Loading...
HomeMy WebLinkAbout20080466 Ver 2_Certification of Completion_20100215og- o 1?6t4 Ccrtiffcati®n of C let?o DWQ Project No.: O 8 - () L46 ? „s.2 County: ?., }-f- Applicant: Eo,s+P rn nes -De-,je- lnA me.n Ir LL r Project Name: Arta n r ,1? s Sic, ? Date of Issuance of Wetland Permit: ? 1?j X668 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. hereby state that, to the best of my abilities, due care and diligence was used in the observation of e construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting aterials. Signature: •' '? > 4?,;/ f ? t -? , . Date: r - / Agent's Certification D FEB 15 20;p L: 1iAN?S grypWA?YA 1, , hereby state that, to the best of my abilities, due care and diligence as used in the observation of the constriction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Date: If ihis project was designed by a Certified Pro essioKal F as a duly registered Professional (i.., Engineer Landscape Architect, Surveyor, etc.) in. the State of North Carolina, having .been authorized to observe (periodically, weekly, full time) the construction of the project, for the Perrnittee hereby state that, to the best of m} abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 water Quality Cer ification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No. Date