HomeMy WebLinkAbout20031409 Ver 3_Certificate of Completion_20201023ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
NORTH CAROLINA
Environmental Quality
WR Project No.: DWR# 03-1409 V3County: Cherokee
Applicant.. Michael and Kimberly Lewis
Project Name: Little Brasstown Creek - Lewis
Date of Issuance of 401 Water Quality Certification: July 15, 2020
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 and
Buffer Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh,
NC, 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or
the project engineer. It is not necessary to send certificates from all of these.
Applicant's Certification
I, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature:
Agent's Certification
I, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature: Date:
If this project was designed by a Certified Professional
I Greg Jennings , as a duly registered Professional Engineer (i.e.,
Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to
observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to
the best of my abilities, due care and diligence was used in the observation of the construction such that the
construction was observed to be built within substantial compliance and intent of the 401 Water Quality
Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature: qy�� 9' w ' Registration No. NC PE# 25454
Date October 23, 2020
D E Q�� North Carolina Department of Environmental Quality I Division of Water Resources
Asheville Regional Office 1 2090 U.S. Highway 70 I Swannanoa, North Carolina 28778
NORM CAROLINA
Depanmamarenmronmenmiaual /� 828.296.4500