Loading...
HomeMy WebLinkAbout20030181 Ver 7_Emails_20100728Dorney, John From: Johnson, Steven R [Steve.Johnson@duke-energy.com] Sent: Wednesday, July 28, 2010 11:31 AM To: Dorney, John Cc: Lineberger, Jeff Subject: Franklin WQC Attachments: Franklin Final 401 version 1.5_Duke_Energy_Clean 7-28-2010.doc Good morning John: Rather than confuse you with a bunch of red-line edits, I am providing a clean version of the Franklin WQC with Duke's suggested edits for your consideration. We ask you to please review the clean version and see what you think. We can then provide you with redline edits if in fact you need them. We took your revised draft, accepted all your revisions in Word and then made a few additional changes aimed at making the document as clear as possible for compliance assurance. Here is a summary of the edits we made: 1) Removed the Certificate of Completion since this 401 provides for changes in operational procedures 4- and not construction. 2) Tightened up the use of abbreviations and acronyms to be consistent with technical reports and articles 3) We have made changes to Condition 6 that we believe more accurately depict the content of Addendum No. 3. Addendum No. 3 contains the requirement for the Sediment Removal Pilot Study. Addendum No. 3 does not contain a "Short Term Sediment Management Plan." 4) We have made changes to Condition 7 to clarify the intent. The goal of Addendum No. 3 is to develop a Long-Term Sediment Management Plan. In our opinion this is a more suitable point for the Town of Franklin to be involved in the consultation rather than the highly technical aspect of sediment monitoring. 5) Corrected a few typos. John we greatly appreciate the opportunity to review these documents ahead of time. I would be glad to discuss this with you any time today. Once we have had a chance to talk I will forward our comments on the remainder of the WQC's. Thanks Steve Johnson Duke Energy Carolinas - Hydro Strategy and Licensing 526 S. Church Street/P.O. Box 1006 Charlotte, NC 28201-1006 Office: 704-382-4240 Cell: 704-754-6618 TOWN OF FRANKLIN Post Office Box 1479 Franklin, North Carolina 28744 (828) 524-2516 Mr. John Dorney NC Div. of Water Quality 2321 Crabtree Blvd. Raleigh, NC 27604 Via email and regular mail Re: Franklin Hydroelectric Project Macon County DWQ # 2003-0180, Version 7.0 FERC Project # 2603 Dear Mr. Dorney; The following comments are submitted on behalf of the Town of Franklin, Macon County, NC to the June 9, 2010 issued water quality certificate for relicensing of Project No. 2603. 1. We request that the Town of Franklin be made part of all future proceedings involving Lake Emory and/or the Franklin Project. including, but not limited to, any meetings or conference calls, etc., between Duke Energy Carolinas and any and all resource agencies such as the NC Wildlife Resources Commission, U. S. Fish and Wildlife Service, NC Divisions of Water Quality, Land Resources, or Water Resources. We further request that the Town of Franklin be placed on the mailing list to receive copies of all correspondence between your Division, Duke Energy Carolinas and the above named resource agencies. 2. The 401 certificate should be corrected and reissued to reflect the fact that we are referring to the Franklin Hydroelectric Plant and not the Mission plant in Cherokee/Clay Counties. 3. Page 4, # 8. The Town of Franklin requests that when the Shoreline Management Plan and the Long and Short Term Sediment Management are developed, we would like to have an active role in preparing this document. Of particular 4 concern is our desire to insure that all recreational facilities, such as boat ramps, canoe portage, and bank and handicapped fishing access be included in the Shoreline Management Plan. In addition, we will be requesting that this Sediment Management Plan for Lake Emory include dredging of the entire lake, not just that part in front of the trash racks. Along with the full lake dredging, a monitoring program should be established for incoming sediment and a target trapment rate be mandated for the lake. This will insure that the Little Tennessee River downstream of Lake Emory will be protected. Of course, along with the dredging of Lake Emory, we will be requesting that Duke Energy Carolinas institute an aquatic habitat improvement program for Lake Emory. Should you have any questions, please contact Sam Greenwood, Town Manager. All notices, correspondence, etc., should be directed to me at the following address: TOWN MANAGER P.O. Box 1479 Franklin, NC 28744 A copy should also be sent to the Town's attorney at the following address: John F. Henning, Jr. Henning & Henning, P.A. 139 lotla St. Franklin, NC 28744 The Town . would also appreciate receiving in electronic format the underlying applications for this 401 and that for the repair of the trashrack. Sincerely, Sam Greenwood Town Manager CC: Mayor/Board of Aldermen