HomeMy WebLinkAbout20001195 Ver 12_Stormwater Info_20120504ONE COMPANY
I—DR Many Solutions
10fl-1IQs U12,
Transmittal
Attention Annette M Lucas PE Date 5/2/12 Job No 100062 75476 018
Environmental Engineer
To NCDENR I DWQ I Wetlands and Stormwater Branch Phone 919) 807 6375
1650 Mail Service Center Raleigh NC 27699 1650
Regarding CDIA SWN P West Blvd
We are sending you ® Attached ❑ under separate cover via — the following Items
❑ Shop drawings ❑ Prints ® Plans ❑ Samples ❑ Specifications
❑ Copy of Letter ❑ Change Order ® Reports ❑ CDs ❑ Other _
Copies Date No Description
3
4/18/12
1
Updated Geotechnlcal Report
3
5/2/12
2
Bloretentlon Cell Supplements and Calculations
3
5/2/12
3
New Sheet 14A, 14B and 6A of SWMP Colored Plans
1
5/1/12
Letter responding to recent comments
oil Q9
MAY
�ww
These are transmitted as checked below
® For approval ❑ Approved as submitted
® For your use ❑ Approved as noted
® As reque e,+ ❑ Returned for mrrPctions
For review /comment ❑ Other_
ror Dias aue —
Remarks Enclosed are only the updated documents
If enclosures are not as noted please notify us at once
C %pwwork ngl pa d03737 7aransmittal Form20 »0502 dor
HDR E -Igmearing In of the Carolinas
Employee -owned
® Resubmit 3 copies for approval
❑ Submit _ copies for distnbution
Fj Return M corrected prints
P,irts t m d of +er ioa }o is
Ronald A Geiger PE
128 S Trvon Street Suite 1400 I Telephone (704) 338 6700
Charlotte NC 18tU2 5004 I Fax t7041 3 8-6760
May 1 2012
Annette M Lucas PE
Environmental Engineer
NCDENR I DWQ I Wetlands and Stormwater Branch
1650 Mail Service Center Raleigh NC 27699 1650
Re Charlotte Douglas International Airport s (CDIA)
UT to Coffey Creek [0308834,11 137 4 C]
Dear Ms Lucas
ECEIVE
MAY 4 2012
On April 13 1212 HDR Engineering Inc of the Carolinas received a letter from the Division
of Water Quality (DWQ asking for additional information regarding the CDIA s Modified
Storm Water Management Plan (SWMP) specifically the addition of the West Blvd project to
the plan Attached are the relevant documents which constitute our previous Express Review
Stormwater Management Plan submittal package for the above referenced project
The following addresses your questions in the letter
Bioretention Cell #1
The bioretentzon cell is still sloped on the plan anew of sheet 14A Bioretention cells must be flat
throughout their section to function properly
a Plan has been adjusted to comply
Both Bioretention Cells
1 The plans still show ponding of 18 Pondzng shall not be greater than 12 Please revise
a Plan has been adjusted to comply
2 Anon Oe,M agreemem form must be sub mz�fied Only a photocopy of the sgratu� page was
submitted It can be downloaded from bgp /[portal ncdenr oal web /wq/su/bmp ch12
d A-i or giria' O&M agreement va sabmitted Tt has been located by Robert
Patterson
3 The SHWT elevation determination should be bases on a soil boring that looks for mottling of the soil
that results from mineral leaching The use of a pie�ometer for a single day w 1lonly provide you with
what elevation of the water table is on thatgiven day not the seasonal high water table elevation
a Additional information is provided in the re submittal to reflect SHWT
eievauon data received dt eacil BMP'ocatio -i
HDR Engineering inc of the Carolinas 440 S Church Street Phone (7041338 6700
Suite 1000 fax (704) 338 6760
Charlotte NC 28202 2075 www hdrtnc com
Page 2 of 2
4 Please he sure that any changes are consistently reflected on all documents (plans calcs and forms)
a Calculation sheets have been updated
