8/20118:27 AM To: Kevin Martin Cc: Karoly, Cyndi; Higgins, Karen Subject: Constructed wetlands chapter of the BMP manual Morning Kevin. Attached is the 2007 version of the constructed wetlands chapter of the BMP manual you requested. There is no 2008 version. The next version is 2009. Please let me know if you need anything else. -Amy Amy Chapman Wetlands, Buffers, Stormwater, Compliance and Permitting Unit (WeBSCaPe) NCDENR/Division of Water Quality - Wetlands and Stormwater Branch 1650 Mail Service Center Raleigh, NC 27699 -1650 Office: (919) 807 -6400 Fax: (919) 807 -6494 Website: httv:/ /Dortal.ncdenr.orp-/web /wci/s" /ws /401 /riDarianbuffers E -mail: amy.chapman ancdenr.g_ov E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Patrick Smith From: Kevin Martin Sent: Friday, May 04, 2012 8:13 AM To: Patrick Smith Subject: RE: Highway 581/70 Stormwater Design i got DWQ to confirm that the design criteria for the wetalnd should be that which was in place when the second 401 was issued (2/13/2008) and that they would have to review the plan. They also said we could phase the design and installation of the BMP's. so we can do a detailed design for sheets now and show only a conceptual design for a fast food joint similar to what we did for the initial variance. I wall ask the enaineer for the DA info but we may have to fiaure it. Kevin Appendix B Supporting Stormwater Calculations N O N C 6� M C �6 Q Z_ ui � N IL N CO U r i IL 0 C Z U U � O Q IL Z L i E Z U V U O C� 1� — 0 do � L In = L � � U O � � L O � U = _ O O O O cn L � m 0 � o U N O � O L L O '6 9 _ Sj- O Q N � N U � U7 a Lr) U � N H c u E L 7 U C) 0 n L u -I' c � � V � U QI O O k CD C\j O v 0 Q O O O O O 0 Ea� m m �I O O U m m cVp 10 N v u > 0 > 0 co a% L N v IL U U L � to O 0 0 O O � z � m E 0. — i ti O r" O m I O I '6 _ QN n I O C� 1� — 0 do � L In = L � � U O � � L O � U = _ O O O O cn L � m 0 � o U N O � O L L O '6 9 _ Sj- O Q N � N U � U7 a Lr) U � N H c u E L 7 U C) 0 n L u -I' c � � V � U 4l _ 0 N u-� n 0 J m O 0 rtL V 11 t 1 N fl C 6 ll n ll 6 U Q m L I U- Q C Op O f� !` V Z 1. � O LO y N m 3 t� E O O Ui -N u Z 0. to- w O Fl, J 0 J z U O z O O � L L9 QI k O O O v C O O O 0 0 0 o v m m �I O O U N N U cVp N � � > 0 > 0 a% L E IL N O O O O � m 4l _ 0 N u-� n 0 J m O 0 rtL V 11 t 1 N fl C 6 ll n ll 6 U Q m L I U- Q C Op O f� !` V Z 1. � O LO y N m 3 t� E O O Ui -N u Z 0. to- w O Fl, J 0 J z U O z O O � L L9 E @ � E 0 U � � 2 Q @ D � (L � E � 0 � � 13 � 2 Q k � � | i E § § } § I o I � U § \ ® / 3 / % 6 d d v ? ■ § to / \ § § ± / E � \ §k § � 2 § / a \ % / / d G \ d D \ 2 § ¥ \ E ® \ 6 ± � % * 2 { / ] ) ( ` / / « f * ] ~ \ \ in C) / 2 tL \ 4.1 _ $ { n \ § e 7 3 t R « � / \ / / \ 3 - > / t � R \ \ / E 2 \ /j }\ \/ \ � \ :2 \ \ % ? / ± � \ § � 2 / a 2 / \ \ D \ 2 § ¥ \ E ® \ 6 ± � \ 2 £ / ± / ~ \ \ in C) / 2 tL \ 4.1 _ $ { \ \ § ƒ 3 t R « Q / — \ 3 - > / t o \ \ / E 2 \ \ _ u o u ® ® ° ° % E ® e Q j 4J 7 in 0 S / / � ■ k 2 / § k \( 2/ ) 2J % \ 2 \ \ : e e e > « R lO �6 c O S t8 C_ �6 u 0 c O_ O DL N O E O v 7 O E O N II W 0 E Q O � O O � II II N a� s O O (V O \I E U Ln m 4, + D E U N 4� O O 67 O O N Q� O O O N O — N O O O — N