Loading...
HomeMy WebLinkAbout20030293 Ver 2_Certification of Completion_20110620R yS o?I North Carolina Department of Environment and Natural Resources 401 /Wetlands - Division of Water Quality Winston-Salem Regional Office 585 Waughton Street Winston-Salem, NC 27107 Via US Mail RE: Certificate of Completion Duracell Supplemental OU-1 Remediation Project 305 New Highway 64 East Lexington (Davidson County), North Carolina Dear 401/ Wetlands Unit: On behalf of Duracell USA (Duracell), ERM NC, Inc (ERM) is transmitting one copy of the Certificate of Completion for the Duracell Supplemental OU-1 Remediation Project. Please contact me at the letterhead address or Mr. Victor Miles of Duracell (203-796-4541) if you have any questions or comments. Sincerely,,? Scott Robinson, P.E. Senior Engirleer Enclosure: cc: Mr. Victor Miles -- Duracell Mr. Phillip Patey - ERM NC, Inc. ERM NC, Inc 8000 Corporate Center Drive Suite 200 Charlotte, NC 28226 (704) 541-8345 (704) 541-8416 (fax) ERIM BRP\NC171-'NR ESC completit-m letter 06161-Ldoc Mr. Victor H. Miles DWQ# 03-0293 v2 October 4, 2010 Page 3 DWQ Project No.:p d Applicant: W)Y, Project Name: o- c S, - G Date of Issuance of 401 Water uality Certification: JU 2 t V- - ----- County: Vi 560 r 7? Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1.650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, OR the project engineer. It is not necessary to send certificates from all of these. A licant's Certi zcation 1, _ , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction. was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: A ent's• Certi rcation 1, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Engineer's Certification Partial Final as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, arltl other suppoAng materials. Signature Registration No. (u ?Z117 Date 46?m?e)