HomeMy WebLinkAbout20020836 Ver 1_COMPLETE FILE_200205240F wArF9OG
CO r
Wdiiem G. Ross Jr., SecretaryNorth Carolina Department of Environment and Natural Resources
Alan Klimek, P.E., Director
Division of Water Quality
June 4, 2002
Catawba County
DWQ Project #: 02-0836
Approval Of 401 Quality Certification with
Additional Conditions and Catawba River Buffer Rules
Scott Barr
1766 Richmond Drive
Sherrills Ford, NC 28673
Dear Mr. Barr:
You have our approval, in accordance with the attached conditions, to place fill material in 0.014
acres of wetlands or waters for the purpose of shoreline stabilization at Lot# 22 at N V Harbor
subdivision as you described in your application dated May 24, 2002. After reviewing your
application, we have decided that this fill is covered by General Water Quality Certification Number
3376, which may be viewed on our website at hqp://h2o.enr.state.nc.us/ncwetlands. This certification
allows you to use General Permit Number 30 when the Corps of Engineers issues it. This approval is
also valid for the Catawba River buffer rules (15A NCAC 2B .0243). In addition, you should get any
other federal, state or local permits before you go ahead with your project including (but not limited to)
Sediment and Erosion Control, Coastal Stormwater, Non-Discharge and Water Supply Watershed
regulations. This approval will expire when the accompanying 404 or CAMA permit expires
unless otherwise specified in the General Certification.
This approval is only valid for the purpose and design that you described in your application
except as modified below. If you change your project, you must notify us and you may be required to
send us a new application. If the property is sold, the new owner must be given a copy of this
Certification and approval letter and is thereby responsible for complying with all conditions. If total
wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be
required as described in 15A NCAC 2H.0506 (h) (6) and (7). This approval shall expire when the
corresponding Nationwide Permit expires or as otherwise provided in the General Certification. For this
approval to be valid, you must follow the conditions listed in the attached certification and any
additional conditions listed below.
1. Stormwater shall be directed to flow at non-erosive velocities across the entire protected stream
buffers;
2. No trees shall be removed from Zone 1 of the Catawba Buffer unless they are directly within
the construction access corridor. If trees are removed, at least two species of native forested
vegetation shall be re-established within the construction access or other temporary impact area
occurring in the protected buffer zone within the next growing season following construction
of the project;
3. This project is for the installation of a bulkhead to prevent further erosion of the property due
to wave action. The use of mechanical equipment on the beach must be minimized;
N. C. Division of Water Quality, 401 Wetlands Certification Unit,
1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address)
2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location)
(919) 733-1786 (phone), 919-733-6893 (fax), (http://h2o.enr.state.ric.us/rcwetiands
4. Equipment and materials may be offloaded to the beach at the bulkhead site, but steps must be
taken to keep all equipment out of the reservoir;
5. Any disturbance within 50 feet of the shoreline must be done in compliance with the Catawba
River buffer rules;
6. Upon completion of the project, the applicant shall complete and return the enclosed
"Certification of Completion Form" to notify DWQ that all the work included in the 401
Certification has been completed The responsible party shall complete the attached form and
return it to the 401/Wetlands Unit of the Division of Water Quality.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory
hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send
a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the
Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and
its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean
Water Act. If you have any questions, please telephone John Dorney at 919-733-1786 or Mike Parker at
our Mooresville Regional Office at 704663-1699.
Attachments
cc: Corps of Engineers Asheville Field Office
Mooresville DWQ Regional Office
File copy
Central Files
Chip Bridges, CBC Custom Shorelines, Inc.
Sincerely,
The following is an abbreviated application form for those applying ford 401 Water
R 1 t C lss'
Quality Certification to impact FEW, (Federal Energy egu a ory omm ron)
regulated lake shore or bottom under the U.& Army Corps of Engineers Permit
GP30. This Application cannot be used for. wetland or stream impacts. Please
provide seven (7) copies of this application and supporting information as well as a
non-refundable application fee to the Division of Water Quality of $200.00 for
impacts of to lake bottom of less than 1 acre add $475.00 for impacts to lake bottom
of greater or equal to 1 acre.
Applications should be sent to: --`?
Division of Water Quality.Wetlands Unit MAY 2
1650 Mail Service Center
Raleigh, NC 27699-1650r?? lip
I. Applicant Information
1. Owner/Applican Infi
Name: C r)
Mailing Address:
p
Telephone Number: Fax Number: -
E-mail Address:
2. Agent Information (A signed and dated copy of the Agent Authorization letter
must be attache t (the Agent has signatory authority for the owner/applicant.)