If you have any questions concerning the information in this letter or need additional
information please feel free to contact me at (704) 338 6825
Sincerely
HDR Engineering, Inc of the Carolinas
r
Ronald A Geiger PE
Project Manager
cc Jack Christine CDIA
Jimmy Jordan CDIA
HDREng neering in aitheCarchnas
STORM WATER MANAGEMENT PLAN
AREA WEST
OF
2ND PARALLEL RUNWAY
CharlotteeDou las
g
INTERNATIONAL AIRPORT
REVISED OCTOBER 24 2008
UPDATED MARCH 1 2012
UPDATED MAY 2, 2012
PREPARED BY @@@g�
TALBERT& BRIGHT MAY 4 2012
4944 Parkway Plaza Boulevard SUITE 350
Charlotte NC 28217 A R�
704 426 6070 aee• ee,►q,
704 426 6080 (FAX)
HDR ONE COMPANY I Many Solutions
440 South Church St, Suite 1000 1 Charlotte, NC 128202 5004
Phone 704 973 6889 1 Fax 704 338 6760
STORM WATER MANAGEMENT PLAN
AREA WEST
OF
2ND PARALLEL RUNWAY
Charlotte im Doug
INTERNATIONAL AIRPORT
REVISED OCTOBER 24 2008
UPDATED MARCH 1 2012
UPDATED MAY 2, 2012
waes�,�►.,�
e•••.••'�jp
�e
PREPARED BY
° GIs
TALURT& hRIGH_[
4944 Parkway Plaza Boulevard SUITE 350
0�
Charlotte NC 28217
tv"If##0001
704 426 6070
704 426 6080 (FAX)
HDR ONE COMPANY I Many Solutions
440 South Church St Suite 1000 1 Charlotte NC 128202 5004
Phone 704 973 6889 1 Fax 704 338 6760
ATAboa w rFq
NWEHR0
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
BIORETENTION CELL SUPPLEMENT
This form must be filled out pnnted and submitted
The Required Items Checklist (Part Ill) must be punted filled out and submitted along with all of the required
I PROJECT INFORMATION
Project name Charlotte Douglas International Airport
Contact name Ron Geiger
Phone number 704 338 6825
Date May 2012
Drainage area number L14 (Bio #2)
II DESIGN INFORMATION
Site Characteristics
Drainage area
199 543 ft
Impervious area
45142 ftz
Percent impervious
226% ova
Design rainfall depth
10 inch
Peak Flow Calculations
Is pre /post control of the 1 yr 24 hr peak flow required? N (Y or N)
1 yr 24 hr runoff depth in
1 yr 24 hr intensity in /hr
Pre development 1 yr 24 hr peak flow ft3 /sec
Post development 1 yr 24 hr peak flow ft3 /sec
Pre /Post 1 yr 24 hr peak control ft3 /sec
Storage Volume Non SA Waters
Minimum volume required 1 715 9 ft3
Volume provided 1 740 00 ft3 OK
Storage Volume SA Waters
n/a
15 runoff volume
ft3
Pre development 1 yr 24 hr runoff
ft3
Post development 1 yr 24 hr runoff
ft3
Minimum volume required
0 ft3
Volume provided
ft3
Cell Dimensions
Ponding depth of water 12 inches OK
Pondmg depth of water 100 ft
Surface area of the top of the bioretention cell 1740 00 f 2 OK
Length 58 00 ft OK
Width 30 00 ft OK
or Radius ft
Media and Sods Summary
Drawdown time ponded volume
8 hr
OK
Drawdown time to 24 inches below surface
16 hr
OK
Drawdown time total
24 hr
In situ soil
y (Y or N)
OK
Sod permeability
0 60 in /hr
OK
Planting media sod
702 5 fmsl
Sod permeability
150 in /hr
OK
Sod composition
installing grassed cell
% Sand (by volume)
85%
OK
% Fines (by volume)
10%
OK
% Organic (by volume)
5%
OK
Are underdrams being installed?
Total 100%
Phosphorus Index (P Index) of media
(urntless)
OK
Basin Elevations
Temporary pool elevation
703 50 fmsl
Type of bioretention cell (answer Y to only one of the two
following questions)
Is this a grassed cell?
y (Y or N)
OK
Is this a cell with trees /shrubs?
(Y or N)
Planting elevation (top of the mulch or grass sod layer)
702 5 fmsl
Depth of mulch
017 inches
Insufficient mulch depth unless
installing grassed cell
Bottom of the planting media sod
699 35 fmsl
Planting media depth
315 ft
Depth of washed sand below planting media sod
0 33 ft
Are underdrams being installed?
