HomeMy WebLinkAbout20021157 Ver 1_Triage Check List_20020731riage Check List
v
`~,.~ ~.,
~~ ~ ~
Date: ~ ~ ~ Project Name:
y~
~,
~m DWQ#: ~~ I~~
County:
TO: ^ ARO Mike Parker ~ WaRO Deborah Sawyer
^ FRO Ken Averitte ^ WiRO Joanne Steenhuis
^ MRO Mike Parker ^ WSRO Jennifer Frye
^ RRO Steve Mitchell
From: ~~ f ~` ~ Telephone : (919) `i ~.~ ' ~ 7 ~b
The file attached is being forwarded to your for your evaluation.
Please call if you need assistance.
^ Stream length impacted
^ Stream determination
^ Wetland determination and distance to blue-line surface waters on USFW topo maps
~Minimization/avoidance issues
^ Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman)
^ Pond fill
^ Mitigation Ratios
^ Ditching
^ Are the stream and or wetland mitigation sites available and viable?
^ Check drawings for accuracy
^ Is the application consistent with pre-application meetings?
^ Cumulative impact concern