HomeMy WebLinkAbout20181638 Ver 3_More Information Received_20200417SYnF.
Staff Review
Does this application have all the attachments needed to accept it into the review process?
(-- Yes C No
ID#* Version*
20181638
Is this project a public transportation project?* C Yes
r No
Reviewer List:* Sue Homewood:eads\slhomewood
Select Reviewing Office:* Winston-Salem Regional Office - (336) 776-9800
Does this project require a request for payment to be sent?*
C
Yes
No
Project Submittal Form
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Type: r
New Project
r
New Project w Existing ID
r
Pre -Application Submittal
r
More Information Response
r
Other Agency Comments
r
For the Record Only (Courtesy Copy)
r
Stream or Buffer Appeal
New Project - Please check the new project type if you are trying to submit a new project that needs an official approval
decision.
Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and
do not have the expectation that your submittal will be considered a complete application requiring a formal decision.
More Information Response - Please check this type if you are responding to a request for information from staff and
you have and ID# and version for this response.
Other Agency Comments - Please check this if you are submitting comments on an existing project.
Is this supplemental information that needs to be sent to the Corps?*
r Yes r No
Project Contact Information
Name: Heather Patti
VUio is subaitting the inforrration?
Email Address: hpatti@trccompanies.com
Project Information
Existing ID #: Existing Version:
20181638 3
20170001(no dashes)
Project Name: MVP Southgate Project
Is this a public transportation project?
r Yes
r No
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
r Yes r No r Unknown
County (ies)
Alamance
Rockingham
Please upload all files that need to be submited.
Oickthe upload button or drag and drop files here to attach document
MASTER_NC_JPA Table Updates 4.17.2020.pdf
1.03MB
Appendix M_State_Permitting_11x17_Landscape_...
20.37MB
Append ix_M State_Permitting_11x17_Landscape_...
21.98MB
(S-A18-140 S-A18-143 S-A18-144) Detail Sheet.pdf
649.87KB
MPV-NC-S-C18-32-2-36-1 Detail Sheet.pdf
561.97KB
2020 IRS SOA MVP Southgate.pdf
141.17KB
MVP Southgate Project DMS Acceptance
352.12 KB
Letter202O.pdf
Wildlands Mountain Valley Pipeline Wetland SOA
139.14KB
04-16-2020. pdf
Appendix G_Wetland and Waterbody Crossing
586.54KB
Analysis April 17 2020.pdf
April 2020 401 Supplement Cover Letter - Final.pdf
231.91 KB
Only pdf or Ivre files are accepted.
Describe the attachments:
Updated impact tables, impact figures, updated alignment sheets and other updated Joint 404/401
Appendices including updating mitigation bank reserve letters
Sign and Submit
V By checking the box and signing box below, I certify that:
o I have given true, accurate, and complete information on this form;
o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the
"Uniform Electronic Transactions Act")
o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act');
o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature; AND
o I intend to electronically sign and submit the online form."
Signature:
Submittal Date: Is filled in autorratically.