Y (Y or N)
How many clean out pipes are being installed?
4
OK
What factor of safety is used for sizing the underdrams?
10
OK
(See BMP Manual Section 12 3 6)
Additional distance between the bottom of the planting media
1 ft
and the bottom of the cell to account for underdrams
Bottom of the cell required
698 02 fmsl
SHWT elevation
696 fmsl
Distance from bottom to SHWT
2 02 ft
OK
Internal Water Storage Zone (IWS)
Does the design include IWS
Elevation of the top of the upturned elbow
Separation of IWS and Surface
Planting Plan
Number of tree species
Number of shrub species
Number of herbaceous groundcover species
Additional Information
Does volume in excess of the design volume bypass the
bioretention cell
Does volume in excess of the design volume flow evenly
distributed through a vegetated filter?
What is the length of the vegetated filter?
Does the design use a level spreader to evenly distribute
flow?
Is the BMP located at least 30 feet from surface waters (50
feet if SA waters)?
Is the BMP located at least 100 feet from water supply wells?
Are the vegetated side slopes equal to or less than 31
Is the BMP located in a proposed drainage easement with
access to a public Right of Way (ROW)?
Inlet velocity (from treatment system)
Is the area surrounding the cell likely to undergo development
in the future?
Are the slopes draining to the bioretention cell greater than
20 %?
Is the drainage area permanently stabilized?
Pretreatment Used
(Indicate Type Used with an X in the shaded cell)
Gravel and grass
(8inches gravel followed by 3 5 ft of grass)
Grassed swale
Forebay
Other
Y (Y or N)
699 81 fmsl
2 69 ft OK
Y (Y or N) OK
N (Y or N) Excess volume must pass through
filter
ft
N (Y or N) Show how flow is evenly distributed
Y (Y or N) OK
Y (Y or N) OK
N (Y or N) Insufficient vegetated side slopes
Y (Y or N) OK
15 ft/sec Insufficient inlet velocity unless energy
dissipating devices are being used
N (Y or N) OK
N (Y or N) OK
Y (Y or N) OK
M
501.1
NOTES
The 10 year design storm flow is evenly distributed through weirs leaving the forbay and entering the bioretention basins The
basin has a 24 ft weir leaving the basin An additional weir is located at the end of the forebay for higher storms
The side slopes are 21 do to the steep terrain
The inlet velocity from the forbay is entering a biorentention basin that is using grass for its pollutant removal
Per chapter 8 of the BMP manual filter strips are not required for bioretention cells and per conversation with R Patterson no
action is required
Permit No
(to be assigned by DWQ)
A� 0F WA Llz O
NCDENR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
BIORETENTION CELL SUPPLEMENT
This form must be filled out printed and submitted
The Required Items Checklist (Part III) must be printed filled out and submitted along with all of the required information
I PROJECT INFORMATION
Project name Charlotte Douglas International Airport
Contact name Ron Geiger
Phone number 704 338 6825
Date
Drainage area number
II DESIGN INFORMATION
Site Characteristics
May 2012
Y2 (Bio #1)
Drainage area
445 589 0 ftz
Impervious area
34 848 0 ff
Percent impervious
78% %
Design rainfall depth
10 inch
Peak Flow Calculations
Is pre /post control of the 1 yr 24 hr peak flow required?
