Loading...
HomeMy WebLinkAbout20080797 Ver 2_Application_20100211V. a STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEVERLY EAVES PERDUE GOVERNOR February 10, 2010 Mr. Garcy Ward North Carolina Division of Water Quality 943 Washington Square Mall Washington, NC 27889 Jv ti'a EUGENE A. CONTI, JR. SECRETARY Dear Mr. Ward, The North Carolina Department of Transportation Ferry Division is requesting a modification to DWQ project # 20080797 to install a 6" water line to the second dormitory in Hatteras. A portion of the water line will be directionally bored leaving approximately 100'. This will cost the Ferry Division app. 9,000$ to directionally bore. The Ferry Division is asking for approval to dig with a rubber tire excavator from the roadway a trench app. 2' wide and 100' long to tie in the water line with some areas in the wetlands.- This could result in app. 500 sq. ft. of temporary wetland impacts. We then propose to restore the wetlands to its natural elevation and allow the vegetation to naturally grow back. The WBS number for this project is 41954. If you need any additional information or have any questions concerning this project please call me at 252-473-3461. Sincerely, 1, /. ) - Lance Winslow '"4 T Environmental Supervisor N.C. Ferry Division 8550 Shipyard Road, Manns Harbor, N.C. 27953 Telephone: (252) 473-3461 Fax: (252) 473-1490 J , `; d ti V?g } y S ri . J ?af?l ?' oo \ 7 z Y \ t f i S ? O o M j CJ C J7 _i L}J U JIB J IC- H l v C O ., cn _ Zo c c` f r \ Ra