Loading...
HomeMy WebLinkAbout20010404 Ver 3_Information Letter_20100910 _n ro M 0 1 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION 'BEVERLY EAVES PERDUE EUGENE A. CONTI, JR. GOVERNOR SECRETARY September 10, 2010 Mr. Ronnie Smith Wilmington Regulatory Office ACOE 69 Darlington Avenue Wilmington, NC 28402-1890 Re: UT to Little River Mitigation (Site 10Moore County, State Project No. 8.T560302, TIP No. R-021 OA, Action ID No. 1993-0-0570; DWQ Project No. 010404 Mr. Smith: As you are aware, the Department has monitored the UT to Little River relocation (Site 10) since its construction in July 2003. Located in Moore County, adjacent to the US 1 bypass near Vass, this site provides 174 linear feet of stream relocation for impacts associated with the R-0210A project. The stream relocation was constructed and revegetated with appropriate hardwood species. Per the permit requirements, NCDOT was required to annually monitor the stream mitigation site for channel stability by visual observation for five years or until success criteria were met. During the five year monitoring period, annual reports were submitted to the appropriate regulatory agencies via the PDEA Natural Environment Unit's (NEU) website: httn://www.ncdot.oro//oh/preconsarucliPChteu/Monirorin?/Monitoritt Kepnr '.html After five years of vegetation and stream stability monitoring, the UT to Little River relocation (Site 10) indicates that the planted vegetation is surviving and the streambanks remain stable at this time. Individual annual monitoring reports are available on NEU's website for 2005-2009. MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1598 MAIL SERVICE CENTER RALEIGH NC 27699-1598 TELEPHONE: 919-431-2000 FAX: 919-431-2001 WESSITE: WWW NCDOT.ORG LOCATION: ENVIRONMENTAL RESOURCE CENTER 4701 ATLANTIC AVENUE SUITE 116 RALEIGH, NC 27604 A site visit was conducted on August 12`h, 2010 with the regulatory agencies and NCDOT personnel present. It was detennined at that meeting that the site success criteria had been met and that no further monitoring would be required. NCDOT requests that the appropriate resource agencies provide documentation stating that no further monitoring is required and that the site.is closed. If you have any questions about this project, please contact Mr. Randy Griffin at (919) 431-6529. Sincerely, Philip S. Harris, III, P.E., Unit Head PDEA- Natural Environment Unit cc: Mr. David Wainwright, DWQ Mr. Travis Wilson, WRC Mr. Chris Militscher. EPA Mr. Gary Jordan, USFWS Mr. Scott McLendon, ALOE Mr. Brian Wrenn, DWQ Mr. David Harris, P.E., NCDOT-REU Mr. Art King, NCDOT-DEOS Mr. Randy Griffin, NCDOT-NEU