Loading...
HomeMy WebLinkAbout20001195 Ver 17_Monitoring Report_20210224Strickland, Bev From: Hurwitz, Leslie Jo < LeslieJo.Hurwitz@cltairport.com > Sent: Wednesday, February 24, 2021 2:59 PM To: Jordan, Jimmy; Homewood, Sue Cc: Thames, Kelly; Leathers, Amber; Wiebke, Mark Subject: [External] RE: CLT Airport recent 401 #WQC004233 DWR Project # 20001195 V17 Attachments: FINAL Proposed Monitoring Homewood 022321.pdf Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hello Sue - I hope this finds you doing well. As a follow up to the establishment of a monitoring plan for the CLT South Cross Field Regional Detention Basin, I am attaching a document identifying our proposed monitoring locations. Construction of the basin is anticipated to begin in mid -April and we look forward to receiving your review and approval so that we can perform the baseline monitoring prior to construction. Please contact Jimmy Jordan or myself if you have any questions or need additional information. Thanks in advance for your time and take care - Leslie Jo LESLIE JO HURWITZ, PE CM I ENGINEERING PROJECT MANAGER CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT m 704.564.7919 lesliejo.hurwitz@cltairport.com cltairport.com From: Jordan, Jimmy <jdjordan@cltairport.com> Sent: Monday, February 15, 2021 4:33 PM To: sue.homewood@ncdenr.gov Cc: Thames, Kelly <Kelly.Thames@hdrinc.com>; Hurwitz, Leslie Jo <LeslieJo.Hurwitz@cltairport.com>; Leathers, Amber <amber.leathers@cltairport.com>; Wiebke, Mark <mdwiebke@cltairport.com> Subject: CLT Airport recent 401 #WQC004233 DWR Project # 20001195 V17 Ms. Homewood; I understand you are point of contact with regards to concerns or discussions related to the referenced water quality certification that was last year issued to Charlotte Douglas International Airport, for various Airport Improvement and Expansion Projects. 1 As you can see by my signature, I am involved with certain environmental matters out at CLT including this very important project, and I wanted to share a concern with you regarding specific permit requirements centered around stream monitoring locations and submittal of information to your agency. Please read through the attached document as soon as you can, and share with others at your agency as you see fit. Your response is appreciated, and certainly feel free to call me if you wish to discuss. Have a good evening. JIMMY D. JORDAN, P.G. I ENVIRONMENTAL MANAGER CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT 980-288-3793 cltairport.com February 23, 2021 Ms. Sue Homewood Environmental Specialist II NCDEQ – Division of Water Quality 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27105 RE: Deicing Pad and South Crossfield Taxiway 401 Water Quality Certification WQC004233 (City of Charlotte) DWR Project 20001195 V17 (USACE Action ID. No. SAW-2018-01071) Charlotte Douglas International Airport, Mecklenburg County Dear Ms. Homewood: As required by the conditions of our 401 Water Quality Certification, we are sending this correspondence for your review and approval of the proposed monitoring locations for the Deicing Pad and South Crossfield Taxiway in-line detention basin in accordance with the NCDEQ Approved Monitoring Plan dated August 4, 2020. Construction of the Deicing Pad and South Crossfield Taxiway project commences on March 1, 2021 and in-line basin construction is anticipated to start around the middle of April. Monitoring locations