HomeMy WebLinkAboutMayo_20180207NOTE
1. ALL PROPERTY WITHIN COMPLIANCE BOUNDARYOWNED BY DUKE ENERGY.
PARCEL INFORMATION OBTAINED FROM PERSON COUNTY GIS, DOWNLOADED IN 2014,
AND ORIGINAL PARCEL PLATS CREATED BY MOORE, GARDNER, AND ASSOCIATES.
2. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO
ON SEPTEMBER 11, 2017. AERIAL DATED OCTOBERS, 2016.
•
•
SEE NOTE I
■
WA
R.O.W. loo,
-■
a
■
LEGEND
ASH BASIN WASTE BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
1981 DEMOLITON LANDFILL BOUNDARY
HIGHWAY 501 RIGHT-OF-WAY
(DUKE ENERGY PROPERTY- SEE NOTE 1)
PLANT BOUNDARY
p
4A
U
�n
sx
-4
A
%Z.
till.
300 150 0 300 600
M0:30K:3111MMMK:::=
GRAPHIC SCALE IN FEET
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
Terra ..1:.2/14/2018
P,RtOjEt.1t.lrl,,,Nll.ttERL:",Im-I.. CHECKED BY: B. MILLER
FIGURE 1
WASTE AND COMPLIANCE BOUNDARIES
MAYO STEAM ELECTRIC PLANT
DUKE ENERGY PROGRESS, LLC
ROXBORO, NORTH CAROLINA