N (Y or N)
1 yr 24 hr runoff depth
in
1 yr 24 hr intensity
In /hr
Pre development 1 yr 24 hr peak flow
ft3 /sec
Post development 1 yr 24 hr peak flow
ft3 /sec
Pre /Post 1 yr 24 hr peak control
ft3 /sec
Storage Volume Non SA Waters
Minimum volume required
4 470 2 ft3
Volume provided
4 500 0 ft3
Storage Volume SA Waters
15 runoff volume
ft3
Pre development 1 yr 24 hr runoff
ft3
Post development 1 yr 24 hr runoff
ft3
Minimum volume required
0 ft3
Volume provided
ft3
OK
Form SW401 Bioretention Rev 3 Part III Page 1 of 3
Form SW401 Bioretention Rev 3 Part III Page 2 of 3
Permit No
(to be assigned by DWQ)
Cell Dimensions
Pondmg depth of water
12 inches
OK
Pondmg depth of water
100 ft
Surface area of the top of the bioretention cell
4500 0 ft2
OK
Length
300 0 ft
OK
Width
15 0 ft
OK
or Radius
ft
Media and Sods Summary
Drawdown time ponded volume
8 hr
OK
Drawdown time to 24 inches below surface
16 hr
OK
Drawdown time total
24 hr
In situ soil
Sod permeability
0 60 In /hr
OK
Planting media soil
Sod permeability
150 In /hr
OK
Soil composition
% Sand (by volume)
85%
OK
% Fines (by volume)
10%
OK
% Organic (by volume)
5%
OK
Total
100%
Phosphorus Index (P Index) of media
(umtless)
Basin Elevations
Temporary pool elevation
710 5 fmsl
Type of bioretention cell (answer Y to only one of the two following
Is this a grassed cell?
Y (Y or N)
OK
Is this a cell with trees /shrubs?
N (Y or N)
Planting elevation (top of the mulch or grass sod layer)
709 5 fmsl
Depth of mulch
017 inches
Insufficient mulch depth unless
Bottom of the planting media sod
706 33 fmsl
Planting media depth
317 ft
Depth of washed sand below planting media sod
0 3 ft
Are underdrams being installed?
Y (Y or N)
How many clean out pipes are being installed?
8
OK
What factor of safety is used for sizing the underdrams? (See BMP
10
OK
Additional distance between the bottom of the planting media and the
1 ft
Bottom of the cell required
705 0 fmsi
SHWT elevation
698 fmsl
Distance from bottom to SHWT
7 0 ft
OK
Form SW401 Bioretention Rev 3 Part III Page 2 of 3
Internal Water Storage Zone (IWS)
Does the design include IWS
Elevation of the top of the upturned elbow
Separation of IWS and Surface
Planting Plan
Number of tree species
Number of shrub species
Number of herbaceous groundcover species
Additional Information
Does volume in excess of the design volume bypass the bioretention
Does volume in excess of the design volume flow evenly distributed
through a vegetated filter?
What is the length of the vegetated filter?
Does the design use a level spreader to evenly distribute flow?
Is the BMP located at least 30 feet from surface waters (50 feet if SA
Is the BMP localed at least 100 feet from water supply wells?
Are the vegetated side slopes equal to or less than 31?
Is the BMP located in a proposed drainage easement with access to
Inlet velocity (from treatment system)
Is the area surrounding the cell likely to undergo development in the
Are the slopes draining to the bioretention cell greater than 20 %?
Is the drainage area permanently stabilized?
Pretreatment Used
Gravel and grass
Grassed swale
Forebay
Other
Permit No
(to be assigned by DWQ)
Y (Y or N)
706 79 fmsl
2 7 ft OK
Y (Y or N) OK
N (Y or N) Excess volume must pass through filter
ft
N (Y or N)
Y (Y or N)
Y (Y or N)
N (Y or N)
Y (Y or N)
19 ft/sec
N (Y or N)
N (Y or N)
Y (Y or N)
Y
Show how flow is evenly distributed
OK
OK
Insufficient vegetated side slopes
OK
Insufficient inlet velocity unless energy
OK
OK
OK
NOTES
The 10 year design storm flow is evenly distributed through weirs leaving the forbay and entering the bioretention basins and the bypass weir
leaving the end forebay The basin has a 40 ft weir leaving the basin An additional weir is located at the end of the forebay for higher
storms
The side slopes are 21 do to the limited space
The inlet velocity from the forbay is entering a bioretention basin that is using grass for its pollutant removal
Per chapter 8 of the BMP manual filter stnps are not required for bioretention cells and per conversation with R Patterson no action is
required
Form SW401 Bioretention Rev 3 Part III Page 3 of 3
22 February 2012
18 April 2012 — Revision 1(addition of sod profile details)
Introduction
In order to obtain groundwater and limited hydrogeological data with respect to proposed bio retention
basin siting areas (specifically the determination of a seasonal high water table SHWT) along West
Boulevard the Charlotte Douglas International Airport Environmental Affairs Manager Mr Jimmy D
Jordan contracted with Probe Technology Inc a licensed North Carolina Well Driller to conduct a
limited subsurface investigation at the site(s) of the proposed basins The sites of the proposed basins
are shown on those drawings prepared and held by HDR Engineering Charlotte North Carolina
Investigation
On February 21 2012 Probe Technology a North Carolina Licensed Well Driller Concord NC arrived at
