HomeMy WebLinkAbout20001195 Ver 12_Approval Letter_201009149 NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary September 14, 2010 Mr. Jerry Orr Charlotte-Douglas International Airport P.O. Box 19066 Charlotte, NC 28219 Re: Charlotte-Douglas International Airport, Mecklenburg County DWQ #20001195, Ver. 12; USACE Action ID. No. 2006-32531 Ut to Coffey Creek [030834, 11-137-4, C] APPROVAL of 401 Water Quality Certification with Additional Conditions - MODIFICATION Dear Mr. Orr: Attached hereto is a copy of Certification No. 3581 issued to Jerry Orr of Charlotte-Douglas International Airport, dated September 14, 2010. This Certification replaces the Certification issued on May 13, 2010. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Solid Waste, Sediment and Erosion Control, Stormwater, Dam Safety, Non-discharge and Water Supply Watershed regulations. If we can be of further assistance, do not hesitate to contact us. CHS/ijm Attachments: Certificate of Completion Since ely, Coleen H. Sullins cc: Becky Fox, EPA, 1307 Firefly Road, Whittier, NC 28789 USACE Asheville Regulatory Field Office Alan Johnson, DWQ, Mooresville Regional Office DLR, Mooresville Regional Office File Copy HDR Engineering, Inc., Eric Mularski, 440 S Church St., Charlotte NC 28202 Filename: 001195V erl2CharlotteDougl asInternationalAi rport(MecWenburg)401_IC_MOD 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 Location: 2321 Crabtree Blvd., Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX: 919-733-6893 Internet: http:/Iportal.ncdenr.org/web/wq/ws An Equal opportunity 1 Affirmative Action Employer Charlotte-Douglas International Airport Page 2 of 6 September 14, 2010 NORTH CAROLINA 401 WATER QUALITY CERTIFICATION THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92- 500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality (DWQ) Regulations in 15 NCAC 2H, Section .0500 to Mr. Jerry Orr of Charlotte-Douglas International Airport to fill 1.148 acres of 404/jurisdictional wetlands, 21,818 linear feet of stream (149 linear feet of perennial stream impact associated with this modification request), and 7.522 acres of open waters (ponds), in the Catawba River Basin, associated with a modification to the proposed impacts along West Boulevard, in Charlotte, Mecklenburg County, North Carolina, pursuant to an undated and unsigned application/modification filed on the 6 h day of July of 2010 and received by the DWQ on July 6, 2010, and by Public Notice issued by the USACE on July 1, 2010, and received by the DWQ on July 6, 2010, and by additional information received on August 11, 2010. The application and supporting documentation provides adequate assurance that the proposed work will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth. This approval is for the purpose and design submitted in the application materials and as described in the Public Notice. If the project is changed, prior to notification a new application for a new Certification is required. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions of this Certification. Any new owner must notify the Division and request the Certification be issued in their name. Should wetland or stream fill be requested in the future, additional compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h) (6) and (7). If any plan revisions from the approved site plan result in a change in stream or wetland impact or an increase in impervious surfaces, the DWQ shall be notified in writing and a new application for 401 Certification may be required. Compliance with the conditions listed below is required. Conditions of Certification Impacts Approved 1. The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification are met. No other impacts are approved including incidental impacts: Type of Impact Amount Approved nits Plan Location or Reference 404 Wetlands 1.148 (acres) A lication and Narrative Stream 21,818 (linear feet) [149 Application and Narrative linear feet perennial stream impact associated with this modification request] Open Waters (ponds) 7.522 (acres) Application and Narrative Sediment and Erosion Control 2. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: Charlotte-Douglas International Airport Page 3 of 6 September 14, 2010 a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the 404/401 Permit Application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 4. Sediment and erosion control measures shall not be placed in wetlands or waters without prior approval from the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or stream beds or banks, adjacent to or upstream and down stream of the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Land Resources or locally delegated program has released the project; 5. Construction Stormwater Permit NCG010000 Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an NPDES General stormwater permit (NCGO10000) administered by DWQ is automatically issued to the project. This General Permit allows stormwater to be discharged during land disturbing construction activities as stipulated by conditions in the permit. If your project is covered by this permit [applicable to construction projects that disturb one (1) or more acres], full compliance with permit conditions including the sedimentation control plan, self-monitoring, record keeping and reporting requirements are required. A copy of this permit and monitoring report forms may be found at http:11h2o.enr.state.nc.us/su/Forms Documents.htm. Continuing Compliance Mr. Jerry Orr and Charlotte-Douglas International Airport, shall conduct construction activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State law and federal law. If the Division determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the Division may reevaluate and modify this Certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15A NCAC 2H.0507(d). Before modifying the Certification, the Division shall notify Mr. Jerry Orr and/or Charlotte-Douglas International Airport and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 2H.0503 Charlotte-Douglas International Airport Page 4 of 6 September 14, 2010 and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to Mr. Jerry Orr and/or Charlotte-Douglas International Airport in writing, shall be provided to the United States Army Corps of Engineers for reference in any Permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. 