HomeMy WebLinkAbout20081602 Ver 4_Application_20111220r
�
M sTNE �
� � �
'� .�
���
STATE OF NORTH CAROLINA
0 ��a '� r�-a
��"
� ��
Cr� ! � � �
� � 201>
���SAND T R�� ACIry
DEPARTN�NT OF TRANSPORTAT`ION A�Re''�cr�
BEVERLY EAVES PERDUE
GOVERNOR
U S Army Corps of Engineers
Regulatory Field Office
�Post Office Box 1000
Washington NC 27889 1000
ATTN Mr William J Biddlecome
NCDOT Coordinator
EUGENE A CONTI 1R
SECRETARY
December 16 2011 �' � 11� �� V �
�
N C Dept of Environment and Natural Resources
D�vision of Coastal Management
400 Commerce Avenue
Morehead City NC 28557
ATfN Mr Stephen Lane
NCDOT Coordinator
Sub�ect Permit Modification Request for the Individual Section 404 Permit,
Individual Water Quafity Certification, and CAMA Permit for the widening of
US 158/NC 34 from East of Pasquotank River to the US 158/ NC 34 split in
Camden County Federal Aid Pro�ect No STP 158(2) Division 1
TIP Nos R 2414 A&B Debit $670 from WBS 34430 1 1
Reference Original Permit Application requested October 15 2008
Section 404 Individual Permit issued January 14 2009
USACE Permit No SAW 1994 02124
Section 401 Water Quality Certification issued December 18 2008
NCDWQ Pro�ect No 003774
Division of Coastal Management Permit issued January 13 2009
DCM Permit No 03 09
Dear Gentlemen
Please see the enclosed revised permit drawings (Sheets 1 14 15 16 17 29 30 31 32 of
38) roadway drawings and revised EEP Acceptance Letter for the above referenced
pro�ect Due to the continual re�ections of bids by contractors due to the stabilization
methods the NCDOT has redesigned the soil stabilization method which has resulted in
impact changes at the three culvert locations on the above referenced pro�ect Due to
these changes a permit modification is requested by the Department
MAILING ADDRESS
NC DEPARTMENT OF TRANSPORTATION
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS
1598 MAIL SERVICE CENTER
Rn�EtGH NC 27699 1598
TELEPHONE 919 707 6100
FAX 919 212 5785
WEBSITE WN/W NCDOT ORG
LOCATION
1020 BIRCH RIDGE DRIV
RALEIGH NC 2761 O 4328
�
Substrate Stabilization Method Change
.
Due to the need to prevent subsidence around the three culverts along the pro�ect
different stabilization methods have been proposed The department considered using
aluminum cuiverts and then a mass soil mixing to stabilize the area It has now been
determined that the most predictable and cost predictable method is to use a buoyant
cement method (also referred to as foamed concrete) at the approaches and to place the
---culverts on piles atthe crossings This wiil-ensure stability-as well remove the-concerns of-----
the uncertainty of subsurface material
Despite of the Department s minimization efforts the pro�ect footprint will expand at the
culvert sites This is necessary to safely detour traffic around this larger stabilization
operation Right of way limits will not change as a result of these activities
This activity will occur at the approaches at two of the three culverts sites previously
identified as Permit Sites 3 and 6
The concrete will be contained inside the protective form providing a barrier between the
concrete and the �urisdictional resources abutting this activity
Site 3
The fill slopes will be expanded into a wetland area previously permitted as hand clearing
However the hand clearing limit will not be expanded at this location As a result the
permanent fill in wetlands will increase from 0 65 to 0 67 acre and the hand clearing
impact will be reduced from 0 26 to 0 24 acre
The culvert type has also been reverted back to a single barrel 8 by 6 reinforced concrete
box culvert (RCBC) as this stabilization method obviates the need for the lightweight
aluminum
Site 6
The fiil slopes will be expanded into an area previously permitted as hand clearing and the
area of hand clearing will also expand out in the amount previously identified in earlier
permits (0 37 acre) As a result the permanent fill in wetlands will increase from 0 85 to
0 87 acre The hand clearing amount will remain the same (0 37 acre) as it will be moved
out from the expanded fill line
The cutvert type has also been reverted back to a double barrel 6 by 5 RCBC as this
stabilization method obviates the need for the fightweight aluminum
�
v
Mitigation
Compensatory mitigation for the additional 0 04 acre of wetland impact will be provided by
EEP A copy of the acceptance letter is included with this request
Section 404 Permit NCDOT requests that the USACE review this application and issue a
modification for the Individual 404 Permit issued October 6 2010 as required for the
above described activities — ---- - —
Section 401 Permit NCDOT requests that the NCDWQ review this application and issue a
modification for the Individual 401 Certification issued October 20 2010 as required for
the above described activities In accordance with 15A NCAC 2H 0501(a) we are providing
five copies of this modification request to the DWQ for their approval and $570 to act as
payment for processing the permit modification (see sub�ect line)
CAMA Permit NCDOT requests that the Division of Coastal Management review this
application and issue a modification for the permit issued December 9 2010 as required
for the above described activities Debit $100 modification fee from the aforementioned
(see sub�ect line) WBS element
A copy of this permit modification request and its distribution list will be posted on the
NCDOT website at http //www ncdot org/doh/preconstruct/pe/neu/permit html
Thank you for your assistance with this pro�ect If you have any questions or need
additional information please contact Michael Turchy at maturchy@ncdot gov or (919)
707 6157
Sincerely
�
� Gregory J Thorpe Ph D Manager
Pro�ect Development and Environmental Analysis Unit
Cc
NCDOT Permit Application Standard Distribution List
-,