the two areas shown on the attached figure and installed a 15 foot piezometer at each location
denoted (BR 1 and BR 2) The piezometer probe points were constructed by use of a DT 66 Geoprobe
track mounted Direct Push vehicle driving 2 75 diameter hollow push point tooling Soil samples were
collected continuously at each location from the ground surface to a depth of approxmately 15 feet
below grade level (BGL) The samples were collected in disposable acetate liners Once procured from
the tooling strand the samples were observed and the lithology recorded by Mr Jordan a North
Carolina Licensed Geologist The resultant lithologic descriptions from this work are included as Figures
1 and 2
Upon completion of each piezometer the % inch PVC well material was installed into the borehole and
constructed as a temporary water level monitoring device A 10 foot long 010 slotted screen section
was installed from the bottom of the hole up to an elevation of 5 feet below ground level (BGL) and
each well was completed flush to the ground surface by the addition of a 5 foot PVC riser with a
compression fitting cap A sand filter pack was placed around the screen section of each piezometer
Results
Soil Profiles
Soil profiles at BR 1 indicated micaceous reddish brown sandy silt to a depth of approximately 14 feet
Although the sand became more coarse and abundant with increasing depth no mottling was observed
and no characteristics of a water table were apparent The profile from BR 1 indicated moisture and
damp conditions at approximately 13 feet BGL Approximately 1 hour after installation of the BR 1 a
disposable PVC bailer was lowered into the well to check for the presence of water A measurable
volume of water was present in the bailer and the depth to water was initially measured by a water
level detection device as being approximately 13 4 feet BGL
The observations for the soil profile at BR 2 showed reddish brown slightly sandy becoming tan in color
and silty at around 10 feet From 10 to 15 feet the soil was tan to deep brown with medium to coarse
silt with some mica feldspar and silica (quartz) This saprolite as appropriately called showed no
indication of a fluctuating or seasonal high water table at any portion of the interval There was no
significant moisture and only moist conditions at approximately 11 feet BGL Approximately 1 hour
after installation of the piezometer a disposable PVC bailer was lowered into the well to check for the
presence of water No water was present in the bailer and a static water table surface was not evident
when checked with a water level detection device
24 hour check
Approximately 24 hours after installation Mr Jordan returned to both BR 1 and BR 2 to check for the
presence of groundwater At location BR 1 no groundwater had collected into the piezometer and no
measureable amount of water could be collected by the bailer Likewise at location BR 2 no
groundwater had collected into the piezometer and no measurable water could be collected into the
bailer
Conclusions
Despite the occurrence of water initially seen at location BR 1 it is the opinion of this investigation that
the depth to the shallow water table or surficial aquifer (SHWT) is greater than 12 feet Within 36
hours prior to the investigation a measurable and prolonged rainfall event had occurred and it is likely
that the water initially collected into the well bore was from percolating precipitation through the upper
soil column and not representative of a surficial aquifer or static permanent groundwater condition
Assuming the piezometer had been installed and screened into the static water table then the well
would have supplied water as it was being bailed or pumped which it did not Thus this well was dry
on the morning of the 22nd
AT location BR 2 there was no measurable groundwater penetrated by the installation of the
piezometer It is therefore the professional opinion of the Geologist that the suf►c►al water table at this
location averages (throughout the year) is greater than 12 feet below the surface Based on the
observations made the seasonal high water table is also greater than 12 feet below ground surface
Limitations
The findings conclusions opinions and observations expressed in this report are relative to those
activities conducted and those site conditions which existed at the time and date of the investigation
and location of the field investigations with respect to the measurements made No warranties are
made written or implied with respect to site conditions specifically including geological and
hydrogeological conditions that may exist elsewhere in the same geographical locale or that may have
existed at different times before or after the investigations were made All measurements expressed in
this report should be considered approximate
Jimmy D Jordan P G
North Carolina Licensed Geologist #1777
NOTES:
1' CONTRACTOR TO INSTALL STONE D| CHECKS, AS DIRECTED BY
INSPECTOR, FOR EROSION CONTROL.