s m 73 II II cz > II O II II 0 s N t -V N O� O m c O IL 2, C m ry Z U m z m z co ui U Ny� u Z u O � Q c N •� � � S E N O II II m O m m 0 a� 0 c O E .N N _N 3 O Q E _E N 7 U W K > O N M _ S C) 0 �n n� O O m w O O O N J N N In � N m 3 I� E o O „ z 46 u u z o w J w 0- o_ Q O Ln O O u I I tY N Q c _O J-� U N c O U U Ln m 4, + N U N 4� O O 67 O O N Q� O O O N O — N O O O — N s m 73 II II cz > II O II II 0 N N M _ S C) 0 �n n� O O m w O O O N J N N In � N m 3 I� E o O „ z 46 u u z o w J w 0- o_ Q O Ln O O u I I tY N Q c _O J-� U N c O U U O � U N z p z o � 0 o � N s m 73 Q) _O O O tl N N W _ 0 W O fL E O Z N N c O U w O z N N c N 3 O 0 A N Q o 0 � 0 0 to C)IC;I q O ° y, N �m 3 h a� E m o ° „ z y uO O 0 o 2 U I o O S C7 LU F a� vO ' s0 O � H o n `r 0 o s s L N E E E LL� o m Q 0 0 Ln N � 0 to y, N �m 3 h E o ° „ z N -0 U O S C7 LU U 1 N N 4 L a) = O cz cf7 U m Z 4� 7 U 7 v p c"_ L rO U! _ > M 4O p O N O = p U) m >SU O= 0 U � !� U L U o-C�. 4° u) o° U 2 o s O O c O vNi In W L N Si _ 4-1 6 7 4O c 3 Q N O O d-� Ln N O ;' O O II c O 4u m U N O �O s O N p s U j-b ^ _ s N O s 4� Ln s Ln m 4) O Q s (D 4�t+� Z s O o O C) � U- = o m p a� 3 U Z N U N n v (� m O 3 S N ° 0 _= ZL O •u s u 1 �— N U > c 6� `6 5 � _� Q) O O s S m o cn U) z C O 6 cp = Q.) _ O to R j n L u) Ln L 1 J J O U p = J u J j is Q U Z = U U O p O M z o L L u) _ o u u) v O O p O p p 1-sl 0 N u) \ � /k \ /k\\ 2 2 2 C) \ q) & u a \ X; 41' E 4 \ j \ t E / \ / \�� / \ \ - ° @ 2 \ D / e ® j u R 2 E 2 \ ƒ > \E \[ e $ \ \ / / \ § Z % « ƒ \ \ 3a E± \ \ \ / / t e G ƒ % ƒ\/_ / & o _ \ 4 -1 \ \ \ \ e ƒ $ ' o t �\ \\ / e \ \ ƒ \ / 0 \ \ 3 / % \ / L \ ƒ \ / $ / O 2 � _ ¥ � - o G \ 11 11 ƒ + < 0 / % / 2 � « e 0 R \ 0 � \ \ 2 / \ [ 3 > 4 0 \ \ o \ � / C; 7 / \ r � / \ \ k A )\ (\ /\ \ƒ \ m \ z r � 4 AM 1= \ \2 Z %2 \\ 2 o` u q 6 < £ U ® z f \ 2 u b � \ t E z J 4 r e \ \ o \ � / C; 7 / \ r � / \ \ k A )\ (\ /\ \ƒ \ m \ z r � 4 AM 1= \ \2 Z %2 \\ W 3 z L ca H U 6� N in DL O U E m Ln v m 0 M u Ln _O E > > E Uj E O N � N y N �o m 3 t� E 0 0 y Z N u u z o C7 0. N w 0 w w Mil -u u a� 0 OL i U z u o z `O o � 0 0' 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0000000000000000000000000 � Lnmm�— Ln�Nin6;— ��m— NmmN —�Nm�� N O n I� u 't N— p u It N O n Ln m_ _ — c'� 0000000000000000000000000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 — 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0000000000000000000000000 s O N It [� O co O N �t CD cQ O N It u Q O N It u co O N It u co ` 0 c� 67 N u n N Ln co N Ln 00 — 't Q — -t � O 't i� 0 m u — — — N N N m m (Y) Nt Ln to Ln 0 0 u r- r- m Ln v m 0 M u Ln _O E > > E Uj E O N � N y N �o m 3 t� E 0 0 y Z N u u z o C7 0. N w 0 w w Mil -u u a� 0 OL i U z u o z `O o � 0 c- C) _U ca U O 75 c6 L Q O nnO t� \3 L L O N O O O — — O O C9 O J N N In +, N E O O .. Z N � U N Z O D � J W U O � U J z z O w O O � O 0 N O O -0 O m 0 L O � O Ln 0 Nr O m 0 N O O O O O � N O O O O J N N In +, N E O O .. Z N � U N Z O D � J W U O � U J z z O w O O � O 7 / k $ 0 � q $ � & 6 � \ % k n � $ % § M O k / � \ \ : B § \ 2 > n y / O U z E \ / \ \ \ ; \ / k E 0 \ \ e E % \ \ \ \ > § 3 - 3 u \ co J / ® 2 \ \ ± 3 0 \ O / \ / $ �@ \ o / » e n \ r x @ g $ � - t 7 I e 3 § e ƒ/} t \ % % / / \ ® \ U ƒ § \ / m & » _ @ % E @ \ [ r \ \ ) % < 2 N $ / Q) ( / 0 \ Ln \ X� 2 \ a \ \ \ e » / E f f f C) @ /\ )\ §\ /{ \ � § \ \ ■ / \e \\ %$ {o k 0 R e % \ / \ J / \ ± � 0 \ O / \ / $ �@ \ o / » e n = r x @ g � \ - I e 3 m e ƒ/} ® \ U ƒ § \ \� ° —Oz< /\ )\ §\ /{ \ � § \ \ ■ / \e \\ %$ {o \� \| // )\ §\ j{ \/ \ > \ ƒ 2 2 - r e R % / \ E / � S [ i & 5 ° ° ) \ z \ \ e 4,11 § ƒ g r a o 0 ƒ \ 2 2 \ ] % \ n o ƒ \ / u / U % / \ 9 `II ) \ o v 2 o \� \| // )\ §\ j{ \/ \ > \ ƒ 2 2 - r e R % / \ E < 7 i & ; � � \ 7 g o \ % ƒ % / \ ) o g $ \ \ a � \ / « � y 3 � « ® 2 \ � � t 4-1 _ \ t \ - g § o § o n / ( / ° \ § \ _ - t / ƒ ° 0 \ �� E / u \ Wl S = \ u / c \ t ƒ 3 - § § \ � ( n c - SN \ 2 �� a B R 1 e rI \ n 0 / e O 0 o= { o Ln 6 E m E c E 7 N M E E U Q� O N 41 c S c� O U N 3 O O N � N L N- U �+ ,n m Lrn � O O � O O II II II o Q F-1_ �o L� y� N N c O N v w O o � Ss N O U t.. G'1 O� II � s � N L 0 N N N LL- N II 0 m - Q tj- II N LL ai m a' N � � E 6 Q J II � II II o N Q J d.> Qi 0 0 N m Lu O t U O LO u U H O E N Q M -1 O 1- O O — — .6 N tD II II II II E Q J o a� Lo � N 3 r E 0 0 y Z LLJI � z Q Q J ILI CL CL A U N 0 IL -:3 U J Z z O u o 0 9 m Ln N o � Ss � o N in CD 1 n O N N � ni s N L O N oC Q= K C D i O s y? D = LL m N II II o i- 0 N N N LL- N II 0 m - Q tj- II N LL ai m a' N � � E 6 Q J II � II II o N Q J d.> Qi 0 0 N m Lu O t U O LO u U H O E N Q M -1 O 1- O O — — .6 N tD II II II II E Q J o a� Lo � N 3 r E 0 0 y Z LLJI � z Q Q J ILI CL CL A U N 0 IL -:3 U J Z z O u o 0 9 m Ln ƒ G \ r U E � 2 � � k @ 5 \ � � \ L E J / t 4 ƒ % � / % _\ \ E /0 ^ E �2 \ e @ g 5 ( ® \ � \ z U 2 ƒ LL- CD C � � / « \ m z - a LL- \ m E 3 § ® ƒf /± \ \ / 4- = \\ K- M / n � / \ U- LL � \ \ |\ a k ƒ & 2 \ m CO - 'q- w co - @ LL � �| j � 0 w g E e \ °m / » ) / \ \ co \ $2[ / @ / / / \ ) � \ \ 2 t v \ L \ 3 � � g 2 \ \ \ c / o * * / ) @ /4 / ) _ » 9 x G > \ 2 // E \ \ \ / / \ > / \ \o u= \ ( \\ =5 a a 4� � » \ \� \k° a R e o ! ® $ u 6 \ $ J b,/ « \ ED // E \ \ \ / / \ > / \ \o u= \ ( \\ =5 (Y) J ( \ � \ > � , } > \ \ \ � & � ƒ \ a e \ [ 6 ( ƒ \ e [ ) / ( ( _k u 2 3 9 ) ? 7 Ep ( \ 6 t \ 4 \ ƒ / % IS \ � $ \ 5 C\j \ > > > > b m f §@ ) > E � \/ k � / / } \ { ( � \ I o \ \ ± L \ � b / u m \ \ 5 C /j k / \ t \ 2 ± y / & / — \ f r / ) > \ k � } / _o ( � \ { ± L \ � 4-� E [ \ u /ƒD- 5 /j Q z � L O� Q � Q 1= N O µ- C� Q G � L L L � Q � � 3 � L Q O L 111 L Q Q I C N N N V (6 L Q � I t 41 Osu Q L O � O c � � O — O U E -N N � � � O s � � O � � � O U O � O � � U � � � O � o � o � O � Q � E Q Q W O � N 3 0 Ln y N 3 r E O � y Z In 0 U U C� Lu W C) .--A W W m 0 J U Z Z � L (� W L' i t tn f] Y Y U +� Q U tn C O c O }, U Q s N F- N u O O Q = N r N u u = �Oin u � • N U (f} e N U U 41 U Ou II o`_ 3 L m II II I I u T CS II II II � � II U — U Q U — U = Q 3 0 Ln y N 3 r E O � y Z In 0 U U C� Lu W C) .