Loading...
HomeMy WebLinkAbout20001195 Ver 17_Response to Public Notice Comments_20200603Staff Review Does this application have all the attachments needed to accept it into the review process?* r Yes r No ID#* Version* 17 20001195 Is this project a public transportation project?* r Yes r No Reviewer List:* Sue Homewood:eads\slhomewood Select Reviewing Office:* Winston-Salem Regional Office - (336) 776-9800 Does this project require a request for payment to be sent?* r Yes r No Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: r New Project r New Project w Existing ID r Pre -Application Submittal r More Information Response r Other Agency Comments r For the Record Only (Courtesy Copy) r Stream or Buffer Appeal New Project - Please check the new project type if you are trying to submit a new project that needs an official approval decision. Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and do not have the expectation that your submittal will be considered a complete application requiring a formal decision. More Information Response - Please check this type if you are responding to a request for information from staff and you have and ID# and version for this response. Other Agency Comments - Please check this if you are submitting comments on an existing project. Is this supplemental information that needs to be sent to the Corps?* r Yes r No Project Contact Information Name: Kelly Thames Vft is subrritting the inforrration? Email Address: kelly.thames@hdrinc.com Project Information Existing ID #: Existing Version: 20001195 17 20170001(no dashes) Project Name: Charlotte Douglas International Airport Expansion Is this a public transportation project? r Yes r No Is the project located within a NC DCM Area of Environmental Concern (AEC)? r Yes r No r Unknown TIP#: WBS#: (Applies to DOT projects only) County (ies) Mecklenburg Please upload all files that need to be submited. click the upload button or drag and drop files here to attach document SAW-2018- 47.45MB 001071_CLTAirpot_ResponsePublicNoticeCommen... Only pdf or krre files are accepted. Describe the attachments: Response to Public Notice comments for the Individual Permit application. Sign and Submit V By checking the box and signing box below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the online form." Signature: K6ff# Tuw Submittal Date: Is filled in autorratically. CLT Airport Expansion I SAW-2018-01071 Responses to Public Notice and Request for Information June 2, 2020 June 2, 2020 Mr. David Shaeffer U.S. Army Corps of Engineers Wilmington Regulatory District Charlotte Regulatory Field Office 8430 University Executive Park Drive, Suite 611 Charlotte, North Carolina 28262 Subject: Charlotte Douglas International Airport Expansion SAW-2018-001071 AND DWR# 20001195 Response to Public Notice Dear Mr. Shaeffer, On behalf of the City of Charlotte — Aviation Department, HDR would like to thank you for your comments in response to their Individual Department of the Army Permit, submitted on January 31, 2020 for the proposed expansion of the Charlotte Douglas International Airport (CLT or Airport) in Mecklenburg County, North Carolina. A copy of the Public Notice comments is included in Appendix A. Please see the following Public Notice responses, organized by date. Should you have any questions or require additional information following your review of the enclosed materials, please contact me at (704) 338- 6710 or kelly.thamesa-hdrinc.com. Sincerely, HDR, Inc. Kelly Th mes, PWS Environmental Project Manager Attachments: Appendix A: Public Notice Comments Appendix B: IP Figures (IP Appendix A) — REVISED Appendix C: Plan Sheets — REVISED Appendix D: Stormwater Master Plan Map and Airport Layout Plan Appendix E: Monitoring Plan CLT Airport Expansion I SAW-2018-01071 Responses to Public Notice and Request for Information June 2, 2020 Since the submittal of the Individual Permit (IP) application and with the evaluation Public Notice comments below, one permanent loss impact (PS1-1) and two temporary impacts (TS5-1 and TS6- 1) have been eliminated from the North End Around Taxiway (NEAT) element in Phase 1. Additionally, the reevaluation of culvert slopes and the waterline alignment resulted in a reduction of permanent loss and temporary stream impacts of 261 linear feet and 366 linear feet, respectively (Table 1 and Table 2). New impacts in the form of permanent, non -loss stream impacts (204 linear feet) are associated permanent stream impacts, but do not result in permanent loss of waters (Figures 10, 13, and 17, Appendix B). Overall stream impacts for Phase 1 have been reduced by 423 linear feet. Phase 1 stream mitigation credits would be reduced by 470.25 credits for a total of 8,714.5 stream credits proposed for 3,284 linear feet of permanent loss stream impacts (Table 3). A previously approved permanent loss stream impact totaling 2,614 linear feet (SAW-2006-32521), is not included in total stream loss totals, but is included in the stream credits proposed. Wetland impacts and credits have not changed since the IP submittal. Table 4 provides an overall summary of changes noted above. A complete set of revised IP figures (from IP Appendix A) is provided in Appendix B. Table 1. S for Phase 1 and Phase 2 — REVISED 5/20/2020 Perennial Streams (LF) 11,117* 174 246 11,537 Intermittent Streams (LF) 318 30 172 520 Wetlands (AC) 5.89 0 0 5.89 �tream Total: 11,435 ILM Wetland Total: 5.89 AC — * Does not include the 2,614 LF of a previously approved impact per SAW-2006-32521 Table 2. Phase 1 — REVISED 5/20/2020 Perennial Streams (LF) 1,302 174 246 1,722 Intermittent Streams (LF) or 0 0 172 I 172 Wetlands (AC) 0.68 0 0 0.68 Perennial Streams (LF) 1,857* 0 0 1,857* Intermittent Streams (LF) 125 30 0 155 Wetlands (AC) 0.14 0 0 0.14 1,982 LF* 0.14 AC Stream Total: 0 LF 2,012 LF 0 AC 0.14 AC 418 LF Wetland Total: — * Does not include the 2,614 LF of a previously approved impact per SAW-2006-32521 3,906 LF 0.82 AC 2 07Z CLT Airport Expansion I SAW-2018-01071 Responses to Public Notice and Request for Information June 2, 2020 Table 3. Phase 1 Mitigation Credits - REVISED 5/12/2020 Stream Impacts HUC 03050101 PS2-1 S2 NEAT High 2:1 215 430 PS3-1 S2 NEAT High 2:1 66 132 PS4-1 S1 NEAT High 2:1 400 800 PS5-1 S10 NEAT High 2:1 484 968 PS6-1 S9 NEAT High 2:1 137 274 HUC 03050103 PS7-1 S25 SCF Low 1.5:1 823 1,234.50 PS8-1* S25 SCF - 1:1 (2,614)* 2,614 PS9-1; Reach 1 S26 SCF Low 1.5:1 91 136.5 PS9-1; Reach 2 S26 SCF High 2:1 444 888 PS10-1 S27 SCF Medium 1.75:1 42 73.5 PS11-1 S25 SCF High 2:1 457 914 PS12-1 S34 SCF High 2:1 125 250 Total Proposed Stream Impacts/Credits: 3,284 LF* 8,714.50 Wetland Impacts HUC 03050101 PW1-1 W5 NEAT High 2:1 0.46 1 PW2-1 W6 NEAT Low 1.5:1 0.22 0.5 HUC 03050103 PW3-1 W15 SCF High 2:1 0.01 0.25 PW4-1 W22 SCF High 2:1 0.04 0.25 PW5-1 W24 SCF High 2:1 0.09 0.25 Total Proposed Wetland Impacts/Credits: 0.82 AC 2.25 ^ PS1-1 = Permanent Stream Impact 1 - Phase 1; PS2-1 = Permanent Stream Impact 2 - Phase 1, etc * Does not include the 2,614 LF of a previously approved impact per SAW-2006-32521 3 01 CLT Airport Expansion I SAW-2018-01071 Responses to Public Notice and Request for Information June 2, 2020 Original New Impact Original New Impact ^ Feature Impact Amount Stream Stream Number Amount (LF) (LF)" Credit Credit Amount Amount PS1-1 S8 207 eliminated 362.25 eliminated Eliminated Duke Access Drive culvert crossing Refined design of Old Dowd Rd PS2-1 S2 250 215 loss 500 430 relocation culvert crossing slope evaluated 66 loss 136 132 Ticer Branch Detention access road culvert slope evaluated PS3-1 S2 68 Ticer Branch Detention access 42 non -loss n/a n/a road grade control as rock vanes to lessen culvert slope 125 loss 284 250 Coffey Creek Detention access road culvert slope evaluated PS12-1 S34 142 Coffey Creek Detention access 30 non -loss n/a n/a road grade control as rock vanes to lessen culvert slope New impact; permanent PS13-1 S1 n/a 63 non -loss n/a n/a stormwater outfall rip rap on stream bank New impact; permanent PS14-1 S11 n/a 18 non -loss n/a n/a stormwater outfall rip rap on stream bank New impact; permanent riprap PS15-1 S11 n/a 51 non -loss n/a n/a bridge abutment protection on stream bank Temporary Impacts TS3-1 S6 274 52 n/a n/a Realigned waterline in this location TS5-1 S11 102 eliminated n/a n/a Waterline realigned to avoid temporary crossing TS6-1 S12 93 eliminated n/a n/a Waterline realigned to avoid temporary crossing TS7-1 S11 81 87 n/a n/a Waterline realigned; location of TS7-1 moved Constructability issues on road TS8-1 S15 60 72 n/a n/a embankment slope; temporary easement flipped to the north New impact; temporary waterline TS9-1 S2 n/a 33 n/a n/a crossing downstream of ODR culvert ^ PS1-1 = Permanent Stream Impact 1 - Phase 1; PS2-1 = Permanent Stream Impact 2 - Phase 1, etc. A loss impact is the permanent loss of waters; a non -loss impact is a permanent impact that does not result in loss of waters. 4 CLT Airport Expansion I SAW-2018-01071 Responses to Public Notice and Request for Information June 2, 2020 National Oceanic and Atmospheric Administration — National Marine Fisheries Service: February 19t", 2020 1. Based on information in the public notice, the proposed project would NOT occur within essential fish habitat (EFH) designated by the South Atlantic Fishery Management Council, Mid -Atlantic Fishery Management Council, or the NMFS. Present staffing levels preclude further analysis of the proposed work and no further action is planned. No response required. CLT Airport Expansion I SAW-2018-01071 Responses to Public Notice and Request for Information June 2, 2020 North Carolina Department of Environmental Quality, Division of Water Resources — Request for Additional Information: March 6t", 2020 1. If the U.S. Army Corps of Engineers requests a response to any comments received as a result of the Public Notice, please provide the Division with a copy of your response to the USACE. [15A NCAC 02H .0502(c)] Provided herein. 2. On IP Appendix A- Figure 8, please explain why the road cannot be aligned to further minimize the impacts to the stream by using the existing culvert location. The existing culvert remains from what appears to have been an erosion control basin that is currently inactive. Negotiations with Duke Energy have progressed since submittal of the IP application and the Duke Access Drive (the exclusive driveway originally requested by Duke Energy) has been removed from the North End Around Taxiway (NEAT) element and will not be constructed as a part of this project. Stream 8 (PS1-1) will no longer be impacted by the Duke Access Drive. IP Appendix A, Figure 8. NEAT Impacts TS1-1 — REVISED 5/12/2020 6 CLT Airport Expansion I SAW-2018-01071 Responses to Public Notice and Request for Information June 2, 2020 3. The application notes that Duke Energy has requested an exclusive access road. Please provide further justification that explains why exclusive access is necessary. Negotiations with Duke Energy have progressed and the Duke Access Drive (the exclusive driveway originally requested by Duke Energy) has been removed from the project and will not be constructed as a part of this project. Stream 8 (PS1-1) will no longer be impacted by the Duke Access Drive. 4. On IP Appendix A — Figure 11 it is noted that impacts are proposed to Stream 10 for removing connectivity (jurisdiction) to downstream impacted areas. The Division believes the same would be true for Wetland W6. Please update the plans to include impacts to Wetland W6 in Phase 1 rather than Phase 2. The remaining portion of Wetland 6 is downstream of proposed Phase 1 impacts depicted in this figure. Wetland 6 flows to the north and is connected to downstream waters via a pipe beneath existing Old Dowd Road where flow discharges to a rip rap lined ditch between Old Dowd Road and the Norfolk Southern Railroad. This stormwater drainage ditch then connects to a pipe beneath the railroad where flows are connected to downstream waters. Therefore, this portion of Wetland 6 would not be disconnected from jurisdiction as a result of Phase 1 impacts. We respectfully ask to maintain this portion of Wetland 6 as an impact accounted for in Phase 2. City Stommater Pipes eX sting • rr •t]o d'Raad __ r=— _- s t f Welland 6 - PW2-1 0.22 ac permanent impact �.• �.. .:n�",..1,. (grade and fill) NCWAM: Low s' Proposed Ratio: 1.5:t jI W5 . 0.5 wetland credits ajam ' ]1'.. y '•.. Stream 9 - PS6-1 Wetland s - PW1 1 137 if permenent impact 0.46 ac permanent impact (grade and HII) (grade and fill) lVCSAM: High 01 NCSAM: High cLT IPar�undaq l4,$52W.) Proposed Ratio: 2:1 c. "'ir., n a l Proposed Ratio: 2:1 �.-- Sl earns } - 274 stream credits 1.1] wetland credits welmnas �r o. open wafer Stream 10 - PS5-1 �t o- - Runway 1$CY36C c,nvans 484 If permanent impact _ Raaroad ceraenlne (removing from jurisdiction for �s �d 1I NEAT Impac[a impacts to W5 and S9) . r 14 rV. Parma nenl stream Impacts Temporary Stream Impacts Charlotte flouglas Intamational Airport (CLT) Propos f: High � Applicant: City of Charloke-Aviation Deparhnenl Perna nern Wetland Impacts proposed R9t10: 2:1 :+•;;�' ',• t. i r� Date: 5/1212020 ��'A'�-'� Borrow Pit 988 stream credits ;:- ' _ :L'% IpII' snW-20l8i0 1071 1P I'? eVfA.i--agxsc. it IP Appendix A, Figure 11. NEAT Impacts PS5-1, PS6-1, PW1-1, and PW2-1 — REVISED 5/12/2020 7 CLT Airport Expansion I SAW-2018-01071 Responses to Public Notice and Request for Information June 2, 2020 5. Please provide information regarding alternative alignment of the relocated waterline. It appears thatthere may be alternative alignments which would minimize impacts. Please also explain the need forthe significant width of the corridor as it appears that this width increases the impacts beyond what is typically require for utility installation. Since the IP submittal, further field investigation was performed by the Design Team. In conjunction with field observations and a more detailed survey, the waterline alignment will move north of Stream 11 and cross the stream downstream of an existing culvert. The 60-foot-wide easement is intended to be reserved for future CLT Water utilities. The revised alignment eliminates Impacts TS5-1 and TS6-1. The NEAT requires the relocation of existing Old Dowd Road, which is also the same alignment for an existing 24-inch water main. Therefore, as a result of the NEAT construction, the existing 24% inch water main along the road would be directly impacted. The proposed waterline is the relocation of the existing water main in an effort to accelerate the project schedule by filling the gap in the CLT Water system for those impacted by the demolition of the existing 24-inch waterline. The water line relocation will also provide redundancy and a temporary source of water. This will allow the safety - oriented project of the NEAT to progress significantly faster than if this relocation is not implemented. Additionally, two new impacts are located in the figure below. Both are permanent, but non -loss of waters impacts; meaning that the impact is a permeant impact to the channel, but does not result in a loss of waters. Impact PS14-1 is a permanent non -loss impact associated with rip rap protection of a stormwater outfall that extends down the right bank of Stream 11 (Sheet 3 of 25, Appendix C). Additionally, in the same location of PS14-1, there will be approximately 60 linear feet of rip rap bank protection on the right bank (outside bend) of the channel, to be hand -placed, keyed into existing grade, and placed above the ordinary high water mark, thus not constituting an impact. This bank protection is necessary due to the potential for scour resulting from the placement of a concrete wall supporting the bridge's approach. Impact PS15-1 is a permanent non -loss impact associated with the rip rap protection of a bridge bent located approximately 12 feet from the right bank of Stream 11 (Sheet 3 of 25, Appendix C). Rip rap scour protection wraps around the bent and down the bank of Stream 11. Due to the proposed length, height, and span of the bridge to accommodate the existing railroad, the bent requiring scour protection cannot be moved further from the stream bank. 01 CLT Airport Expansion I SAW-2018-01071 Responses to Public Notice and Request for Information June 2, 2020 ucanp Charfolte Douglas Internalional Alrport (CLTj ©crT Iv ea,.,day µ,esz ee.l Applicant City of Charlolte-Avialicn Department ,v 1 inch = MG feel;' rr„ s ­ DATE: 5112r2020 Stream 11 - TS4-1 96 Yaewnd. SAW2019-01071 51 if temporary impact g� Ownyyy,er (tempoary construction Old Dowd Road D i.S aCroae"e access) da Relocation + RnMeetl enb Inr Stream 11 - TS7-i p to span railroad neArlmp.a. 87 If of temporary impact PS15-1 c with bridge t dit� Permanent 5vea m l rripaas waterline installation 51 If permanent non -loss 7empaay8eream Impx (24" ductile iron pipe impact (rip rap bridge bent 9 z P"'w'"lWmWndt"'nact• open cut utility install) protection) a."aenaM Easement � Tempwary Ea"nnernt permanent Lasc:rlu:rl: ,s- �---y[ . Propwed za' Slarm p,an■9e E.a■men ,... �=:sT:y •�,.ti �•-.-, tie .•:�s� �. Stone Oran OWall I iaS'f+r'4� .w3� .. _:���� •. r ft �i"� r:aterline movedtonorth 1 y :>. '°" de of Stream 111m�y v ` I' '��rLr� ;. '!.xr.•. _ � _ _� .:�rer locations of T55 :- °.:ii .f:%, `A • -56-1 impacts i r:... 19V8 .. ..r" _ {y ..,1I"• .,, impact move:::;, former location of TS7-1 abeam 11 - PS14-1 :. 18 1f permanent impact [non -Sass} (storm drainage outfall) a waterline to be jack" 30-ft permanent easement ■ and bored beneath 10-ft lemporary easement each side no mitigation ■� • railroad (no impacty tk connection to existingr waterline along Old ����AA �.� Dowd Road � � IP Appendix A, Figure 13. NEAT Impacts TS4-1, TS7-11, and new Impacts PS14-1 and PS15-1 — REVISED 5/12/2020 9 CLT Airport Expansion I SAW-2018-01071 Responses to Public Notice and Request for Information June 2, 2020 6. On IP Appendix A —Figure 12, Impact area TS3-1: Please provide site specific drawings indicating how these features are to be impacted during construction activities and how they are to be restored upon construction completion. The typical dewatering specifications provided with the application for stream crossings are not sufficient for paraIle Iimpacts. Please also describe how downstream water quality will be protected during construction activities when a stream is parallel within the project corridor. Please provide site -specific restoration details for this location. The Division is specifically concerned with any proposal to restore the channel to pre- construction location when the channel is parallel with the utility line and within a location where long term maintenance activities are likely to have permanent impacts to the channel. [15A NCAC 02H .0506(b)(2)] Since the IP submittal, further field investigation was performed by the Design Team. In conjunction with field observations and a more detailed survey, the waterline alignment has been revised to minimize impacts to Stream 6. The previous waterline alignment was parallel to a portion of Stream 6 and previously proposed impacts would have required site -specific restoration details. With the alignment revision, there is one perpendicular crossing and restoration of the stream is not necessary. LEGEND Q CLT IP Boundary (4-1552 ac.) dreams waaands open miler Fxmbnrt CuP ens - Ralmad ceruernna NEAT lmpao(s 139rmaronl Seeam Impact Temporary Stream Irr"ols Pg anent Wetland rrmacts farmer location of TS3-1 ` survey data revealed j that bend in stream was not correct K• �r Stream 6 - T53-1 WIN. rn 52Iflemporary imps waterline 0'. , (24" ductile iron pipe open cut 0hly install) S V y ] vc h = 150 Feet 30-ft wide permanent easement 10-ft wide teri easement both sides to existing Stream 7 - T52-1 •,�I eigarn Rt $5 If temporary impat : - line along Sears Road ne and g�rnstall) -. . Temporary Easement E-nnection :ColoPipeline cut Cha rfc tte Lao uglas IMe rn al is naI Alrpcn [L Lr'= Apip cant: City of Charlotte -Aviation Department Proposed 24-Wa%rnne = 390 reef ;pcen r., Itv Dale: 5112M20 Pro sed corrnial pa=.AW-201M1071 - Pipeline .. ��.e� .�-.-- .... �,�.- -Y�.r�rl�lreri�s��a�rr = .'evil!'