2' CONSTRUCT ALL DIVERSION DITCHES PRIOR TO INSTALLATION OF
B|C)RETENTlON BASIN.
3' UNDERDRA|N PIPES TO BE SCHEDULE 40 PVC. ALL DRAIN PIPES SHALL
BE PERFORATED EXCEPT DISCHARGE PIPE. DISCHARGE PIPE T0 BE
SOLID.
4' CONTRACTOR TO BUILD E3|(]RETENllON BASIN TO COMPLY GENERALLY
WITH THE SHAPE ILLUSTRATED AND TO MAINTAIN 1920 S.F. OF
SURFACE AREA. -- -
5, CONTRACTOR SHALL BE PROHIBITED, FROM USING SOD THAT IS GROWN
IN SOIL THAT HAS AN IMPERMEABLE LAYER /SUCH AS CLAY). SOD
SHALL BE KENTUCKY 31 TALL FESC�Z
1310—KLILN(|QN b8b|N
EXISTING PAVEMENT
PROPOSED CLEANDUT
—~~-~-~~~~~— PROPOSED UNDERDRA|N
���
TRANSVERSE VIEW
w�o��pnm��m� *�—�� "r-,`^^ ,.,`'_-7f%=,
30,
|
�-'
'`01
'
' f\ Y
_
. _�,
-'
U N PIPE TURN
'
(SEE SECTION AA\ / /
_ ~~'
LONGITUDINAL VIEW
/
/
TIE |N
SECTION A-A
EXIT WEIR
, BERM
NOT TO SCALE Fa
ELEV.=703.5'
51
!c'
'
ENTRANCE WEIR
12 OUT PIPES PONDING
FILL MEDIA
85% SAND
10% FINES
5% ORGANIC
24
3"
UNDERDRAIN PIPE
TURN NTH PVC TIE Il
BENDS AS REQUIRED.
ELEV. 701.5'
TOP BEND INV.=699.81
LELEV.
702.5--
3' FILL MEDIA
FILTER FABRIC DIA.
UNDERDRAIN
ELEV. 699.35
1-4-
OUT ELEV.=E
STONE
4�' DI A. UNDERDRAIN
DISCHARGE PIPE
LS
ELEV.
698.35'—""
15' —15.
_15'_ 5f
4" DIA. UNDERDRAIN
DISCHARGE PIPE
58'
|
L_M.A
NOTES:
1' CONTRACTOR TO INSTALL STONE D| CHECKS, AS DIRECTED BY
INSPECTOR, FOR EROSION CONTROL.
2' CONSTRUCT ALL DIVERSION DITCHES PRIOR TO INSTALLATION OF
B|C)RETENTlON BASIN.
3' UNDERDRA|N PIPES TO BE SCHEDULE 40 PVC. ALL DRAIN PIPES SHALL
BE PERFORATED EXCEPT DISCHARGE PIPE. DISCHARGE PIPE T0 BE
SOLID.
