Loading...
HomeMy WebLinkAbout20030180 Ver 7_Emails_20100623Dorney, John From: Mead, Jim Sent: Wednesday, June 23, 2010 5:04 PM To: Sullins, Coleen; Dorney, John Subject: FW: FERC request for clarification on Duke Power Nantahal Area 401's Coleen and John, Most of what FERC picked up on are oversights in the cut and paste process that are simple to clarify and correct. However, the cut and paste issue in one condition of the Nantahala Project 401 (FERC #2692) is a little more complicated. The way section 8 of the Nantahala 401 certificate reads now: 8. Comprehensive Settlement Agreement - The Comprehensive Settlement Agreement dated October 23, 2003 is hereby incorporated into this Certification by reference. In particular, the following sections, including any attachments identified within those sections, of the TCST Settlement Agreement dated October 23, 2003 are hereby incorporated into this Certification by reference: Section 1.0 (Reservoir Level Agreements); Section 3.0 (Minimum Flow Agreements for Bypassed Reaches); Section 4.0 Scheduled High Flow Releases to Nantahala Bypassed Reach; Section 6.0 Shoreline Management; Section 7.0 (Sediment Management Agreements); Section 9.0 Compliance Monitoring and Reporting Requirements as well as the Low Inflow Protocol Hydro Project Maintenance and Emergency Protocol (HPMEP) and Minimum Flow For Bypassed Reaches for the Nantahala Project. The correction involves more than just replacing TCST with NCST, because the numbering of the two sets of settlement agreement conditions are not the same. Note also that what I listed in DWR's comments are just numbered in ascending order - they do NOT correspond to the settlement agreement condition numbers. To agree with the conditions that John wanted to bring particular attention to, section 8 of the Nantahala 401 certificate should be revised to read: 8. Comprehensive Settlement Agreement - The Comprehensive Settlement Agreement dated October 23, 2003 is hereby incorporated into this Certification by reference. In particular, the following sections, including any attachments identified within those sections, of the NCST Settlement Agreement dated October 23, 2003 are hereby incorporated into this Certification by reference: Section 1.0 (Reservoir Level Agreements); Section 4.0 (Minimum Flow Agreements for Bypassed Reaches); Section 5.0 - article #406 Scheduled High Flow Releases to Nantahala Bypassed Reach; Section 7.0 Shoreline Management; Section 9.0 (Sediment Management Agreements); Section 13.0 Compliance Monitoring and Reporting Requirements as well as the Low Inflow Protocol Hydro Project Maintenance and Emergency Protocol (HPMEP) and Minimum Flow For Bypassed Reaches for the Nantahala Project. The other cut/paste corrections are: - Bryson and Franklin 401's mistakenly refer to Mission in one place in condition #3, two places in condition #5 and one place in condition #7. - The Nantahala 401 mistakenly refers to West Fork in one place in condition #3. Let me know if you have any questions. Jim Jim Mead, Environmental Supervisor NOTE NEW EMAIL ADDRESS Jim.Mead(@ncdenr.eov 919/715-5428 fax - 919/733-3558 ************************************* NC Division of Water Resources - DENR 1 1611 Mail Service Center Raleigh, NC 27699-1611 (for overnight mail, UPS, or FedEx - contact me for street address) E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message----- From: eService@ferc.gov [mailto:eService@ferc.gov] Sent: Wednesday, June 23, 2010 2:25 PM To: Jim.Mead@ncmail.net Subject: Document Service in P-2601-000,et al. This notification is served on you in accordance with the requirements set forth in Section 385.2010 of the Commission's rules. On 6/23/2010, the Federal Energy Regulatory Commission (FERC), Washington D.C., published the following issuance: Docket(s): P-2601-000 P-2601-007 P-2601-007 P-2603-012 P-2619-012 P-2692-032 Description: Letter requesting North Carolina Department of Environment and Natural Resources to file w/in 20 days clarification of their intent to the 401 Water Quality Certificates for the Bryson Project et al under P-2601 et al. You can view the issuance at: http://elibrary.FERC.gov/idmws/file list.asp?accession num=20100623-3032 You may also eSubscribe to the docket number(s) in the issuance by clicking on the following link to login to FERC Online. https://ferconline.ferc.gov/eSubscription.aspx ------------------------------------------------------------------------ Please do not respond to this email. Online help is available here: http://www.ferc.gov/efiling-help.asp or for phone support, call 866-208-3676. Comments and Suggestions can be sent to this email address: mailto:FERCOnlineSupport@Ferc.gov z