-. a;` IP Appendix A, Figure 12. NEAT Impacts TS2-1 and TS3-1 — REVISED 5/12/2020 ill CLT Airport Expansion I SAW-2018-01071 Responses to Public Notice and Request for Information June 2, 2020 7. On Appendix A —Figure 14, please explain why the waterline alignment cannot be within, or closer to, the road shoulder as shown further down Old Dowd Rd. At this location, Old Dowd Road embankments are steep (approximately a 1:1 slope) and shoulder widths are very narrow after edge of pavement ends (2 to 3 feet) on both sides of the road. Additionally, the existing shoulder is already occupied by existing telecom utilities. The embankment grade exceeds that which CLT Water allows for utilities to cross a slope (3:1 or flatter) and the North Carolina Department of Transportation (NCDOT) will not allow the construction of the waterline within the pavement limits. Considering the existing cross section of the roadway, lack of road shoulder, and CLT Water and NCDOT requirements, it is necessary to install the waterline at the base of the existing slope. The installation of the waterline at the toe of the slope would not result in permanent impacts to the stream. This existing condition is not present further to the east, along Old Dowd Road, where the existing embankments are not as steep. This allows the placement of the waterline much closer to Old Dowd Road. If the waterline were to be installed closer to the road pavement in the road shoulder or in the embankment, additional embankment fill would be needed to widen the road shoulder and reduce the slope embankment grade. An extension of the culvert to accommodate for the additional embankment fill would be necessary, resulting in permanent impacts to the stream. Since the submittal of the IP, temporary impacts at this location have increased slightly due to the need to flip the temporary easement from the south to north side of the waterline alignment as a result of constructability issues on the road embankment. IP Appendix A, Figure 14. NEAT Impact TS8-1 — REVISED 5/12/2020 01 CLT Airport Expansion I SAW-2018-001071 Public Notice Response May 12, 2020 8. While buria I of culverts is typica I ly required by the regulatory agencies, given the relatively steep slope (2.5%) of the some of the proposed culverts, we are concerned that the streams at these locations would be subject to headcutting above the proposed culverts due to the proposed 1' invert burial. Please re-evaluated each location and provide revised plans that do not include culvert burial (beyond that necessary for low flow passage), or otherwise address the concern for headcutting, for any culverts proposed to be installed at steepgrades. In the original IP submittal, three culvert crossings (Impacts PS2-1, PS3-1, and PS12-1) were designed with greater than 2.5% slopes. Due to this request, these culverts were reevaluated and redesigned with lessened slopes. Revised plan sheet details are provided in Appendix C. PS2-1 originally was designed at a 3.65% slope and the reevaluation of this culvert resulted in a 2.92% slope (Figure 9, Appendix B and Sheet 2 of 25, Appendix C). Original total impacts at this location were 250 linear feet. Upon refined design, the impacts have been reduced to 215 linear feet which includes permanent impacts to the channel as a result of the culvert and rip rap aprons. The 2.92% slope is the minimum design slope that can be maintained to minimize the necessary culvert length associated with the road fill embankment slopes. A rip rap apron at the culvert inlet as the transition area between the natural channel bed and the culvert will prevent headcutting of the channel at the inlet. Additionally, the applicant is proposing 1-foot high sills at both the inlet and outlet of the culvert and baffles every 35 feet within the culvert to promote natural substrate accumulation and the seamless transition from natural channel upstream, through the culvert, to natural channel downstream. PS3-1 was originally designed at a 4% slope and the reevaluation of this culvert resulted in a 2.5% slope (Figure 10, Appendix B and Sheets 8 & 9 of 25, Appendix C). Original total impacts at this location were 68 linear feet, which included a culvert and rip rap aprons. With the reduction of culvert slope, the impacts increase to 108 linear feet as a result of additional grade control to maintain the stability of the channel upstream of the culvert. However, of the 108 linear feet of impact, permanent loss of waters impacts are proposed to be 66 linear feet (culvert + rip rap aprons) and 42 linear feet of permanent non -loss of waters impacts for rock vane grade control upstream of the inlet rip rap apron. In this way, permanent loss of waters impacts are reduced by 2 feet and those additional impacts necessary to prevent channel instability are permanent, but are non -loss of waters impacts in the form of rock vanes. PS12-1 was originally designed at a 6.5% slope and the reevaluation of this culvert resulted in a 2.5% slope (Figure 17, Appendix B and Sheets 23 & 24 of 25, Appendix C). Original total impacts at this location were 142 linear feet, which included a culvert and rip rap aprons. With the reduction of culvert slope, the impacts increase to 155 linear feet as a result of additional grade control to maintain the stability of the channel upstream and downstream of the culvert. However, of the 155 linear feet of impact, permanent loss of waters impacts are proposed to be 125 linear feet (culvert + rip rap aprons) and 30 linear feet of permanent non -loss of waters impacts for rock vane grade control upstream of the inlet rip rap apron. In this way, permanent loss of waters impacts are reduced by 17 feet and those additional impacts necessary to prevent channel instability are permanent, but are non -loss of waters impacts as rock vanes. IN CLT Airport Expansion I SAW-2018-001071 Public Notice Response May 12, 2020 9. Please provide additional information regarding the necessity of providing stormwater detention with an "online" detention area. Please include an overall plan of the airport's current stormwater control measures, a conceptual plan for all future proposed stormwater treatment control measures, and a detailed analysis that clearly explains why stormwater detention cannot be practically achieved in uplands. Please include analyses which include the use of multiple smaller devices, underground devices, or other alternative stormwater measures. Please evaluate each project area separately. Charlotte Douglas International Airport created a Stormwater Master Plan (initially in 2013 and updated in 2018) to guide stormwater management allowing long-term vision to support airport growth while supporting holistic water quality improvement. The development of the Stormwater Master Plan also takes into account the Airport Layout Plan (ALP), which depicts the Airports near-, intermediate-, and long-term facilities for an airport (Appendix D). The strategy of in -line stormwater detentions as proposed in this application was outlined in the recent Stormwater Master Plan which follows the City of Charlotte Stormwater Ordinance (Chapter 18, Article IV of the City Code of Ordinances) and Federal Aviation Administration (FAA) design criteria (Advisory Circular AC 150/5200-33C, Chapter 2.3). The City of Charlotte Stormwater Ordinance requires development projects exceeding one acre of disturbance to include stormwater treatment system design in accordance with North Carolina statute 15A NAC 2H.1008 (c), and to include stormwater peak control based on city policies. The FAA Advisory Circular requires stormwater facilities within 10,000 feet of an airfield to hold water for no more than 48 hours and prohibits permanent water bodies in order to reduce glare from surface water that can be dangerous for navigating aircraft pilots. Moreover, FAA design criteria prescribes that stormwater management facilities should be sited and/or designed to not attract hazardous wildlife such as birds and other animals. These FAA criteria narrows the choices of stormwater facility types of infiltration basins (for water quality treatment), and dry detention basins (for peak discharge control). Therefore, the proposed in -line detentions were located in accordance with the City Stormwater Ordinance, FAA Design Criteria, and the Stormwater Master Plan while also considering near-, intermediate-, and long-term facility planning in the ALP. The proposed detention basins have been planned to be consolidated and sited as far from the airfield operation area while still being located on airport -owned property. In an effort to enhance the airport's capability to protect public safety by maintaining working operation of stormwater ponds, the consolidation of detention also allows airfield maintenance to focus efforts on maintaining fewer, though larger, stormwater facilities which is critical to the success of the facilities while also meeting the City's Stormwater Ordinance and FAA design criteria. Both of the proposed in -line detentions promote airport safety and growth by avoiding locations that would conflict with future development identified on the ALP in the near and intermediate future, and to avoid the runway approach and departure surfaces (vertical and horizontal safety areas for aircraft take offs and landings) to minimize bird strikes and surface water glare. Additionally, due to the extensive growth required to meet the demand of the airport (i.e. increases in impervious surfaces), stormwater facilities are designed for the 2-, 10-, 25-, and 100-year storm events, and are best located downstream of planned airport projects, while avoiding aircraft approach and departure surfaces. Finally, it is important that stormwater facilities be sited in areas that would not require relocation due to future development. This also eliminates the need in the near future (5- 10 years) to construct multiple, smaller, basins which may be replaced or enlarged to support peak discharge increases associated with further development. The result of the Stormwater Master Plan 13 CLT Airport Expansion I SAW-2018-001071 Public Notice Response May 12, 2020 analysis concluded that water quality treatment basins (because of their smaller footprint as they are sized to capture less intense storm events) are able to be located upland; however, the locations that are most conducive for detention (sized to control storm frequencies up to the 100-year event) are proposed to be located in -line with existing streams (Ticer Branch and Coffey Creek). The in -line detention basins would avoid direct disturbance to the streams within the detention basins except for the culvert/berm necessary to provide the detention at the downstream end of the proposed basins. Earthen embankments will be created surrounding the extent of the basin to promote added storage in the floodplains of both Ticer Branch and Coffey Creek. This will also include preserving a vegetated streambank buffer for water quality and habitat enhancement. Only the trees outside of this buffer will be removed due to the extensive grading need in the floodplain to establish the storage required. If the detentions were proposed with only the culvert/berm to promote storage in the absence of the earthen embankment and floodplain grading, the storage capacity (detention) of each detention basin would not meet the capacity needed to control the peak discharge of the 100-year event. The Ticer Branch in -line detention is designed to control the 100-year peak discharge within its drainage basin with regard to future impervious development in that basin (not specifically for the NEAT project alone). Similarly, the Coffey Creek in -line detention is designed to do the same. The in -line detentions are designed to fit the storage needed to control peak discharge for future development including, but not limited to, the NEAT and SCF projects; therefore, the storage needed is equal to the storage gained with grading and construction of earthen embankments (Table 5). Table 5. Peak Discharge Needs for 100-Year Storm Frequency NEAT 100 Year 58.2 33.0 58.2 SCF 100 Year 134.7 48.5 134.7 The Stormwater Master Plan does depict other future detention basins located "off-line" along with the proposed in -line detentions as a holistic approach to future airport development for the entire airport. North Carolina Department of Environmental Quality, Division of Water Resources: March 6t", 2020 1. The Division has requested additional technical information from the applicant and requests that the USACE also consider the attached letter during the review of the application. Provided in the response above. 14 CLT Airport Expansion I SAW-2018-001071 Public Notice Response May 12, 2020 North Carolina Wildlife Resources Commission: March 17t", 2020 1. It is unclear as to why Duke Energy requires an exclusive driveway. The proposed impact is 207 If. The size of the impacts seems unnecessary for a small access road; please state the reason for such a large culvert and why the existing culverts are not used. Figure 6-2 of the Environmental Assessment (EA) shows an existing 54-foot 48" RCP already occurs near the proposed crossing, and another culvert occurs upstream of the proposed stream crossing near the proposed Private Access Drive. Negotiations with Duke Energy have progressed since submittal of the IP application and the Duke Access Drive (the exclusive driveway originally requested by Duke Energy) has been removed from the North End Around Taxiway (NEAT) element and will not be constructed as a part of this project. Stream 8 (PS1-1) will no longer be impacted by the Duke Access Drive. Further discussion can be found in the NCDEQ Request For Information response above (#2). 2. We recommend the Old Dowd Road is relocated along Sears Road and then crosses the railroad tracks further to the west in order to avoid impacts to waters of the U.S. If the road cannot be relocated, we recommend reducing the length of the culvert to the greatest extent possible. The relocation of Old Dowd Road is necessary in order to construct the North End Around Taxiway in Phase 1 (Figure 2, Appendix B). The proposed alignment of the Old Dowd Road Relocation as presented in the IP application aligns with a new signalized intersection at US 74 (Wilkinson Blvd) and the newly relocated Tuckaseegee Road as shown in Appendix C (Sheet 5 of 25). Relocating Old Dowd Road along Sears Road would limit the intersection functionality at Sears Road and US 74 due to the proximity to the new signalized intersection (where the currently proposed alignment ties into US 74). Also, In Phase 2 of the IP application, the 4t" Parallel Runway would be constructed, if funded and approved by FAA (Appendix D, Airport Layout Plan). Sears Road is approximately located along the extended centerline of the proposed 4t" Parallel Runway and the area along and around Sears Road would need to be preserved for the 4t" Parallel Runway's Approach Lighting System. Additionally, another component of the end around taxiway (for a "full" NEAT) would be constructed to tie in the taxiway systems of the center and 4t" parallel runway. Lastly, FAA 14 CFR Part 77 which implements height restrictions within aircraft approach and departure surfaces, would restrict Old Dowd Road being elevated to span the Norfolk Southern railroad with a bridge. The Old Dowd Road relocation as proposed, including the Norfolk Southern railroad and stream crossing, would not require an additional relocation in the future due to future phases of airport development. If Old Dowd Road were to utilize Sears Road, it would require another relocation more westward to accommodate future phases of development associated with the 4t" Parallel Runway as noted above. Therefore, the currently proposed relocation of Old Dowd Road would not only support Phase 1, but also support future phases of development. The length of the culvert for the stream crossing due to the Old Dowd Road relocation, has been reduced to the minimum length practicable while also considering the culvert slope and natural 15 CLT Airport Expansion I SAW-2018-001071 Public Notice Response May 12, 2020 topography. Please see further discussion in the NCDEQ Request For Information response above (#8). 3. Stream 25 is rated High according to NCSAM. The NCWRC prefers stream daylighting rather than piping the stream, we suggest relocating the stream channel around the Deicing Pad using natural channel design methods if feasible. Stream daylighting can reduce the risk of flooding, restore water quality and aquatic habitat and reduce future costs associated with repairing aging pipes. The impact associated with enclosing Stream 25 beneath the Taxiway F extension was previously permitted and approved under SAW-2006-32521 (expires December 31 st, 2024) for the same purpose of extending the Taxiway. The fill slopes necessary to elevate the taxiway extension up to the existing airfield elevation would have necessitated the enclosing of Stream 25 at that time as well. In this IP application, the Deicing Pad is advantageously sited atop the fill slope area needed for the taxiway extension and is thus capitalizing on space needed for airport facilities that would otherwise still require impacts to the channel. A channel relocation alternative is not practicable to the west due to the existing airfield. To the east, the Deicing Pad intersects an existing parking lot and abuts the air traffic control tower, which would require impacts to the channel regardless. Additionally, existing sanitary sewer infrastructure parallels Coffey Creek in this location and would also likely result in impacts for a sewer relocation as a result of rerouting the channel to the east. Ultimately, this impact was previously approved at a 1:1 ratio under a permit that is still valid. 4. With the information provided, we prefer the detention basins are off-line, especially since the streams are rated High according to NCSAM. It is unclear on the effectiveness of these in -line detention areas during higher flood events (i.e., 100-year flood) and the potential for increased sedimentation, erosion and water quality of the streams; the frequency and intensity of flood events continue to increase with urbanization and climate change. The EA indicates that stormwater quality treatment areas would be in upland areas; please depict these on the figures as well as current stormwater detention areas. It seems that the current stormwater detention areas could be expanded, or off-line detention areas could be constructed in the forested areas near the streams. Please see the NCDEQ Request For Information response above (#9). 5. We do not recommend burying RCBCs if slopes of culverts are greater than 2% due to concerns of headcutting. Please see similar question from NCDEQ and subsequent discussion in the NCDEQ Request For Information response above (#8). IN CLT Airport Expansion I SAW-2018-001071 Public Notice Response May 12, 2020 6. Should the permit be issued, we offer the applicant the additional general recommendations to minimize impacts to aquatic and terrestrial wildlife resources. Maintain a minimum 100-foot undisturbed, native, forested buffer along perennial streams, and a minimum 50-foot buffer along intermittent streams and wetlands. Maintaining undisturbed, forested buffers along these areas will minimize impacts to aquatic and terrestrial wildlife resources, water quality, and aquatic habitat both within and downstream of the project area. Also, wide riparian buffers are helpful in maintaining stability of stream banks and for treatment of pollutants associated with urban stormwater. The Airport is subject to the Surface Water Improvement and Management (SWIM) buffers, Water Supply Watershed Buffers, and Post -Construction Buffers as administered and reviewed by the City of Charlotte.' Buffer disturbance will be approved and mitigated for appropriately, as needed. b. Due to the decline of bat populations, avoid tree clearing activities during the maternity roosting season for bats (May 15t" — August 15th) Best management practices will be utilized to avoid tree clearing from May 15 through August 15. This Phased IP submittal is for the most imminent project elements (NEAT and SCF) and Section 7 consultation will occur under the FAA NEPA process per specific element in the future as well. Prior to any airport element construction, either a Finding of No Significant Impact (FONSI) or Record of Decision (ROD) must be issued by the FAA, regardless of USACE IP approval. Additionally, the project was reviewed in accordance with the northern long eared bat (NLEB) Standard Local Operating Procedures for Endangered Species (SLOPES) between the USACE, Wilmington District, and the Asheville and Raleigh U.S. Fish and Wildlife Service (Service) Offices. It was determined that the project is located outside of the 12-digit hydrologic unit codes (HUCs) with known NLEB maternity roost trees or hibernation sitesz and activities in the project limits do not require prohibited incidental take; as such, this project meets the criteria for the 4(d) rule and any associated take is exempted/excepted. As established in the NLEB SLOPES, this project does not require prohibited intentional take of the NLEB and it meets the criteria for the 4(d) rule. Finally, according to the NCNHP Data Explorer report provided in Appendix D of the Environmental Assessment as part of the IP application, no known occurrences of the NLEB, including hibernacula and/or maternity roost trees, have been documented within or within close proximity to the site. c. Disturbed areas should be re -seeded with native see mixtures. Avoid lespedeza and fescue -based mixtures, which are nonnative and/or invasive. Native, annual small grains appropriate for the season are preferred and recommended. https://charlottenc.gov/StormWater/Regulations/Pages/Charlotte Reg ulations.aspx 2 https://www.fws.gov/asheville/htmis/project review/NLEB in WNC.html 17 CLT Airport Expansion I SAW-2018-001071 Public Notice Response May 12, 2020 Plant and seed mixtures containing lespedeza will not be utilized; however, CLT has committed to the Wildlife Hazard Management Plan enforced by FAA 14 CFR Part 139 which would avoid the use of anything that attracts wildlife for airfield and aircraft safety. Therefore, while lespedeza will be avoided, seed mixtures will not be conducive for wildlife on or near areas of the Airport. d. The use of biodegradable and wildlife -friendly sediment and erosion control devices is strongly recommended. Silt fencing, fiber rolls and/or other products should have loose - weave netting that is made of natural fiber materials with movable joints between the vertical and horizontal twines. Silt fencing that has been reinforced with plastic or metal mesh should be avoided as it impeded the movement of terrestrial wildlife species. These measures should be routinely inspected and properly maintained. Excessive silt and sediment loads and have numerous detrimental effects on aquatic resources including destruction of spawning habitat, suffocation of eggs, and clogging of gills of aquatic species. Best management practices for the use of wildlife -friendly sediment and erosion control measures will be considered and utilized, if appropriate. Erosion and sediment control measures are designed according to the NCDEQ Erosion and Sediment Control Planning and Design Manual3 and the City of Charlotte Soil Erosion and Sedimentation Control Ordinance.4 s https://deg.nc.gov/about/divisions/energv mineral-land-resources/energv mineral-land-permit-guidance/erosion-sediment-control- planning-design-manual 4 https://charlottenc.gov/Id/Pages/ErosionControl.aspx 18 CLT Airport Expansion I SAW-2018-001071 Public Notice Response May 12, 2020 North Carolina Department of Natural and Cultural Resources State Historic Preservation Office: April 15t", 2020 As required by Section 402 of the CWA, Erosion and Sedimentation Control Plans and Stormwater Pollution Prevention Plans (SWPPP) for each individual element (i.e. NEAT or SCF) will be submitted to the North Carolina Department of Environmental Quality (NCDEQ) Division of Energy, Mineral, and Land Resources (NCDEMLR), and the North Carolina State Historic Preservation Office for approval. As required by Section 402 of the CWA, Erosion and Sedimentation Control and SWPPP plans for each element will be submitted to NCDEQ-DEMLR for approval. CLT will also ensure submittal of plans to NCSHPO. 2. Land disturbance cannot commence without the above approvals or without either a FONSI or ROD issued by the FAA. Land disturbance will not commence without Erosion and Sedimentation Control and SWPPP plan approvals or without either a FONSI or ROD issued by the FAA. 3. The proposed work takes place in an area known to have the potential for the presence of prehistoric and historic cultural resources; however, the area has not been formally surveyed for the presence of cultural resources. No sites eligible for inclusion in the National Register of Historic Places are known to be present in the vicinity of the proposed work. However, based on recommendations from the North Carolina State Historic Preservation Office, additional work may be required to identify and assess any historic or prehistoric resources may be present. Future project phases (and individual elements) will be reviewed during the FAA NEPA process and participating agencies will also be involved in the NEPA scoping process. The SHPO will be given the opportunity to comment during this process. IIiK CLT Airport Expansion I SAW-2018-001071 Public Notice Response May 12, 2020 United States Army Corps of Engineers: April 17t", 2020 1. The proposed storm water detention basins appear to be heavily engineered and involve mass grading of mature riparian areas and the construction of large berms and roadways. Please explain in detail why it is not practicable to design a less intrusive inline detention system with smaller access roads and grading and filling at the culvert location only. This would allow for flooding of upstream riparian areas in their current state during storm events. If a less intrusive design cannot be achieved, additional justification for inline treatment will be required and compensatory mitigation may be required for indirect impacts to these tributaries. Please see the discussion provided in the NCDEQ Request For Information response above (#9) which provides additional justification and clarification regarding the design and proposed construction of the in -line detention basins. The Applicant would like to utilize the monitoring plan proposed under #2 below to determine and assess indirect impacts at the time of the plan's implementation. 