--A W W m 0 J U Z Z � L (� $ \ / t \$f� � \\ \ 2 \ { K E k ; r / \ \ \ C) [ 2 t » ± \ \ / ± 5 t e a » \ / U — / / ƒ\$ E \ \ \ L� ƒ\ { ( \ E \ g \ / / \ \ \ /\ )LO /a {/ \ / \ > j Fm § e s /7 \ ( ,§ /\ G ) 2 / . k ,) /) l§ )\ )\ :§ ] � $ \ « (In k � If IN k L ) % } / / \ - M \ _ � E \ k ® [ # j I e � R \/ \ § \ k � U m \ § \ m \ imn -p 2 ( ) : 7 IL ƒ , R � y + \ t k © a u $ \ / A g \ r \ > § 2 / / 6 2 a k � k 2. § k � ) 2 d § w A g \ r / / / / \ \ / \ k \ $ j e §% y \ j § \ { 1 / / 2 2 6 § � \ R / / 9 \ \ \ 9 2 2 ƒ # * « q / § ± \ _ \ , < ) ! ® G A t \ u M / u � a \ 6 ( ( ( ( / \ ) Z \ j k \ \ j / jf \j) 2 // / ƒ) ��r no dab --r-s S� *A SWA I 711 rir z2 %, I pm. 1. s. LL.& dA 4 196) - AF- w VAN) --,el n Ln S 0 Ql) rn OL O la V z2 %, I pm. 1. s. LL.& dA 4 196) - AF- w VAN) --,el n 6 le (Tin 0 lV3 pto oc C.P. Xl� of) N d N&A l-', IAII ; mzs, 14 to, I ,�4vjl 114 CA I' ry d N&A l-', IAII ; mzs, 14 to, I ,�4vjl 114 CA I' Appendix C Preliminary Wetland Plant Selection Nyssa bifiora— Blackgum /Swamp Tupelo Viburnum prunifolium — Blackhaw Viburnum Aronia arbutifolia — Red Chokecherry Clethro alnifolia — Sweet Pepperbush Magnolia virginiana — Sweetbay Magnolia Sambucus canadensis -- Elderberry Carex spp. — Sedges Hibiscus moscheutos — Rose Mallow Hymenocallis eulae — Spider Lily Eupatorium fistulosum — Joe -pye Weed Lobelia siphilitica — Blue lobelia Iris versicolor— Blue Flag Iris Saururus cernuus — Lizard's Tail Pontederia cordato — Pickerelweed Sagittaria latifofio — Arrowhead luncus effusus — Softrush Nuphar lutea ° Spatterdock, Yellow Pond -lily Appendix D nary Nitrogen Export Calculations Adjacent Parcel PRELIMINARY Nitrogen Export Calculations Project No.: 7325.02 Nitrogen Export Rate Calculations: EXI5TING CONDITIONS Based on Existing Site Uses Method 2 Quantifying TN Export from Residential / Industrial / Commercial Developments when Footprint of all Impervious Surfaces are shown calculation Steps: 5tep / Determine area for each type of land use and enter In in Column (2). 5tep 2 Total the areas for each type of land use and enter at the bottom of Column (2). Step 3 Multiply the areas In Column (2) by the TN export coefficients In Column (3) and enter In Column (4). Step 4 Total the TN exports for each type of land use and enter at the bottom of Column (4). Step 5 Determine the export coefficient by dlvwdlnq the total TN export from uses at the bottom of Column (4) by the total area at the bottom of Column (2). (1) (2) (3) (4) Type of Area TN Export TN Export Land Cover (acres) Coeff. from Use Permanently Protected Managed Open 5pace (grass, landscaping, etc.) 0.49 1 1.20 1 0.59 Peranently Protected Undisturbed C 00 0. GC 0.00 Open Space (forest, unmown meadow) (Disregard Limited Site Buffers as Perm. Protect, Undisturbed Open Space) 21.20 24.23 TOTAL I.G3 24.82 Permanently Protected Managed O.G7 1.20 0.80 Open 5pace (gra55, land5capmq, etc.) Impervious Surfaces (roads, parkmq, 0.9G 21.20 20.44 lots, dnveway5, roofs, paved storage areas, etc.) t I t TOTAL I.G3 21.24 Total Nitrogen Export Coefficient = 1 13.01 lbs. /ac. /yr. NOTE: If TN export rate is greater than 10.0 Ibs. /ac. /yr. then a BMP must be installed to remove enough Nltrogen to brinq the TN export rate below 3.G Ibs. /ac./yr. Nitrogen Export Rate Calculations: UtrGzmg similar Calculation Steps., PPOP05ED C011DITION5 Based on Proposed Site Uses (1) Type of Land Cover (2) Area (acres) (3) TN Export Coeff. (lbs./ac./ r.) (4) TN Export from Use (Ibs. /vr.) Peranently Protected Undisturbed Open 5pace (forest, unmown meadow) 0.00 O.GO 0.00 (Assume No Farm. Protect. undisturbed Open 5pace) Permanently Protected Managed Open 5pace (grass, landscaping, etc.) 0.49 1 1.20 1 0.59 (Assume All Non- imperv. Areas to be Managed Open Space) Impervious surfaces (roads, parklnq, lots, driveways, roofs, paved storage areas, etc.) I . 