Name: t
Company Affiliation:
Mailing Address: $
Telephone ivumoer:
E-mail Address:_U
II. Project Information
Attach a vicinity map clearly showing the location of the property with respect to
local landmarks such as towns, rivers, and roads. Also provide a detailed site
plan showing property boundaries and development plans in relation to
surrounding properties. You may use the diagram below to make a hand sketch of
{
your project. Also, see the example below for guidance. Both the vicinity map and
site-plan must include a scale and north arrow.' The footprints of all buildings,
impervious surfaces, or other facilities must be included.
1. Location
County: CtG???tX? . Nearest Town: sY`c
Subdivision name or site address (include phase/lot number):
Directions to site please include road numbers, Ian etc.k This is not
necessary if an adequgte vicinity map is included):
2. Describe the existing land use or con itto of the site at the time of this
nr.r??ir?ttnn• ?f f?3? Q ? ?•!?
8
3. Property size (acres): 1
4. Nearest body of water (stream/river/sound/occan/lakc): P-lYeir
5. Describe the purpose of the proposed work: ??i'G>v ?5h Il'1 E
G. List the type of equipment to be used to construct the project: ?t?T. &e
7. Amount of impact (including all excavation, backfill, rip rap, reta} ,L.: ingjwalls,
etc.) below the normal pool lake level in square feet or acres: / Z.
a. Amount of impact (including all clearing, back fill, excavation, rip rap,
retaining walls, etc.) above the ngt{zt?1 pool lake level and 50 feet land-ward in
square feet or acres:
b. Please describe vegetation above the normal pool lake level and 50 feet
wad to be impacted (number of tree1 L- s for insta nCOI-,,,„? JY?4
Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
51)11 remcri I eadard ?en
Sd? drmc
Flooded IEf .
E- myi/a,
a ?c`X V4h high
7oi&l .S?e?in2?
a..10 1C 3I
Please approximately sketch the following information on this plan
(please provide dimensions for each item, such as 10 ft. x 100 ft):
1) AN `proposed vegetation clearing (provide dimensions)
.?) Location of rip rep or fill to be placed above the "Normal Pool" eleva rm
3) location of rip rap or till to be placed below the 'Normal Pool" elevation
4) The location of any proposed structures such as buildings, retaining
wails. docks, etc. below the "Normal Poor
5) The location of any excavation or dredging
elevation.
6) Location of construction access corridors.
DUKE POWER LAKE MANAGEMENT, EC12-Q
P O BOX 1006
CHARLOTTE, NC 28201-1006
704-382-1567 or TOLU FREE 14500-443-5193
APPLICATION FOR PERMIT TO STABILIZE THE SHORELINE IN NORTH CAROLINA
Please type or print and fill in all blanks. If information is not applicable, so indicate by placing N/A in
blank. PLEASE SUBMIT APPLICATION AND APPROPRIATE DUKE POWER FILING FEE,
PAYABLE TO DUKE POWER, TO ABOVE ADDRESS
I. Applicant Information
A. Name _? h [?t+
B. Mailing Address t0 Q 1 tJ 1K?tn?CA 12041_
^rr?1 ?/(?L cQ 50'73
C. Telephone:C /1 S - 4 1 S - 53JCS
U. Location of Proposed Project
A. Lake [100DEW \
B. Street Address W , C
C. County D. City, town, community or landmark
E. Section Lot # Subdivision r
F. Directions to pro erty b rod .-7 ;A6,Shettt11s AaW
M" I r C 13kiE in C'_kc
G. Latitude and longitude for the project site - ' DD 86,949YOD
Please submit a map showing the coordinates or a detailed map (USGS qufk map, city
map, etc.) showing the exact location of the project site. (NOTE: Latitude/ longitude
coordinates can be found on internet site, www.mapblast.com)