2. Please submit a plan for long term monitoring of all waters subject to inline detention. Please see Appendix E. 20 Appendix A Public Notice Comments Appendix B IP Figures (IP Appendix A) —REVISED Appendix C Detail Plan Sheets - REVISED Appendix D Stormwater Master Plan & Airport Layout Plan Appendix E Monitoring Plan Appendix A Public Notice Comments DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 151 PATTON AVENUE ROOM 208 ASHEVILLE, NORTH CAROLINA 28801-5006 April 17, 2020 Regulatory Division Action ID: SAW-2018-01071 Mr. Brent Cagle City of Charlotte — Aviation Department 5601 Wilkinson Blvd. Charlotte, North Carolina 28208 Dear Mr. Cagle: Please reference the application for an Individual Department of the Army Permit submitted on your behalf on February 3, 2020 by Mrs. Kelly Thames of HDR, Inc. to discharge fill material into 12,480 linear feet of stream and 5.89 acre of wetlands for the expansion of the Charlotte Douglas International Airport (CLT). The project would involve increasing airfield capacity to meet expected demand over the next 13 years, enhancements to terminal gate and ramp capacity to reduce delays, and enhancements to the efficiency and operational safety of the airport taxiway system. The project area is composed of approximately 4,652 acres of land and is located at 5501 Josh Birmingham Parkway in Charlotte, North Carolina The project was advertised by public notice on February 18, 2020. Comments in response to the notice were received from the National Marine Fisheries Service, the North Carolina Wildlife Resources Commission, the North Carolina Department of Natural and Cultural Resources, and the North Carolina Division of Water Resources. These comments are enclosed for your information. Please provide a detailed written response to each of the comments. In addition to conducting a public interest review which balances the reasonably expected benefits against the reasonably foreseeable detriments, all Clean Water Act Section 404 permits must meet guidelines for the specification of disposal sites for dredged or fill material under CWA Section 404(b)(1). These comments are being submitted pursuant to the Clean Water Act Section 404(b)(1) guidelines (40 CFR 230). We have completed our initial review of the application and determined that the following additional information is necessary to expeditiously complete our permit decision: -2- 1. The proposed storm water detention basins appear to be heavily engineered and involve mass grading of mature riparian areas and the construction of large berms and roadways. Please explain in detail why it is not practicable to design a less intrusive inline detention system with smaller access roads and grading and filling at the culvert location only. This would allow for flooding of upstream riparian areas in their current state during storm events. If a less intrusive design cannot be achieved, additional justification for inline treatment will be required and compensatory mitigation may be required for indirect impacts to these tributaries. 2. Please submit a plan for long term monitoring of all waters subject to inline detention. The information requested above is essential to the expeditious processing of the application, please submit one consolidated response to all comments by June 16, 2020. This information is required pursuant to 33 CFR 325 Appendix B and 40 CFR 1506.5. If you do not submit this information within the given timeframe, the application will be administratively withdrawn. Withdrawal of the application does not preclude you from reopening the application at a later time, provided you submit the required information. If you have any questions regarding these matters, please contact me at (704) 510- 1437 or David. L.Shaeffer(ousace.army. mil. Sincerely, Digitally signed by SHAEFFER.DAVID.LEIGH.121 3 2 D Date: 202 0.04.17 12:5 7:2 6 Date: -04'00' David L. Shaeffer Project Manager Charlotte Field Office Enclosures cc (via email): NC Division of Water Resources sue. homewood�ncdenrov North Carolina Department of Natural and Cultural Resources State Historic Preservation Office Ramona M. Bartos, Administrator Governor Roy Cooper Office of Archives and History Deputy Secretary Kevin Cherry Secretary Susi H. Hamilton April 15, 2020 David L. Shaeffer . US Army Corps of Engineers Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-5006 david X shaefferkusace.army.mil RE: Phased ACOE Permits to Include Future Projects Through 2033, Charlotte Douglas International Airport, SAW-2018-0107, Charlotte, Mecklenburg County, ER 19-5449 Dear Mr. Shaeffer: We are in receipt of the above -referenced Public Notice dated February 18, 2020 and apologize for our delayed reply. Having reviewed the submittal, we provide the following comments. According to the Public Notice, the US Army Corps of Engineers is asking that we concur in its finding that historic properties, or properties eligible for inclusion in the National Register, are present within the Corps' permit area; however, the undertaking will have no adverse effect on these historic properties. Given that the WPA Hanger (MK3761, determined eligible and a locally -designated Historic Landmark) is within the permit area and the permit covers the construction of projects through 2033, it is difficult. to concur that there will be no adverse effects on the historic hangar or on other properties that may become eligible during the life of the permit. We are, however, willing to concur with the finding, if the following conditions are included in the permit. o As required by Section 402 of the CWA, Erosion and Sedimentation Control Plans and Stormwater Pollution Prevention Plans (SWPPP) for each individual element (i.e. NEAT or SCF) will be submitted to the North Carolina Department of Environmental Quality (NCDEQ) Division of Energy, Mineral, and Land Resources (NCDEMLR), and the North Carolina State Historic Preservation Office for approval. o Land disturbance cannot commence without the above approvals or without either a FONSI or ROD issued by the FAA. Plus: o The proposed work takes place in an area known to have the potential for the presence of prehistoric and historic cultural resources; however, the area has not been formally surveyed for the presence of cultural resources. No sites eligible for inclusion in the National Register of Historic Places are known to be present in the vicinity of the proposed work. However, based on recommendations from the North Carolina State Historic Preservation Office, additional work may be required to identify and assess any historic or prehistoric resources that nnay be present. Location: 109 Fast Jones Street, Raleigh NC 27601 Mailing Address: 4617 Mail Service Centex, Raleigh NC 27699-4617 Telephone/Fax: (919) 807-5570/807-6599 The above comments are offered in accord with Section 106 of the Historic Preservation Act and the regulations of the Advisory Council on Historic Preservation at 36 CFR 800. We recognize that in this action the US Army Corps is following its guidance on the treatment of historic properties. Regretting the delay in our comments, we look forward to any feedback or questions you may have. You may reach me at 919-814-6579 or at reneealedhill-earley ncdcr.gov. Sincerely, v4v�� , Renee Gledhill -Earley Environmental Review Coordinator cc: Tommy Dupree, FAA /Memphis tomm.djjpree&faa.gov 9 North Carolina Wildlife Resources Commission 9 Gordon Myers, Executive Director MEMORANDUM TO: Davide Shaeffer U.S. Army Corps of Engineers FROM: Olivia Munzer, Western Piedmont Coordinator Habitat Conservation DATE: 17 March 2020 SUBJECT: Public Notice for the Charlotte Douglas International Airport Expansion Individual Permit, Charlotte, Mecklenburg County, North Carolina. USACE Action ID: SAW-2018-001071; DEQ No. 20191585. Biologists with the North Carolina Wildlife Resources Commission (NCWRC) have reviewed the subject document. Comments are provided in accordance with provisions of the Clean Water Act of 1977 (as amended) and Fish and Wildlife Coordination Act Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661 et seq.). On behalf of the City of Charlotte -Aviation Department, HDR has submitted an Individual Permit application for the Charlotte Douglas International Airport (CLT) Expansion Project in Charlotte, Mecklenburg County, North Carolina. CLT proposes to permanently impact 12,480 linear feet (If) of jurisdictional streams and 5.89 acres of wetlands, and temporarily impact 784 if of streams. Projects that would impact waters of the U.S. include a deicing pad and south crossfield taxiway; road realignments; stormwater in -line detention basins in Ticer Branch and Coffey Creek; North End Around Taxiway; airport overlook relocation; private access drive; a parallel runway and associated taxiway enhancement; and south ramp expansion. We have no known current records of the federal or state rare, threatened, or endangered species at or adjacent to the airport. Although we have no known current records of federally or state -listed rare, threatened, or endangered species within or adjacent to the site, the lack of records from the project area does not imply or confirm the absence of state -listed species. An on -site survey is the only definitive means to determine if the proposed project would impact state -listed rare, threatened, or endangered species. We hesitate to agree with the amount of proposed impacts to the streams and wetlands. We have the following recommendations for minimization and/or avoidance of impacts. 1. It is unclear as to why Duke Energy requires an exclusive driveway. The proposed impact is 207 If. The size of the impacts seems unnecessary for a small access road; please state the reason for such a large culvert and why the existing culverts are not used. Figure 6-2 of the Mailing Address: Habitat Conservation • 1721 Mail Service Center • Raleigh, NC 27699-1721 Telephone: (919) 707-0220 • Fax: (919) 707-0028 Page 2 17 March 2020 CLT IP Public Notice USACE Action ID: SAW-2018-01071 Environmental Assessment (EA) shows an existing 54-foot 48" RCP already occurs near the proposed crossing, and another culvert occurs upstream of the proposed stream crossing near the proposed Private Access Drive. 2. We recommend the Old Dowd Road is relocated along Sears Road and then crosses the railroad tracks further to the west in order to avoid impacts to waters of the U.S. If the road cannot be relocated, we recommend reducing the length of the culvert to the greatest extent possible. 3. Stream 25 is rated High according to NCSAM. The NCWRC prefers stream daylighting. Rather than piping the stream, we suggest relocating the stream channel around the Deicing Pad using natural channel design methods, if feasible. Stream daylighting can reduce the risk of flooding, restore water quality and aquatic habitat, and reduce future costs associated with repairing aging pipes. 4. With the information provided, we prefer the detention basins are off-line, especially since the streams are rated High according to NCSAM. It is unclear on the effectiveness of these in -line detention areas during higher flood events (i.e., 100-year flood) and the potential for increased sedimentation, erosion, and water quality of the streams; the frequency and intensity of flood events continue to increase with urbanization and climate change. The EA indicates that stormwater quality treatment areas would be in upland areas; please depict these on the figures as well as current stormwater detention areas. It seems that the current stormwater detention areas could be expanded, or off-line detention areas could be constructed in the forested areas near the streams. 5. We do not recommend burying RCBCs if slopes of culverts are greater than 2% due to concerns of headcutting. Should the permit be issued, we offer the applicant the additional general recommendations to minimize impacts to aquatic and terrestrial wildlife resources. 1. Maintain a minimum 100-foot undisturbed, native, forested buffer along perennial streams, and a minimum 50-foot buffer along intermittent streams and wetlands. Maintaining undisturbed, forested buffers along these areas will minimize impacts to aquatic and terrestrial wildlife resources, water quality, and aquatic habitat both within and downstream of the project area. Also, wide riparian buffers are helpful in maintaining stability of stream banks and for treatment of pollutants associated with urban stormwater. 2. Due to the decline in bat populations, avoid tree clearing activities during the maternity roosting season for bats (May 15 — August 15). 3. Disturbed areas should be re -seeded with native seed mixtures. Avoid lespedeza and fescue -based mixtures, which are nonnative and/or invasive. Native, annual small grains appropriate for the season are preferred and recommended. 4. The use of biodegradable and wildlife -friendly sediment and erosion control devices is strongly recommended. Silt fencing, fiber rolls and/or other products should have loose - weave netting that is made of natural fiber materials with movable joints between the vertical and horizontal twines. Silt fencing that has been reinforced with plastic or metal mesh should be avoided as it impedes the movement of terrestrial wildlife species. These measures should be routinely inspected and properly maintained. Excessive silt and sediment loads can have numerous detrimental effects on aquatic resources including destruction of spawning habitat, suffocation of eggs, and clogging of gills of aquatic species. Page 3 17 March 2020 CLT IP Public Notice USACE Action ID: SAW-2018-01071 Thank you for the opportunity to provide input for this project. If I can provide further assistance or provide free technical guidance, please call (919) 707-0364 or email olivia.munzer(2ncwildlife.org. ec: Alan Johnson, N.C. Division of Water Resources (NCDWR) Todd Bowers, Environmental Protection Agency Byron Hamstead, U.S. Fish and Wildlife Service Sue Homewood, NCDWR Kelly Thames, HDR ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality March 6, 2020 DWR # 20001195 Ver 17 Mecklenburg County City of Charlotte — Aviation Department Attn: Mr. Brent Cagle 5601 Wilkinson Blvd Charlotte NC 28208 Subject: REQUEST FOR ADDITIONAL INFORMATION CLT Airport Expansion Dear Mr. Cagle: On February 7, 2020, the Division of Water Resources — Water Quality Programs (Division) received your application dated January 29, 2020, requesting a 401 Individual Water Quality Certification from the Division for your project. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until all of the following information is received: 1. If the U.S. Army Corps of Engineers requests a response to any comments received as a result of the Public Notice, please provide the Division with a copy of your response to the USAC E. [15A NCAC 02H .0502(c)I 2. On Appendix A- Figure 8, please explain why the road cannot be aligned to further minimize the impacts to the stream by using the existing culvert location. 3. The application notes that Duke Energy has requested an exclusive access road. Please provide further justification that explains why exclusive access is necessary. 4. On Appendix A — Figure 11 it is noted that impacts are proposed to Stream 10 for removing connectivity (jurisdiction) to downstream impacted areas. The Division believes the same would be true for Wetland W6. Please update the plans to include impacts to Wetland W6 in Phase 1 rather than Phase 2. 5. Please provide information regarding alternative alignment of the relocated waterline. It appears that there may be alternative alignments which would minimize impacts. Please also explain the need for the significant width of the corridor as it appears that this width increases the impacts beyond what is typically require for utility installation. North Carolina Department of Environmental Qualfty I Dfvlsion of Water Resources 5t2 North Salisbury street 1 1617 Mail Service Center I Ueigh, North Carolina 27699-1617 oa7Ri or rmi,�m �wi v�o �� 919.707.9000 City of Charlotte — Aviation Department DWR Project #20001195 Ver 17 Request for Additional Information Page 2 of 3 6. On Appendix A— Figure 12, Impact area TS3-1: Please provide site specific drawings indicating how these features are to be impacted during construction activities and how they are to be restored upon construction completion. The typical dewatering specifications provided with the application for stream crossings are not sufficient far parallel impacts. Please also describe how downstream water quality will be protected during construction activities when a stream is parallel within the project corridor. Please provide site -specific restoration details for this location. The Division is specifically concerned with any proposal to restore the channel to pre - construction location when the channel is parallel with the utility line and within a location where long term maintenance activities are likely to have permanent impacts to the channel. [15A NCAC 02H .0506(b)(2)] 7. On Appendix A— Figure 14, please explain why the waterline alignment cannot be within, or closer to, the road shoulder as shown further down Old Dowd Rd. 8. While burial of culverts is typically required by the regulatory agencies, given the relatively steep slope (2.5%) of the some of the proposed culverts, we are concerned that the streams at these locations would be subject to headcutting above the proposed culverts due to the proposed 1' invert burial. Please re-evaluated each location and provide revised plans that do not include culvert burial (beyond that necessary for low flow passage), or otherwise address the concern for headcutting, for any culverts proposed to be installed at steep grades. Please provide additional information regarding the necessity of providing stormwater detention with an "online" detention area. Please include an overall plan of the airport's current stormwater control measures, a conceptual plan for all future proposed stormwater treatment control measures, and a detailed analysis that clearly explains why stormwater detention cannot be practically achieved in uplands. Please include analyses which include the use of multiple smaller devices, underground devices, or other alternative stormwater measures. Please evaluate each project area separately. Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the proper consideration of the application. Please respond in writing within 30 calendar days of receipt of this letter by sending one (1) copy of all of the above requested information to the 401 & Buffer Permitting Branch, 1617 Mail Service Center, Raleigh, NC 27699-1617 OR by submitting all of the above requested information through this link: https.//edocs.deg.nc.gov/Forms/Supplemental-Information-Form (note the DWR# requested on the link is referenced above). City of Charlotte — Aviation Department DWR Project #20001195 Ver 17 Request for Additional Information Page 3 of 3 If all of the requested information is not received within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be denied as incomplete. The denial of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. Please be aware that you have no authorization under the Water Quality Certification Rules for this activity and any work done within waters of the state may be a violation of North Carolina General Statutes and Administrative Code. Please contact Sue Homewood at 336-776-9693 or Sue.Homewood@u ncdenr.gov if you have any questions or concerns. Sincerely, F9ocu49D91BA53EF4E0... Signed by: �WO Paul Wojoski, Supervisor 401 & Buffer Permitting Branch cc: Kelly Thames, HDR (via email) David Shaeffer, USAGE Charlotte Regulatory Field Office (via email) Olivia Munzer, NCWRC (via email) Byron Hamstead, USFS (via email) DWR MRO 401 files DWR 401 & Buffer Permitting Unit ONITED STATES DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration NATIONAL MARINE FISHERIES SERVICE • Southeast Regional Office 263131h Avenue South 'v.°..� St Petersburg, Florida 33701-5505 h s:/Av".flsheries.noaa. vlr ionlsoutheast (Sent via Electronic Mail) February 19, 2020 Colonel Robert J. Clark, Commander USACE Wilmington District 69 Darlington Avenue Wilmington, North Carolina 28403-1398 Dear Colonel Clark: NOAA's National Marine Fisheries Service (NMFS) reviewed the projects described in the public notices listed below. Based on the information in the public notices, the proposed projects would NOT occur in the vicinity of essential fish habitat (EFH) designated by the South Atlantic Fishery Management Council, Mid -Atlantic Fishery Management Council, or the NMFS. Present staffing levels preclude further analysis of the proposed work and no further action is planned. This position is neither supportive of nor in opposition to authorization of the proposed work. Notice No. Applicant(s) Notice Date SAW-2018-01073 NCDOT; US 158 Gates February 18, 2020 County SAW-2018-01071 City of Charlotte Aviation February 18, 2020 Department Please note these comments do not satisfy consultation responsibilities under section 7 of the Endangered Species Act of 1973, as amended. If an activity "may effect" listed species or critical habitat under the purview of the NMFS, please initiate consultation with the Protected Resources Division at the letterhead address. for Sincerely, Virginia M. Fay Assistant Regional Administrator Habitat Conservation Division Appendix B IP Figures (IP Appendix A) — REVISED CLT Airport Expansion I SAW-2018-001071 Public Notice Response May 12, 2020 LEGEND CLT I P Boundary �4,652 USGS Quadrangles `` r`•• Hydrologic Unit Code MOUNTAIN -ISLAND LAKE.DERITA } 0 Miles 2 HlJC:0305010.1" ,sIc v (till �,���f�r�;"�" '�''r t -, t , �:•. - . .. BELMONT g �'- �"� - - CHARLOTTE i ;. �a - • �.9 CIO ' �- HL1C:0305016 � r CHARLOTTE rr ) { i� 1• -WEST" r , M050102 Charlotte Douglas International Airport (CLT) y Applicant City of Charlotte -Aviation Department � Mecklenburg County, ]RT-MILIL' tDate: 511212020 North Carolina r' SAW-2018-01071 i tx 1- Figure 1. Project Location — REVISED 5/12/2020 Page 11 M CLT Airport Expansion I SAW-2018-001071 Public Notice Response May 12, 2020 �e ►. iy r 771 My k ec _D,-:., ,w ec , .. A '-Terminal8�::•; �� Concourse LY L7! C, a SSA--e.,.