14 21.20 24.23 TOTAL I.G3 24.82 Total Nitrogen Export Coefficient = 1 15.20 ,Ibs. /ac. /yr. >,dJ —t Parcrl Storm::,ater W.tua d Gold >bo — IIC I of 2 Pr erect Ilo 7325.D2 NOTE: If TN export rate Is greater than 10.0 lbs. /ac./yr. then a BMP must be Installed to remove enough Nitrogen to brinq the TN export rate below 3.6 lbs. /ac. /yr. Nitrogen Export Rate Evaluation: If the computed TN export rate for the past- development site Is qreater than 10.0 lbs. /ac. /yr. then the Owner must use on -site BMP's to brmq the development's export down to 10 lbs. /ac. /yr. Then the Owner may utilize one of the follownq options; 1.) 5upplemental 5Iv1P'5 to reduce the TN export rate down to 3.6 lbs. /ac. /yr. 2.) Pay a one -time offset payment of $330 /Ib. to brmq the rate down to 3.6 lbs. /ac. /yr. 3.) Do a combination of BMP's and offset payment to brmq the rate down to 3.6 lbs. /ac./yr, Consider that proposed 5tormwater Wetland removes 40 percent of the Total Nitrogen (TN) from the runoff then the resultmg TN Ecport Coefficient will be: Pre - treatment Export Removal Efhcaency Post- treatment Ex ort 15.20 40 9.12 Ibs./ac./ r. Percent Ibs./acJyr. Adj-1 Parcel 5tornn: ate,'& tland Goldsboro. IIC 2 of 2 P,o 1 Ilo. ;325.D2 Appendix E Draft Stolgmwater Wet :and operation & Maintenance Agreement Permit Number: (to be provided by DWQ) Drainage Area Number: Stormwater Wetland Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — Immediately following construction of the stormwater wetland, bi- weekly inspections will be conducted and wetland plants will be watered bi- weekly until vegetation becomes established (commonly six weeks). — No portion of the stor*_rwater wetland will be fertili��ed .tier �he first initial ferti' ;-- atior. chat is required to establish the wetland plants. — Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wetland. — Once a year, a darn safety expert should inspect the embankment. After the stormwater wetland is established,1 wi?1 inspect it monthly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP elements Potential robiew How I will, remediate tlhe. !0Aem:: Entire BMP Trash/ debris is present. Remove the trash/ debris. Perimeter of wetland Areas of bare soil and /or erosive Regrade the soil if necessary to remove the gullies have formed. gully, and then plant a ground cover and water until it is established. Provide lime and a one -time fertilizer application. Vegetation is too short or too long. Maintain vegetation at an appropriate height. Inlet device: pipe or The pipe is clogged (if applicable). Unclog the pipe. Dispose of the sediment swale offsite. The pipe is cracked or otherwise Replace the pipe. damaged if applicable). Erosion is occurring in the swale (if Regrade the swale if necessary to smooth applicable). it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. t —� cT L, o ,1 Zri--u D Form SW401- Wetland O &M -Rev.4 Page 1 of 3 Permit Number: (to be provided by DWQ) BMP element: Potential problem: How I will remediate the problenr. Forebay Sediment has accumulated in the Search for the source of the sediment and forebay to a depth that inhibits the remedy the problem if possible. Remove forebay from functioning well. the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spraying. Deep pool, shallow water Algal growth covers over 50% of the Consult a professional to remove and and shallow land areas deep pool and shallow water areas. control the algal growth. Cattails, phragmites or other invasive Remove invasives by physical removal or plants cover 50% of the deep pool and by wiping them with pesticide (do not shallow water areas. spray) - consult a professional. Shallow land remains flooded more Unclog the outlet device immediately. than 5 days after a storm event. Plants are dead, diseased or dying. Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one -time fertilizer application to establish the ground cover if necessary. Best professional practices show that Prune according to best professional pruning is needed to maintain optimal practices. plant health. Sediment has accumulated and Search for the source of the sediment and reduced the depth to 75% of the remedy the problem if possible. Remove original design depth of the deep the sediment and dispose of it in a location pools. where it will not cause impacts to streams or the BMP. Embankment A tree has started to grow on the Consult a dam safety specialist to remove embankment. the tree. An annual inspection by appropriate Make all needed repairs. professional shows that the embankment needs repair. Evidence of muskrat or beaver activity Consult a professional to remove muskrats is present. or beavers. Micropool Sediment has accumulated and Search for the source of the sediment and reduced the depth to 75% of the remedy the problem if possible. Remove original design depth. the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or re lace the outlet device. Receiving water Erosion or other signs of damage have Contact the NC Division of Water Quality occurred at the outlet. 401 Oversight Unit at 919 - 733 -1786. �)ED, J � i� C� t Form SW40 1 -Wetland O &M -Rev.4 Page 2 Of 3 Permit Number: U U ` f'� !•' 1 (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Highway 70/581 Project, Goldsboro, NC BMP drainage area number: No. 1 Print name:HWB of North Carolina, LLC (Attn: Mr. David Weil) Title:PropertY Owner Address:P.O. Box 2063, Goldsboro, NC 27533 Phone: 919-734-1111, Ext. 231 Signature: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, a Notary Public for the State of County of , do hereby certify that personally appeared before me this day of , and acknowledge the due execution of the forgoing stormwater wetland maintenance requirements. Witness my hand and official seal, SEAL My commission expires ED) R '-- ' L" Form SW401- Wetland O &M -Rev.4 Page 3 of 3