Loading...
HomeMy WebLinkAbout20030394 Ver 1_COMPLETE FILE_20030402AW) WA G ? r > =i April 17, 2003 Franklin County DWQ Project #: 03-0394 APPROVAL OF 401 Quality Certification, ADDITIONAL CONDITIONS and Tar-Pamlico River Charles Kotynski 709 Marjoram Court Wake Forest, NC 27587 Dear Mr. Kotnski: You have our approval in accordance with the attached conditions and those listed below, to place fill material in 0.0042 acres of waters for the purpose of shoreline stabilization at Lake Royale, Lot# R2030, as you described in your application dated March 25, 2003. After reviewing your application we have decided, this fill is covered by General Water Quality Certification Number 3373. This certification allows you to use General Permit Number 198200030 when the Corps of Engineers issues it. This approval is also valid for the Tar-Pamlico River buffer rules (15A NCAC 213.0259). In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Coastal Stormwater, Non-Discharge and Water Supply Watershed regulations. This approval will expire when the accompanying 404 or CAMA permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application except as modified below. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland-fills-for this-project (now or in the future)-exceed one acre; compensatory-mitigation-may be required as described in 15A NCAC 2H.0506 (h) (6) and (7). This approval shall expire when the corresponding Nationwide Permit expires or as otherwise provided in the General Certification. For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. 1. Deed notifications or similar mechanisms shall be placed on all lots with remaining jurisdictional wetlands and waters or areas within 50 feet of all streams and ponds to notify the state in order to assure compliance for future wetland and/or water impact. These mechanisms shall be put in place within 30 days of the date of this letter or the issuance of the 404 Permit (whichever is later). 2. An additional condition is that stormwater shall be directed to sheetflow at non-erosive velocities through the protected stream buffers. 3. An additional condition is a final written stormwater management plan shall be approved by this Office before the impacts specified in this Certification occur. The stormwater management plan must include plans and specifications for stormwater management facilities designed to remove 85% TSS according to the most recent version of the NC Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E., Director Division of Water Quality N. C. Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center. Raleiah. NC 27699-1650 (Mailina Address) DENR Stormwater Best Management Practices Manual. Also, before any permanent building is occupied at the subject site, the stormwater management facilities, as approved by this Office, must be constructed and operational, and the stormwater management plan, as approved by this Office, shall be implemented. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone John Dorney at 919-733-1786 or Steve Mitchell at our Raleigh Regional Office at 919-571-4700. Sincerely, ;,---e,4 Ira,-'-04 Attachment h-110 Alan W. Klimek, P.E., Director cc: Corps of Engineers Raleigh Field Office Raleigh DWQ Regional Office File Copy Central Files Dana.Mayberry, Affordable Landscaping, Post Office Box 369, Bunn, NC 27508 The following is an abbreviated application form for those applying for a 401 Water Quality Certification to impact FERC (Federal Energy Regulatory Commission) regulated lake shore or bottom under the U.S. Army Corps of Engineers Permit GP30. This Application cannot be used for wetland or stream impacts. Please provide seven (7) copies of this application and supporting information as well as a non-refundable application fee to the Division of Water Quality of $200.00 for impacts of to lake bottom of less than 1 acre and $475.00 for impacts to lake bottom of greater or equal to 1 acre. Applications should be sent to: 0 Division of Water Quality Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 WETL4NDS1401 GROUP APR 2 2003 1. Applicant Information , WATER QUALITY SECT10 N 1. Owner/Applicant Information Name:-(! d h F-l.tf'? bTt/N5" Mailing Address: 7Q c/ /4?A/e ??Rr?1 GT Gt 1 AKA 6 CGS f j Ax- 21st-7 Telephone Number: 91g'5? 'J35(? Fax Number: E-mail Address: 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: f1Gl n(n) mrt k i hn r rIA Company Affiliation: nri Mailing Address:_ PD ^,xtc P?'('L -,n , NG ?? 5D Telephone Number: ,?)G?a - L4? - ? Fax Number: QiS& - Li '-I - 55w`l E-mail Address: (-i'I t ! °I Icl - q `1 t - Q)`153 1 , II. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. You may use the diagram below to make a hand sketch of your project. Also, see the example below for guidance. Both the vicinity map and site plan must include a scale and north arrow. The footprints of all buildings, impervious surfaces, or other facilities must be included. Location County: Fr C), +--\ 1L-1 % n Nearest Town: • t3, I,( Subdivision name or site address (include phase/lot number): LcJ4 C \2oyC7.AQ lzk- t? P-LO r Directions to site please include road numbers, landmarks, etc. (This is not necessary if an adequate vicinity map is included): -fl-,? ?Y tr?L??c c `' Y•,1 ?>11C??.? 0- -t>. TGx_ICZ Le kk uw-, C(x. ,t-E y- C°,>vC. l i z C LA StC:%- C,--) vim 2. Describe the existing land use or condition of the site at the time of this application: 3. Property size (acres): Q . 'A 4. Nearest body of water (stream/river/sou?ld/ocean/lake): I CZ4.-k -e- 5. Describe the purpose of the proposed work: °Tt) r, ?? c1 t1dC' t C.1 SEEa ,? 6. List the type of equipment to be used to construct the project: _ 0-4- 7. Amount of impact (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level in square feet or acres: 8. a. Amount of impact (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level and 50 feet land-ward in square feet or acres: eQ C_k-1; 11 i !?q ( ?L) . to U Pt 7- b. Please describe vegetation above the normal pool lake level and 50 feet land- ward to be impacted (number of trees for instance): N'D •irees, GL> •7tD 1c _ Applicant/ (Agent's si ,2s 5--0 -7 Date is valid only if an authorization letter from the applicant is provided.) Lake (Full Pond) Full Pond Shoreline Please approximately sketch the following information on this plan (please provide dimensions for each item, such as 10 ft. x 100 ft): 1) All proposed vegetation clearing (provide dimensions) .2) Location of rip rap or fill to be placed above the Full Pond elevation 3) Location of rip rap or fill to be placed below the Full Pond elevation 4) The location of any proposed structures such as buildings, retaining walls. docks, etc. 5) The location of any excavation or dredging below the Full Pond elevation. 6) Location of construction access corridors. f t .-5th .. 71 rl, 0A17? ,.. r 12 t *- i _ - j.