� � R Borrow areas to be used for the SCF Element and potential future elements The utilization of borrow areas will have no anticipated impacts to jurisdictional waters. 17� �SCF Element Charlotte Douglas International Airport [CLT] Applicant: City of Charlotte -Aviation Department Date: 5112J2020 SAW-2018-01071 LEGEND CLT IP Boundary Charter Terminal 4th Parallel Runway Satellite Terminal (4,652 ac.) Expansion North End Around West Ramp Expansion Borrow Areas FedEx Expansion RehabShoulder ® South Ramp Expansion - Airport Overlook _ General Aviation Group 0 Concourse Expansions Streams Relocation Hangar 0 Amazon Expansion � JOC South Crossfield Taxiway'-. Wetlands & Deicing Facility C> Open Water Centralized Receiving and I Daily North Parking Deck _ Hold Pads Distribution Center Long Term 1 Parking Lot -x" Culverts (CRDC) _ = Expansion Taxiway Enhancement Figure 2. CLT Elements - REVISED 5/12/2020 Permanent Stream Impacts Temporary Stream Impacts Permanent Wetland Impacts 1 inch = 1,800 feet 0 Feet 1800 Page 12 M Q CLT I Boundary (4,652 ac.) -'%-- Streams Wetlands Open Water Existing Culverts Railroad Centerline NEAT Impacts Permanent Stream Impacts Temporary Stream Impacts Permanent Wetland Impacts 1 inch = 800 feet 0 Feet Boo pi l� "N' Proposed 12-inch Waterline Proposed Ticer Detention Flood Limits Tcer Branch Existing Sanitary Sewer Tcer Branch Sanitary Sewer Relocation Proposed Waterline Proposed Colonial Pipeline Borrow Areas Storm Drainage Storm Drain Outfall Sewer Relocation Sewer Abandonment In Place Proposed Titer Branch Detention Figure 3. NEAT Element— REVISED 5/20/2020 Page 13 F�11 . 1&� 140"1 Tcer Branch Detention _ Access Road Proposed Old Dowd Road Relocation A o Proposed Colonial Pipeline Gas Line 5 Proposed 24-inch Waterline � u 6 WW 00 } �i J Perennial Streams (LF) 1,302 Int W 0 Wetlands (AC) 0.68 Ilit 1,302 L' IF 0.68 Al CLT Airport Expansion I SAW-2018-001071 Public Notice Response May 20, 2020 Proposed Private Access Drive �6�h "a .5 - Charlotte Douglas International Airport (CLT) Applicant: City of Charlotte -Aviation Department Date: 5/2012020 SAW-201 B-01071 174 0 0 246 1,722 172 172 0 0.68 418 LF FNCLT Airport Expansion I SAW-2018-001071 Public Notice Response May 12, 2020 ro LEGEND t; Ohl CLT I Boundary SCF Impacts {4,652 ac.} Permanent Stream .Ir4— Streams Impacts Wetlands SCF -Already Permitted P Open Water (SAW-2006-32521) Culverts Permanent Wetland mpacts Tr Proposed Culverts 1 inch = 600 feet 'j y �_ Coffey Detention Flood Limits �� 0 Feet 600 AL r ,. a= merican Airline Hangar Figure 4. SCF Element — REVISED 5/12/2020 Perennial Streams {LF) 1,857' 0 Intermittent Streams (LF) 125 30 Wetlands IAC) 0-14 ❑ Stream Total; I JM2 LP SO tip Wetland Total: 0.14AC 0AC ' noes not �nclwe The 2.614 LF of a previous approved impact per SAW-200f 32521 raw- Proposed- Yorkrnont Road -f Realignment ow+4 L.� Page 14 M CLT Airport Expansion i SAW-2018-001071 Public Notice Response May 12, 2020 Charlotte Douglas InternationaI Airport (CLT) Y - Applicant: City of Charlotte -Aviation Department . Rate: 5/12/2020 r.. SAW-2018-01071 _77 Daily° _ Deck`• _.. T W-N M A Termirral�BL•:� �� � -- C0 7CDurse i GO r co WF 1�71 .1`•w. _� `Y y I .. sti k FeatureTy f J� { ®�® a —South Rarn i Expansion Perennial p10 1,526.50 0 1,526.50 Intermittent{If) 1925 0 192-5 Wetlands [ac,} 0.16 0 0.16 5treamTotaL 1,7191 Off 1,7191f Pj + 1• Wetland Total: 0.16 ac v 0 &C. 0.16 ac. Perennial{f) 6.429 0 6.429 f tntenwitent {If} 0 0 0 LEGENa 0 LT lP Boundary T, Wetlands lac,} 4.9 0 4.9 .s5z ac.) C.. F= �-- Stream Total; 61429 If 01f 6,4291f �a- Phase 1 Impacts Wetland Total; 4.9ac. 0&C. 4.9ac. -^o— Streams Stream Impacts PLAkHIHC. LEVEL FROM SEQ CL7 ELEMENTS '+ C�3 Wetlands [ - _ Wetland Impacts = Borrow Areas General Aviation Group 0 Concourse Expansions = Amazon Expansion Hangar _ Hold Pads �- Phase 2 Impacts Jt2C Open Water P Centralized Receiving and Taxiway Enhancement Stream Impacts l♦ Distribution Center [CRDCj _ ! Daily North Parking Deck Satellite Terminal =m=m=iw: Existing Culverts 0 Charter Terminal Expansion Long Term 1 Parking Lot West Ramp Expansion 1 inch = 1,800 feet C Wetland Impacts FedEx Expansion Expansion p l� South Ramp Expansion Ilk 0 4th Parallel Runway Fee' 1,800 Figure 5. Remaining Phases — REVISED 5/12/2020 Page 15 FN 09 7 I[ Figure 6. Phase 2 Impacts Page 16 CLT Airport Expansion I SAW-2018-001071 Public Notice Response May 12, 2020 LEGEND w/.- Streams +uaMn�c �txi.rarUGxocu eedwrwr3 � 4#h Parallel Runway 0 Ammon Expansion C3© :°detlands 0 Concourse Expansions Centralized Receiving Distribution Center Hold Pads 0 and 0 Open ;'dater 0 Taxiwa.vEnhancemerlt rCRDC1f Charter Terminal FedEx Expansion 0 0 Expansion Existing Culverts ® General.Aviation Group Phase 1 Impacts Hangar J4C Stream Impacts 0 Daily North Parking Deck Aletland Impacts 0 Long Term 1 Parking Lot Expansion Phase 2 Impacts 0 Satellite Terminal Wrest Ramp Expansion Stream Impacts ® South Ramp Expansion 'Aletland Impacts BorroAreas Chad Dvuf,las Internetio-nel fi,kprnt :tte {vLT'+ Applicant: City of Chaalatt�Aviatian ❑epertment DATE: 1 ;31:'2020 S W-201&01071 01 LEGEND CLT IP Boundary (4,652 ac.) Streams Wetlands `_. Open Water Existing Culverts Railroad Centerline NEAT Impacts Permanent Stream Impacts Temporary Stream Impacts Permanent Wetland Impacts 1 inch = 800 feet 0 Feet 800 -6 Stream 15 TS8-1 Figure 14 CLT Airport Expansion I SAW-2018-001071 Public Notice Response May 20, 2020 - Stream 1 i ricer Branch Detention s PS13-1 Old Dowd Road Relocation Figure 10 Stream 2 Stream TS9-1 TS3-1 Figure 9 Figure 12 Stream 2 _ i TS2-1 Stream 8 Stream 1 '' Figure 12 T51-1 PS4-1 - Figure 8 connection to Figure 10 existing waterline Stream 2 ' PS3-1 Stream i1 Figure 10 TS 7-1 Figure 13 Private Access Drive connection to Stream 11 Stream 11 i existing waterline TS4-1 P514-1 Figure 13 Figure 13 Proposed Tcer Detention Flood Limits Tcer Branch Existing ` Sanitary Sewer Tcer Branch Sanitary t _ Sewer Relocation Proposed Waterline Proposed Colonial Pipeline Borrow Areas Airport Overlook Storm Drainage Relocation ---- Storm Drain Outfall Figure 7. NEAT — Proposed Permanent and Temporary Impacts Overview — REVISED 5/20/2020 Page 17 a 0 !North End Around Taxiway Daily North `. Charlotte Douglas International Airport (CLT) Applicant: City of Charlotte -Aviation Department Date: 5/20/2020 SAW-2018-01071 ■ IN Perennial Streams (LF) 1,302 174 Int * 0 0 Wetlands (AC) 0.68 0 6 1,302 L j- 174 LF IF 0.68 ACC 0 AC 246 1,722 172 172 0 0.68 CLT Airport Expansion I SAW-2018-001071 Public Notice Response May 12, 2020 Figure 8. NEAT Impacts PS1-1, TS1-1, and TS2-1 - REVISED 5/12/2020 Page 18 CLT Airport Expansion I SAW-2018-001071 Public Notice Response May 12, 2020 Figure 9. NEAT Impact PS2-1 and new Impact TS9-1 - REVISED 5/12/2020 Page 19 M Stream 1 - PS4-1 400 If permanent impact (74-foot, 9'Hx10'W RCBC, rip rap aprons) NCSAM: High Proposed Ratio: 2:1 800 stream credits Stream 2 - PS3-1 108 1f permanent impact [66 If of permanent loss & 42 if of permanent non -loss) (42-foct, 42-inch RCP, rip rap aprons, and rock cross vanes) NCSAM: High Proposed Ratio: 2:1 132 stream credits Stream 1 - PS13-1 63 If permanent impact (non -loss) (storm drainage rip rap outfall and bank stabilization) no mitigation � nQ impact r; fii. ' ned in 1p18ce 5ewer to be abandn - $1 existing s� 1 inch = 200 feet = 276 �_ Charlotte Douglas IntemationaI Airport {CLT) Applicant: City of Charlotte -Aviation Department Date: 5/2012020 i SAW-2018-01071 i i lift!-: ant 11Ommmsa amwv,,k�, is"• Figure 10. NEAT Impacts PS3-1 and PS4-1 and new Impact PS13-1 - REVISED 5/20/2020 Page110 CLT Airport Expansion I SAW-2018-001071 Public Notice Response May 20, 2020 Detention Maintenance Road ri LEGEND +''' • Q CLT I Boundary (4,652 ac i • ?ro Pc cer pefenhon iJ Flood Limi[s• Streams 'racer Branch Existing V*tlands Sanitary sewer Open Water Ticer Branch Sanitary = sewer RelocaBon z-� Existing Culverts - Proposed Waterline t Railroad Centerline Proposed Rip Rap NEAT Impacts Proposed culverts W. permanent Stream Impacts Storm Drainage _ Easement Temporary Stream Impacts - Stwm Drain Qutfall Cfj' permanent V*tland Impacts FNCLT Airport Expansion I SAW-2018-001071 Public Notice Response May 12, 2020 S1 3 City Stvrmwater Pipes 1 inch = 400 feet �6L ; y xLell ist g Old Dowd Road iri Figure 13 City 5tormwater Pipe At ,• .� �� a #~ vi .i:.;.'•" `. ` :; '� Wetland 6 - PW2-1 • % ' f f� _ ,� : 0.22 ac permanent impact ���1 (grade and fill) NCWAM: Low Q-I ;,: �i'•x, .•.e =---,�..t �. '-� 4.1' Proposed Ratio: 1-5,1 '�.`�:.,;`.:::''•; -� " W5 0-5 wetland credits - , Wetland 5 - PW1-1 0.46 ac permanent impact (grade and fill)d LEGEND ,,,. . �p .:" NCSAM: High CLT IP Boundary (4,652 ac-) o <• + s,reams _ Proposed Ratio: 2:1 t- � 1.0 wetland credits m Wetlands o- apenwater IV,Stream 10 - PS5-1 _3K_1 Culverts 484 If permanent impact 1 + Railroad Centerline l " (removing from jurisdiction for INEAT Impacts impacts to W5 and S9} 111 I = Permanent Stream Impacts Temporary stream Impacts NCSAM: High' f�l + Permanent Wetland Impacts - }proposed Ratio: 2:1 Borrow Pit 9$ Stream credits Figure 11. NEAT Impacts PS5-1, PSG-1, PW1-1, and PW2-1 — REVISED 5/12/2020 Page111 Stream 9 - PS6-1 137 If permanent impact ' (grade and fill) i NCSAM: High i Proposed Ratio: 2:1 274 stream credits tit Runway 18C136C 1 •��. _E Charlotte Douglas lnternational Airport (CLT) Applicant: City of Charlotte -Aviation Department Date.- 5/12/2020 SAW-2018-01071 ►rt�► I iftd��� M LEGEND CLT IP Boundary {4,652 ac ] -Ok— Streams wetlands Open Water -31m ExisSng Culverts 0 Railroad Centerline NEAT Impacts ,^W- Permanent Stream Impacts Temporary Stream Impacts OS Permanentwetiand Impacts M Stream 6 - TS3-1 521 2 If temporary impact waterline (24" ductile iron pipe open cut utility install) former location of TS3-1 survey data revealed that bend in stream was not correct W1 CLT Airport Expansion I SAW-2018-001071 Public Notice Response May 12, 2020 1 inch = 150 feet �� 30-ft wide permanent easement 10-ft wide tempoary easement bath sides rAl�. y z connection to existing Stream 7 - TS2-1 85 If impact , _ Penmenant Easement ' temporary g as line alongSears Road . � and gas line E Temporary Easement 1 inch = 300 feet .A . (Colonial Pipeline open cut Charlotte Douglas International Airport t;CLT) a Applicant: City of Charlotte -Aviation Department Proposed 24" Waterline � utility Install) Date: 5112/2020 Proposed Ccionial o F.n ao _ SAW-2018-01071 Pipeline Figure 12. NEAT Impacts TS2-1 and TS3-1 — REVISED 5/12/2020 Page112 CLT Airport Expansion I SAW-2018-001071 Public Notice Response May 12, 2020 LEGEND Charlotte Douglas International Airport fCLij li1p � `� .� WWWAIWk © CLT IP Boundary (4,652 ac.) Applicant: City of Charlotte -Aviation Department A 1 inch = 300 feet: river streams DATE: SIS212020 Stream 11 - TS4-1 40 l6 Wetlands sAw2als-o1071 51 If temporary impact ;►� D aF " '� open Water (tempoary construction 0C Old Dowd Road � Existing Culverts access) Relocation + Railroad Centerline Stream 11 - TS7-1 to span railroad NEAT Impacts 87 If of temporary impact PS15-1; �o with bridge '4M0 Permanent Stream Impacts waterline installation 51 If permanent non -loss ❑ Temporary Stream Impacts 24" ductile iron pipe � o en cut utility t s all impact (rip rap bridge bent Permanent Wetlandlmpac:_ _ _ �] y install) ]protection) ` PermenarntEasement �Y�� Temporary Easement :,fir,"-: fiD-ft permanent easemeni o Proposed 24" Waterline.__ w,;•. y Storm Dramage Easement Storm Drain autfall �r -` G] 1 CA I� Waterline moved to north side of Stream 11; r = former locations of TS5-1 IN W9 - and TS6-1 impacts _ K _ impact moved to Stream 11; former location of TS7-1 Stream 11 - PS14-1 18 if permanent impact (non -loss) .' {storm drainage outfall) waterline to be jackr 30-ft permanent easement • 1Q-ft temporary easement each side * ' and bored beneath �� p Y na mitigation �P ' ,. � :•►� railroad (n❑ impact) i connection to existing._=` _� waterline along Old Dowd Road Figure 13. NEAT Impacts TS4-1, TS7-1 and new Impacts PS14-1 and PS15-1 — REVISED 5/12/2020 Page113 CLT Airport Expansion I SAW-2018-001071 Public Notice Response May 12, 2020 0 CLT IP Boundary (4,652 ac.) Streams Wetlands Open Water r-- Railroad Centerline NEAT Impacts Figure 14. NEAT Impact TS8-1 - REVISED 5/12/2020 Page114 FNCLT Airport Expansion I SAW-2018-001071 Public Notice Response May 12, 2020 LEGEND 0 CLT I P Boundary (4,652 ac.) W%p - Streams Wetlands Open Water �r Existing Culverts T� Proposed Culverts Figure 15. SCF — Proposed Permanent Impacts — REVISED 5/12/2020 SCF Impacts Permanent Stream I mpacts SCF - Already • ^— Permitted (SAW- 2006-32521) Permanent Wetland ' I mnarts Page115 FN Charlotte Douglas International Airport (CLT) LEGEND Applicant: City of Charlotte -Aviation Department : rr CLT IP Boundary pate: 5l1212020 (4,652 ac.) SAW-2018-01071 40%ow Streams Wetlands Taxiway F l5 Open Water Extension T� Culverts Permanent Stream Stream 25 - PS8-1 Impacts 2,614 If permanent impact SCF - Already r (p e�iously permitted far Permitted (SAW- Taxiway F Extension. 2006-32521 ) (dual 2,300-foot, Permanent Wetland 10'Hx10'H RCBCs)�— Impacts T� New Culverts Agreed Ratio: 1:1 2,614 stream credits ' 0 Riprap CLT Airport Expansion I SAW-2018-001071 Public Notice Response May 12, 2020 Stream 25 - PS7-1 823 If permanent impact ` -R [dual 750-foot,l0'Hx8'W RC11Cs] NCSAM: Low 10 Proposed Ratio: 1,51 ;'.'' f�. 1,234.5 stream credits u i r k Stream 26 - PS9-1 91 If permanent impact (73-foot, 36" RCP) NCSAM: Reach 1, Law Proposed Ratio: 1.5:1 136.5 stream credits Stream 26 - PS9-1 R2 444 if permanent impact (533-foot, 48" RCPy NCSAM: Reach 2, High Proposed Ratio: 2:1 888 stream credits Deicing Pad NCSAM- Medium spy Proposed Ratio: 1-75:1 1 c7D0 feet 73 5 stream credits inh = �. - --- - � rt •s�9 Figure 16. SCF Impacts PS7-1, PS8-1, PS9-1, PS10-1, and PW3-1 — REVISED 5/12/2020 Page116 Wetland 15 - PW3-1 0.01 ac permanent impact (grade and fill) NCSAM- High Proposed Ratio: 2:1 0.25 wetland credits Yorkmant Road Realignment Taxiway H (South C rossf e ld Taxiway) M Charlotte Douglas International Airport (CLT) CLT Airport Expansion I SAW-2018-001071 Public Notice Response May 12, 2020 1 Applicant: City of Charlotte -Aviation Department -��, f '--. Wetland 22 - PW4-1 impact - 1 Inch 200 feet - Date: 5/12/2020 �'.l 0-04 ac permanent 0 FeeL 200 SAW-2018-01071 [grade and fill) W22 NCSAM: High Proposed Ratio: 2:1 S2fi 0.25 wetland credits W23 1W26 g3z Stream 34 - PS12-1 155 If permanent impact If lass A, •6 y :.,_; 1125 of permanent & 30 If of permanent non -loss a r (47400t. 36-inch RCP,rip rap J5 aprons and rock crass vanes] { a' • \ 25 �'• a NCSAM: Nigh `.. Proposed Ratio: 2:1 stream credits ! Detention Maintenance RoaLEGEND d W2 and 24 - PW5-1 O CLT IP Boundary (4,652 ac-} 4 f9• :; y, 0.09 ac permanent impact (grade and fit) ter+ Streams Wetlands y. _ NCSAM: High - Proposed Ratio: 2:1 Open Water - 0.25 wetland credits Existing Culverts iq Stream 25 - PS11-1 406— Permanent Stream Impacts''•' Permanent Wetland impacts y,, ••:.ir 457 If permanent impact (dual93-foot. 7'H x10'W Coffey ❑elention '., •. :::: ���'�r•" - RCBCs and rip rap aprons) Flood Limits =,� • - a Proposed Culverts Detention Maintenance Road t' r ^';:� t • ` 't r NCSAM: High Proposed Ratio: 2:1 0 Rip Rap y. _ kr,. s..:w,;'�, _ w$ 914 stream credits Figure 17. SCF Impacts P11-1, PS12-1, PW4-1, and PW5-1 - REVISED 5/12/2020 Page117 CLT Airport Expansion I SAW-2018-001071 Public Notice Response May 12, 2020 Charkotte Douglas InternationalAipart fCLT+ Applicant: City of Charlotte-Avietkon Department DATE: 1131=3 SAW-Z,d 1 &01 U71 'J4MXAIG s.t1li �114TQGzn { LI �l14JtE IS �. Streams _ -1th Parallel Runway 0 Amazon Expansion 0 Concourse Expansions CentraIV-ed Receiving C3 .:aHands Hold Pads and Distribution Gender 0 Taxiway Enhancement (CRDC) Open Water � Airport Ovedook 0 CbarterTerminaI Relocation Expansion Culverts 0 FedEx Expansion Phase 1 Impacts General Aviation Group ® Hangar +� Stream Impacts J CIC C37,7etIsnd Impacts 0 Daily North Parking Deck 1 indr=aoa feet Long Term 1 Parking Lot Ph as e 2 Impacts Expansion fl Feet mo 0 aidifteTerminal Stream Impacts West Ramp Expansion ® South Ramp Expansion 'V�etland Impacts C3 0 Borr0wAreas 9flrrow areas to be used for the BC Element and potential future elements. The util¢afion of bourne areas win have no anticipated impams toJurisdictior al waters Figure 18. Phase 2 Impacts (4th Parallel Runway and Associated Taxiway Enhancement and South Ramp Expansion) — See EA Appendix A for mitigation assessment data Page 118 Appendix C Detail Plan Sheets - REVISED ........................... . S i�� ]ZE PER NCDOT EROSION \ / CONTROL GUIDELINES) \ \ OPEN CUT CONSTRUCTION NOT TO SCALE usT STONE 6" ➢EEIF (MIN.I H A B EXISTING GRADE 12' BR z 3 DIAMETER OF P]RE. •i WH]CHEVER IS 7'F'IL"L GREATER 2C. m]NWITH EOTEXTILE FORCLASS B RALFACE ONRIP-RAP B❑ITDM OF NUMBER IF PIPES AND CREEK DIAMETERS VARY. REFER TO B TEMPORARY PIPE TABLE, THIS SHEET, BACOT CLASS B STONE (5 T015 INCH DTA)2 2 FILL WITH _ I CLASS B FLOW RIP -RAP A57 WASHED N HIS STONE 6' DEEP FOR LARGER CHANNELS USE NCDOT CLASS I PIP -RAP (MIN) FACED WITH 9 57 WASHED STONE. 1, SLOPE APPROACHES TD CROSSING 2.1 OR FLATTER. 2. SPILLWAY LENGTH = BANK TO BANK WIDTH OF STREAM OR AS SHOWN ON PLANS. STONE CHECK DAM J. PIPE TO EMEND COMPLETELY ACROSS PERMANENT RIGHT OF WAY AND 1 FT BEYOND LIMITS OF RIP RAP. PIPE LENGTH SHALL BE 20MINIMUM, 0227003 4. CROSSING TO BE REMOVED UPON COMPLETION OF CDNSTRUC71ON_ STREAM TO BE RE STORED TO ORIGINAL CROSS-SECTION_ TEMPORARY STREAM CROSSING 0227019 SANDBAG DAM SECTION 1. BASE FLOW OF STREAM WILL BE PUMPED AROUND WORK AREA AND RELEASE' BACK INTO EXISTING STREAM BELOW THE WORK AREA ONTO RIP RAP OR CLASS B STONE PAD BYPASS PUMP SHALL UTILIZE A FLOATING INTAKE. _. PUMP AROUND SYSTEM SHALL BE SUFFICIENI SIZE TO CARRY BASE STREAM FLOW. 3. SANDBAG MATERIAL: SANDBAG SHALL BE WOVEN POLYPROPYLENE. POLYET HFLENE OR POLYAMIKE FABRIC, SGUARE FARO. MULLEN BURST IIRENGTH EXCEEDING 300 PSI IN ONE ORMA NCE WITH THE REQUIREMENTS IN ASTM DESIGNATION '37 86. AND ULTRAVIOLET STABILITY EXCEEDING T0'/. 1N CONFORMANCE WITH THE REDUIREM ENTS IN ASTM OESJGNAT I ON 04355. USE OF BURLAP IS NOT ACCEPTABLE. 4. SAND FOR SANDBAGS SHALL BE A MINIMUM I IOLB/CU. FT MATERIAL. TO FOLLOW ALL OSHA AND STATE SAFETY REDUIREM ENTS PERTAINING TO THIS EXCAVATION. 6. ADDITIONAL EROSION CONTROL DEVICES MAY NEED TO BE INSTALLED AS DIRECTED RY THE ENGJNEER. 7. FOR NON ROCK CREEK BOTTOMS. KEY SANDBAGS ON UPSTREAM SIDE I' INTO SOIL. S. PERFORM CROSSING DURING ANTICIPATED DBY WEATHER ONLY. INSTALL PROPOSED UTILITY IN A DRY TRENCH. NOTE=SANDBAG DRM HEIGHT SHALL BE A MINIMUM OF 2'-6' UPSTREAM ANO I'-6' DOWNSTREAM. ADJUST FOR SITE CONDITIONS PRESENT DURING CONSTRUCRION. 635 \ \ \ 630 \ 6251 620 (-)0.44070�/o i / / PROPOSED GRADE / PROPOSED // EXISTING 72" RC � 1' BURI D � 615 \ 610 605 39+50 40+00 40+50 41+00 41+50 42+00 42+50 635 630 625 620 615 610 605 STREAI INV = 10 INV =F i I QILL 600 1' INSIDE CULVERT) 00+00 00+50 PROFILE AT ROADWAY CENTERLINE J F- / \� 11 V %-.r i r v■ r r ■ NATIVE MATERIAL 01 +00 01 +50 02+00 CROSS SECTION AT STA. -L- 40+88 02+50 STREAM BED INV = 602.99 NV = 601.99 03+00 / S V / i �� 1 —� co W /�v IV,// /, 6E DUE / UE—i � / / / / ! P Ems--P UE �0� �0� �\ / PDE, �n\V � ovi ' / I / (_000 \ TIC 3 TL 3 / I i � REU TL-3 009_ I \ /\ / �W 07 v ) � I i- / PDE P D I I I I i/ PDE ' PDE P W I I E� / PDE TOTAL STREAM IMPACTS: 56' TEMPORARY STREAM IMPACT 215' PERMANENT STREAM IMPACT NOTE: IMPACT LENGTHS TAKEN ALONG STREAM CENTERLINE 03+50 MSTv 100 STV Engineers, Inc. 900 West Trade St., Suite 715 Charlotte, NC 28202 NC License Number F099t REL R NARY NOT RELEASED FOR CONSTRUCTION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED TALBERT, BRIGHT & ELLINGTON ENGINEERING & PLANNING CONSULTANTS 3525 WHITEHALL PARK DRIVE, SUITE 210 CHARLOTTE, NORTH CAROLINA 28273 PHONE:704-426-6070 FAX:704-426-6080 NC LICENSE N0 C-1163 w Q 0 z 0 w N r� Ln 0 N 0 N Q < w z Q m \ \ M m o w z U vl z U w 0 0w z U w 0 m z Q m o w y c) w w D (n n w w w � w = Q oa_a_oUo ti 0 w W � Z U c� o � "' z �0 o� U �Q Q 0U n 00 w 0 � W w Q z w J w Old Dowd Road Relocation Sheet 2 of 25 (submitted with Public Notice Response 5/12/2020) A, � 9 1 I I ; I Q - �'- o O T w - �I CCL - - 0 Q- 0 C: (A O 0 + �I N �' LO 4-1 U) e e az I' i co CLASS B RIPRAP Q c' EST. 6 TONS • - I EST. 11 SY GEOTEXTILE o505 - ° C) SEEPDE \ - W C - _ 0504 CO FRCP -I W/ELBOWI +39.39 O 0' & LANE TAPER 23.50 r (LT RT) a BEGIN BRIDGE -L- STA. 21 +86.86 " CP -IV 0502 i I I O II N ��4 O C14 O r ,� � o 0 012 4- 2 -1 rr2 m vJ ` _ 21 0 T +39.39 0501 YP 23.50 I BEGIN APPROACH SLAB' I n 0 - F -L- STA. 21 +62.87 W # PDE_ PD 05 33 D�GI a ,--\PROPOSED d3 PDE PDE PDE P RETAINING WALL LATERAL BASE DITCH c, L ` SEE DETAIL J I • �' v 227 CY DDE V) Z s AX n w � I G � U) (,-I o e 0- # I DETAIL A LATERAL BASE DITCH ( Not to Scale) �b Natural Ground 2.7 T T 1"/Ft. Fill �" Slope / Min. D= 1.0 Ft. I B= 2 Ft. b= 5 Ft. -� FRCIM -1 - 9Q+-rn Tn '11+1 r, I T n f / I DETAIL B LATERAL BASE DITCH ( Not to Scale) Natural Ground 2.7 D T_ 1"/Ft. Fill Slope I-.-B Min. D= 1.5 Ft. B= 2 Ft. b= 5 Ft. FROM -L- 31 +33 TO 33+00 LT FROM -L- 29+20 TO 30+22 RT FROM -L- 30+22 TO 32+00 RT DETAIL F TOE PROTECTION ( Not to Scale) o� e 21. S�oQ Natural Ground In d= 1 Ft. �� d b= 1 Ft. Geotextile Type of Liner- Class - I Rip -Rap FROM -L- 27+50 TO 29+50 LT FROM -L- 28+50 TO 29+20 RT DETAIL C LATERAL BASE DITCH ( Not to Scale) Natural Fill Ground D 21 1" Ft. Slope d GEOTEXTILE B Min. D= 1.5 Ft. Max. d= 1.5 Ft. "When B is < 6.0' B= 2 Ft. Type of Liner= Class - I Rip -Rap b= 5 Ft. FROM -L- 27+50 TO 28+50 RT DETAIL G CUT DITCH ( Not to Scale) Front Ditch Natural of Ground ?.7 D�a�et Slope Type of Liner-- Class - I Rip -Rap Min. D= 1 Ft. FROM -DR1- 14+50 TO 17+00 LT City of ChcHotte OH 24389-873 MF 51 -308 �si2l' I 1 13-021 -10 O a ' G Q I I of I' I f0 PROPOSED 24" WATERLINE (INCLUDED WITHIN THIS PROJECT) _m LL U, 11 -L- CURVE DATA -DR1- CURVE DATA PI= 18+62.86 PI= 36+52.14 PI Sta 11 +64.59 D= 680 58' 21.89" (LT) D= 51- 07' 44.26" (RT) D = 79' 28' 23.6" (LT) L= 644.03' L= 1,222.55' L = 138.71' T= 367.51' T= 655.35' T = 83.13' R= 535.00' R= 1,370.00' R = 100.00' SE = 4% SE = 3% DS = 40MPH DS = 40MPH ICI I QJ a PROPOSED FORCE SEWER BY OTHERS / o (TO BE BUILT IN ADVANCE OF THIS PROJECT) i -o I w m G I II O i ti �.wl w O N roe CD _ O i °l - t i Q it -o \2p 0 C)wit 0 C <� �° I CD LL c I cD TOE w, � -0 � O PR TE O T 10 x O SEE DETAIL LL I` -0 CLASS I RIPR P r O e DUE EST. 41 TONS LL u I` wCD \ DUE EST. 90 SY GE TE 1 � • DUE G DR N O \ °(jEi 1 \i pG W F ' w11 END BRIDGE Q a -L- STA 27+27 86 FUTURE SLUDGE LINE BY OTHERS / (TO BE BUILT AFTER THIS PROJECT) / C') + N �` G \` C) i' U , A PUE i \i \ e w W I 0 0 o o o M � 0 k 0 i C) LAT RAL BASE DITCH SE DETAIL B 63 Y DDE LATERAL BASE DITCH -L- Sta. 32+65.00 = SEE DETAIL /A -DR1- Sta. 10+00.00 100 CY DDE e e PUE PU PUE W w w e \\ PUE PUE / �,�,�V6 DUE °G !y A�F a X ILE \ i \ PUE P� PDE PDE- G ?DIE- I� D m CB END APPROACH SLABUj i II D_ ROW 51 o �\ 00 a- -L- STA. 27+51.86 ' � 50:1 APE DUE 2G1 0513 i PDE > AUF F e \ U �/► o� F F F y ENU SBG F co +50.00 to OQ, I 21' a- 0G �� - �:,�:.:����� ��I•I-__fir r �� � ��i1) • `l •, , � •rrrl.rlrt'�rrrrrrrrlirrrr�� Illi►. moor-m i�'/II. ,' III , • rrrrnriii�ninniiirrir�lrrrrlr rr 0 • " : 1101 • •� .. F- q � LdCja PUE CD DI CD wi 0507 C + o e C O o w e J� CUT DITCH LLc ; 0 Q SEE DETAIL G Q 2 CLASS I RIPRAP , EST. 184 TONS I EST. 311 SY GEOTEXTILE DETAIL D STANDARD BASE DITCH ( Not to Scale) Natural Natural Ground ?