4' CONTRACTOR TO BUILD E3|(]RETENllON BASIN TO COMPLY GENERALLY
WITH THE SHAPE ILLUSTRATED AND TO MAINTAIN 1920 S.F. OF
SURFACE AREA. -- -
5, CONTRACTOR SHALL BE PROHIBITED, FROM USING SOD THAT IS GROWN
IN SOIL THAT HAS AN IMPERMEABLE LAYER /SUCH AS CLAY). SOD
SHALL BE KENTUCKY 31 TALL FESC�Z
1310—KLILN(|QN b8b|N
EXISTING PAVEMENT
PROPOSED CLEANDUT
—~~-~-~~~~~— PROPOSED UNDERDRA|N
���
TRANSVERSE VIEW
w�o��pnm��m� *�—�� "r-,`^^ ,.,`'_-7f%=,
30,
|
�-'
'`01
'
' f\ Y
_
. _�,
-'
U N PIPE TURN
'
(SEE SECTION AA\ / /
_ ~~'
20 10 0 20 40 60
SCALE IN FEET
L-4
,
�
7
C8`��o�/ON
PROPOSED -~ ~`~``~
DITCH
/
APPROXIMATE FUTURE /
FILL SLOPE TIE |N/ `
' �
LOCATION
/
-
vn*
/ ��~ ^ '
\ ^^*` _`- � \+'
' \ ,~
/
JL1-4 (Blo #2)1
Will,
E IN
/
/
'
'
'
!c'
'
20 10 0 20 40 60
SCALE IN FEET
L-4
,
�
7
C8`��o�/ON
PROPOSED -~ ~`~``~
DITCH
/
APPROXIMATE FUTURE /
FILL SLOPE TIE |N/ `
' �
LOCATION
/
-
vn*
/ ��~ ^ '
\ ^^*` _`- � \+'
' \ ,~
/
JL1-4 (Blo #2)1
Will,
E IN
mill
TIE IN
0.0%
5' 1 1 5'-" --1 o'--v- 4!' DIA. UNDERDRAIN
—75 '_75' _75'— DISCHARGE PIPE
I— - 300'
B
NOTES:
1. CONTRACTOR TO INSTALL STONE DITCH CHECKS, AS DIRECTED BY
INSPECTOR, FOR EROSION CONTROL.
2. CONSTRUCT ALL DIVERSION DITCHES PRIOR TO INS_"?;LLATION OF
BIORETENTION BASIN.
3. UNDERDRAIN PIPES TO BE SCHEDULE 40 PVC, ALL DRAIN PIPES
EXCEPT DISCHARGE PIPE SHALL BE PERFORATED. DISCHARGE PIPE
SHALL BE SOLID WALL.
4. CONTRACTOR TO BUILD BIORETENTION BASIN TO COMPLY GENERALLY
WITH THE SHAPE ILLUSTRATED AND TO MAINTAIN 4.490 S.F. OF
SURFACE AREA.
5. CONTRACTOR SHALL BE PROHIBITED FROM USING S00 THAT IS GROWN
IN SOIL THAT HAS AN IMPERMEABLE LAYER (SUCH AS CLAY). SOD
SHALL BE KENTUCKY 31 TALL FESCUE.
LEGEND
BIO-RETENTION BASIN
EXISTING PAVEMENT
PROPOSED CLEANOUT
PROPOSED UNDERDRAIN
SECTION B-B
NOT TO SCALE
TIE IN
OVERFLOW WEIR
El FV.=710.5"
UhIDERDRAIN INV. ELEV.= 708.5'
OUT El FV.=7049 I
L 3' FILL MEDIA
TIE IN I
BERM ELEV.=71
4" DIA. CLEAN
OUT PIPES
WITH SCREW CAPS
1 893
8" STONE
5A \\-4" DIA. UNDERDRAIN PIPE 5'—
15'
A—]
\7--i 5'
A--�
EXISTING PIPE ------
---EX: I NV_-OUT ::�- 7TG
-INV OUT=711.5
PROP.
15 LF OVERFLOW WEIR
:ue.-xi
7
0e,
X
_710—
-7
-7 1
7'1 o. 5
EXISTING
COT DITCH
.........................
""n
—71 .0 . .. . .......
'710.5
'7 Al2-
og
ROW— ROW— ROW— ROW ROW—, ROW— ROW— ROW ROW— ROW,— ROW— ROW— ROW— F?nw—L
OVERFLOW WEIR
ELEV.= 710.5'
, 2 � 1
20 10 0 20 40 61
SCALE IN FEET
V$=2C
LOT
TIE IN
TALBERT&BRIGHT
ENGRGERING 6L PLANNING CONSULTANTS rj
4944 PAPJCWAY PLAZA BOULEVARD6 SUff E 350
diAMM-M NORTH CAROUNA 28217
PHONLi 704-426-6070 FAX- 704-426.6=
www.to bertondbright.com
�377-
cn
Z
0
C14
LONGITUDINAL VIEW
-t
I Lo
N
SECTION A-A
B
0
NOT TO SCALE
OVERFLOW WEIR
BERM ELEV.=712'
Lo
0
C14
ELEV.= 710.5! 5'
2
ENTRANCE WEIRS
<
W
w
CL
N
N
1293
t--
1 w 1-
n
w
0
G1
z
(D
Fn
w
Z
W
w
0
w
z fJ
w
__:>
0
w
dot
z
3�:
<
w
0
0
uJ
=
(n
UJ
a
a_
CL
a
0
6
OVERFLOW WEIR
ELEV.= 710.5'
(TYP�
PONDING
2
12" ELEV.=710.5'
4" DIA * CLEAN
—1
OUT PIPES
3
70�/
ELEV.= 709.5'
/2," S D
FILL MEDIA
85% SAND
10% FINES
UNDERDRAIN PIPE TURN WITH
5% ORGANIC
3' FILL
MEDIA
r—GEO FILTER
FABRIC
PVC BENDS AS REQUIRE
TOP BEND INV.=706.79
ELEV.= 706.,3,3--0%-_
010%
r-4" DIA.