UL Description of Project 1
A. Length of wall o?
B. Material u Y e- l' &r
- C. Distance from property line/shoreline
IV. Intended Use of Project Area
A. Private
B. Commercial
V. Applicant Signature Date 0 2._
PLEASE NOTE THE FOLLOWING:
• A COPY OF THE COMPLETED APPLICATION WITH A ROAD MAP SHOWING LOCATION OF
THE PROPERTY MUST BE SUBMITTED TO: US ARMY CORPS OF ENGINEERS, 151
PATTONAVE. - ROOM 208, ASHEVILLE, NC 28801-5006
• A COPY OF THE "DUKE POWER APPLICATION FOR PERMIT TO STABILIZE THE SHORELINE
IN NORTH CAROLINA" AND SEVEN (7) COPIES OF THE COMPLETED "NC DIVISION OF
WATER QUALITY PRE-CONSTRUCTION NOTIFICATION APPLICATION" MUST BE
SUBMITTED WITH THE DIVISION OF WATER QUALITY APPLICATION FEE TO:
NC DIVISION OF WATER QUALITY
ATTENTION. JOHNDORNEY
1621 MAIL SERVICE CENTER
RALEIGH, NC 27699-1621
919-733-1736
1 l/ 10/00ssb
sM, Sy Ate.. ??KY?' 's +?w•,
KE-MORMAN
w?
fi 56• ??
c;
5G C?P? Oa
0
9p 3p o, s. p?
?t
PT.
a
as: 1
3.00
V '
?. rr
0
?s
23"W
D 21i
t
ti
L15
1
A cp
l? 0 2.2-
V. A
V a
V, v
' f 1.19
?V o ACRES
A
O?
i- G
-' of
Lib Ll°
9 ,.
23 $
t _:? .25
ACRES
f 0.92 •
ACRES *...?? MgL .? .*
440526 ftW 204
t. 1.06
ACRES
(OZI
98' G'
t7? Of
? U
0
\15-RCP
L
ISEE COS
NOT
Z;
COS ??. AO
t SEE NOTE 12 `??
ZO/IZ/S uu1nojL=pmioVoOOZ--oMSduWWjtg'LO£ZOIIaIjo2m]R ?uISIJ/Sn•3u•o4ujs•iua•s!2//:d:niq
dum xopul
?6?orj
U041130-1 1W jO II01
jasn SIf) aoj d olN
alSmipmo ainuztu-g•L
uminois
Mi OooZ = g3ui I :olmS duW
I 3o I a$ud duW juud
ZOIIZ/S=Z(IVV=t,(IVDV=£QVJ2B=Z(IVDW=I(IVDV=IY1DV=A'IV--OIV=j,DWOH0=QIi1tDLgLu. i°..
ash do swJal TOOZ oO 346uAdo:)
AS OINIMOd
:)!!0d en!ad sn ul!M as!laanpy M:)egpaad IaH sn Inogd awoH
0 u031 deyy Q :anon, of dew)plo
YS PUe cN?h ?l '(718
?*"¦woo
i %M ut do swrmmo
i •L-l 11
tio?a?e? a ??aias
:dew Aw uo seaeld army mogS
4pmeS faouwv
sapo:D:poda!y Sn
apoo )joda!v
`pjoj Smile anuQ Mep J!eJ
apoo d!Z ao a}e tleUO!ldo) ssaapp`d IaajIS
sawis pai!un
i? uoo
?(ao}s!H ssaJppy :uol1e?o?
I jo I aged iwIgdLW
390E9'SE :del mz-£L98Z ON'PioJ sllWQ4s
N , MRSaa% 4 ia4«am -10 3leo Aedd
iAepo> >a;s-!U9-,d Zjagwew ;selgdeWAW a Told Zp.'oenssed ino,,;sol i4selg eW W of w o-I
0
A
-n
O
o
i
i BUUESTONE
; cr 4PO4.
Me i
po(Nt
{'t ?i ?i_? { + 2 S
R
?
D
r
x
2? i V
`e5do eP? Pl
E
Yt
w.
?O I Yl uwaI y 1
1 ', a nir?r: 150 J?<
Rp ( H MARS °t_ GAF ?.
y: RErA 'L{y FPS
bdY pp0
G
IC , 111 CR .
4 ?O< J?
Sy( p y 9 pSC GORDp
Riv?RWp
MP
R??s
N . 4 Qr Cy ??? ? RCS. n ?? Qo- . l c
r ?' P? ? m O?1?J` o r03
1 ? 000 ? ? QQ'Q ?? ? P2 ?+ av'y ?, G t?
BEATEN ao? s
E
c S 0 y
V Sk' O
)N ? HO Hi ?BEECHFIELD
,LO a EECH C-r
°e ",ter )? a ?? q
e ? O
o?oP.cQ `2a o?? m ??Py? SR
A;1:C
E4sr
pA T A _ 7 _ 1 1-?u °°-• CN P- - ---