•7 TD 2� Ground d Geotextile B Min. D= 1.5 Ft. *When B is < 6.0' Max. d= 1.5 Ft. Type of Liner= Class - I Rip -Rap B= 2 Ft. FROM -L- 26+85 TO 27+50 RT DETAIL J LATERAL BASE DITCH ( Not to�Scale) lo Natural Ground 2 7 D 2_N 1"/Ft. Fill Slope Q Min. D= 1.5 Ft. B B= 2 Ft. b= 5 Ft. Type of Liner= PSRM FROM -L- 20+00 TO 21+59 RT / SPECIAL LATERAL'V' DITCH ( Not to Scale) I + N Natural of C') Ground 2. 2��a��et Sllope I00 / N. D Min. D= 1 Ft. FROM -DR1- 13+00 TO 14+50 LT W' m DETAIL K STREAMBANK STABILIZATION EXISTING ( Not to Scale) STREAMBANK I� KEY -IN `� PROPOSED PIER Natural STREAMBANK I ELEV. = 647' Ground- \STABILIZATION CL-II RIPRAP - 2' MIN EXISTING STOP AT NORMAL STREAMBED W.S.E Est. = 189 Tons of Class II Rip -Rap FROM -L- 25+99 TO 26+32 I I DETAIL M RIP RAP AT EMBANKMENT ( Not to Scale) 10'min. 1.25' Min. Ditch 1.01,min. Grade � Geotextile Type of Liner- 10 TONS,CL I Rip -Rap Geotextile= 17sy FROM -L- 26+41 TO 16+51 RT DETAIL R STREAMBANK STABILIZATION EXISTING ( Not to Scale) STREAMBANK KEY -IN Natural STREAMBANK Ground \STABILIZATION CL-II RIPRAP - 2' MIN EXISTING STOP AT NORMAL STREAMBED W.S.E Est. = 86 Tons of Class II Rip -Rap FROM -L- 26+25 TO 26+54 TYP o �� END SBG A°F col _ _ +50.OU Li 0 F co GREU Tl-3 _ O / C OLD DOWD ROAD O � 15 2G1 0 12' 2G1 " RCP -IV - oG 0515 = ' � � 0517 a GREU 7-L_ 8. 1 2 o PC Sta. 10+81.46 3 - - �20, X LL_ F 0516 = `- 30 05 \\ a 00 14 F ' +00.00 a o 1 21.00 N a co ` PDE PDE PDE ' PDE-- PDE PDE CLASS B RIPRAP D LATERAL BASE DITCH EST. 2 TONS rn / SEE DETAIL B EST. 7 SY J� 168 CY DDE GEOTEXTILE Q LL/ i G a PUE eJE 0 F l; C � C C -/ PUE C Ply e wise e SPECIAL LATERAL 'V' DITCH SEE DETAIL E PROPOSED TRANSMISSION BY OTHERS LATERAL BASE DITCH aJ SEE DETAIL C CLASS I RIPRAP p EST. 123 TONS + EST. 225 SY GEOTEXTILE 390 CY DDE N PROPOSED 100' PUE C6 FOR DUKE ENERGY Cn TRANSMISSION LINE Plans Prepared By: ST too STV Engineers, Inc. 900 West Trade St., Suite 715 Charlotte, NC 28202 NC License Number F-0991 SEE SHEET 9 FOR -L- PROFILE SEE SHEET XX FOR 24" PROPOSED WATERLINE TALBERT, BRIGHT & ELLINGTON PRELIMINARY ENGINEERING & PLANNING CONSULTANTS NOT RELEASED FOR CONSTRUCTION 3525 WHITEHALL PARK DRIVE, SUITE 210 CHARLOTTE, NORTH CAROLINA 28273 DOCUMENT NOT CONSIDERED PHONE: 704-426-6070 FAX: 704-426-6080 FINAL UNLESS ALL SIGNATURES COMPLETED NC LICENSE NO. C-1163 w Q p to Of w w z_ o N w Q = Cnn z a_ c� to m m o w zz p m p LLI Z w w z Y - C� _D � 0 w w Df � Of = Q 0 tL a_ 0 0 0 0 u) til J Q 0 to O o l- z 3:Q Q O U 0 O a- 0 LLJ � O w Q z w J E Old Dowd Rd Relocation Sheet 3 of 25 (submitted with Public Notice Response 5/12/2020) 790 7 1 730 720 tM I 1 11 1 1 1 1 11 1 1 710 \\ zz11 1 EX S N G RO N D \ - O d J M \ H�k _� O Z Q 717 �- 700 + \ N ° o - II JCL- \`? 0- 0- ROP \ \ c� 2' o- 690 SE RET INI LL - - / c 4 1 RO \ 680 24+00 PROPOSED RETAINING WALL REAMBANK STABILI ATION ASS II RIPRAP 25+00 -L- 26+00 EL VC = 6 K= 88 DS = 50 MPH mom ' 1 11 IN679.51' J 7D - V±1 PI = 2 +50.00 RT oE L = 671.40 PI = 29+20.0 RT '\, "' EL=67 .08 ��-144 /-LEN f 9 -- T1 TFFEL#$ PI = 32+0 .00 Fl = 29 50.00 LT EL = 676. `"ru 73 720 FMOW.J mIl] 111860111 650 620 610 TALBERT. BRIGHT W Q p Z 0 W ry HNH.-q- Ln Cn Qf W W o Z_ N W � Q C Uj Z W = LO U) mwo m LLJ Ld p U U m p z W W ZY— cD -, � 3;: 0 W w � � Q = Q p 0_ W p U p I 3 C2 �Z z a a a Z LU x 0 w J Q U 0 V) ryz O W o I= �Q O U � O � n 0 w ry O w Q z W J MSTV 100 & ELLINGTON Old Dowd Rd PRELIMINARY Relocaton NOT RELEASED ENGINEERING & PLANNING CONSULTANTS Sheet 4 of 25 STV Engineers Inc. FOR CONSTRUCTION 3525 WHITEHALL PARK DRIVE, SUITE 210 NORTH CAROLINA 28273 (submitted with Public CHARLOTTE, Notice Response 900 West Trade St., Suite 715 DOCUMENT NOT CONSIDERED PHONE: 704-426-6070 FAX: 704-426-6080 5/12/2020) Charlotte, NC 28202 NC License Number F-0991 FINAL UNLESS ALL SIGNATURES COMPLETED NC LICENSE No. C-1163 C: \Users\tcssitmc\Documents\Old Dowd rdy psh09 pfl dgn 5\11 \2020 DETAIL B LATERAL BASE DITCH ( Not to Scale) b�Natural _�- Ground .1 D 2� I" /Ft. Fill Slope Min. D= 1.5 Ft. B= 2 Ft. b= 5 Ft. FROM -L- 46+00 TO 47+50 LT FROM -L- 46+50 TO 49+00 RT DETAIL STANDARD BASE DITCH ( Not to Scale) Natural Natural Ground ? D 2� Ground d Geotextile g When B is > 6.0' Min. D= 3.5 Ft. Std. No. 876.01 Max. d= 3.5 Ft. Type of Line - Class - I Rip -Rap B= 10 Ft. FROM -L- 48+92, 60 TO 49+02, 276 LT DETAIL H SPECIAL CUT DITCH w/HINGE ( Not to Scale) Natural Ground G _k of Front 9� L6O �1 z0 Ditch D�a�Slope Min. D= 1.5 Ft. FROM -L- 43+50 TO 44+50 LT FROM -L- 43+50 TO 44+50 RT DETAIL L STANDARD BASE DITCH ( Not to Scale) Natural Natural Ground '� Ground ?"7 D 2. Min. D= 1.5 Ft. B B= 2 Ft. =ROM -L- 47+50, 101 TO STA. 48+70, 147 LT BEGIN MEDIAN & PAVING CONSTRUCTION MATCH EXISTING -Y- STA. 10+89.74 MATCH EXISTING -Y- STA. 14+55.85 o� ou ou ou _ou existing road eW limit - SURVEY PENDIN LINK 100' BAY TAPER a; + City of Charlotte 0D 26960-630 1 1 3-021 -08 (riot surveyed) 55 r7 y 5 7 PROPOSED 12" SEWER LINE (INCLUDED WITHIN THIS PROJECT) O� V zz' e ss /�Ss s 5S I �� SS 75 /A, s / �Ss / e - � eat LOp <O roa M 'i / City of ChaHot`ie DB 9136-790 o + Lot 3 / Lj MH 65-448 / 055-371 -21 1 xl U. �I a I -L- POT Sta. 50+30.09 = -Y- POT Sta. 18+04.10 i END PROJECT / -L- STA. 49+96.00 oe CATCH BASIN IE OUT _6154 LLB 7' ---- S 78° 1 �'Eu�l� CATTOPCCURB.6�2o.s RIM:- 8' I4I I I I M - 11 II I JII II t� III III W II II 1 IIII � �I�� I I II II IIII �1I��� � III1IIIII� I I I II II IIII I I" � I I IIII II IIII I I' I I,I IIII I 111111 I It � �v � IIII II1111 I I I II IR I I I III, 1" I I II II I I I IR I II � � y I II II I I III I I jl I I I IIII IIII II ►III I "� I II II I I II l i N I �I I II II IIII QD I I I IIoPGUR�sIN 2T 6 6 IRIM 11 T 1' Iln 1 CATCH3FSIN RTOMP60 (5 ). � (I S 1 "(NE)Sec, 12,103 U te zo1( q�, ordinances DROP INLET - r _Tff 1_ �ll1 n o ll 11 � RIM 635 3 E CUT_133.2 e0U "F OI U OU pe --14 i FO FO F. FO 1�- ��F O W FO CATCH BASIN OP CURB: 63T,3 RIM�636.6 IE iN: 632.8'(S) \ 1 IE IN833. 0'(NE) IE OUT: 627.B'(NW) IA/ VV IA/ +� ly o * R=8.25 0709 �y ou S o t o rB � h f r� R_ �S ss i w o t o it of (� adot s LO 3SS / s 3SS LO 4Z, .02 z PDE JB - PDE o7oa W/ H STREAMBANK STABILIZATION STANDARD BASE DITCH 15" U o b a. SEE DETAIL Q SEE DETAIL I W/ELBOWS 0 CLASS I RIPRAP CLASS I RIPRAP `n EST. 31 TONS EST. 330 TONS -o w O I 0 T 0 D (n 0 SURVEY PENDING FOR -Y- WILKINSON BOULEVARD CROSS SECTIONS. DETAIL Q STREAMBANK STABILIZATION ( EXISTING Not to Scale) STREAMBANK KEY -IN Natural STREAMBANK Ground STABILIZATION - AlCL-I RIPRAP 0.5e 1' MIN EXISTING STOP AT NORMAL STREAMBED W.S.E Est. = 31 Tons of Class I Rip -Rap o FROM -L- 48+93 TO 49+10 (D C) Q X I X I 0 Q_ MATCH EXISTING -Y- STA. 20+30.40 City of ChaHotte 0E 7145-360 055-521 -01 END MEDIAN & PAVING CONSTRUCTION MATCH EXISTING -Y- STA. 24+70.10 0 00 OLo SLAB TOP BRANAGE INLET NLET: 648' IE 5. OUT: 640,8' FO ou F- FO j FO o� FOW FO ou Z' F �� WO FO�OU F W FO u FO SURVEY PENDING PROP. US 74 (WILKINSON BLVD) - MONO. ISLAND - - OU - OU OU e ll) see Rc. 1 2,1 03 - _ °U ou ou - - - _ _ aning ordinance W W - _ 1pp BAY TAP u �- PUE ��,-vim- PUE PUE W ER 0 o I ad o_ e e PUE W +_ HW - >_ e PUE e _ o7os - Ck w / a_ G EST. 52 SY GEOTEXTILE EST. 558 SY GEOTEXTILE �� �` 4 FQP 4 u Df�S 895 CY DDE STANDARD BASE DITCH 15" CPII-IV SEE DETAIL L 54 CY DDE w �- W 0 CB CD CL_0 o 07 Q CD LOD LATERAL BASE DITCH � U X I o OD ��- SEE DETAIL B I �O 68 CY DDE w PT St 46+50 12 6 DD-9E7 07 6 o +19.34 w 0 w a• �W IJ .02 81 12 CB1 i - +85.00 CQ .03 M O w 1_8�1 � CY U ryQ W �I I Lu �I o �O i a 3 FdPS I +/43.38 LAJ � L 7' � N °d CJ w I uU I v w 09 SPECIAL CUT DITCH w/HINGE 44j SEE DETAIL H U Q� W I O U SPECIAL CUT DITCH MA�IIw/HINGE CHLQ SEE DETAIL /NE.ftG ST A 43+ 5o S i EE SHE ET 6 LATERAL BASE DITCH SEE DETAIL B 784 CY DDE J H o' w w I- H LL In 0 0 Q0 City of ChaHotte 0B 26960-603 1 1 3-021 -06 -L- CURVE DATA -Y- CURVE DATA P1= 44+36.52 PI Sta 23+04.03 D= 18° 00' 57.43" (LT) p = 13° 54' 23.9" (RT) L= 430.78' D = 11' 59' 59.5" T= 217.18' L = 695.38' R= 1,370.00' T = 349.41' 0 R = 2,865.00' DS = 40MPH DS= 50MPH Plans Prepared By: T too STV Engineers, Inc. 900 West Trade St., Suite 715 Charlotte, NC 28202 NC License Number F-0991 LE - e LE _ e EXISTING TRAFFIC SIGNAL SEE SHEET 11 FOR -L- PROFILE SEE SHEET XX FOR 24" PROPOSED WATERLINE SEE SHEET XX FOR 12" SEWER LINE SEE SHEET XX FOR REGIONAL DETENTION BASII TALBERT, BRIGHT & ELLINGTON PRELIMINARY ENGINEERING &PLANNING CONSULTANTS NOT RELEASED FOR CONSTRUCTION 3525 WHITEHALL PARK DRIVE, SUITE 210 CHARLOTTE, NORTH CAROLINA 28273 DOCUMENT NOT CONSIDERED PHONE: 704-426-6070 FAX: 704-426-6080 FINAL UNLESS ALL SIGNATURES COMPLETED NC LICENSE NO. C-1163 w Q 0 (n Z 0 (n > LLJ 0_ to Of w w Z_ 0 N CD 0 w Q _ (n Z n m OZ m � W 0 m 0 U 0 Cn Z W W Z Y - � 3: 0 w w Df Of � = Q 0 a_ a_ 0 0 0 0 w J a 0 Cf) O_ o� z 3: Q Q O U O LL 1 � O w Q z w J LL Old Dowd Rd Relocation Sheet 5 of 25 (submitted with Public Notice Response 5/20/2020) y- -JI - -- -- llll�l ll�l/�/�/ I ' / '/' `_ �� /r / r / \ / / f / \ \ - _ - ^ \ , � ) � � \ I /j j/ - — — _ = = wl I / / r- _- / /� // /////Ill// / / l ) �r / \ \ 1 / ( /////i �--------- - - \���'EXI IV O / / / I / / / /� \ � - / \ \ \ -\ \ I I _ // /i/ ___-_ _ \ \ l r _ _ l /l �/ / / - f \ / �✓ '�-%,=- ��\� �\ 7Q0 F7 LEVARp I l I---- / / /// //////// I l �`' / �\ \ \ \ / _ / i// /�//ii�=====_==---= _-- /r \ \\\ \�\ \ �-- /, lr l / // r / /// / I I ---- 411 ,, , //� \ \ /// // INTERSTATE485OFFRAMP / /^ -�� _, / / I // r - ---_// \� `_ 1 / 1P \ / ��� // / / III( I ( \ - -- / \\\ ,, J / //�/i s- ( /� _ _ - / // % // 11 / 1 \ \ \\\ PROPOSE 15 \ IIIII 1��� - / ✓/ / ///// / /�%�i% /// / /ill/) 1 I \ \ �� �' --_/ j- \\\\� / \ — -625- \ \ i /. / ��(���\\ II I '�oF RI \ ' \ i Y'/// / \ ' / \ \ l l \\ _ T MIT \ l l/ll / // / / -/ //�l / / 1 1 I \ \ \ / / / \ l \ -_------ / //////i�/// /---- 1 \ //� /// /\ \ \�\\\ \ 11-1 /ll///Q o& 1 / '\ / / / / / / 11 \ �_� --� / /\, �\ I-JlP I ---' - - , � _---- / / // / =_ ��___ 1-_ / // / \ \\ \ �// /o / / / / / / / 1 I \ \ - \ \ "I \I / / / ///?/ /i / /,: z _ .. -- _ l l \ �\\� \ \ j�// wj w�/� ,� \� / / / / �///� ll I )III // / l \ \\\ \� ��,__,, -- ------ '� \\\\\� J//\\I/� \\�_�� �� --,--' ,-��j�/%/%/% / / /�� - == __-_ - __F.%' / I I \ ^�' ���\\\ \\\ �// a ►-; ( / / ! I �� / s1 \ \ \ \ - \� -/\\�_\_---_--_--� __ �' //,/i i \ _ \_ / I f ��\ \ \� / / \ - - - _-_----_ / / / / / --- I I I \ /// a ?� /-_� ( _ / I 1/f�,/ /l�\\ \ \ \ \\�;`_; - 6 �,- ---- -� �, �� -.\ -� _ = _ = _ — _ ��__--�' -- --- � /�%///%'�'%%// //� \\ </ I I I I I I \' I I I\ \�iI*N I. . // V / l I I f /- j// \ \ \ \ — =_\ _\� \ S �' ------ \ \ — = ��� I / / _ \ / - - \ �l , l�/ �/ /� /j ///� \ I I l \ I I I I I I \ \ \\\ -- � - -_-- - \ \ / \ \ / l/ll/l//�/ // // I I \ I I I I I I• /ii /� / I / / I I I ///�� \ ---� - -- _ - \ - ��\\ ///// / I I 1 / /' l ) \ ( / �� \ �� `\\��',\_�'��'�_- --- - / \\\ ��/----- \\ \_--\��\\/- -_/ \�_�////j/l//ll�/l� I/// //71�• I I \ \ I I I \ \ I\` 1 I 1 I • / l I 1 \ l \ �-- -\ \ \ \ - _ --�\ \\ ` -\\\\ /// //I IIII 1l/ ! I I I \\ 1 I 1 1 \ \ — — — � \—_ \\\-- IIIII l l/ \ \ I \ \ I 1 // � \ 11\\ \ , - - ---_ --- _ \ � _ _ \- \\\ _ I lIl )/ll ll 1 ) 1 1 1• !---_ ) /\\ �__ \ \\ \ / - _ _ �__�,__, �\ \. \��\\�� _ // // / / / ' 1 I \ 1 / / - I � - \\ \ \ \ \ 610 / - --- �_-_____� = z _ \� , /�lIlll(1 l // 1 / 1 / l l 1 1\\\\ \ \ 1 I \ I � I \ l / -� \ - / \ \ \ / \ \ \ \ 1-1 _-� / ��� / / - --_ - _-\ \\_ --- \� \/l 6 �� //IIII Il/// // I l , l l / / / J\\�I I 1 \: l / \ \ \\ �\ \ \ -/ -% \ �\ = = — �\\�\\``\ �_J��/ ////////i //l 1 II I 1 / ---- / \ \ \\\\ \ \� \ _ / /%�� ----- Z:N �_ �� "610 _ /j//�//// / 11 / / / / / / / / /, ►I I / / \ \\\�� \ \ \\\\ \ S ----/ /i l ' /'- - �_�\ \ _ -- _\ "\\` �� \ / r- // / / / / / / I III I \ 1 / / J \ \ \\\� \ \ \ \ / /-- �� �� --�-/ �I-- \ \� \\\\ �� \\\� -, r J // I / l l 1 / I 1 1 Jl I I \ / I / \ \ \( \ \ _ -_' / ��///l- \\ \\ \\ �� IIIII��� / . // I 1 / / I I I -�'�--_ \ \ \ \ \ - - // // - � _ \ � \ .,\\\\ Ill,l l/ t ///� �� ( I / / / l 1 I I \ /i ) I (/ , \\\ \ \\ \ _ - / -/ / / _ _ / ( _ - _ \ \ ) \ ) I \\ \ \\ - - / / / /' // - 42" CULVERT BURIED 8" WITH l LIJ /// \ k, l / / / I l I I \ ✓ / / j \ / I I �\I III r\ \ \ _ / // / NATURAL STREAMBED MATERIAL �- : // I / / ( I \ / \ / / l / \(1 \ , \_ \ \ 600— /I l / ///�/ / \ 3F \,- -\\\6 i l/ I / l I I / / I I I l l / / ( -/I - \\\___/ I /� \`\�\\ \\\ -- ,- -'/ I,/'/ � / 1 �l I / \�, \ \ \ , - 0�- � / // I \' /' 600 �� l 1 I ( / 1 1 I l / I / III/ I / / / ' / \ \ \\\�� - � / - / /- / ,' NED - s / / , // / 1 so I I 1 , /r / / / // / // / / � / / / / / / - \ - - - / \\ � -- � mot-- / /' / BE p B ANOO ss 1 iS A / // / o� \ c,,)- _ s I \ I / / , / � / / / , f / \ � \\ \ \ --- --� / --- 10 / / l — I\ I / /// ,/ / / l I J l / // ( l � J / \ _ � �' _ - \\\\ \ ' � \ '' / IST\N SEWER SS 1 PROPOSED 15' WIDE I \ : // / o / /// 5 \ / / / / / / _/ / \ \ \ \ �- ( _ � _ � EX MAINTENANCE ACCESS 1,1 / // I l /// / // i - -' � � / �' j / �' ////, /I /r // \�'-' --�� \ \ \�\\ \\\ ��' �\ SS - o _ -3g _ \ �� /II// / `° 6,o h / ///� iii'� _ = 1 ' '/ / // / / o / - ---- \ 1 /-;f59 0 /// /",i / / - - // / / 'IO/ / / -- i — — — \ I / \\ -'\ SS / ��� /'- - � < \��\ 0 -i' / /////// //� _\ / //'-/ / / - -__ \\ / > I\ -- =— -1( � / o / // / / /�- l l / -'/ / / / ' ' / - \ „ - / \ / / SS / / 0 !1. � ' / / � � �� //i0 // // /'� — - / l / / ��� --'/ � / - I I SS I \ / \ / \_ �/ / �� —^�4 �ta��_� \ < i �• //// ///�,--_ / �'i// - 10'W x 9'H RCBC 74 LF CULVERT - \ ` / i / \ - =� fi o - _ - - o,`� \ \ /^ / // / - - - \ \ ( / �� / / FLOW I-' -��j J — - _ - , - 0 / / / In —- o ,n O 1 1 1 // ' o --- \ 1 to o // I I // / ENERGY I .n c9 cc P .�/ � _ - -- o° / - _ / / / - - _ \ \'60 , 2�/ "/ // \ i / ISSIPATION RIPRAP / do 0 1 1 cJc�Q- // i '�— — '— — i p4� /' / / / - / // /''/' ��/ / i' /—_ - _��� \\ \� _ \ \ \ \ \ ( I ' / �- / // /// // / / - / - - ZTD _ _ LOD� / / / / / j / / / - \ , 0 \\ \ 1 I I / �/ / / / � / �c _ G/ / / // / / — \\ \ � \ � 5$ ,9 / / - _- ,�\ - / J ( I -II( / / -1�/ _- \ 6 ,\ \\\ \ \ I / / / / s //'to/// • / -/ / , / - - � \ / / h III �/ /// ///ram -\\ 1 \ \ \ \ \ / l ( / �' // I,/ , \ / I----- / / / --' \\\ \\\\ � �/ / // -- I 11 / /,/ / -/ — —\ � \ \ \ \ I I 0 O� I / / "/ I / / / -\-\\\ \ \ \1\ / Ij \ - - � -- / / ` \ / / / __ � \1S , �\\\\\�\ \ \ 11 1 I I I ( / ,- � s --`� / / / /// // / vv Vv__ / � -- / / �1\ \ \ / / / / / / vvvv� A \v A I I I / / < -� 3 / / / / �\ \\ — -1 - ---- II 1\ 1/ // / / \�6 \\ ���\\ \\\\\\\\\ \\ I I IIII / / /�10 o \ �� - I / - / / // // // / \ \ i'' �- - - - _ I I / �\ \ 1'0 \ \ \\\ \ \ \ 1 I I I ( / / c� - - /// // \ \.--/ //// IIII /i' \� \ \\\\\\\\\\\\\\� \ 1 ) I I I /'�/�//// o - // I \ \ 11 I I ///ti / /// _ / / / / --�\ \ \ /// // - �\ I / / / �\� \ \\ - 5a �' / � / - - /� s / - \ \\\\\ �\ \\ \\ \ \\ \ \ \ \ /1 1\ / � / / ///� to/ / / o l (l I / / / /i i i �O.o % = J \ \ \ \ �' ��/ //- % // / - (//(/ll \� \ \ \\ \\\\\�� \\\\ ,- -\� (J \ \ \ \I \ / / / 2/ i / I 1 �/ / / / \ - - \ \ \\ \ \ \ - \\\ `\ \ \ \\ \ 1 l I I X o 590 \ I / // // j - -\ \ \ //, \ \I I I �\� \\ \\\\\ \\\ \\\\ \ / \\ -. \ \ / / �/ �/, - \\ /� , / -- -_ \\ \ \ \ \� \\ \ \ 1 I I 1 I I �\ \\ \\ \ \\ \ \�\\\ \\ \ \ \ \ \\ \�\ \ \ I I \ 1 1 I I \ 1 1 I / / / \ � / �� //- �_-i _ -\\ "I I- /// //,\1 / / \���� \\� \\\\\\\ \\\ \ I \\ \ \\III\\\ \ 1 1 1 11 I \ I I IIII / / / / - \ -- / / / \ \ \ \\\ \ / / \ _ / / - \ \ / / // - (/ \\`�s \ \ \\ \ \\ \ \ 1 \ 11 \ \ \\ I / / I I II I I I I I IIIII I/ / \ \\ \ \\ \ \ I( // /I / ,,/ / / ��\ \ / //,/ ,/, /�. - .-\ \ �_ ///// •\ � \\\\\ \\\ \\\``\\\,\\� -1 � 1 \\\11 I/ / // I I I III I I I ' / - IIII % \\\\\\ \ \\\�\\ \\\ \\\ \\\ \ I \ \ \� \� \ I III (/ / I ( I / / / / / / \ \ \ �05 //' END 12" ABC STONE / \ / / / / , / / / - / /, \ \ / i - _ _ - 6�3 l\II 5 \ \ \ \ \\ \ \ \\\ I \� \\\\\III I ( / / 1 I III I I / / , - , // ON ACCESS ROAD \ \\ _ - / % / / /✓' ' // - O O 3 O \ \ \ \ \ \\\ I' I \ \ _ \ ' I I , I I �; 6`L 1113 oti o3 0 \ \o\ \\\\\\\\\\\\�\ \II \ �J I \ I III / / 1 I I I I / / / � / � -' / � - � \ 1 / �' / / // � / � - �\ , , _ _ / /�� � - �'� _ 111 oti I \ 1 \` 1 \ \ 111\l \\ 1\1 \\\\ 1 I I \ � - 11 I I 1 I I I \ // / / 1 1 1 I 1 Ill / I 1 1 11• / / "� - \\ \ \\ \ / o U / / / , --- \ \ // 03' s- o'�° \\I 1 lI 1111 ► 1 I IIIIIII , \ \ \ 1 I I I111 I / / I I I ! I / / / / / / _ - \ \ 1 \ / o / o / / / / / - i , 005 'o° `� -°�' - \ \ I III III IIIII IIIII IIII III \ \ 1 II\ \1\I l \\\1``111 / // / / I I I \ 1 0, / i / /- -- 1\ , // / / oo ' -= _ / I \I IIIIIII IIII II III 11 I �I \ 1 i I 1 \\\\ IIII �// / / 1 I l / / / / // / // / -� \\\ \ \ / /j / / / / / / _ / ' °/ `� / I I I IIIII III 111 I \ Q, 1 I I I I I / / // 1 I I I I / ",-,� /� �- - - -\ \\\\ \ \ 1 / / / / � - / _ _ I I I I I I I \ 1\ I ( ( r / • I I //// /- / - _ - / 1 I //� ,- /�/- \\\\\\\\\\\ / I / 15 //' // / // / // -- ,/ / /// //� /�// \\\\\1 IIIIIIII1�11I�IIII�IlIl1110 it III \\\ \,/ \\ 1 v��ll\1\\II\\I\�1�1\I I I 1f I I 1 I I I I r / / / // / ii%/� -- \\ \\\\ \ 0 1 / / \ 1 / / / / / / / _--- / / / // ��1 III Illlll IIII Illl 11 11111 \_ \ \ I11\\11111�1 \I I / I I I l / / /� --\ \ 9 / / / �/ /i / / /�/ o\ IIIIIII/�/III IIII \I1111I1�1111 II I1 I I / //i /////i // / /// ^ - \�� \\\ \ \\ 5 / / l l / 1 // / / / / / - _ _ - /'/ ' ' / �i \ \\ I I II IIIIIII �, I I - III III / \\ \ III 1 �\I \I,I I I I I I I / /// // ��\ \\\ \ 1 / / _ , / / / - _ // \\ 1 I II I I 1 I ! I I Il j \ \ \\ I I 1 I j I 1 \\l \ \ V \\ 1 MOLD DOWD I I // , / // // //// /�\�_- \\\\�\\\\ \ //// /II( / /l /�i ////' / ///` ��/ '/ / /'/ / s __J / \\ II11111111111111I1111)\\\\\\ \\\\ \11I \ \ / I I I I / 1 �/ ' // //�/ ///�/// __�_--\�\\\\ \\ \\ \ / 111 (l /// �/ / / / /� .-// / , / / //- / , �s \ \ 11 11 III III IIII 11(\\ \\\ \\\\ II �� / / III ROAD GRADING I I I / I I / / / / //- _ \ \ \\\\ \\ \ / ( I / / - / / / /- - 1 I) 1 11 I \ \ \\\ L , 1 i i I l / / I / / / / _ s 1\ IIII 111 111 I111\\ \ \�\\ \\\\\\\\� \ \ \ \ / ! / / �1) IIIII IIIIII \ l �// / / ///� - - \ \\ I // / / - 11 I I I 1 / / / /� / \\ \ \\\ _ / / / _ I \ III 11 I I I \\( \\ \\\ \ \ ti / I I /� / /�// //- '�\�\\\\\�\ \\\\ ,I I soo / J / / / / - IIII II III II \ \ \ \\ 1 11111111 \ I I / / / - \ \ / - / _ - I III I \ \ \\\ \ I I I - / / / / - \ \ \111` ! I I / / / / // / / / - I I l \ I Ill IIIIIII \ \ \\\ \\\ \ / f \ 1 I I I \ I I I - //// /// / \\ \ \\\ / 1 I / / / , - --i / - II III I l l\\�\\\ \\\\ \\\�I \ / I�\ ) 1111111111 I 1 I //// / \\\ \\ \ \\\S I I / / - / / - - /\\ I I I II Il \\\ \\\\\ \\ \\\ I \ I I \ --/�///j j_ \\ \ \ 5 I / / / - / / -\\11II11111\;\I\�\\\�\\\\\�\\\\\\\�\\\ \ 1 ��\�\ 1111111111111111\\ I IIIII \ 1 I I III \ \ \ \ \ k \ \\ I I I II — / / / / \ 1 1 \,I / / / s' .fl \ \ I \II \I \I\ \\\ \\\� \ \\ \ � \IIII10111IIIIII I I I I / -\ \ \ I 1 s \ i i / / / \\\,\\ IIII\\ ,�',' \ \ \ �\\ \\ \\ \\ \ \ 1 - -� /�/// // � -. IIII\\ I I \ `� / / / /' / / i // -- \\\ \ 1 \ 1 `\\\ \ \\\ \IIII \ \ \ \\ IIII \ ` 1 i/ // // / / / / \ \\ \ I I I \ s i - \ 1 I I \\ \I IIII\ \ \ \\�\ \\ \ 1 \ \ \ \ �'' / / " "— \� \\ \\\ 1 IIII \ , , / / - / �- 11\ I \\ 1 \ \ \\\\�\ \1\ \ \ \ I 1\� \\ ' \ •• ^( /- -// / \ \\ 1 / / / / / / / �/ / / , / -- i -- 6 \ \\ \ \`Il IIII\\\�\�� ��\\\\ \ \\\ \\\ \ \ ----\ \ 111\ \ IIII IIII \ \ \ - / / -1-1 \ \\\ l l l ) o I 1 / / / / - \ \ \ \\\\\ \� \\\\\ \ �i// //--��\,\,,, \\\\IIIII\\ \ \ I J / / / _ S \ \ \ \ \\ \X��� \\\\\\\\\\\\\\\ \ \ \ Il\lX\\ \\\ I \% _ _ / \ I I / '/ / / /// /' / -6�j �, /° - �,- IIII \ \ IIII\\\ \IIII II 1 \\\ \ / / / / / / / h h o_ \ \\ \ \ \\ �\\\\� \ \\� \ \ I \1 \ \\ /�ti\� \\ � \\1 1 I Ill / / ) I 595 / �o /° 6 0 \\ IIII \\\� IIII\\\ \ \ \ \ \ 11( i �-- % %i'/ _ _ \�\ \\ \ \ \\\I I I I�11(/ / j/^ l I / l 1 / / ! l / / / / / �/ / / / / /-6�3 // - o \ \\�\\\\\\\\ \� \� \\\\\\ \� \\\\\\��\1 �\\\\IIII\ \\✓ \ \\ -- \ IIII\I\I I I I I I IIII \ / - \ \\ III I\ \ \ I / I � / / 1 . / / / / / / / / / / / / / \ \\ \\\ \� � \ \\\\ \ \IIII\\ \ \\ 1 1 -- \ IIII IIII I I / / / 6�0 \ \ \\ \\ \\ \\�\\� \IIII \\ � \\\\ \ \\ ' \\ - \ \ \ \ \\ \ r\ \I \ � ��� \\\\\1\\ 1\\\I1111Ij11 /! ll (lrn`'�/ l / / l I l / / / / / / / / / j/i - ems- \ \ \ \ \ \� \\\ IIII\\ IIII �'� \ / \ ,\\ \ \ IIII \ \ / - / / - �\ \ \\ / / �\ \\ \\ \\ \\\ \ \ \ \ \\ \ \ \ \ \ --, � - //- -- \ \\I IIII I I(I I� ( / / / // // / _ \\ \ \\ \ \ \\\� \ \\\ \\\ IIII\ \� \ \ \ \\ % j- %-\\�\�\ \\IIII I I IIII Ill I I I / / / , / / / / / / / / / / / - -\ \ \\ \\ \\ \\ \ \ - - - - �\\ \\ \\ 1 \III I\I\ \ I l I / / I =� I l / l / / / IIII\ \\ \\\\\�\\\ \ IIII\\\\\\\\\\\\�� \\ \ \ \ \ V I ' / // \\ \\\ \ \ \ \ \\\ \\ \\ \ \ \\ \ �\ ---��---'' \\\\\ IIII IIII\ 1'II\\ \\\ \ / o% / t:•: _\ (/ I 1 I 1 (I / / / / / / // /' \\ \\ \\ \ \\\ \\\ \\ i \\ \_ \ - � \ - / - - - \ \\\\� �\ 11 \ \ \ 1 /o // I I I o I I / / 3 / / �6 _ \\ \\ \ \ � \ \\\ \ \\\ \ \\ \ \ \ \ \ -// /i-�_-`-_\\\ \ \ \\\ \\\ 1 �o(��i),,\ \ \\ ( /�o// / , \ I I I o / / / // 60 / / ° �\ \�\� \�\ \\ II II\ \\\ �\\\\�' ��\\\ \__\ \- -- / / / - \ \\ \ \\ \ \ \ \ / ( I s \ 1 1 I o 1 / / / / 3.