HomeMy WebLinkAbout20030293 Ver 2_Certification of Completion_20110620R yS
o?I
North Carolina Department of Environment and Natural Resources
401 /Wetlands - Division of Water Quality
Winston-Salem Regional Office
585 Waughton Street
Winston-Salem, NC 27107
Via US Mail
RE: Certificate of Completion
Duracell Supplemental OU-1 Remediation Project
305 New Highway 64 East
Lexington (Davidson County), North Carolina
Dear 401/ Wetlands Unit:
On behalf of Duracell USA (Duracell), ERM NC, Inc (ERM) is
transmitting one copy of the Certificate of Completion for the Duracell
Supplemental OU-1 Remediation Project. Please contact me at the
letterhead address or Mr. Victor Miles of Duracell (203-796-4541) if you
have any questions or comments.
Sincerely,,?
Scott Robinson, P.E.
Senior Engirleer
Enclosure:
cc: Mr. Victor Miles -- Duracell
Mr. Phillip Patey - ERM NC, Inc.
ERM NC, Inc
8000 Corporate Center Drive
Suite 200
Charlotte, NC 28226
(704) 541-8345
(704) 541-8416 (fax)
ERIM
BRP\NC171-'NR ESC completit-m letter 06161-Ldoc
Mr. Victor H. Miles
DWQ# 03-0293 v2
October 4, 2010
Page 3
DWQ Project No.:p d
Applicant: W)Y,
Project Name: o- c S, - G
Date of Issuance of 401 Water uality Certification:
JU 2 t
V-
- -----
County: Vi 560 r 7?
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules,
and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit,
North Carolina Division of Water Quality, 1.650 Mail Service Center, Raleigh, NC, 27699-1650. This form
may be returned to DWQ by the applicant, the applicant's authorized agent, OR the project engineer. It
is not necessary to send certificates from all of these.
A licant's Certi zcation
1, _ , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction. was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved
plans and specifications, and other supporting materials.
Signature: Date:
A ent's• Certi rcation
1, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved
plans and specifications, and other supporting materials.
Signature: Date:
Engineer's Certification
Partial Final
as a duly registered Professional Engineer in the State of
North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the
project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the
observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, arltl other suppoAng materials.
Signature Registration No. (u ?Z117
Date 46?m?e)