Loading...
HomeMy WebLinkAbout20181638 Ver 3_More Information Received_20200417SYnF. Staff Review Does this application have all the attachments needed to accept it into the review process? (-- Yes C No ID#* Version* 20181638 Is this project a public transportation project?* C Yes r No Reviewer List:* Sue Homewood:eads\slhomewood Select Reviewing Office:* Winston-Salem Regional Office - (336) 776-9800 Does this project require a request for payment to be sent?* C Yes No Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: r New Project r New Project w Existing ID r Pre -Application Submittal r More Information Response r Other Agency Comments r For the Record Only (Courtesy Copy) r Stream or Buffer Appeal New Project - Please check the new project type if you are trying to submit a new project that needs an official approval decision. Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and do not have the expectation that your submittal will be considered a complete application requiring a formal decision. More Information Response - Please check this type if you are responding to a request for information from staff and you have and ID# and version for this response. Other Agency Comments - Please check this if you are submitting comments on an existing project. Is this supplemental information that needs to be sent to the Corps?* r Yes r No Project Contact Information Name: Heather Patti VUio is subaitting the inforrration? Email Address: hpatti@trccompanies.com Project Information Existing ID #: Existing Version: 20181638 3 20170001(no dashes) Project Name: MVP Southgate Project Is this a public transportation project? r Yes r No Is the project located within a NC DCM Area of Environmental Concern (AEC)? r Yes r No r Unknown County (ies) Alamance Rockingham Please upload all files that need to be submited. Oickthe upload button or drag and drop files here to attach document MASTER_NC_JPA Table Updates 4.17.2020.pdf 1.03MB Appendix M_State_Permitting_11x17_Landscape_... 20.37MB Append ix_M State_Permitting_11x17_Landscape_... 21.98MB (S-A18-140 S-A18-143 S-A18-144) Detail Sheet.pdf 649.87KB MPV-NC-S-C18-32-2-36-1 Detail Sheet.pdf 561.97KB 2020 IRS SOA MVP Southgate.pdf 141.17KB MVP Southgate Project DMS Acceptance 352.12 KB Letter202O.pdf Wildlands Mountain Valley Pipeline Wetland SOA 139.14KB 04-16-2020. pdf Appendix G_Wetland and Waterbody Crossing 586.54KB Analysis April 17 2020.pdf April 2020 401 Supplement Cover Letter - Final.pdf 231.91 KB Only pdf or Ivre files are accepted. Describe the attachments: Updated impact tables, impact figures, updated alignment sheets and other updated Joint 404/401 Appendices including updating mitigation bank reserve letters Sign and Submit V By checking the box and signing box below, I certify that: o I have given true, accurate, and complete information on this form; o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the online form." Signature: Submittal Date: Is filled in autorratically.