� 06 0'\ -\� - \\� �\ \\\�\\ \\ \\ \\ \ \\\ \ \IIII\\r �\ \\ � \\\III\ \\ 1 1 1 // I 99 ( 1 I I o /l J 66, 6 ` _ \ --� \ \ \\ � \�\\ \\ IIII\/�. \\ _ __ \ \ \ / \o I o / / - - \ \ \\ \\\ \ \ \ \\ \ \\\ \ LEGEND \\\\\\�\\ \ \ I I Il 11 / / III `\ I 11 I III o / / // ' / - _ _ - - \\ \\\\\\\\\\\ \ \ \\\ �� \�/\�\�\� - \ \\ \ \ \ \ \\ \ h / / / _-�\\ IIII \ \\\ \\�\ \\\l/n\\\�\\� \� \ \\� \ \\ \\ \ IIII\ \ \ \ / \\ IIII �\ \\�� IIII\ \\� IIII\ \\\\\\ �\\ \\ \ \ \ \ \\ \ \ \\ IIIII\I \\ 11 \ \IIII/II / I r I l 1 A s \\\ I\I\\\\ I �" /�yo I / / / ( - \ \ \ \ \ \ � \ \ 1 \ I s o / / / I - / / \ \ \\\ \\ \ \ \ \ \�\\ \ \ \\\ �\\ � \\ \ \ PROPERTY LINES IIIII \ 11 \ \II ((// I / I 1 \ 9 \ \ \ I l - - \ / \ - _ \ \ \\ \\ \\ \ \ \\ \\ \ \ \ \ \ I \ 1 \ / \ \ \\ \\\ \\ \ \\\ \\\ \ \ 1 l \ J oti o / (/ \ \ \ \ / / \ IIII\ �\ \\ \ IIII\\ \ \\\ \ \ \\\ \ \ \ I` \� \ \ \ \ I I I 67 S - \ \ \ \ \\ \\\ \ \\\ \ � \ \ � N\ \\\ x\\\ �\\ I I �� -- RIGHT OF WAY LIMITS ONCRETE SPILLWAY I \ \ \\ \ �o M o I I 1 - - _ \ \ \ 1 \ \\ \\ \ \\\ \�\\\\\ \\\\\\\ \\\\�I �11 CREST �ELEV. = 599' \ l \ \ I \ \ �o I 1 I / J - - - _ \\ \ / �\ \\ \\ \ \\ \� \ \ \ \ \\�\ IIII \�\ \\ 1 \ \ `° \ \ \ \ \ \ \ \\\ \\ \ \ \ \\\\\�\� \\ \\\\\� \ \\\\ \ \ \ \ EXISTING TREE LINE I\\\ \ II II 1 I II I I1 I ( \ \ \ \ I \ \ I I o I \ / -//' �\ \\ IIII \ \ \ \\\ , , \\\ \\ \\\\\\\\\IIII \\\\� \ \� \\ I I \ \ I I I \ \ \ \\ \\ \ �\\ \ \\ \\� \ \\ \ \\ � \\\ \\ \ \\ \\ \\ \\ PROPOSED TREE LINE I\\\\\ \\\IIII IIIIIII \� / I I I \\\ \ \ \\ \\ coh o -/ /ii'= \\�\\\\\\\\\ \ \ \ \ \\\\\\��\\�W\\\\\\\\\\\\\\\�\\\\\\�� / \ \\\ \ `\I ►)) \ \ \ I l \ \ \ \ \ \ \\ \ \ IIII\\ IIII\\\ \ \ \\\ \ \ \ \ co / — -� \ \ \ \ \ \\�\IIII (ll 1 \\ �\ \\ \ 1 1 \ o \ /- / -/-�_- \\ \\\ \\ \ \� \ IIII\\\\\��\ \\��� \\\\� �\\ \ \\ \ EXISTING MAJOR CONTOUR \\\ \II\ I \\ \ I I I III \ \ IIII \ 1 \ \ \\ -'i- -1� \\ \ \ \\ \\\\\ � \ I �� \\ "\\ \ IIII \\\\\\\ \\\ \ \\ \ \\ 11 \ \\\\\\\ \ 1 I \\\ \ \ \ \ -, / - j \ \\\ \ \ \ \ \ \ \ I \ \\ \ \\\ \\\\\ \ \\\\ IIII \11 \\\ \\ \`� I I I \ \\\ \\\ \\ \ I ( 111 1 \ / / /- - / \ \ \ \ \ \ \ \ \ \ \ \ PROPOSED MAJOR CONTOUR \ \\\ \\\\ \ \\`- J I \ \ IIII\ 1\ \ l ( \ I _ - - /�/� � � �\\\\ \\\ \\\ \ \\ \\\'\ \ \\\ I �\\ \\\\\\ \ \\\�\�� GENERAL NOTES: \\\ IIII\\\\\\\\\_-I I I I 1 , l I I ) I I I \ I \ \ \\ _ '- - �-/�/��//-\\\\ \\\IIII\ \\\\ \\ \ \ \ \\\\�\\\\\\\\\\� IIII \\\ IIII\ I I I I I I I I , / / I /// / /� \ \\ \\ \ \ \ \ \ \ \\ / \ \\\ \ \\ � 1. NO GRADING ALLOWED WITHIN 5 FT OF TOP OF BANK 3. EXISTING MINOR CONTOUR �\\\\\\\\\\` \\ \ /J I I I I I III I I 1 I I I \ 1 1 \ / / \ \ \ \ j j// �%iii\\ \IIII \\ \ \\ \ \\ \ \ \ \ " / /1 \\ \ \\ \ \ \\\\\ \ J I I I I I I I I \ \ _ _ - \ \ \ \ \ / \ \ \\\ \\\ \ UNLESS OTHERWISE SHOWN BY LIMIT OF DISTURBANCE. \ \ \ \ \ I \ I I I I I I \ 1 I \��---//�//i%% r-\\�\\ \\\\\\\\ \\\\\\\\� ���� - /, \\ IIII \\ PROPOSED MINOR CONTOUR �\\\\\\� \\�\\\\ \ 1 I \ \ I I I I I I I I I I I l \ 1 1 1 \ I `\ \ - / // \ \ \ \ \\ \\\ \ \ \ \ � \ / \ \ \. \ \\ \\\ \\I 1 IIII\ / \ \ I I I \ 1 \ 1 I \ / �/ // / //// )\\ \ \ \ \ \ \\ \ \ \ \ \ \\ \ f \ / - -IIII \\ 2. ACCESS ROAD TO BE FINISHED WITH 12 THICK TOP I 1 / \ \ \ I I \ / /- \ \ \ \\\ \ \\ \\ � / \\ \ EXISTING STREAM IIII\ \\\I IIIII\\\\\ 1 I \ 1 \ III I I I I I 1 I 1 1 1 1 \ 1 \\ I I ) ` -' ^ // j, / // / \ \ \ \\ \ \\ \ \ \ \ \ \ LAYER OF ABC STONE. \\`'�`\\\\1\\\\I�\\\�\\\`; / / \ \ \ 1 l I , 1 I , 1 IIII I/ / ' I I 1 / / / I I \ \ ` \ \_ - / , ,- � , \ \ , \\\\\ \ \ �\ , - \ \\\ \ \\ \ / \ \\\ I I I 1 I I 1 I I I I I I I / /�/�- /� / \\\ \ IIII \ \\� \ \ \\\ � \ PROPOSED RIPRAP \\\\ \ IIII \\\ IIII / / 1 \ \\I I 1 I I I I I 1 1 ) I I \\ ��� --/ //� j////-, \, \\\� \\\� -,\\ \ \\\ \\\ -- \\ \\\\\\\\ \\ \\` \ 1 III I III 1 I I I I \ / ( I I I \ - , \ -/// i // / � -\ \ \ IIII \\\\ \\\\\ \ \\` ��-- \\ \ \\IIII �\\�\\\\\\\\ I I / / 1 l I I I I I I I I \ 1 1 I \ \ I I I I I I \ \ \ - - / //i/�i /, / \ \ \\ \ \\ \IIII , O PROPOSED SANITARY SEWER MANHOLE \IIII\\\ \\\ IIII \ 1 \1\ I III 1 1 \ I I \ \ \ 1 \ I I I I I I \ \ \ \ \ \ \` ; _ / / , //, \ \\\ \ \\ \\ \ \\ \ � , _�\ HDR Engineering Inc S \ \ \ \ \ \ \\\\\ / / \ \ I I \ \ I I I \ \ \ // / / \ \ \\� \ \ \ \ \\ \ \ of the Carolinas \\\\\\��\ \\ J III I I 1 1 \ I I I I I \ \` \ �// \ \ \\ \\ \\ \\ --\ \\\\, \\\\\\\\\\ 1 , I /llII I I ,I I\ 11II I \\ \\ \ I IIII 1, \\\ \ ,- „�//// ,/- \\ ,� \ ss PROPOSED SANITARY SEWER PIPE \ \\\ \ \ \I I I I 1 \ 1 \ 1 \ 1 1 1 \ \ -- -- - - // / / \ \ \ \ \\ \\ \ \ �� \ \ 1\Ill j \ \I\ I\\1\\\\ / I l III \ 1`\\ \ \ \ \ \ \ \\` \\ \\\ \ \--- _ j// /ill \ \ IIII\ \\ \\ \\\ PRELIMINARY Illll 1 ,, \�\ \ \) \ \ \ \ \ \ \ \ \\ \ \ \\ \\\ , -- _ - �/ / i//, � \ \\ \\ \\,,� , , II IIII I I II III IIII \\ / / Ill \ \ \\ \ \ \ \ \ \ \ \ -- - / / \ \ \\\ \\ \\\ \\ NOT RELEASED EXISTING SANITARY SEWER MANHOLE 1 I II \ / I \ \ \ \ \ \ \\ \ \ \ \\ \ - /i //// i \ \ \ \ \ \\ \ ��\\\ \ _ \ 440 S. Church Street, Suite 1000 O IIII IIIII III IIII IIII I \\ IIII\\ 1 \ \ \\ \ \ \ \ \\\ \� \ , ------ - - //// //\\\ \ \ \ \ IIII - I I II II IIIIIII IIII / / / \\ \\\ \\ \ \�\ \ \\� \\\ \\ \ \ \ \ \ \\ \ \ \ \ \ ------ - - - / \ \ \\ \\\\� � ,, \\ ; � / / \\ \ \ /j jj jj j/ \ \ \ \ \ _ Charlotte NC 28202 FOR CONSTRUCTION ss EXISTING SANITARY SEWER PIPE III III 1 I I 1\I \\\ \ \ I \\ \ \\ \ \ \ \ \\ \ � \ \ \ \ - - _ - - - - l \ \\ - _ 111 I I \ / \ \ \ \ \ \ \ \ \ \ \ \ \ _ / � \ 1 \ \ \ \ \ \ _ 704.338.6700 I I IIII 1111 IIII\\ \\\ I \\ \ \\\ \ \ I III \ \\\ \ \\ \\ \� \ \ \ _ -/ / \`\ \ ,\ � "-- \\\\\ -/� I IIIII I I I 1 \ / / 1 \ �\ \\ \\ \ \ \ \ \ \ \ \ \ - � _ _ - =--i/ i ' \\\`\� \ \ \ \ ��� \ /1 LOD I I IIIIIII II II \\ \ \ \ \\ \ \\ \ \ \ \ \ \\ \ \\ \ \ \ \ - -� -' , - i' � - \ \ \ \ \ � \\ , � -' LIMITS OF DISTURBANCE III 11111 \II / / / \ \ \ \ \ \ \ \ \ \ \\ \ _ - - _ - - - �- \\ \\ \ 1 N.C.B.E.L.S. License Number F-0116 III III \ \�\\\\ / \\ Nam\ �\\�� " , " � \\.\\\\\�\\ �\\\\. \\_\ _-Z -: - I- _--/ �i �\\�: �� \. \ \ \ \ \ \. ��1 1 1 I.I IIIIIII II I\1 11� \ \ i 0 \ �\ \ 1 \ I / //// I I I I // / / ,-' l Ili Il I I II I l I I I I\ I�°�I I I � I I QI 1 \ 11 I I\ I I � o f 1 I I /1 I/ol I I \. \\\ \ \\l\\ o I \ \ \- \ �,a \ \ \\ \\ \ \\ \ \ II,/ ,,\\ I - I I \ \ \ \ \ 1 �\ \I \ \ \ \ \\ \ /\\\ •\\\\ \ \ \�\\\�i� �\ l cI/� \ IIII \ II \\\\\ j \\\\ \ \ `�� /ji//� \� \\\ ll �\ \ \ \\ '�711%-�\\ \\ \\ \ IIII \ �/-7))J - \ \\ � • \\� \\ �\ \ \//Jlt- \\ \ . \ \\ \ \ \ / // / \I \ f\ � \ \\\\ \\ `-,�- �\, ,\\N -��/IIII\\, _ _ \7 - // \ \I `\\\\ �� 1-1 ,--�' \_'-_///IIII\\ \\ \ \ \ \ \ \ - \\\ \\ �\ \ \ --- -- \ \ IIII \�\ �- \\\ � \ ", - 0 25' 50' 100' \� \\\ \ -'- HORIZONTAL SCALE 1 "=50' III-- \ k , . -, \_\-\ EXISTING STREAM THROUGH DETENTION BASIN NOT TO BE DISTURBED EXCEPT FOR EMBANKMENT, ENTRANCE/OUTLET PROTECTION, AND ACCESS ROAD FORD. TALBERT, BRIGHT &. ELLINGTON ENGINEERING &. PLANNING CONSULTANTS 3525 WHITEHALL PARK DRIVE, SUITE 210 CHARLOTTE, NORTH CAROLINA 28273 PHONE:704.426-6070 FAX:704-426.6080 NC LICENSE NO. C-1163 1 w Q 0 U) z 0 U) > w r N M Itt LO N 0 r- w * � �[-- 0 0 m m o= Q Q 0 0 z 0 m z O m o w z w m0 � w CD 3 3 � U w 0 d \ '2� 0 F _ CDo CD CD == 0Q C d W z 0 ~a vz J W d '- z_ Cj a E x w 0 r= ■= �Q n z W s F- ►¢ 0 a 0 L0 u O w � a z LLJ I- oz z Q a_ U) Qm< 0 z z o O_ Q CD W 01-1 0 z Q �y LL 0- 0- CD z 0 Q Of 0 ui 2 Q z LLI Ticer Branch Detention Sheet 6 of 25 (submitted with Public Notice Response 5/12/2020) 610 W 590 ME I-- 25' 67' -I- 30' 66' I 40' 1 +50 2+00 2+50 3+50 4+00 4+50 STREAM SCALE: VERT=1"=4' HORIZ= 1"=20' 3A NOTE: 1. EMBANKMENT OVERFLOW ELEVATION IS 599.00'. SEE GRADING PLAN FOR SPILLWAY LOCATION. 610 5+00 i e HDR Engineering Inc of the Carolinas PRELIMINARY 440 S. Church Street, Suite 1000 NOT RELEASED Charlotte NC 28202 FOR CONSTRUCTION 704.338.6700 4' VERTICAL 2' SCALE 1 "=4' 0 0 10' 20' 40' HORIZONTAL SCALE 1 "=20' TALBERT, BRIGHT &. ELLINGTON ENGINEERING &. PLANNING CONSULTANTS 3525 WHITEHALL PARK DRIVE, SUITE 210 CHARLOTTE, NORTH CAROLINA 28273 PHONE:704.426-6070 FAX:704-426.6080 W Q 0 1 z O W N rt) .14- LO N LO W CD 0 ry 12 � m m o= Q Q g m w Z m o W 0 L7 z W cn m c� w w Z v W cn O O Q W W of of of = Q 0 0_ 0_ 0 U 0 W O z ry z N Q 0 � w � w Q U z � U N wz �� � �< J w Q LLJ inI zM w of 0 J U w z zl m Z z w m W W Q Z W J Ticer Branch Detention Sheet 7 of 25 (submitted with Public Notice Response 5/12/2020) N.C.B.E.L.S. License Number F-0116 NC LICENSE NO. C-1163 670 670 HP STA = 0+32.95 W HP EL = 644.94 a VPI STA = 0+45.45 VPI EL = 644.44 K 5.00 25.00' VC 660 M - M 660 r` N N Ln ro ro O + ,Yj + 4 O O O � O (n Q Q Q Q0 + (n W (n W Q N z O 07 650 a- aLi - U U O � 650 i 4.p0% 640 640 / N M � LO 630 6 630 L EL = 600.26 VPI STA = 5+28.60 /CN V I EL = 600.96 K = 10.00 I / 12 w � 70.04' VC /9 00% � o o � T z o 620 N ° J. c0 N O 620 m Z W o Z m o W + O + 0 O 4- O / / C, Ld z W W m Z o W Y (n (n Q W of rt rt Ld 2 Q U W W W 610 N 610 co QD 00 \ Q� Cn� N \ D_ J /' W _ M CD 600 600 —2.0% \ --- -_ C3 OJ r a _ 8' Q a 590 - - VERTICAL 590 w � z - 42" RCP CULVERT BURIED 8" WITH 4' SCALE _ — v NATURAL STREAMBED MATERIAL (TYP.) _ _ 1 "=8' 0 7+50 7+00 6+50 6+00 5+50 5+00 4+50 4+00 3+50 3+00 2+50 2+00 1+50 1+00 0+50 0+00 ACCESS ROAD PROFILE VIEW - PH. 1 1 0 20' 40' 80' SCALE: VERT=1"=8' HORIZ= 1"=40' 3B HORIZONTAL SCALE 1 "=40' \ \-_-0� II ,\ \ ---SS-- / 1 /// / 1 I I 1 / / l / //, �\ \ \\ \\\\\\\ I / l l l/ /' ///i' //,', ■ \ Ss / / 1// \ I 1 1 l \� / , / / ,/--� \ I / �4 ON / / / > \ \\ l / / z LLJ /:• \ rl// �l / / Ss \ �, II //f I / . /// r7%2" // < / _ — _--- I SS CULVERT II / ---- � \ 3F l/ � _ — — '- co \ 6,, � l /// // / �� � / / / %/ =�-- —1 —�1\ 1 1 I IIT�/ 1\\\ \ \ I ( I S s 9 600 I \ I I \ SS \ /' /'- �'�—`-- H TIC \/ NORTH — _— ER BRANCH —� 1 //Uj \ -'r--- �-_ e— /' o \ 0 \ l�I'll — — \\��= ��`\� °?// / o / -,=o /' ,\ \\ / l / I / / I I 1 I / , I I \\ /I �I r / ( I I I / J / I I Q L Z / 20 / / o� 1 1 f /�\� \\ \\-1 I I I ( /' I ' \\\I I^ \\ a l l 1 1 I I\ I I I I I I( \/I \\ I LLJ 0 cn 0 x xT ..._•_ ;//%— __ ---_— � � / D �i /� ,— / / __ _— __— __-- \ \ \\ \ \\ �y� LO x x / / J / \ \ /— // / // / � I I I / \\ I \ o O 1 1 1 1 I \� - \ \ I I \� \ / / I / I O w Q / c / / / \ \ \ - o x / / / / / \ \ \\ \\ 00 \ `o/' /'//' �____--_ =_� \ \\ 6_ �^\ \ \ 1 // / /�/ \ \\\ I r / � Q a Q \ 1 1 / /' \� \ / I I / / % ^ / / IIIII III / / / \ �///lam c� I I I I I I / / \ \ \ / / Z n LOD — \\ �� \ \'NN \ \ \ /x ' / _ — _W ( I \\///—OO`�\\, 1\I I / / / ✓\\\\\ / / I I I I / LLB _ �__ --- \ \ Ox NNNNN ✓/ / I W � \� �� -\ \\ I ^�•`\\\\\�/ / III J coo \\ �\\\ / / / l I 1 / �l I l ��- �� 1 / _ I / / / / //i 5/ // / _— — \\ \ \ \\ \ \ \ \ i� l / I / 630 ! I / / / / // / Q I _ \ 1 / / / o� �/ c� _ \ I I I \\\\\ / IIII// — � Q _-�__ \ \ / / I / / / Q N % /II i I / J / \\� \ / / I z Q \ �___ \\\ \\\ \ \\�\\� \\ ( - II ' // �/ I \ \\\\\ / I IIII / / / ' \�\ O O N) l \ 1 IIII 1 / /// i//�/// ���__—� \ \\\ \ \\�\�\��\ \\\ \ I I I I'I I / / o �/ ° — _-- a i;1v' N -- _/ %/ \ ��\v O LLJ W IIII / / // /�/ / / --_ \\11 \ I / / / /\ _ \\ - II \\ \\\\ \ \ /ll �llll 1 I ' '/ III 1 III / ��/// �_,-- �_----___ �\ f I \I / \�I, / ' / I I\1 \ // ���%%/ W / / / //\\\\ -\\ \\\\\\\\ \ \ \ / l l III 1 I 1 // --- \ , _ \ \6 \� 1 \ 1 \\\ \ \ \ \\ \ \ \ \ / I o ( I I I / / w r( �, o , — — / i (I� i -- \� I / �l - J I I� lI(III�Z��\��� 1111 U Z in �\ \\ \ \ \ \ \�\\ 1�\ \ \ / / \ ) l l / / 111 I \ \ / J I I \ ( / / / 2 / / ,�-- __ ��.— ,/ J/i\ ;— 11i/ / / — ,� i _ / / / I\\�/— / // / / i ,/�1\1 ///��// U Q a o' c� \ \ \ \\ \ \\ � \ \\\\\ \\ \\ \ \ \ \ \ o \ \\\\ \ \ \ \ \ —\ \�_\ \ \\ \1 \ \ / \ \ I \ 1 I I 1 1 I o I I I I / � \ / / I \\'� \ \\�\�\�\\\\\\\\\�\\\ \/ \� �� \\ \ I I 1 I 1 1 I 1 I I II \ \ I o __ o� �/ �/ 11l"'' ,��'I'� �J1 111�� z \\ \\ \\ \ 1 1 I I I I ///// ��_/ �/' ���\�\�/// TALBERT, BRIGHT W J `` ACCESS ROAD PLAN VIEW - PH. 1 2 SCALE: 1 "=40' 3g oft a Carolinas EngineeringHDR Inc PRELIMINARY �. ELLINGTON Ticer Branch Detention NOT RELEASED ENGINEERING & PLANNING CONSULTANTS Sheet 8 of 25 440 S. Church Street, Suite 1000 Charlotte NC 28202 FOR CONSTRUCTION 3525 �7HITEHALL PARK DRIVE, SUITE 210 ( submitted with Public 704.338.6700 CHARLOTTE, NORTH CAROLINA 28273 Notice Response p PHONE: 704 426.6070 FAX: 704 426 6080 5/12/2020) N.C.B.E.L.S. License Number F-0116 NC LICENSE NO. C-1163 NOTE: w Q 1. 10'Lx8'Wx18"D CI. I RIPRAP ON D/S END o 2. 5'Lx8'Wx18"D CI. I RIPRAP ON U/S END ELEV. 599' u7 z 0 600 600 � w FLOW 0 v � O ROCK CROSS VANES NORTH TICER BRANCH N 6" RISE (TYP.) ELEV. 592.8' � N M � LO I 3% SLOPE ELEV. 591.5' 47 LF OF 42" RCP BURIED 8" WITH FOR 10' I `� CN NATURAL STREAMBED MATERIAL 3% SLOPE FOR 6' I CD 0 w � \ 2.5% SLOPE — — _ m o m o p = Q z Q o 2% SLOPE w m o w cn O O FOR 10' z U Z Y — � w o Of o Of Q Of w 2 Q 590 590 U 2' G� VERTICAL CcX o 1' SCALE v< 1 "= 2' G � Q 0 LJ � Ha a �z 0+00 0+50 1+00 1+50 2+00 0 5' 10' 20' Q~ STREAM 1 "=10' v HORIZONTAL SCALE 1 SCALE: VERT= 1 "=2'HORIZ= 1"=10' 3F \ \ \ SS _ SS606 SS — _ 42" CULVERTSS 1 \ o ssI o \ \ LU I ss / k \ s M ► NORTH TI CERB \ \ --- RANCHZz /• / // I Z I orL .—_-- z \ \ o /Ld (50 a LL- -J— — — — — — — W Q O Ld _ - ' / -------------------- 2 P Q M ( )L.Li LJ- w L.Li \\ 1 \ I / /------- ----- - — -- `\ \ \ \ \ �6— ROCK ROCK CROSS VANE o / Q o th NLd a 67 STREAM 2 0 10' 20' 4I TALBERT, BRIGHT SCALE: 1" = 20' 3F HORIZONTAL SCALE 1 =20 HDR Engineering Inc of the Carolinas & ELLINGTON Ticer Branch PRELIMINARY Detention NOT RELEASES ENGINEERING &. PLANNING CONSULTANTS525 Sheet 9 of 25 440 S. Church Street, Suite 1000 Charlotte NC 28202 FOR CONSTRUCTION 3 WHITEHALLPARKDRIVE, SUITE 210 (submitted with Public 704.338.6700 CHARLOTTENORTH CAROLINA 28273 , Notice Response PHONE:704.426-6070 FAX:704-426.6080 5/1I 2/?UZU) N.C.B.E.L.S. License Number F-0116 NC LICENSE NO. C-1163 It x FLOC SILL (T X3 - RIGHT INTERCEPT CONI ELEVATION (S FLOW STREAM BANK, TOE OF BANK, TYPICAL TYPICAL RANKFI II 1 (.qFF NinTF '�l ROSS VANE INVERT DNTROL POINT _EVATION D FOOTER BOULDERS, =E NOTE 6) FILTER FABRIC, TYPICAL (SEE NOTE 5) FT VANE ARM ERCEPT CONTROL POINT VATION (SEE NOTE 3) PLAN VIEW :y_1041R, all II Ln x x N FLOODPLAIN SILL, TYPICAL STREAM BANK /__ FILTER FABRIC (SEE NOTE 5) COARSE BACKFILL (SEE NOTE 8) - HEADER BOULDER (SEE NOTE 6) FOOTER BOULDER (SEE NOTE 6) X17 N STREAM BED - POOL � \x' TOE OF BANK VARIES 0 TO 1/3 X5 X14 VANE ARM SECTION A —A' NOTES: 1. A BOULDER CROSS VANE IS A GRADE CONTROL, IN -STREAM STRUCTURE THAT DIRECTS STREAM FLOW AWAY FROM THE STREAM BANKS AND IN TOWARD THE CENTER OF THE CHANNEL. 2. CONTRACTOR SHALL ESTABLISH AN ELEVATION CONTROL POINT AT THE UPSTREAM INVERT (CENTER) OF THE CROSS VANE TO ESTABLISH PART OF THE PROFILE. POOL ELEVATION CONTROL POINT SHALL BE DESIGNATED TO ESTABLISH THE REMAINING PROFILE. SURVEY OF CONTROL POINT SHALL BE REQUIRED TO ESTABLISH ACCURATE CROSS VANE INSTALLATION WITHIN THE TOLERANCE SPECIFIED. 3. THE VANE ARM SHALL INTERCEPT THE STREAM BANK AT A HEIGHT EQUAL TO BETWEEN'/z BANKFULL STAGE AND BANKFULL STAGE. ELEVATION CONTROL POINT IS ESTABLISHED AT THE LEFT AND RIGHT STREAM BANK/VANE ARM INTERCEPT POINT TO SCALE. THE VANE ARM INTERCEPT LOCATION IS DESCRIBED BY ITS RELATIONSHIP TO BANKFULL STAGE OR BY THE LENGTH AND SLOPE OF THE VANE ARM. BANKFULL IS NOT NECESSARILY THE TOP OF THE STREAM BANK SLOPE SEE TYPICAL CROSS SECTIONS FOR ADDITIONAL INFORMATION. 4. OMITTED 5. TYPICAL RIFFLE AND POOL CROSS SECTIONS ARE PROVIDED ELSEWHERE IN THE PLANS TO ESTABLISH THE DIMENSIONS OF THE CHANNEL GRADING INTO WHICH THE BOULDER CROSS VANES ARE TO BE INSTALLED. 6. THE CROSS VANE SHALL BE CONSTRUCTED WITH FLAT -SIDED BOULDERS OF A SIZE (LENGTH, WIDTH, AND DEPTH) AS SPECIFIED ON THE PLANS. 7. NON -WOVEN FILTER FABRIC SHALL BE USED TO SEAL THE GAPS BETWEEN THE BOULDERS AND UNDER THE COARSE BACKFILL MATERIAL. THE FABRIC SHALL BE PLACED ALONG THE ENTIRE LENGTH OF THE SILL. THE FABRIC SHALL BE SECURED BY THE WEIGHT OF THE HEADER BOULDER PLACED ON TOP OF THE FOOTER BOULDER WITH THE FABRIC END PLACED BETWEEN THEM. THERE SHALL BE NO FILTER FABRIC VISIBLE IN THE FINISHED WORK; EDGES SHALL BE FOLDED, TUCKED, OR TRIMMED AS NEEDED. 8. COARSE BACKFILL SHALL BE NO. 57 STONE. COARSE BACKFILL SHALL BE PLACED TO A THICKNESS EQUAL TO THE DEPTH OF THE HEADER AND FOOTER BOULDERS AND SHALL EXTEND OUT FROM THE VANE ARMS TO THE STREAM BANK AND UPSTREAM A DISTANCE SPECIFIED IN THIS DETAIL. 9. THE INVERT (CENTER) OF THE BOULDER CROSS VANE SHALL BE CONSTRUCTED FIRST, FOLLOWED BY ONE VANE ARM AND THEN THE OTHER VANE ARM. THE FLOODPLAIN SILLS SHALL BE CONSTRUCTED LAST. 10. BOULDER CROSS VANE SHALL BE BUILT TYPICALLY AS FOLLOWS: A. OVER -EXCAVATE STREAM BED TO A DEPTH EQUAL TO THE TOTAL THICKNESS OF THE HEADER AND FOOTER BOULDERS. B. PLACE FOOTER BOULDERS. THERE SHALL BE NO GAPS BETWEEN BOULDERS. C. INSTALL FILTER FABRIC. D. PLACE COURSE BACKFILL BEHIND THE FOOTER BOULDERS. E. INSTALL HEADER BOULDERS ON TOP OF AND SET SLIGHTLY BACK FROM THE FOOTER BOULDERS (SUCH THAT PART OF THE HEADER BOULDER IS RESTING ON THE COARSE BACKFILL). HEADER BOULDERS SHALL SPAN THE SEAMS OF THE FOOTER BOULDERS. THERE SHALL BE NO GAPS BETWEEN BOULDERS. THE SLOPE OF THE VANE ARM IS MEASURED ALONG THE VANE ARM WHICH IS INSTALLED AT AN ANGLE TO THE STREAM BANK AND PROFILE. F. PLACE COARSE BACKFILL BEHIND HEADER BOULDERS ENSURING THAT ANY VOIDS BETWEEN THE BOULDERS ARE FILLED. 11. EROSION CONTROL MATTING IN THE VICINITY OF THE VANE ARM INTERCEPT POINT AND FLOODPLAIN SILLS SHALL BE NEATLY SECURED AROUND THE BOULDERS. FII FA ►-4� CROSS SECTION B—BI X1 - CROSS VANE INVERT CONTROL POINT ELEVATION (SEE NOTE 2) BANKFULL (SEE NOTE 3) COARSE BACKFILL------------- (SEE NOTE 8) w� �X FLOW X12 (SEE NOTE 10E) > \ x POOL /X8 \ FILTER FABRIC PROFILE VIEW X2 OR X3 - LEFT OR RIGHT VANE ARM INTERCEPT CONTROL POINT ELEVATION x X4 - POOL CONTROL POINT ELEVATION (SEE NOTE 2) FLOW ROCK CRQ$$ VANE DIMEN SION$ VARIABLE VALUES TYPICAL UNITS DESCRIPTION x1 SEE PLAN FT. (NAVD) CROSS VANE INVERT CONTROL POINT ELEVATION X2 NOTE 3 NONE LEFT VANE ARMINTERCEPT CONTROL POINT ELEVATION X3 NOTE 3 NONE RIGHT VANE ARMINTERCEPT CONTROL POINT ELEVATION X4 SEE PLAN FT. (NAVD) STEP INVERTCONTROL POINT ELEVATION X5 10 FT. (NAVD) BANKFULL WIDTH X6 12 FT. VANEARMLENGTH X7 4 FT. LENGTH OF FLQODPLAIN SILL X8 Not Used X9 Not Used X10 Not Used X11 <20 DEGREES VANE ARM LENGTH WITH 5TREAM BANK X12 7 PERCENT VANEARMSLOPE X13 24 IN. BOULDER LENGTH (MINIMUM) X14 24 IN. BOULDER WIDTH (MINIMUM) X15 24 IN. BOULDER THI CK N ESS (MINIMUM) X16 SEE PROFILE FT, MAXIMUM POOL DEPTH FROM VAN ARM IINTERCEPT CONTRCL POINT ELEVATION X17 6 1 N. HEADER BOULDER SETBACK ROCK CROSS VANE NOT TO SCALE HDR Engineering Inc of the Carolinas PRELIMINARY 440 S. Church Street, Suite 1000 NOT RELEASED Charlotte NC 28202 FOR CONSTRUCTION 704.338.6700 N.C.B.E.L.S. License Number F-0116 TALBERT, BRIGHT &. ELLINGTON ENGINEERING &. PLANNING CONSULTANTS 3525 WHITEHALL PARK DRIVE, SUITE 210 CHARLOTTE, NORTH CAROLINA 28273 PHONE:704.426-6070 FAX:704-426.6080 NC LICENSE NO. C-1163 1 w a 0 U) z O U) w r N M LO N Ln W W W m Q o Q Q 0 Z z 0 m z 0 m o w z w m W Z W W Z Y C� 0 d M 0 U 0 _ J G= 0- C a 0 J d W z o H Q G z J LU d � = z Ul z 0 w J � a U z U) LL-I wz (/) Q Q Q M z F__ LLJ C:) 0 W E Ul J_ a W 0 w a Z w J LL Ticer Branch Detention Sheet 10 of 25 (submitted with Public Notice Response 5/12/2020) 700 . • • 670 •.1 650 640 r. 630 2 Iffill EXISTING GRADE 424 LF DUAI 10'W X 10'H RCBq @ 0.17% 0+00 1+00 2+00 3+00 COFFEY CREEK CULVERT (STA -1 +00.00 TO 6+70.58) HOR SCALE: 1 ":40' VER SCALE: 1 ":10' PROPOSED GRADE 4+00 M PROP. 48 LF 60" RCP 5+00 PROP. 1193 IF DUAL 101W X 10'[ RCBC @ 0.62% I I -IY 6+00 700 .•• .:• 670 ••1 650 640 630 WSP USA INC. NORTH CAROLINA LICENSE NO. F-0165 GENERAL NOTES. 1001MOREHEADSLLUAREDRIVE, SUITE 610 CHARLOTTE, NC 28203 T 704-342-5401 1 www.ws .com 1. XXXXXXXXXXXX NO. I DESCRIPTION DATE N � ` O � r r O Qm IJJ ct 7- ftftft U) q O w o � J Q J z Z w z N LL a U)�Oz 3: Q Cl) Lu Of 00 z OCD �U �� W UoF--- 2z U ~ =Mz zw WaftU� 2� f)fo Q o Lu m � J C/ Q n = p oU W —�/j 3 O Z = L.L O QUa LLo o 0 C)UU W Q LL �m o O (D J z U � U Q — = L.0 V � INTERIM REVIEW DRAWINGS NOT FOR CONSTRUCTION THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF INTERIM REVIEW. IT SHALL NOT BE USED FOR CONSTRUCTION, BIDDING, OR PERMITTING. W, �I �j uu� w am ❑ r C r m n r m m Cn m 1711 C� O -` -� -� _-- -� --_ --- _ _ _--_ ---_---____---- _ — —� = `—� r~`ram �_ _i�� J _ J—�= ----- -- -- -- _~�� ` — — — — — -� —_—; _�_=_—��= - — -- � _., l 1 — ............_ .. `� — — _ — N. all g+00 IN Er, ❑UAL 1 p'W y ~ X 10'I { RC - - -- - 11+00 IVA 11 13+00 _ 7 � l - 14+0Q co O W 2 LL! C1) W J 0 Q J Q 700 700 PROPOSED GRADE 690 - 690 Al 680 - 680 EXISTING GRADE 670 - 670 660 660 60 � - P. 1193 LF 650 UAL 10'W X 10'H R BC @ 0.62% 650 640 - 640 CV N (0 CO (0 ro C'') co 00 00 N N r 0) 0') CIO L66 LOLO 1- ,It 'IT LO LO LO LO LO LO LO LO LO 0 LO LO LO LO 630 630 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 COFFEY CREEK CULVERT (STA 6+70.58 TO 14+70.55) HOR SCALE: 1 ":40' VER SCALE: 1 ":10' GENERAL NOTES: 1. XXXXXXXXXXXX 0 20' 40' 80 HORIZONTAL SCALE 1 "=40' KEY PLAN . I I I , �t cr^ei G c ec nir)Tr: WSP USA INC. NORTH CAROLINA LICENSE NO. F-0165 1001 MOREHEAD S UARE DRIVE, SUITE 610 CHARLOTTE, NC 28203 T 704-342-5401 1 WWW,WS .00m NO. I DESCRIPTION DATE Q Q x < co � Q CD ❑ M J r WZa LL C� Q (1) co z Z q�c cf)W� 0�00 O ❑ U 0_ CD o 0: 2N Q f— = z ~ = C'r3 Z (D LLi O Z W F- :D O W m J Q 0Q� =Q �l 2 p o U ❑ W z=� o C) Q�Q L0 LL ❑ U- 0- O Y Z W ❑ INTERIM REVIEW DRAWINGS NOT FOR CONSTRUCTION THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF INTERIM REVIEW. IT SHALL NOT BE USED FOR CONSTRUCTION, BIDDING, OR PERMITTING. SCHEMATIC 30❑ DESIGN SHEET TITLE COFFE CREE CULVERT PLAN AND PROFILE SHEET 2 OF 8 DATE NOVEMBER 22, 2019 SCALE 1" = 0' DRAWN BY MILS CHECKED BY xxx APPROVED BY xxx WSP PROJECT NUMBER 188970 SCF Element SHEET NUMBER Sheet 12 of 25 (submitted with IP Application 1131/2020) SHEET THIR RHFFT ARP RASFT7 nN A F[)I I SI F 77 X '14 SHPFT 700 .M .M 670 ••1 650 640 630 W, �I I 00 dz C I— rn n m 1 m 1711 m 171 0 N -- - _ ,.r - J -- J / // —I —� _ _ _—�� r-� � � ��/i111I1111I I /♦/ , �!'S/ ��=. �-. �' ' Z — — / ~ ' ` r • / 1 I / I / 1 // / I / / DUAL 10'W X 1 D'H RCBC 22+00 r 1 1 1 1 1 � �'r --__ --� — --- � �/r/f /I II /1 / / o .•-- �� 1 I � � -� LO 14 43.97 BEND • 4 STA 20+20.75 — / / ZX � —�� � -- ���� _�-�� •- -- r/�� � // / ���� �� �° f � l l /i/ 1 /ICJ J � �;�;=� Ile ����_� ,— J—�-�-r �� r♦r, I/rJy 1 I / f/�/�_-(qUR N r : / / f�/f f♦♦ / = / r _(OP CURB: C I/ �r�� ♦ram / r — INV. fN(18').67 // / J f INV. OUT(3l 67 f- {/0" 1 /II/ / r I ♦ 1 r �- --�� ��— f/ / 1 y r =f /lf♦/I Il 1 1 I f f 51.90 BEND--�` I ��� /1 1 / i /� i/{ 1 tit I rf I �`� T�� — --J r r / ( \ \�� l 1 t STA 16+16.67 � /t O r I 1 / / / / � � -- —( � r 7 � /� /r/ II r ❑ � 11 r / I f/� J � \ \� I �� 1f r � �♦_/ i' I/f � `�/ I 1 11 1 /III ' � �l�lll 1 / / /♦ ♦f/ f � / �- 1111 � 1 •-r 15+00 ❑UAL10'W._ / I11 /�1 y / I //�/ /�//// �♦ I �/ 1 1 fi[3'H RCBC 16+ / / / / J! I / / / I / / r / /III { ♦ I / 1 1 I I 48" RCP 0d / ��� I L /I / / ♦ / / 1 I / I / 1 1 1 1 Irr/ I ri ♦� Ilfc.�f/! II I / � 1 1� � SEE SHEET UC1.07 / /II r f r f / /III J PROPOSED GRADE PROP. 533 LF 48" RCP I I EXISTING GRADE PROP. 1193 LF DUAL 10'W X 10'H RCBC @ 0.62% -f r-HORIZONTAL BEND HORIZONTAL BEND 4 LF DL AL I X 10'H RCBC @ 0.62% PROP. 225 LF DUAL 10'W X 10'H RCBC'@ 0.62% 14 1 M m O O O O I- 1­ O O It It 11­ 00 00 so co 00 00 00 LOT) M � � r � N N O O � � co CO Cfl Cfl Cfl Cfl I COO (0 co (0 CD COO" CO co CD 15+00 16+00 17+00 18+00 19+00 COFFEY CREEK CULVERT (STA 14+70.55 TO 22+20.66) HOR SCALE: 1 ":40' VER SCALE: 1 ":10' 20+00 21+00 22+00 700 690 680 670 660 650 640 630 GENERAL NOTES: 1. XXXXXXXXXXXX 0 20' 40' 80 HORIZONTAL SCALE 1 "=40' KEY PLAN WSP USA INC. NORTH CAROLINA LICENSE NO. F-0165 1001 MOREHEAD S UARE DRIVE, SUITE 610 CHARLOTTE, NC 28203 T 704-342-5401 1 www-wS .COM NO- DESCRIPTION DATE 1-ft I >- Q xfti C'7 Q Q � CD ❑ 10 J r W Z a LL C� Q (1) CIO Z CIOW� �00 O❑U <CD 04 = Z ~ = Cr) Z 0 LLi O z� 0 �w rz O O .�, �, Uj m rr p oU Q Qom= L0 ❑ ❑ CJ Lu < U_ 0- O Y Z V Q W V ❑ INTERIM REVIEW DRAWINGS NOT FOR CONSTRUCTION THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF INTERIM REVIEW. IT SHALL NOT BE USED FOR CONSTRUCTION, BIDDING, OR PERMITTING. SCHEMATIC 30❑ DESIGN SHEET TITLE COFFE CREE- CULVERT PLAN AND PROFILE SHEET OF 8 DATE NOVEMBER 22, 2019 SCALE 1" = 0' DRAWN BY MILS CHECKED BY xxx APPROVED BY xxx WSP PROJECT NUMBER 188970 SCF Element SHEET NUMBER Sheet 13 of 25 (submitted with IP Application 1131/2020) SHEET A FULL SI E 22 X 34 SHEET. n 2 Iffil -7~ �v=: zz COIF EY CREEK ♦ 11 11111 �♦ \/1/11- - � 1l 1111 Ill, \/ 1 1 DUAL 8`W X 10'H TO DUAL 10'W X 10'H RCBC TRANSITION/ 11/lll,l Q\ X 11 \ 1111 l 11 1 X \1 1 L 0 H RcaC r \ \lll 11 1 - -- \\\r♦� �\1 _ _ — - \,,1111111t11111/l { HRCp,G 24.310 BEND �� I /65n.05- \ 111111 1111 ❑S �C 1� p� �� N STA 26+10.34 r 8 - - - - � r �- � •. �� 1\�111 � 111 � � psx �x x 1 • — .� `:;` ���-- �`-� - — ., 11 � — 13 ,�.... 