Loading...
HomeMy WebLinkAboutNC0004961_Compliance Boundary Appendix-2020_20210215• • `. / / /♦/ • ♦ /♦/ /• • ♦ ♦ ♦ I I • MW-09 • • 1 • • MW-10 MW-11SRI1 • • • MW-01S MW MW-01 D - -•'S "". MW-08g MW-11 DR MW-02S MW-03S M W-02 D i MW-03DI MW-04S MW-05S MW-06S MW-07D ¶MW-07SRI • • '. ♦4 • / • LEGEND VOLUNTARY WELL COMPLIANCE WELL APPROXIMATE STREAM (NON -JD) ASH BASIN BOUNDARY • • - • • - COMPLIANCE BOUNDARY DUKE ENERGY CAROLINAS RIVERBEND SITE •• •• BOUNDARY NOTES: 2016 AERIAL ORTHOPHOTOGRAPHY OBTAINED FROM USDA NRCS GEOSPATIAL DATA GATEWAY (https://gdg.sc.egov.usda.gov/GDGOrder.aspx). PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83/2011). synTerra 300 150 0 300 600 GRAPHIC SCALE IN FEET 1 DUKE ENERGY 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.svnterracor0.com DRAWN BY: A. ROBINSON PROJECT MANAGER: J. MAHAN CHECKED BY: 6. WYLIE DATE: 10/26/2017 FIGURE 2-3 COMPLIANCE AND VOLUNTARY MONITORING WELLS RIVERBEND STEAM STATION PLANT DUKE ENERGY CAROLINAS, LLC MOUNT HOLLY, NORTH CAROLINA P:\Duke Energy Progress.1026\00 GIS BASE DATA\Riverbend\MapDocs\CSA Supplement 2\Figure 2-3- Compliance and Voluntary Monitoring Wells.mxd