7. Culvert Installation All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual (http://www.ncdot-org/doh/operations/BMP _ manuaUdownload/BMP Manual.pdf) such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. Culverts required for this project shall be installed in such a manner that the original stream profiles are not altered. Existing stream dimensions (including the cross section dimensions, pattern, and longitudinal profile) must be maintained above and below locations of each culvert. Culverts shall be designed and installed to allow for aquatic life movement as well as to prevent head cutting of the streams. If any of the existing pipes are or become perched, the appropriate stream grade shall be re- established or, if the pipes installed in a perched manner, the pipes shall be removed and re-installed correctly. Culvert(s) shall not be installed in such a manner that will cause aggradation or erosion of the stream up or down stream of the culvert(s). Existing stream dimensions (including the cross section dimensions, pattern and longitudinal profile) shall be maintained above and below locations of each culvert. Placement of culverts and other structures in waters, streams, and wetlands must be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis- equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the above structures. The applicant is required to provide evidence that the equilibrium shall be maintained if requested in writing by DWQ. The establishment of native, woody vegetation and other soft stream bank stabilization techniques must be used where practicable instead of rip rap or other bank hardening methods. If rip-rap is necessary, it shall not be placed in the stream bed, unless specifically approved by the Division of Water Quality. Installation of culverts in wetlands must ensure continuity of water movement and be designed to adequately accommodate high water or flood conditions. Upon completion of the project, the Applicant shall complete and return the enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the NC Division of Water Quality upon completion of the project. Please send photographs upstream and downstream of each culvert site to document correct installation along with the Certiftcate of Completion form. Charlotte-Douglas International Airport Page 5 of 6 September 14, 2010 8. Deed Notifications Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place at the time lots or properties are recorded. A sample deed notification can be downloaded from the 401/Wetlands Unit web site at http://h2o.enr.state.nc.us/ncwettands/documents/wet buf compl.pdf. The text of the sample deed notification may be modified as appropriate to suit to this project. 9. Mitigation: Compensatory Mitigation Using the City of Charlotte Restoration Bank Mitigation must be provided for the proposed impacts as specified in the table below. We understand that you wish to make a payment to the City of Charlotte Restoration Bank to meet the stream restoration requirement. This method has been determined by the DWQ to be a suitable method to meet the mitigation requirement. Until the City of Charlotte Restoration Bank has received your payment, no impacts specified in this Authorization Certificate shall occur. The EEP should be contacted at (919) 716-19215 if you have any questions concerning payment into a restoration fund. You have 60 days from the date of this approval to make this payment. Type of Impact Compensatory Mitigation Re wired River and Sub-basin Number Stream (perennial) 149 (linear feet) I Catawba/03050103 *Previously compensated mitigation includes 0.25 acres 404/wetland and 548 linear feet of stream (401 WQC dated May 13, 2010) 10. Stormwater Management Plan Implementation Procedures (No Further Approval Needed) • The approved SMP must be constructed and operational before any permanent building or other structure is occupied at the site. If a development is phased, then the approved SMP for each future phase must be constructed and operational before any permanent building or other structure associated with that phase is occupied. • The approved SMP as well as drainage patterns must be maintained in perpetuity. • The SMP may not be modified without prior written authorization from the SMP approval authority. If the SMP falls under another state stormwater program, then a copy of the approval letter and the modified SMP must be submitted to the 401 Oversight/Express Unit prior to the commencement of the modifications. 11. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may obtain the petition form from the Office of Administrative Hearings. You must file the petition with the Office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered filed when it is received in the Office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Charlotte-Douglas International Airport Page 6 of 6 September 14, 2010 Friday between the hours of 8:00am and 5:00pm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed-provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Telephone: (919)-431-3000, Facsimile: (919)-431-3100 A copy of the petition must also be served on DENR as follows: Ms. Mary Penny Thompson, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699-1601 Unless such a petition is filed, this Certification shall be final and binding. This the 14`h day of September 2010 DIV ION OF W T LITY Coleen H. Sullins CHS/ijm 3581