48" RCP \ \ r\ 1 SEE SHEET UC1.08 1 r, r♦ \\\�ti�` r 15.150 BEND \ . STA 22+45,4741 r �{ \ ` •- - r� / i \� 1/� � 111/r r\\fir � 1 � ♦ ♦� � � r � � � ` �� .ter �` �♦\ F - � rr \ L0 O LU LU LU U) z J U Q J U 710 - 710 700 - 700 690 - - 690_T 680 - 680 670 - - 670 660 -IST. 3rUAL 0 - 660 650 - 650 640 640 23+00 24+00 25+00 26+00 27+00 28+00 COFFEY CREEK CULVERT (STA 22+20.66 TO 28+70.55) HOR SCALE: 1 ":40' VER SCALE: 1 ":10' PROPOSED GRADE \ EXISTING GRADE PROP. 225 LF DUAL 10'W X 10'H RCBC @ 0.62% HORIZONTAL AND � \ PROP. 20 LF DUAL 8'W X 10'H RCBC @ 0.57% � \ PROP. 295 LF 48" RCP \ HORIZONTAL BEND i I � � � PROP. 299 LF DUAL 8'W X 10'H RCBC 1.22% RCBC @ 0.5 EX X 10'H RCBC TRANSITION @ 0.57% PROP. 20 LF DUAL 8'W X 10'H TO DUAL 10'W PROP. 20 LF DUAL 10'W X 10'H RCBC @ 0.57% �� O d� N N O O 00 00 0 0 ti ti rn r � r rn rn O � O CO CO � � � d> � O � co co co cfl cfl co cC co cC co cfl cC GENERAL NOTES: 1. XXXXXXXXXXXX 0 20' 40' 80' HORIZONTAL SCALE 1 "=40' KEY PLAN WSP USA INC. NORTH CAROLINA LICENSE NO. F-0165 1001 MOREHEAD Su UARE DRIVE, SUITE 610 CHARLOTTE, NC 28203 N04 ON 3 DESCRIPTION com DATE 60 QM 1:LO LO ) Q Q O O J � Orn Q J Z w Z N O LL CD a z Q U)w� �o Z 0 U � o VOA =z Z M z � LLI Z � z I.J_ O ►I C� Q � n = p oU W nJ// r O Z QUa 0 p U) U W Q LL ►I z U � U Q — = w INTERIM REVIEW DRAWINGS NOT FOR CONSTRUCTION THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF INTERIM REVIEW. IT SHALL NOT BE USED FOR CONSTRUCTION, BIDDING, OR PERMITTING. SCHEMATIC 30❑ DESIGN SHEET TITLE COFFE❑ CREE❑ CULVERT PLAN AND PROFILE SHEET ❑ OF 8 SCALE DRAWN BY MLS CHECKED BY xxx APPROVED BY xxx 188970 WSP PROJECT NUMBER SCIF Element SHEET NUMBER Sheet 14 of 25 (submitted with 113 Application 1/31/2020) ■0 II �' ��,,♦ ail C r C n r m m IM 711 710 710 700 700 690 690 680 - - 680 670 - 670 660 - 660 650 - 650 640 I I I I 640 29+00 30+00 31+00 32+00 33+00 34+00 COFFEY CREEK CULVERT (STA 28+70.55 TO 35+00.00) HOR SCALE: 1 ":40' VER SCALE: 1 ":10' PROPOSED GRADE EXISTING GRADE @ 1.22% � IPROP. 50 LF DUAL 20'W X 10'H TO DUAL 8'W X 10'H RCBC TRANSITION @ 1.22% HORIZONTAL BEND I PROP. 213 LF 84" RCP 312 LF DU L 8'W X 10'H RCB PROP. 299 LF DUAL 8'W X 10'H RCBC @ 1.22% W, �I oZ❑ J a GENERAL NOTES: 1. XXXXXXXXXXXX � 20' 40' $o HORIZONTAL SCALE 1 "=40' KEY PLAN WSP USA INC. NORTH CAROLINA LICENSE NO. F-0165 1001 MOREHEAO 5 UARE DRIVE, SUITE 610 CHARLOTTE, NC 28203 T 704-342-5401 I www.ws .com ND. DESCRIPTION DATE NTERIM REVIEW DRAWINGS NOT FOR CONSTRUCTION V ❑ THIS DOCUMENT 15 RELEASED FOR THE PURPOSE OF INTERIM REVIEW. IT SHALL NOT BE USED FOR CONSTRUCTION, BIDDING, OR PERMITTING. I SCHEMATIC 30❑ DESIGN SHEET TITLE COFFE CREE CULVERT PLAN AND PROFILE SHEET 5 OF 8 DATE SCALE DRAWN BY CHECKED BY APPROVED BY NQVEMBER 22, 2019 1" = 0' MILS xxx xxx WSP PROJECT NUMBER 188970 SCF Element SHEET NUMBER Sheet 15 at 25 (submitted with IP Application 113112020) SHEE A FULL SI E 22 X 34 SHEET. NO \ �\Mtz PROP. 4$ LF 60" RCP --,zz� REMOVE EXIST. HW & _ CONNECT PIPES WITH PIPE COLLAR (NCDOT 840.72)SO A"� � � 1= � ���� • 11 ! � �� � ����.\ \ � I.I. � . CUSTOM JB. \ , 1''� M t 7x sx .. $ ('P x; PROP. 213 LF 84" RCP 11 1'I"�1'�II; i11�I111111 ���� � r•�-',�� � �I��r l�l� � 11 � III I 1 } I I l � � ! y1111111 1 l l �1f �Ir•I �f>r/ /� � � / I � Ij 11 j m I - - -. \ I ll ll Illlll l,ifI)-j l 11,,, frT 1 l flljf .,llljllff 11lIfj1r i c A r+ I l I ! 1 of 11 [11J1t�1111J1JlIl ��/ f REMOVE 1 I 1 \ t I I1 ! [I11 ! 1 J1! ! { EXISTING y + 1 7 1 I[ ! a1 I I /1l1//!1 !1 1 30" RCP J 1 I I I 1 Jill/ L if if RI I I ll Jlj I1 } 1 �I d0 � E �ABAND NED I , I m� ~ ` ~ I IIIJJJI lll�lllllll[�j ION F rvo{l r 1 rllr frl[ NOTE TO REVIEWER PIPE PROFILES TO BE PROVIDED WITH 70F] DESIGN. GENERAL NOTES: 1. XXXXXXXXXXXX 0 20' 40' 80' HORIZONTAL SCALE 1 "=40' C7 KEY PLAN ,bl J� It p 9LL a� rn L Qm � r a d Z11 f - WSP USA INC. NORTH CAROLINA LICENSE NO. F-0165 1001 MOREHEAD S UARE DRIVE, SUITE 610 CHARLOTTE, NC 28203 T 704-342-5401 1 www.wS .COM NO- DESCRIPTION DATE Q Q X C'7 Q Q O J r W Z a LL C� Q (1) u0 Z Cf) L U 0� oa O ❑ U 4 0: elf ❑ < �N Q I— = Z ~ = C'r3 Z (D LLi Q Z � 0 �w ir_ O p oU ❑ ❑W-j Q Qom= ❑ ❑ CI) Lu < U- 0- Q 'j Z U W V ❑ INTERIM REVIEW DRAWINGS NOT FOR CONSTRUCTION THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF INTERIM REVIEW. IT SHALL NOT BE USED FOR CONSTRUCTION, BIDDING, OR PERMITTING. SCHEMATIC 3D❑ DESIGN SHEET TITLE COFFE CREE CULVERT PLAN AND PROFILE SHEET G OF 8 DATE NOVEMBER 22, 2019 SCALE 1" = 0' DRAWN BY MLS CHECKED BY xxx APPROVED BY xxx WSP PROJECT NUMBER 188970 SCF Element SHEET NUMBER Sheet 16 0125 (Submitted with IP Application 1131/2020) SHEE• J THIS SHEET ARE BASED ON A FULL SI E 22 X 34 SHEET 01 0 0 0 D w o <n rn z� w� LL 1, 1 EV NOTE TO REVIEWER MORE INFORMATION IS RE UIRED FOR THIS DRAINAGE SYSTEM CONNECTION PRIOR TO FINAL DESIGN. I 1111/I11111/� 111 1 1 1 1 }} l } }I } I •� � 111 1 l 111 l 1 1 '} l I 1 - 1;1;11111111/; Ill 1 � 11 11 � ll l I I } l Il 1I/1I111II11 1 � l,� l } l l }1 1l 11�1�1111 � I I l l I I I l •, 1 l llll/I1111/11,1 / } } �1 l I I }` , 5'MH I111/1,11/111 1 } } ;� i 1 I I ♦ 1 I PROP.73 LF 36" RCP �, I l 1 }��-��„►�t,� � 11111111}`11 1 111 l � l l l �;, l� _ - - j111 11� PROP- 533 LF 48 RC_ P ICI s J �.`/.�• ���;,�: �� �' r //IIr-J I } l r r r I 111{{ l 1 40, ellfiirJ NOTE TO REVIEWER PIPE PROFILES TO BE PROVIDED WITH 70F] DESIGN. 1 DM 1JkNqU 69 III II �'i�r =� ♦\ � / 1 1111/ ll I, � 1 1{ Ilflil }1111� •}[III 1}ll 1 /�1�1 \ � ; 1/ 1 RISER 1 11 1 114�/1 TOP: 683.80' 1 `�, 1 1� 1�11 INV. IN (6" ORIFI(NE): 678.7� �� \ ■, 11 11" INV. OUT(18"): 667\92' I' I\ 11 j 1 j 1 1 FLARED END SECTION I - ♦�1 1 1 ,�'� �� INV.:680.73' GENERAL NOTES: 1- xxxxxxxxxxxx 0 20' 40' 80 HORIZONTAL SCALE 1 "=40' KEY PLAN WSP USA INC. NORTH CAROLINA LICENSE NO. F-0165 1001 MOREHEAD S UARE DRIVE, SUITE 610 CHARLOTTE, NC 28203 T 704-342-5401 I www.ws -com NO. DESCRIPTION DATE �% I >- C Q Q Q xWawa C'7 Q C-0 O ❑ � J r W_ Z o LL0CN Q �- U) C0 ° � Z U)W� �00 O❑v a-� El 2N W oF- =z ~ = CY) Z (D LLi O � � cr)— �_ O Q 0 LU m � U) Q F— [n 2 p O c) ❑ W - r Z CD Q � L11 Q L.L a_ ❑ F- ►I Z C� � U Q W V INTERIM REVIEW DRAWINGS NOT FOR CONSTRUCTION THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF INTERIM REVIEW. IT SHALL NOT BE USED FOR CONSTRUCTION, BIDDING, OR PERMITTING. SCHEMATIC 30❑ DESIGN SHEET TITLE COFFE CREE CULVERT PLAN AND PROFILE SHEET 7 OF 8 7. DATE NOVEMBER 22, 2019 !rr SCALE 1" = 0' DRAWN BY MLS CHECKED BY xxx APPROVED BY xxx RC AI F R AS NnTF WSP PROJECT NUMBER 188970 SCF Element SHEET NUMBEF Sheet 17 of 25 (submitted with IP Application 1/31/2020) SHEE FHIR RHFFT ARP RARPf7 nN A FI11 1 SI F 77 X 34 SHFFT .o z O O C a err-- . �i F J I \ F°ter r 1 - �� o �PROP.295LF48"RCP_ ��� 1' III1111 11 I IIIIII� I111 / 1 - I 1 I 1 II; 11 J 1 05' r - J I II II II II III111- j1f111 1 �Ilrl I11 1111 II 1 III I I I {` �J11 �� I I11%r�� � i�i 1 I � i � ■Ili 1 ` � !r 1': ; � i+�r�, , ^ I�111 1 IIII/11/�1� 1 f � 111 1 1 1 I I �J�l �� 1 1 1 1 11III//�II — 1I �� /III /� ���I 1 1 11 1 1 1 1 1 1 � � � 1` ,� �♦ 1/ I I _`ic 1 � — I I,II/III/I II , IIIII 1 �' J I < < '/♦ l+ i I �� I IiI11I �11 I J � � ■ 1 � � � � � I Ili __ `�� r 1 } t 1 I f ,, f:� I - I�IIIII�� �■ 1 I 1 � I I ■ 1 I I J � - -1 + ■ fr f; �, ��f.. � - 11 111 1 1■ I f � f l 1 r, r//� i IIr I. _ 11 1�� ��� �1 I II I , / If ; I - •, { 11 �`''� �: z z %' II ■ f - o wpm itj�g-T TC'1PI OTCBX _ _rT�P7-1rR$: t385 22 f 1 IN ,�- INV• INL5�: £r73-.77'r II Irr � i OUT{36" .01 1 15" RCP 1 //� r 1 1 1 f ti J J �' /♦ ♦ ��� �/ III11/ f � I 11 II 1 r � � �+ ♦If,/■ter ,�,� �- f _� 1111 �jI1 � I I I 1 1■ 1 1 1 t 1 r.. --- I■1 1 1 1� III ri �;; //r,%'ram 4 J'`_ �.—, � /III ��11 1 1 1 J 1 1 1 1 I k�] I jIf — 1 ■III /rrr/ ///C B HILET 14 / IIIII j1 1 1 1 1 1 1 1 I 11 �+ jf� �rf ,' 1 I 111111�11 ♦jT �iL1R 3�681.97' C f f \ I I 1 1 1 1 1111 1111 I �}N(1 .67 j 1 Ile,1 1/ I I I III 11 1 - J? 1, I 1111 ! r I n ] 6"): 673,22-. I11 1 � I 1 + � � -7__I ��# `•J1 _� } � � r+� � fffrfrrl r 1 If J 1 � 1 • I f I c r I � ��}� � +s '� \ i i t+ i�tf i+tr}++ r J � � II{I Ill l y IE�I rr 1}�� l i! f 1fIllt+�ltr NOTE TO REVIEWER PIPE PROFILES TO BE PROVIDED WITH 70F] DESIGN. r —1 GENERAL NOTES: 1. xxxxxxxxxxxx 0 20' 40' 80 HORIZONTAL SCALE 1 "=40' KEY PLAN WSP USA INC. NORTH CAROLINA LICENSE NO. F-0165 1001 MOREHEAD S UARE DRIVE, SUITE 610 CHARLOTTE, NC 28203 T 704-342-Wl I www.ws .com NO- DESCRIPTION DATE Q Q X M Q Q Q J r WZ0 LL Q (1) u0 Z Cf)W� 0�00 O❑U -04 elf ❑ < �N �1J 0 � = z ~ _ Cr) Z (D LLi O z� U F- : �O � J U) 2 O U ❑ W z=� o C) Q�Q L0 ❑ ❑ C/) U Lu Q LL 0- Q (D Z Q LLB u ❑ INTERIM REVIEW DRAWINGS NOT FOR CONSTRUCTION THIS DOCUMENT 15 RELEASED FOR THE PURPOSE OF INTERIM REVIEW. IT SHALL NOT BE USED FOR CONSTRUCTION, BIDDING, OR PERMITTING. SCHEMATIC 3D❑ DESIGN SHEET TITLE COFFE CREE CULVERT PLAN AND PROFILE SHEET 8 OF 8 DATE NOVEMBER 22, 2019 9 , �I SCALE 1" = 0' DRAWN BY MILS CHECKED BY xxx 4, APPROVED BY xxx WSP PROJECT NUMBER 188970 SCE Element SHEET NUMBER Sheet 18 of 25 tsubmitted with IP Application 1/31/2020) SHEE- PHIS SHFFT AR RASFT7 CNJ A F[)I I SI F P7 X '14 SHFFT SC:AI F S AS NnTF 710 700 670 ..e 650 630 PROPOSED GRADE FF --I I I I U 41� v EMBANKMENT F mr 4 i I r F� I I J 1 t Ej H EXISTING GRADE y 2 - 10' X10' EXISTING CULVERT COFFEY CREEK 710 700 670 WON 650 630 SCF Element Sheet 19 of 25 (submitted with IP Application 1/31/2020) 0 0 C� U C� o_ O ti U) 00 00 O co WSP USA INC. NORTH CAROLINA LICENSE NO. F-0165 LEGEND 1001 MOREHEAD CHARLOTTE, SQUARE NC 28203 DRIVE, SUITE 610 / / % / / // / / / / / / / / / / / r \ \ \ — — — / I / / l / / / // / / l \ / / / / / / / \ \ 1 \ \ \ \ // /� // /, // / // / /. i \ l ll l l// / / / / l / / / / // / I / / / / / / // \ 1 / / / / i .l i ./ / \ / // / / / / / / / / / / / // / / / /� // / / / / / / / // / /i COFFEY CREEK \ / // / / / / // // / / / \ I 1 / /// // / \ \ \ _ \ \ T 704-342-5401 I www.wsp.com /------ / �' / / ///i'/ i ' i'// /i, // // / , STREAM CENTERLINE / \ \ I I / /// // / / // / / / / / / I I 1 \ — / / / / /// / // / \ NI \ --PROPERTY LINES NO. DESCRIPTION DATE 000 II i / / / I ) /� o� — 1 I III I I I SEAL EXISTING SEWERI\'T EXISTING TREE LINE I �'/�/-��--�i��/��/ii%//�/����%%� � �i ��x \ I III IIII II i MANHOLE COVERS///'//''ii''/' '�' I I I I `°l\ \ / \ // /// / �'�' / / /' o/ / I 1 /111III(TOTAL=6) \ / \ // //\ PROPOSED TREE LINE ///l I I / / // I I I 1 1 \ \ / / ///\\ \// /- I I II 'i/ /i/ / EXISTING MAJOR CONTOUR / / / / / / / / MAJOR CONTOUR / / ////PROPOSED /�/�/'/ii�///''///// / / // / I I / — -MINOR CONTOUR �� '� �� i / /,/EXISTING I /fi/\////j�j//////// I I I \ ` `� / I PROPOSED MINOR CONTOUR a / \ \ / / / //// ////// I \ _ / //; EXISTING STREAM Q loo — LIMITS OF DISTURBANCE W �- __--__- _- __---- _ /// — — /'i / / / _ _ _ i — _ // /// / / \ \ 6sl \ of / / / I I 1 _ ` �-" / / / // III I I I ♦♦ \ SS PROPOSED SANITARY SEWER PIPE / IIII I I I \ S PROPOSED SANITARY SEWER MANHOLE J O / / ---___�_-, ////� / �/ / // ,�- ---� /' /���_--//i'// / \_ / I - - i / / / / //� // /i / / \ sr — ' I �T / // / / / Q --/ / ///// / I I 1 — — — �� // / I I \ \ XSS EXISTING SANITARY SEWER PIPE J — CD / I I I I I Z W cal / // ;000/ i // /// I I I \ - //ii I I I \LL EXISTING SANITARY SEWER MANHOLE %// // / ' ' ' 1 I I I I I I / ^ ` I I I / ///j// PROPOSED RIPRAP / / / / — — j I I , \ / / \\ CD o0o�� �\� / �// /,//� / ___// /' / /� — -_� j/ // a / -� \� I I / /� /, // / _ / -� _ \ \ I I I / / / / �` � I ABANDON SANITARY / / _-- 'i / \ \\\11\ �_/ /�� III i /// \\\ // II I Q N ! — \ �� \ \ ♦ \ — / / / _ ♦\ \ \ \ / LINE,REMOVE�\ �3 / �/— — �h ___� \ / / \\\\\\\ \ 1 1 III 1 U Q U �/� / —� \\\ \\\ \ \\ \\ /SEWER __ —// //// \\ \\1\ •� + ( �/ �' \\ \ 1 \ \ \ \ \ \ / MANHOLES 62� — �/ / / // / /��--- —co`L— -- _— /\ -- /"—� I ( __ // / / \ \\����\ \\\ II I ol 2 Z 1 1 III 11 II 11 I I 1 \ \ \ �� - '� / / i — — - /000 ___ _� / \ III 1 ' / ` \ \\ —RIPRAP INLET IIII 1 I _ TT 1 = z W 1 — �' \ \ \ \\ \\\ \\ \`\ - \ \` -- � �� 11\ _ I I — 11 PROTECTION II I 1 ~ - __ __ \�� — .— /��// / _- 1 III \2x, \ \♦ _ �, _ _ _ _ _ _- J� \111 \ I ..I I I / - / 1 // III I1111 I 2-24 RCP II N GENERAL NOTES: Cr)/ U !Y O W - J " III I1 I r BURIED I I I / r 1. NO GRADING ALLOWED WITHIN 5 FT OF TOP OF BANK m W/ \— --- / _�� ��/ ////III / (�' 2. ACCESS ROAD TO RECEIVE12"ABC STONE J W 2 Q RIPRAP OUTLET //- 11 l/ lI i ► I I I / N -� -_--� -___ -- --� �// / - \ .,// /�/ _\ / /I I 1/ / / ' /// l/ 11� /��/ U O O U RIPRAP FLUME\�\ \�—_�_-- __ — � PROTECTION •i- //// —♦�� ✓ lI / i } /i////,- \// I I \� \���\� �\ -_ -� -- - / // / �, / // \ ///// ///////N/ 3. EXISTING STREAM THROUGH DETENTION BASIN NOT TO BE V Q J / / I I ► I \ I , / - // ♦ / / / / �� /// / // W O 'ss _ —LO \ N —S = _ — — _ �XSS{� _ — — / ��/ / / , / / / / / / 2 ENTRANCE/OUTLET PROTECTION LU \ — % �— _ \-� ''-----_____ _ III / // / / 61Os\\\\I I//// / / Uj W a LL _ __—-\ \\\\ ---wee--- S+oo I Z0-o _---- LLI 7- // \\ /// / — _,_-__�_ \\\\�\\ \ \ _ _ '---__-_. _ \ \\\ \\\\\ \\ \\5�� _ _ Z c� — \ ♦ \\ �__ _ \ \\\\\\ 'SLAB TYPE INLET \ I _— \` \\ \ //j//% __ ���_��_��\��== __ ____ ___ _ _ ______� `�� ������` ` I \ \ / ♦ //i ----_ -_ -_ �-\ \\ \- __ - - - -\\\ \ \// %'------_ —_�_--� '—=— _=— \ `\ \\ \ \ \ `�' ♦� —=_ = �\ \�\\\\�\\ 18" RCP OUTFALL _ \"�O\ \\PIPE TO STREAM Q U _—\\\\�����—_ I I ♦ \ // %' -_= - \�\���-- _ =� \���LU RIPRAP \ ♦ \\ _- �'\`\\\ \\ \ \\ \\\1\1 111�\\\ 1 /--_\\�� -\ ��\\\�� ENERGY __ �\ ♦ \ \ / ��`` \�\`\\\\\'DISSIPATION \ \ \\ \\ \\11 I111\11111 \\ \ \\\\\' \' \ \ \ T 1 / // / / / — �, ♦ \ \ o\ \ \ `� \ ♦ 6�0 - \I 111 1 1 11 11 1 11 1 \ \ \ ♦ — 1 1 1 I 1 \ / _ \� \` \\ �� \� \ \ \ \ \\\ ROCK DROPIt _ STRUCTURE \ / /j / j j / j - \\ o \� \ \\ \\ \ \ \ \ \ cS� s 1 �I11 ►111 I11II 11111 1\ \ \ \ \ �,' / / // / // / / \\ \_____-_ �\ �♦ ����� ` \ \� \ \\ \\\\\\\ \\\\\\TRIPLE \ \ ♦ S I II //// / IIII 11 \ 11111 \ / / /-- ♦v__-� \ \ \ \ \ / / / / / .01 \6'Wx6'H\ \ \ ♦ 630, l�l/l/ I I I 1 \ ♦ /// / I 1 1 I \\ \ \\ \`�� \ \ \� \\� 20' CONSTRUCTION \\\ \ \\ RCBC 11 l I \ / 1 MAINTENANCE \ \' \ \ / , /� i IIII �, INTERIM REVIEW \ \ — CONCRETE \ \\ \ \ P / � \ ♦ \ \ � \ \ r / / / / — Er7(� — \ \ 1 ACCESS ROAD (\ \\ \ SPILLWAY / / ► I / / / / / ,/ / I I I \ / DRAWINGS / _ --- \ \ \ \ /IIII ICp\ NOT FOR CONSTRUCTION / ��� \\\\�\�\\\��♦`__� / //\\\\\\\\\\\ Ora / i I \�� � — � � ��, � 63 / ' � — \ \ ` \ ♦; \ \\ \ � � �1, 635 / I 1 1 ` ' III I \ _s \ I THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF INTERIM REVIEW. IT SHALL NOT BE USED FOR CONSTRUCTION, BIDDING, OR PERMITTING. loe co �� 1 1 1 RIPRAP CHANNEL 1 I 1 I � \ 1 1 \ / / I I DOUBLE 10'Wx7'H RCBC \ \ 1 1 11 BURIED 1' WITH NATURAL 7 0 % DESIGN ♦ / / / / 6 \ 1 1 \ \ ♦ _ — — / / / / / 63 3� U\ \ \ \ 1 \ \`\ 1 I 1 STREAMBED MATERIAL 0 30' 60' 120' 61 / / / 64 .00 615 \\q \� \\ \ \ \ i "=60' �_ / /� S \ \ \ \ \\ / HORIZONTAL SCALE 1 SHEET TITLE i '/ /'— ------ \ \ \� \\\\\1 \ RIPRAP REGIONAL DETENTION �—ENERGY 15' CONSTRUCTION -- �/ � ,DISSIPATION / / - ' KEY PLAN SITE PLAN MAINTENANCE_-----—__ /' I I 1 \ \ \ 1 \ �'\ \�\\\ \\\ \`\♦ _--�� \ DATE FEBRUARY 20, 2020 � 1 \ �` \� �n \\\\ � \ �— �� _ / / / / ACCESSROAD1 \ \ \ \ \ I I r /---------� �� �/ / / // /. \\ \ \ \ \ \\\ \\ \� \ \� �' iii'i/ i� SCALE 1 =60 '0, __ �� �— _--' / / / \� \ \ \ \`C \ 1\ '// \ \ w \c9 \ \\ \\\\� \ \` �♦� - J 00 ,/ // I \ \ \ \ \ \ 1 1\ I I /J // /'/' �- ____------' //i %'- __�\- �_-'� ' _--____— I I I I 1111\1\\\\ \ \\\ \\\`� DRAWN BY JR //// — — �'/� I - CHECKED BY JB APPROVED BY XXX WSP PROJEC a y Coffey Creek Detention SHEET NUMBI Sheet 20 of 25 0 0 (submitted with IP Application 1 /31 /2020) SH SCALE (S) AS NOTED ON THIS SHEET ARE BASED ON A FULL SIZE 22 X 34 SHEET. I n i �F 7 0 N O N w �o o� oco a WSP USA INC. NORTH CAROLINA LICENSE NO. F-0165 1001 MOREHEAD SQUARE DRIVE, SUITE 610 CHARLOTTE, NC 28203 T 704-342-5401 1 www.wsp.com NO. DESCRIPTION DATE a 650 650 O Q — X U) Q W ~ o Q JJ� Z WAN LL o a> PROPOSED EMBANKMENT 06 z 640 TOP OF BERM ELEV.: 635.50' 640 co 00 CD Z Oda �N � 0 2N W = z 23'� 1 = 0 z L CO U (If O Q 0QI m� J Cl)W~O n= 630 630 J O U o O 624' ELEV. O W = Lo LO ENERGY DISSIPATION I^v `A� FLOW r PLUNGE POOL 622' ELEV. 0 �-/ U BASE ELEV.: 612.20' I LU < a LL 0 EXISTING I 616' ELEV. \ 618' ELEV. J Z U STREAMBED DOUBLE 94 LF OF 10'Wx7'H RCBC r , BOTTOM I WITH HEADWALLS 620 620 W = TIE IN I _ Q ELEV.: 616' — — — — — / 1.5% SLOPE o 0 0 0 0 0 0 0 0 _ _ — — _ _ = I-III-111-rrr111-III-III_ III ��� O _ _ rrT_ _ _ III —III III —III— - d �� �� �� 0 0 0 0 0 0 0 o II —III —III —III —III —I o 0 0 0 0 0 0 0 PE o O O O O O s�o RIPRAPAPRON INTERIM REVIEW 01 D RAW I N G S 0 0 0 0 0 0 0 0 0 0 o NOT FOR CONSTRUCTION BURY CULVERT BOTTOM V WITH 610 NATURAL STREAMBED MATERIAL 610 ENERGY DISSIPATION RIPRAP THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF INTERIM REVIEW. IT SHALL 53' 18' 40' 53' 4' NOT BE USED FOR CONSTRUCTION, VERTICAL BIDDING, OR PERMITTING. 0 o co co w w It 2' SCALE 0 o Un Un O� 0� co c0 00 00 600 600 0 2+00 3+00 4+00 5+00 7 0 % DESIGN 0 10' 20' 40' HORIZONTAL SCALE 1 "=20' SHEET TITLE REGIONAL DETENTION KEY PLAN BERM PROFILE STREAM CENTER LINE (STA. 1 +00 TO STA. 5+25) DATE FEBRUARY 20, 2020 J SCALE 1" = 20' o DRAWN BY JR CHECKED BY JB APPROVED BY XXX WSP PROJECI Coffey Creek J Detention SHEET NUMBE Sheet 21 of 25 (submitted with IP / sH Application 1 /31 /2020) SCALE (S) AS NOTED ON THIS SHEET ARE BASED ON A FULL SIZE 22 X 34 SHEET. c� 0 Uj z 0 U LU U) 0 0-1 0-1 LU J Z) U 0 0 Ir- wC/) �C/) LU zU wU 7¢ 0 N 0 N w �o o� 0co a 660 660 650 650 640 640 630 630 620 620 Ll --1h 610 610 600 600 -200 -180 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 180 - TRIPL 6'Wx6'H RCB DOUBLE O'Wx7'H RCBC BURIED 1 WITH NATURAL STREAMBED MATERIAL TOP OF BERM ELEV.: 635.50' _ ACCESS ROAD CULVERT CROSS SECTIONS o �► o o �� I o i ME f� Maw .�MOMINEXIM r — — MUM in- mlMn mIIIIIq Mill III ow A!�OU a o MM OWN" — VON r IN W—A—MIENNOMMEM —07010A VAN r gwggr�� -��� �o_ —. :yam:. ��•�'�'- L .-L1 �.�� v ♦ �i � ♦� ♦ i ♦ i �i ♦ � ♦ ♦ ♦ ♦ ♦ ♦ ♦ .ate ♦ ♦ ♦ ♦ "�� � �� 071 -01 •�i MNI ��o��irdi�►�'�,!ON .,._ •-��o�ir►��i���oiiII ►>II►i�I��I I I I Io�_- .to��►Io�Io11,�h�,, N►�'►���oi •�ly►�.�ls.�,,�••�•�►�:�•�► ,,�• •I��i..•�•s••'�•�I� �•�• ��1�►�O�I�IJ�•�111�•�•�►t1 �11�����0�� c .• . . . . . �. . ., . .,�, . v . . . . . . . . . 1 ♦ ,• ��h;,��,It� �,�No �►�,Ioo�•= �odo��,�p�►I,,�1�A,,��I�o�ohj,I�,I�,olo�� ��,�'��,� Qom•••-�1,�..•�'11 �����►�►•��A`�w•�•-�►•o•����►•�r•'�I►�•'�•�1-�'•-s�•�f1 ��/��N�•�►�1���'�1���.�E����� � �►�� D%o1�oA.►���h,1%,��,1,�1��►��,�.1�,�--'" I,�di�►�ii`�Go�o�ololo�o�ololn:� ••�•�•�1�.�•�►•�•��I1w•� 1 �•�►11 ���•�Ilj�•�►� �•�.1►�•�•�•�•�►• Ate•-��•�•• •���r►�������a� -- ���'� /�! �! �♦\! �'' r! I!� �! �- w! �'! r! �.! rZ♦��.�i! ice♦ %�♦ I/�! �! /►� /� �._ • _ ♦ ♦ v %♦ wo • ACCESS ROAD CULVERT PLAN VIEW GENERAL NOTES: 1. U/S RIPRAP: X' LONG, 10" THICK, X' WIDTH. 2. D/S RIPRAP: 185LONG, 10" THICK, WIDTH EQUAL TO TOP OF CHANNEL (MAX ELEV. 623'). 10' VERTICAL 5 SCALE 0 0 0 10' 20' 40' HORIZONTAL SCALE 1 "=20' KEY PLAN WSP USA INC. NORTH CAROLINA LICENSE NO. F-0165 1001 MOREHEAD SQUARE DRIVE, SUITE 610 CHARLOTTE, INC 28203 T 704-342-5401 I www.wsp.com NO. DESCRIPTION DATE QM 00 CD O � � Q W (D O � LL O a I� Cl) 06z 3: /ZyON/ 0 � N LLI = z � ==z zw � �~U � W � o Q J 0 m� INTERIM REVIEW DRAWINGS NOT FOR CONSTRUCTION THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF INTERIM REVIEW. IT SHALL NOT BE USED FOR CONSTRUCTION, BIDDING, OR PERMITTING. 70% DESIGN SHEET TITLE BERM CULVERT CROSS SECTION DATE FEBRUARY 20, 2020 J SCALE 1" = 20' DRAWN BY JR CHECKED BY XXX APPROVED BY XXX WSP PROJECT Coffey Creek Detention SHEET NUMBS Sheet 22 of 25 (submitted with IP sHE Application 1/31/2020) SCALE (S) A 0 0 w N C� U c� o_ 0 ti rn co co o_ 00 co 0 N O N co 0 L Q Q WSP USA INC. NORTH CAROLINA LICENSE NO. F-0165 LEGEND 1001 MOREHEAD SQUARE DRIVE, SUITE 610 640 640 CHARLOTTE, NC 28203 T 704-342-5401 1 www.wsp.com PROPERTY LINES NO. DESCRIPTION DATE EXISTING MAJOR CONTOUR PROPOSED MAJOR CONTOUR EXISTING MINOR CONTOUR Q PROPOSED MINOR CONTOUR EXISTING STREAM J w SS PROPOSED SANITARY SEWER PIPE O L 630 630 ct W U PROPOSED SANITARY SEWER MANHOLE U) w 3 COFFEY CREEK 20' ACCESS ROAD ELEV. 622.2' FLOW O �/ O�/ XSS EXISTING SANITARY SEWER PIPE L.L L.L (n „ 47LF OF 36 RCP CULVERT NATURAL WITH BED N _. Q O.0 ROCK CROSS VANE 6" RISE _ M U 0- Uj C� 5" OF STREAM J - _ — — EXISTING SANITARY SEWER MANHOLE _ � ELEV.621' _ _ — — — — Z w �Uj ELEV. 620' PROPOSED RIPRAP O O O I=I I = I I=III= I =I =I I PROPOSED NATURAL STREAMBED MATERIAL N Q U) z 1.5% SLOPE —_ = = — a — 2 5 /° SLOPE EXISTING GROUND . w 06 Q S Q 00 620 0.5% SLOPE 620 _V CD Q J N � � FOR 10' � � � O N � CL. 1 RIPRAP 2%SLOPE FOR 10' LLI �- V � 2 Z � ? z = z z LLi U~�0 0�w � WoEO qq ao (0 (0 �� o�w� �_ 00 00 00 �� �� % ` O U 610 N N N N 610 O O Q w CD U) Lo 0+00 1 +00 2+00 O � 11 U LJ LO ACCESS ROAD CULVERT PROFILE LJJ Z Q � 0 � L � Q X Q _ ROCK CROSS — VANE(TYP.) cn� _� 1 , / / / / // 1 / / / / i O LL Q U _ / / ♦_--__ / CP 625 I / / / / / // / / / CO 1-1 oloo RELCATED SANITARY SEWER ��' �//' `S / // // "1//�//// /''/ 60000//// / / o / GENERAL NOTES: INTERIM REVIEW '// _ _ _ _ / / '/'/'/ ' / / /' // // o� / // �`� �� DRAWINGS �' ��� i \ i\ / / / / / / / / `� \ 1. U/S RIPRAP: 8' LONG 18" THICK 8' WIDTH. NOT FOR CONSTRUCTION �� �'' _ — — — — —— '�'I �' _ ' XSS )(SS / / j / / S / / `� ` 2. D/S RIPRAP: 63' LONG, 18" THICK, WIDTH 625 _ x��\ �//// / i�)(SSXSS '_-- / o j// EQUAL TO TOP OF CHANNEL. //�� / XSS ���---------------------- A/ / / / / /// // / 100, XSS/ — / ' — — — — — — — — — — THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF INTERIM REVIEW. IT SHALL 4' NOT BE USED FOR CONSTRUCTION, _ VERTICAL 2' SCALE BIDDING, OR PERMITTING. 1 =4 I 1 640 0 / - - - - ► ► 1 �s 1 1 �, _- - 100% DESIGN —4— — — — f — 1` — \ / \\\ \ I 1 1 1 \ \ \\ \\ \ I\ 1\ ` \\ `\ \\ \\ \`♦ \\� _ \ \ \ \ \ _ _ — \ \ \` \` 63S \ \ \ 0 10' 20' 40' SHEET TITLE �\ _ — • .L _ — — _ N� \ `� � \ � �\ `� — — — _ ` � _ — — — — HORIZONTAL SCALE 1 "=20' KEY PLAN REGIONAL DETENTION ACCESS ROAD CULVERT PROFILE ___— CONSTRUCTION_— MAINTENANCE ACCESS ROAD DATE JUNE 18, 2020 61\ \ \ ♦ __ _ SCALE 1 20 ---- — -- o00 \ \ ♦ \ \ ` ` --- `_-- ♦ \ \ o DRAWN BY JR N. ACCESS ROAD CULVERT PLAN VIEW m CHECKED BY JB APPROVED BY XXX WSP PROJEC Coffey Creek Detention ° Sheet 23 of 25 SHEET NUMB (submitted with Public o Notice Response SHE 5/12/2020) SCALE (S) AS NOTED ON THIS SHEET ARE BASED ON A FULL SIZE 22 X 34 SHEET. c� 0 vi z 0 U W U) 0 ry U ry LU J U 0 Q 0 ry wC/) �C/) W zU wU 7Q 7 x 0 N 0 N ui a ao 0 O L o< a 650 --F 650 650 650 TOP OF BERM FOR ACCESS ROAD CULVERT CROSSING 640 — 640 640 640 36" RCP CULVERT BURIED 5" WITH NATURAL STREAM BED MATERIAL � 630 � � 630 630 630 � ---- -- — 620 620 620 620 610 610 610 610 -80 -60 -40 -20 0 20 40 60 80 -40 -20 0 20 40 1+36.14 1+46.42 ACCESS ROAD CULVERT CROSS SECTIONS ACCESS ROAD CULVERT U/S CROSS SECTIONS / ------ -- �js\ — G-0' .o\ ACCESS ROAD CULVERT PLAN VIEW 36" RCP CULVERT BURIED 5" WITH NATURAL STREAM BED MATERIAL \ - - - - - - - - - - \ \ 1 __�--------------- — — — — — — — — — — — — — — — 10' VERTICAL 5' SCALE 1 "=10' 0 0 10' 20' 40' HORIZONTAL SCALE 1 "=20' KEY PLAN WSP USA INC. NORTH CAROLINA LICENSE NO. F-0165 1001 MOREHEAD SQUARE DRIVE, SUITE 610 CHARLOTTE, NC 28203 T 704-342-5401 1 www.wsp.com NO. DESCRIPTION DATE w O L Q LU Q 3 ftftm00 Q cn M J U � W o Q ~ ~ o Z ZJa, 0 W o U�Z)N a ~ ZC'6O z Q o Z Q J � 0 �00 �w0Q N LLI 0/ 2 z _ cD z LLi ? U~�0 z� co WZ�w �o OQ� m� Q D�w �_ J Z O O c) —0 Q o p LL J LL LLI � Z 0 � X Q~ � w Q O � J Q x Q X x c� a INTERIM REVIEW DRAWINGS NOT FOR CONSTRUCTION THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF INTERIM REVIEW. IT SHALL NOT BE USED FOR CONSTRUCTION, BIDDING, OR PERMITTING. 