are along Coffey Creek (S25) and two side tributaries (S32 and S34). Attached is a map identifying the proposed locations, as well as photographs to document our selections. The locations are identified as follows: Location Number Description Photo Numbers S25-1 Coffee Creek 1 – Downstream of Basin 1, 2 S25-2 Coffee Creek 2 – Lower Basin 3, 4 S25-3 Coffee Creek 3 – Mid Upper 5, 6 S25-4 Coffee Creek 4 – Upper Basin (near Byrum Drive) 7, 8 S34-1 Stream 34 9, 10 S32-1 Stream 32 – lower end 11, 12 S32-2 Stream 32 – upper end 13, 14 Please feel free to call with any questions. Sincerely, Jimmy D. Jordan Jimmy D. Jordan, P.G. Environmental Manager LJH/ms Enc. Basin Map and Photos cc: Kelly Thames/HDR Amber Leathers/CLT T:\Current Projects\AF18-008 Deice Pad SCF Program Master\Correspondences\Basin Monitoring\FINAL Proposed Monitoring Homewood 022321.docx S S S S SS SS S S S S S S S S S S S S S S S S S S S S SXSS XSSXSSXSSXSSXSSXSSW W W W WWW W W W W PUE PUE PUE PUE PUEPUE PUE PUE PUE PUE PUE PUE PUE PUEPUE PUE PUE PUE XSSXSSXSSXSSXSSXSS XSSXSSXSSXSSXSSXSSXSSWA T E R M H RI M : 6 8 2 . 8 9 ' W W V W V W V W V W V T CW W W G V W W W W W W W W W W W W W W W W V W V W V XSD S25-1 N: 529638.3370 E: 1419796.2270 S25-2 N: 530171.6700 E: 1419494.6650 S25-4 N: 530626.8790 E: 1419342.0610 S25-3 N: 530257.0870 E: 1419090.4980 S32-2 N: 530455.5240 E: 1418895.1860 S34-1 N: 530359.1700 E: 1419800.9150 S32-1 N: 530415.9410 E: 1418632.6860 PLOT DATE:FILE NAME:188970-PKG1-MONITORING.DWG Feb 24 . 2021 - 10:56AMDATE CLT DEICING PAD & SOUTH CROSSFIELD TAXIWAY 1001 MOREHEAD SQUARE DRIVE SUITE 610 CHARLOTTE, NC 28203 T 704-342-5401 I www.wsp.com WSP USA INC. NORTH CAROLINA LICENSE NO. F-0165 SCALE DESIGNED DRAWN CHECKED APPROVEDPACKAGE 1 REGIONAL DETENTION BASIN MONITORING LOCATIONS 02/24/21 JJ TMS MPD JJ 1" = 100' EXHIBIT LIMITS OF DISTURBANCE (TYP) EXISTING TOP OF BANK (TYP) CONCRETE SPILLWAY BYRUM DRIVE TIMBERLY PLACEEXISTING COFFEY CREEK CENTER (TYP) LEGEND MONITORING LOCATIONS / STATIONS FLOOD LIMITS LIMITS OF DISTURBANCE FLOOD LIMITS (TYP) Regional Detention Basin Proposed Monitoring Location Photos Deicing Pad and South Crossfield Taxiway February 23, 2021 2 PHOTO 1 – Point S25-1, view downstream PHOTO 2 – Point S25-1, view upstream Regional Detention Basin Proposed Monitoring Location Photos Deicing Pad and South Crossfield Taxiway February 23, 2021 3 PHOTO 3 – Point S25-2, view downstream PHOTO 4 – Point S25-2, view upstream Regional Detention Basin Proposed Monitoring Location Photos Deicing Pad and South Crossfield Taxiway February 23, 2021 4 PHOTO 5 – Point S25-3, view downstream PHOTO 6 – Point S25-3, view upstream Regional Detention Basin Proposed Monitoring Location Photos Deicing Pad and South Crossfield Taxiway February 23, 2021 5 PHOTO 7 – Point S25-4, view downstream PHOTO 8 – Point S25-4, view upstream Regional Detention Basin Proposed Monitoring Location Photos Deicing Pad and South Crossfield Taxiway February 23, 2021 6 PHOTO 9 – Point S34-1, view downstream PHOTO 10 – Point S34-1, view upstream Regional Detention Basin Proposed Monitoring Location Photos Deicing Pad and South Crossfield Taxiway February 23, 2021 7 PHOTO 11 – Point S32-1, view downstream PHOTO 12 – Point S32-1, view upstream Regional Detention Basin Proposed Monitoring Location Photos Deicing Pad and South Crossfield Taxiway February 23, 2021 8 PHOTO 13 – Point S32-2, view downstream PHOTO 14 – Point S32-2, view upstream