WASHED AND,;
0-5% MIN
8" NO. 57
::4
12"
A
STONE
0.0%
5' 1 1 5'-" --1 o'--v- 4!' DIA. UNDERDRAIN
—75 '_75' _75'— DISCHARGE PIPE
I— - 300'
B
NOTES:
1. CONTRACTOR TO INSTALL STONE DITCH CHECKS, AS DIRECTED BY
INSPECTOR, FOR EROSION CONTROL.
2. CONSTRUCT ALL DIVERSION DITCHES PRIOR TO INS_"?;LLATION OF
BIORETENTION BASIN.
3. UNDERDRAIN PIPES TO BE SCHEDULE 40 PVC, ALL DRAIN PIPES
EXCEPT DISCHARGE PIPE SHALL BE PERFORATED. DISCHARGE PIPE
SHALL BE SOLID WALL.
4. CONTRACTOR TO BUILD BIORETENTION BASIN TO COMPLY GENERALLY
WITH THE SHAPE ILLUSTRATED AND TO MAINTAIN 4.490 S.F. OF
SURFACE AREA.
5. CONTRACTOR SHALL BE PROHIBITED FROM USING S00 THAT IS GROWN
IN SOIL THAT HAS AN IMPERMEABLE LAYER (SUCH AS CLAY). SOD
SHALL BE KENTUCKY 31 TALL FESCUE.
LEGEND
BIO-RETENTION BASIN
EXISTING PAVEMENT
PROPOSED CLEANOUT
PROPOSED UNDERDRAIN
SECTION B-B
NOT TO SCALE
TIE IN
OVERFLOW WEIR
El FV.=710.5"
UhIDERDRAIN INV. ELEV.= 708.5'
OUT El FV.=7049 I
L 3' FILL MEDIA
TIE IN I
BERM ELEV.=71
4" DIA. CLEAN
OUT PIPES
WITH SCREW CAPS
1 893
8" STONE
5A \\-4" DIA. UNDERDRAIN PIPE 5'—
15'
A—]
\7--i 5'
A--�
EXISTING PIPE ------
---EX: I NV_-OUT ::�- 7TG
-INV OUT=711.5
PROP.
15 LF OVERFLOW WEIR
:ue.-xi
7
0e,
X
_710—
-7
-7 1
7'1 o. 5
EXISTING
COT DITCH
.........................
""n
—71 .0 . .. . .......
'710.5
'7 Al2-
og
ROW— ROW— ROW— ROW ROW—, ROW— ROW— ROW ROW— ROW,— ROW— ROW— ROW— F?nw—L
OVERFLOW WEIR
ELEV.= 710.5'
, 2 � 1
20 10 0 20 40 61
SCALE IN FEET
V$=2C
LOT
TIE IN
TALBERT&BRIGHT
ENGRGERING 6L PLANNING CONSULTANTS rj
4944 PAPJCWAY PLAZA BOULEVARD6 SUff E 350
diAMM-M NORTH CAROUNA 28217
PHONLi 704-426-6070 FAX- 704-426.6=
www.to bertondbright.com
�377-
cn
Z
0
....... ..
m
C14
to I
-t
I Lo
N
0
Lo
0
C14
<
W
w
CL
N
N
t--
1 w 1-
n
w
0
G1
z
(D
Fn
w
Z
W
w
0
w
z fJ
w
__:>
0
w
dot
z
3�:
<
w
0
0
uJ
=
(n
UJ
a
a_
CL
a
0
....... ..
m