100% DESIGN SHEET TITLE ACCESS ROAD CULVERT CROSS SECTION G DATE JUNE 1852020 J SCALE 1" = 20' o DRAWN BY JR CHECKED BY JB APPROVED BY XXX WSP PROJEC Coffey Creek Detention Sheet 24 of 25 SHEET NUMB (submitted with Public Notice Response SH 5/12/2020) Rf:AI F IR1 AR NnTFn nN THIS RHFFT ARF RASH nN A FI11 I S17F 22 X 34 SHFFT_ v x FLOC SILL (T z 7 u 0 N O N am 00 L O CL a¢ FLOW STREAM BANK, TOE OF BANK, TYPICAL TYPICAL RANIVP1 II 1 lCFF nl(lTF `21 ROSS VANE INVERT DNTROL POINT _EVATION D FOOTER BOULDERS, :E NOTE 6) FILTER FABRIC, TYPICAL (SEE NOTE 5) FT VANE ARM 'ERCEPT CONTROL POINT VATION (SEE NOTE 3) PLAN VIEW BANKFULL LO X x N TOE OF BANK STREAM BANK FILTER FABRIC (SEE NOTE 5) COARSE BACKFILL (SEE NOTE 8) HEADER BOULDER (SEE NOTE 6) FOOTER BOULDER (SEE NOTE 6) X17 LO X STREAM BED - POOL VARIES 0' TO 1 /3 X5 X14 VANE ARM SECTION A -A' NOTES: 1. A BOULDER CROSS VANE IS A GRADE CONTROL, IN -STREAM STRUCTURE THAT DIRECTS STREAM FLOW AWAY FROM THE STREAM BANKS AND IN TOWARD THE CENTER OF THE CHANNEL. 2. CONTRACTOR SHALL ESTABLISH AN ELEVATION CONTROL POINT AT THE UPSTREAM INVERT (CENTER) OF THE CROSS VANE TO ESTABLISH PART OF THE PROFILE. POOL ELEVATION CONTROL POINT SHALL BE DESIGNATED TO ESTABLISH THE REMAINING PROFILE. SURVEY OF CONTROL POINT SHALL BE REQUIRED TO ESTABLISH ACCURATE CROSS VANE INSTALLATION WITHIN THE TOLERANCE SPECIFIED. 3. THE VANE ARM SHALL INTERCEPT THE STREAM BANK AT A HEIGHT EQUAL TO BETWEEN'/2 BANKFULL STAGE AND BANKFULL STAGE. ELEVATION CONTROL POINT IS ESTABLISHED AT THE LEFT AND RIGHT STREAM BANK/VANE ARM INTERCEPT POINT TO SCALE. THE VANE ARM INTERCEPT LOCATION IS DESCRIBED BY ITS RELATIONSHIP TO BANKFULL STAGE OR BY THE LENGTH AND SLOPE OF THE VANE ARM. BANKFULL IS NOT NECESSARILY THE TOP OF THE STREAM BANK SLOPE SEE TYPICAL CROSS SECTIONS FOR ADDITIONAL INFORMATION. 4. OMITTED 5. TYPICAL RIFFLE AND POOL CROSS SECTIONS ARE PROVIDED ELSEWHERE IN THE PLANS TO ESTABLISH THE DIMENSIONS OF THE CHANNEL GRADING INTO WHICH THE BOULDER CROSS VANES ARE TO BE INSTALLED. 6. THE CROSS VANE SHALL BE CONSTRUCTED WITH FLAT -SIDED BOULDERS OF A SIZE (LENGTH, WIDTH, AND DEPTH) AS SPECIFIED ON THE PLANS. 7. NON -WOVEN FILTER FABRIC SHALL BE USED TO SEAL THE GAPS BETWEEN THE BOULDERS AND UNDER THE COARSE BACKFILL MATERIAL. THE FABRIC SHALL BE PLACED ALONG THE ENTIRE LENGTH OF THE SILL. THE FABRIC SHALL BE SECURED BY THE WEIGHT OF THE HEADER BOULDER PLACED ON TOP OF THE FOOTER BOULDER WITH THE FABRIC END PLACED BETWEEN THEM. THERE SHALL BE NO FILTER FABRIC VISIBLE IN THE FINISHED WORK; EDGES SHALL BE FOLDED, TUCKED, OR TRIMMED AS NEEDED. 8. COARSE BACKFILL SHALL BE NO. 57 STONE. COARSE BACKFILL SHALL BE PLACED TO A THICKNESS EQUAL TO THE DEPTH OF THE HEADER AND FOOTER BOULDERS AND SHALL EXTEND OUT FROM THE VANE ARMS TO THE STREAM BANK AND UPSTREAM A DISTANCE SPECIFIED IN THIS DETAIL. 9. THE INVERT (CENTER) OF THE BOULDER CROSS VANE SHALL BE CONSTRUCTED FIRST, FOLLOWED BY ONE VANE ARM AND THEN THE OTHER VANE ARM. THE FLOODPLAIN SILLS SHALL BE CONSTRUCTED LAST. 10. BOULDER CROSS VANE SHALL BE BUILT TYPICALLY AS FOLLOWS: E X1 - CROSS VANE INVERT CONTROL POINT ELEVATION (SEE NOTE 2) COARSE BACKFILL (SEE NOTE 8) FLOW FILTER FABRIC CROSS SECTION B-B' BANKFULL (SEE NOTE 3) PROFILE VIEW X2 OR X3 - LEFT OR RIGHT VANE ARM INTERCEPT CONTROL POINT ELEVATION X4 - POOL CONTROL POINT ELEVATION (SEE NOTE 2) FLOW ROCK CROSS VANE DIMENSIONS VARIABLE VALUES TYPICAL UNITS DESCRIPTION X1 SEE PLAN FT. (NAVD) CROSS VANE INVERTCONTROL POINT ELEVATION X2 NOTE 3 NONE LEFT VANE ARMINTERCEPT CONTROL POINT ELEVATION X3 NOTE 3 NONE RIGHT VANE ARMINTERCEPT CONTROL POINT ELEVATION X4 SEE PLAN FT. (NAVD) STEP INVERT CONTROL POINT ELEVATION X5 10 FT. (NAVD) BANKFULLWIDTH X6 12 FT. VANE ARM LENGTH X7 4 FT. LENGTH OF FLOODPLAIN SILL X8 Not Used X9 Not Used X10 Not Used X11 <20 DEGREES VANE ARM LENGTH WITH STREAM BANK X12 7 PERCENT VANE ARM SLOPE X13 24 IN. BOULDER LENGTH (MINIMUM) X14 24 IN. BOULDER WIDTH (MINIMUM) X15 24 IN. BOULDER THICKNESS (MINIMUM) X16 SEE PROFILE FT. MAXIMUM POOL DEPTH FROM VAN ARM INTERCEPT CONTROL POINT ELEVATION X17 6 IN. HEADER BOULDER SETBACK WSP USA INC. NORTH CAROLINA LICENSE NO. F-0165 1001 MOREHEAD SQUARE DRIVE, SUITE 610 CHARLOTTE, NC 28203 T 704-342-5401 1 www.wsp.com NO. I DESCRIPTION DATE J W O U_ U) w Q 3 ftftft 00 co U W o IDZ ZJa, 0 �LLJo 0CNI�a ~ Z a2S O QCD Z QJ�U 00 w O Q N 2 Z _ Z W U ~ O z ftaft Z LLJw �o coOQI— m� qq D�Uj �_ J Z o OL) 00Uj Q o p LO LL J LL Lll �Q° � X Q~ � LJJQ�U O L J Q x X c� a INTERIM REVIEW DRAWINGS NOT FOR CONSTRUCTION THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF INTERIM REVIEW. IT SHALL NOT BE USED FOR CONSTRUCTION, BIDDING, OR PERMITTING. 100% DESIGN SHEET TITLE A. OVER -EXCAVATE STREAM BED TO A DEPTH EQUAL TO THE TOTAL THICKNESS OF THE HEADER AND FOOTER BOULDERS. REGIONAL DETENTION B. PLACE FOOTER BOULDERS. THERE SHALL BE NO GAPS BETWEEN BOULDERS. PERMANENT DETAILS C. INSTALL FILTER FABRIC. D. PLACE COURSE BACKFILL BEHIND THE FOOTER BOULDERS. E. INSTALL HEADER BOULDERS ON TOP OF AND SET SLIGHTLY BACK FROM THE FOOTER BOULDERS (SUCH THAT PART OF THE HEADER BOULDER IS RESTING ON THE COARSE BACKFILL). HEADER DATE JUNE 18, 2020 BOULDERS SHALL SPAN THE SEAMS OF THE FOOTER BOULDERS. THERE SHALL BE NO GAPS BETWEEN BOULDERS. THE SLOPE OF THE VANE ARM IS MEASURED ALONG THE VANE ARM WHICH IS INSTALLED AT AN ANGLE TO THE STREAM BANK AND PROFILE. SCALE NTS F. PLACE COARSE BACKFILL BEHIND HEADER BOULDERS ENSURING THAT ANY VOIDS BETWEEN THE BOULDERS ARE FILLED. DRAWN BY JR 11. EROSION CONTROL MATTING IN THE VICINITY OF THE VANE ARM INTERCEPT POINT AND FLOODPLAIN SILLS SHALL BE NEATLY SECURED AROUND THE BOULDERS. CHECKED BY JB ROCK CROSS VANE APPROVED BY XXX STD. NO WSP PROJEC Coffey Creek 1 /CE5.OX Detention Sheet 25 of 25 SHEET NUMB (submitted with Public Notice Response SHE 5/12/2020) SCALE (S) AS NOTED ON THIS SHEET ARE BASED ON A FULL SIZE 22 X 34 SHEET. Appendix D Stormwater Master Plan & Airport Layout Plan JftF STORM WATER MANAGEMENT FACILITIES-� CLT_IPBoundary_rev Existing Major Basins Existing Wetland Existing - Detention r ilmon-CDIA Property 0 MAP Proposed - Detention Existing_Sub_Basins Existing Ponds �y///� Existing - Detention and Water Quality DIA Property Rocktake�c Labelled with a "D" Proposed - Detention (Future) — Streets ../'�- Streams Existing - Water Quality o_ Labelled with a "D" , a Proposed - Water Quality Existing Culverts 1r l� Labelled with a "W" I t a Tuckasee e I MEL 4:v I Center Business CP, Keeter-Dr- NorthF4 City -Dr tu p x. ° f (Tlcer Branch) RRCF1 - •„.. � Z i � - ".fir � F! • � Wilkinson-3 D _ � 'y •�'�•. . °� •' �� Wilkinson-Bv _ S - f' i, .E•, - C Wilkinson-2 W .Y .' .. �a CC; IN -- :. _,.�,,. � Wilkinson4 W _ " . _ d � I / • Entrance Road Eatonton. Street` Biiry-zD _ - .. e' Entrance Road �. _ p Long Term 2 SF-1 (E-2•) Boyer -St' B04 o Entrance Road 9B-3 oiQ'Oo p _ Entrance Road 1111 B-3 (G-3) .� East _ r. k,, 4; •. �' •r 1 �Taziway D Bio '' o _ (Taggart Creek) 1w00 D4N'D'et `rys <1.7�. - h1 ' r� � fir- � r��. Q� � AIVG aft ..� evxl H 10-1 w IL�F S r •-s 4 i� }y � � � r � f r o� / : 't - ,�' •.. a ' iJ it ;, �_-��' '��' — x•�;� `� ,r/l. kfI H10 - - "cif J H4ger-2 W Hanger-1 DT MIt olive Church CY ' K West• West �} Lake Wylie) .` Sentry Post i _ - — a .... ARNG P" air eV 4 e I w Cargo I West By South 14 � ; - ' i = l (Coffey Creek) i a'i p+� Byrum Dr West Blvd-1Al •• , ; t I @:!�' ��'� ;"� .y � -.. ' do � ... . eii y G .. d� o, rahl - SF WQ1 log I WB2Y Dorcas-2 D �'� Dorcas-1 W " ♦ � � `'� 01, -; ' - - ",��•`�..' ,r, Marksw �' 'Rd � .. Y ' , ,�i..,. ' , .. ■ Lake-1 D - '� IL pr pou9t v:: - .�€ . �:., : •, �.. 9�e Lake f 7. Spo Steeiebe� K.'Ys' • ';_ , �.. OrA. 4x • n'� A R i .. Qr a r .�, O A ',' `",r: '�,•�;.�:.. � r � Center �• ... J r - . r . sue:. �•�... � .. c, 14wGre 1 a ah T`_J If ,a.. r Berewick-Commons Giehb 0 Miles 0.5 CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT ' Shutterfl •,.,,...., -°=_• ,,_ .. xt NS i _ FY18—FY23 STORM WATER MASTER PLAN CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT FIGURE 1 AIRPORT -WIDE STORM WATER MASTER PLAN Notes: 1. The depicted Airport Layout Plan (ALP) is based on GIS topography data (2014) and other as -built drawing (CAD) sources. Before any engineering, design, or construction projects are undertaken, the exact location of existing facilities (above and below ground) should be field checked and verified. 2. All taxiways are 75 feet wide (Design Group V), unless otherwise noted. Runway Exit Taxiway (RET) widths will vary depending on their location and design. 3. For additional airport information, see Sheet 4 - Data Sheet. 4. For complete airport property boundaries existing and future, see Sheet 30 - Airport Property Map. 5. Modification of Standards (MOS) table is shown on Sheet 4 - Data Sheet. 6. Elevations shown are based on vertical datum NAVD88. 7. Coordinates shown are based on horizontal datum NAD83. 8. Existing rail and roadway elevations were obtained from Google Earth, February 2014, and included moveable object height clearances (23' for railways, 17' for interstate highways, 15' for public roadways, and 10' for private roadways). 9. All future roadway elevations and configurations are conceptual only and will need to be approved by city and state agencies (NCDOT). 10. The existing ASR-9 is to be demolished and relocated between the existing Runway 18R and future Runway 19 thresholds. 11. The future Air Traffic Control Tower (ATCT) is scheduled to be operational in late 2019 or early 2020. The new tower will be 376 feet (AGL) tall, with a controller eye -level elevation of 1039' mean sea level (msl). All existing and future facility siting and design should be based on having a clear line -of -sight to all airfield movement areas based on the new ATCT eye -level elevation. In addition, prior to commissioning of the new ATCT, there must be a clear line -of -sight to all airfield movement areas from the existing ATCT eye -level elevation of 874'msl. 12. The proposed Phase 3 Multimodal expansion area to the south is only a land hold until a permanent site can be determined. 13. Future runway designations will be determined during the design stage. 14. The RPZ clearance for the future east Runway 17-35 will be determined at a later date when the runway is anticipated to be needed to meet demand. Line of sight will also need to be maintained from the future ATCT to the future east Runway 17-35. 15. The Airport owns all properties in the existing RPZs with the exception of railroads, public roadways, and an outer portion of the Runway 23 RPZ. There are plans to acquire properties within all existing and future RPZs. Also, there are no plans at this time to address the roads/ railroads within the existing RPZs. EXISTING DRAWING LEGEND EXISTING DRAWING LEGEND (CONT'D) I IFUTURE PHASING LEGEND ITEM EXISTING POFZ P:oiml RAILROAD RPZ P �J `7�/77�/ RUNWAY PART 77 APPROACH SURFACE — — RUNWAY TERPS APPROACH SURFACE RUNWAY TERPS DEPARTURE SURFACE THRESHOLD SITING SURFACE DETENTION BASIN FUTURE DRAWING LEGEND ITEM FUTURE AIRPORT PROPERTY LINE (FEE SIMPLE) AIRPORT REFERENCE POINT ROADWAYS AND RAILWAY ELEVATIONS 85.0;� PROJECT NUMBER DETENTION BASIN PHASE 1 DESCRIPTION PHASE 2 PAVEMENT .............:............::: L_ J AIRFIELD SHOULDER PAVEMENT BUILDINGS ■ ■ ■ ■ ■ ROADWAYS ■ ■ ■ ■ ■ ■ ■ ■ ROADWAY / RAILWAY TUNNELS■ ■ ■ AUTOMATIC PEOPLE MOVER (APM) ■ ■ ■ ■ ■ F 1.-.-004-.� I �LL�Q��j�.LL�7 DEMOLITION ...--.-.-.-. 1*941 WAWA F.:.T.::^:.—: 7.,7 7:1 I NTER MO DAL AREA —x—x--x— FENCE —x—x--x- - — — — RUNWAY PART 77 APPROACH SURFACE — — — — -----BRL -----BRL BRL -----BRL -----BRL - _ F-ROFA _ ROFA _ F-ROFA _ -----TOFA-----TOFA— TOFA -----TOFA-----TOFA— F_RSA RSA F_RSA -- TSA -- ----- GS C.A. ----- --------- LOC C.A. ----- OFZ ----- POFZ POFZ POFZ RPZ 4x4 FAA STAMP FAA DISCLAIMER THE FAA'S APPROVAL OF THIS AIRPORT LAYOUT PLAN (ALP) REPRESENTS ACCEPTANCE OF THE GENERAL LOCATION OF FUTURE FACILITIES DEPICTED. DURING THE PRELIMINARY DESIGN PHASE, THE AIRPORT SPONSOR IS REQUIRED TO RESUBMIT FOR APPROVAL THE FINAL LOCATIONS, HEIGHTS AND EXTERIOR FINISH OF STRUCTURES. PREFIX & SUFFIX USAGE ALSF II Approach Lighting System W/Sequence Flashing Lights - Type 2 APP Approach ASOS Automated Surface Observing Systems ATCT Air Traffic Control Tower BRL Building Restriction Line C.A. Critical Area DEP Departure DER Departure End of Runway DISP THOLD Displaced Threshold D.T. Displaced Threshold DME Distance Measuring Equipment E- Existing ELEV Elevation EMAS Engineered Materials Arrestor System F- Future GS Glide Slope GS C.A. Glide Slope Critical Area IM Inner Marker LOC Localizer LOC C.A. Localizer Critical Area MALSR Medium Intensity Approach Light System MM Middle Marker OFA Object Free Area OFZ Obstacle Free Zone OM Outer Marker PACS Primary Airport Control Station PAPI Precision Approach Path Indicator POFZ Precision Obstacle Free Zone PT Point R- Relocated REIL Runway End Identifier Lights ROFA Runway Object Free Area RPZ Runway Protection Zone RSA Runway Safety Area RTR Remote Transmitter Reciever RVR Runway Visual Range RVZ Runway Visibility Zone SACS Secondary Airport Control Station TBR To Be Relocated TDZE Touch Down Zone Elevation TOFA Taxiway Object Free Area TSA Taxiway Safety Area U- Ultimate VOR VHF Omni directional Range VOR C.A. VHF Omni directional Range Critical Area WSK Windsock FUTURE PROJECT LEGEND PROJECT NUMBER PROJECT DESCRIPTION OR EXISTING FACILITY NUMBER BEING REPLACED TOP OF STRUCTURE ELEVATION (MSL) F-01 Bank of America Road Relocation 794 F-02 AA Simulator Addition 726 F-03 FBO Terminal Expansion 738 F-04 Concession Distribution Warehouse 735 F-05 GA Hangars 1 724 F-06 Roadway Canopies 732 F-07 ARFF Station 692 F-08 FBO Ramp Expansion 716 F-09 Pedestrian Sky Bridges 732 F-10 GADO Redevelopment 712 F-11 West Boulevard Relocation 664 F-12 Fourth Parallel Runway Construction 728 F-13 GA Hangars 11 724 F-14 Concourse A Expansion Phase 11 (16 Gates) 808 F-15 Ramp Expansion South Phase 1 730 F-16 R-118 (CLT Center) 803 F-17 Phase 1 General Aviation 765 F-18 Airport Overlook 742 F-19 R-321,R-328 (CMPD Helicopter Hangar & Admin.) 645 F-20 Ramp Expansion Ph 11 730 F-21 C Concourse Expansion 808 F-22 Daily North Parking Deck 824 F-23 Joint Operation Center 786 F-24 B Concourse Expansion 808 F-25 Phase 2 General Aviation 765 F-26 Satellite Terminal 806 F-27 APM 734 F-28 Long Term 3 Parking Deck 824 F-29 Master Plan Land East 640 F-30 R-310 (T-Hangars) 725 F-31 R-310 (T-Hangars) 725 F-32 FBO Building 735 F-33 5th Parallel Runway 767 F-34 NCANG Hangar and Ramp Expansion 825 F-35 R-201 (AA Line Maintenance Hangar) TBD F-36 APM Maintenance Station TBD F-37 R - 218 (AA Cargo) TBD F-38 R -216 (AA GSE) TBD F-39 R-212 (Cargo - Air General, AA Mail Sort, SWA) TBD F-40 Phase 1 Cargo Expansion TBD F-41 Phase 2 Cargo Expansion TBD F-42 Phase 1 Cargo Expansion TBD F-43 R - 214 (Catering - Express/Piedmont) TBD F-44 R-217 (LSG Sky Chefs) TBD F-45 R-218 (AA Catering) TBD F-46 R-245 (American Line Maintenance Building) TBD F-47 AA Heavy Maintenance Expansion Phase 1 TBD F-48 R-231 (American IT) TBD F-49 R-210 (American Airlines Storage) TBD F-50 R-122 (Center Lighting Vault) TBD F-51 R-256 (Glycol Refueling Station) TBD F-52 R-214 (Paradies and Menzies) TBD F-53 Airline Support Expansion Phase 1 TBD F-54 R-224 (IDS De-icing) TBD F-55 Airport Support Expansion Phase 1 TBD F-56 R-212 (STS Line & Republic Maintenance) TBD F-57 R-209 (Delta GSE) TBD F-58 R-211 (Piedmont GSE Maintenance) TBD F-59 R-221 (Airport Storage) TBD F-60 R-247 (PSA Hangar) TBD F-61 R-222 (UPS) TBD F-62 R-223 (Jetstream) TBD F-63 Catering Expansion Phase 2 TBD F-64 Catering Expansion Phase 2 TBD F-65 Airport Support Expansion Phase 2 TBD F-66 Concourse B Holdroom Bumpouts TBD F-67 Concourse C Holdroom Bumpouts TBD F-68 West Triturator Facility TBD F-69 GA Hangar Development Phase 1 TBD F-70 GA Hangar Development Phase 2 TBD F-71 GA Hangar Development Phase 1 TBD F-72 ARFF Expansion Phase 1 TBD F-73 C-17 Simulator Building TBD Top of structure elevations based upon assumed height above ground elevation. (R) is an existing facility that will be relocated. 0 Q 600 0 600 1200 MAGNETICNORTH TRUENORTH Declination 7°44'W (7.73°) (.Ian 24, 2020) SCALE IN FEETChanging 0° Y W (0.05°) per year Revision Description Date By Pen & Ink ALP March 2020 L&B .� Charlotte• Douglas INTERNATIONAL AIRPORT CHARLOTTE U,AS INTERNATIONAL AIRPORT JOB DESCRIPTION AIRPORT LAY1k0Uf PLAN SHEET TITLE ,=a F FUTURE AIRPORT LAYOUT PLAN DESIGNED DRAWN CHECKED APPROVED L&B L&B R, 5rulw CLT SCALE CONTR. NO. AS SHOWN DATE SHEET March 2020 3 of 32 Y:\CLT\On-Call Contract\18-ALP Dwg Set Update (PI)\E-LB Work\8-Pen-Ink ALP - 2020\001-LAYOUTS\Sheet-3 ALP Future.dwg Ltscale: 1 Saved On: April 16, 2020 Plotted: 5/8/2020 12:02 PM Appendix E Monitoring Plan CLT Airport Expansion I SAW-2018-01071 In -Line Detention Monitoring Plan May 20, 2020 Proposed Monitoring Plan Introduction The City of Charlotte — Aviation Department (Applicant) submitted a Department of the Army Phased Individual Permit (IP) on January 31, 2020, for the proposed expansion of the Charlotte Douglas International Airport (CLT or Airport) in Mecklenburg County, North Carolina. A component of the Phased IP proposes stormwater detention in -line with existing channels. During the Public Notice period, the United States Army Corps of Engineers (USACE) requested a monitoring plan of those channels subject to in -line detention. In the application, in -line detentions are proposed on Ticer Branch (Stream 1 [S1]) for the North End Around Taxiway (NEAT) element and on Coffey Creek (S25) for the South Crossfield Taxiway (SCF) element. The purpose of an in -line detention is to provide peak discharge control for storm events up to the 100 year event. Both in -line detentions propose permanent impacts as a result of a culvert and berm that would be sized to detain water for the 2-, 10-, 25-, and 100-year storm events. Additionally, each detention basin also proposes a culverted stream crossing for road access within a basin for construction and maintenance. During the design storm event, the streams would overtop their banks and flood the detention area for stormwater detention, but attenuate within 48 hours. Beyond the culvert and berm and access road culvert in each basin, no other direct impacts as a result of the in -line detention are proposed to the stream channels. However, the streamside areas of both Ticer Branch and Coffey Creek would require an earthen embankment, grading, and removal of trees in order to provide the capacity necessary to detain the designed storm event. A 10-foot vegetated buffer along each stream will be maintained. In the Ticer Branch in -line detention, S1 and S2 are proposed to experience flooding of streamside area. In the Coffey Creek in -line detention, S25, S32, and S34 are proposed to experience flooding of streamside area. All five channels will require monitoring per the USACE request. Methods DIMENSION ASSESSMENT Permanent cross sections at riffle features will be established as a baseline on each channel subject to in -line detention. The location and number of these cross sections will be field located and set prior to construction. Cross section monuments will be marked on both banks with permanent monuments to facilitate comparison of data collected during future monitoring events. Dimensional data will be collected based on The Key to the Rosgen Stream Classification of Natural Rivers' and a stream classification type will be determined at each cross section. Graphical representations of cross sections will be provided. SUBSTRATE Wolman pebble count methodology will be utilized to calculate the D50 (i.e., median particle size) of the stream bed material to establish particle size distributions at the permanent cross -sections. Monitoring substrate during future events can indicate changes in stream character, erosion rates, and sediment supply within the site. 1https://wildlandhydrology.com/resources/docs/River%20Restoration%20and%2ONatural%2OChanne1%2ODesign/Rosgen 2011 Na tural Channel Design.pdf Page 11 CLT Airport Expansion I SAW-2018-01071 In -Line Detention Monitoring Plan May 20, 2020 NORTH CAROLINA STREAM ASSESSMENT METHODOLOGY The North Carolina Stream Assessment Methodology (NCSAM) will be utilized to assess stream quality and function at each cross section. The assessment length at each cross section will be 30 feet upstream and downstream of the cross section location. The NCSAM method provides for an evaluation of streamside riparian vegetation as well as a field assessment of hydrological influence, water quality, and biology within a reach. At each cross section, dimensional data, substrate characterization, and NCSAM will be assessed. A variation of the following table will be utilized to report baseline, post -construction, and annual data at each cross-section. Table 1. Example Table for Assessment Data �ection # Bankfull Width (ft) Floodprone Width (ft) Bankfull Mean Depth (ft) Bankfull Max Depth (ft) Bankfull Cross Sectional Area (ftz) Width/Depth Ratio Entrenchment Ratio D50 (mm) Rosgen Classification NCSAM Score PHOTOGRAPHIC DOCUMENTATION Stream # Stream # Cross Section # Cross Section # Photographs looking upstream and downstream at each cross section will be taken during the baseline monitoring to visually document the existing conditions of the channels. Photographs of each cross section will also be taken post -construction, and at annual monitoring events. Timing/Frequency The first monitoring event will take place prior to construction and permanent cross sections will be set. The second monitoring event will take place post -construction. Subsequent monitoring events will be held on an annual basis for a period of five years post -construction of either the Ticer Branch and/or the Coffey Creek detention basins. If at that time, the results during the monitoring events have not significantly changed since the baseline condition, then the monitoring requirements shall be successfully satisfied. Summary The proposed monitoring plan for the channels subject to in -line detention will consist of multiple measurements and assessments noted above that will provide a way to track the stability of the channels overtime. The NCSAM data forms will be provided in each monitoring report. Additionally, photographs will be taken as photographic documentation. After each monitoring event, a short cover letter and report of findings will be provided to the USACE for review. A variation of the following table will be utilized to report overall data after each collection event over time. Page 12 FN Table 2. Example Table of Results S Rosgen Class Stream Stream Stream Stream CLT Airport Expansion I SAW-2018-01071 In -Line Detention Monitoring Plan May 20, 2020 A Rosgen Dso NCSAM Class Page 13