Loading...
HomeMy WebLinkAbout20071100 Ver 1_More Info Received_20200302; Coastal Management ENVIRONMENTAL QUALITY MEMORANDUM TO: Greg Bodnar THROUGH: Jonathan Howell FROM: Shane Staples DATE: December 2, 2019 SUBJECT: Modification of CAMA Permit No. 66-08 ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director CAMA Major Permit No. 66-08 was issued to Bruce Carlson on June 18, 2008 for the construction of a large marina and associated upland development on Pungo Creek a tributary of the Pungo River in Belhaven, NC; the development is also known as Lancaster Landing Inc. The permitted development included a 95 lot residential subdivision, 24 condominiums, ships store, bathhouse, swimming pool and 109 slip marina. The structures associated with the marina docking facility are the only development that have occurred to date. The permit has been renewed multiple time and had multiple refinements. The last refinement was issued on August 7`h 2017 changing the dimensions of the ships store and bathhouse; the latest renewal was issued on June 19'h 2019. On November 14'h 2019 the Washington district received a request to modify Major Permit 66-08 to include a kayak launch to the existing marina. The launch would include an ADA accessible walkway leading from leading from C-dock which is centrally located in the marina to a step-down platform measuring 8'4" x 38" which would have two 4' x 20' finger piers on either side. The structure will require an additional 9 support pilings be installed and shade approximately 476ft2 of open water but will not add to overall footprint on the marina. The proposed modifications fit the specific use standards as set out in 15A NCAC07.0208(b)(5). A check for $100.00 for the modification has been deposited in the Division's account. This office recommends that CAMA Major Permit No. 66-08 be modified to allow the addition of the described kayak launch to the existing marina. State of North Carolina I Environmental Quality I Coastal Management Washington Office 1 943 Washington Square Mail I Washington. North Carolina 27889 252 946 6481 C nc m L 4- ,e,a.. DECEIVED NOV 1 R Z019 L P /Vy v 1 17 Rom: /��.�,�.,.. 6,6 o Of3 6 6 og - ,ate DCM-WARD 4.8 Ramps 4.8.1* General Any part of an accessible route with a slope greater than 1:20 shall be considered a ramp and shall comply with 4.8. 4.8.2* Slope and Rise The least possible slope shall be used for any ramp. The maximum slope of a ramp in new construction shall be 1:12. The maximum rise for any run shall be 30 in (760 mm). Curb ramps and ramps to be constructed on existing sites or in existing buildings or facilities may have slopes and rises as allowed in 4.1.6(3)(a) if space limitations prohibit the use of a 1:12 slope or less. Level Landing SLIFloce ai Romp Level Landing T/ Horizontal Projection or Run r titaaimem Lose MaILM1Um Liun-'n"sul Ltrolmmyr. Slope n n u f, n 1:12 to < 1:16 3r) 760 39 ' 1:16 to < 1:20 ?(] '60 sp 4.8.3 Clear Width. The minimum clear width of a ramp shall be 36 in (915 mm). 4.8.4* Landings Ramps shall have level landings at bottom and top of each ramp and each ramp run. Landings shall have the following features: (1) The landing shall be at least as wide as the ramp run leading to it. (2) The landing length shall be a minimum of 60 in (1525 mm) clear. (3) If ramps change direction at landings, the minimum landing size shall be 60 in by 60 in (1525 mm by 1525 mm). (4) If a doorway is located at a landing, then the area in front of the doorway shall comply with 4.13.6. 4.8.5* Handrails If a ramp run has a rise greater than 6 in (150 mm) or a horizontal projection greater than 72 in (1830 mm), then it shall have handrails on both sides. Handrails are not required on curb ramps or adjacent to seating in assembly areas. Handrails shall comply with 4.26 and shall have the following features: ■ Complete items 1, 2, and 3. ■ Print your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: 3-lx Ail 0, - �' a ft II I II i I II 9590 9402 4582 8278 2852 47 2. Article Number (transfer from service label A 2290 0001 7652 5676 PS Form 3811, July 2015 PSN 7530-02-000-9053 A. Signature `1A^ e - - Age 3. Service Type ❑ Priority Mail Express® ❑ Adult Signature ❑ Registered MajlT ❑ Adult Signature Restricted Delivery ❑ Registered Mail Restrl ❑ Certified Mail® ❑ Certified Mail Restricted Delivery Delivery ❑ Return Receipt for Delivery ❑ Collect on Del ❑ Collect on Delivery Restricted Delivery Men ridise ❑ nature Conflnnatio 9 ❑ Insured Mail ❑ Signature Confinnatio ❑ Insured Mail Restricted Delivery Restricted Delivery Domestic Return Rece QZU 4.8 Ramps 4.8.1* General Any part of an accessible route with a slope greater than 1:20 shall be considered a ramp and shall comply with 4.8. 4.8.2* Slope and Rise The least possible slope shall be used for any ramp. The maximum slope of a ramp in new construction shall be 1:12. The maximum rise for any run shall be 30 in (760 mm). Curb ramps and ramps to be constructed on existing sites or in existing buildings or facilities may have slopes and rises as allowed in 4.1.6(3)(a) if space limitations prohibit the use of a 1:12 slope or less. Level Landing Surlace of Ramp Level Landing --"'��....���\\\1 Horizontal Projection or Run l r Maximum K"s: Nlahnaum liurttnnutl 1Co4ittun si wv m inm tc rt 1:12to < 1:16 3' '60 JD a 1.16 to < 1;20 30 161) 40 4.8.3 Clear Width. The minimum clear width of a ramp shall be 36 in (915 mm). RECEIVED SEP 11 2019 DCM-WARD 4.8.4* Landings Ramps shall have level landings at bottom and top of each ramp and each ramp run. Landings shall have the following features: (1) The landing shall be at least as wide as the ramp run leading to it. (2) The landing length shall be a minimum of 60 in (1525 mm) clear. (3) If ramps change direction at landings, the minimum landing size shall be 60 in by 60 in (1525 mm by 1525 mm). (4) If a doorway is located at a landing, then the area in front of the doorway shall comply with 4.13.6. 4.8.5* Handrails If a ramp run has a rise greater than 6 in (150 mm) or a horizontal projection greater than 72 in (1830 mm), then it shall have handrails on both sides. Handrails are not required on curb ramps or adjacent to seating in assembly areas. Handrails shall comply with 4.26 and shall have the following features: 4.8 Ra-mps 4.8.1 * General Any part of an accessible route with a slope greater than 1:20 shall be considered a ramp and shall comply with 4.8. 4.8.2* Slope and Rise The least possible slope shall be used for any ramp. The maximum slope of a ramp in new construction shall be 1:12. The maximum rise for any run shall be 30 in (760 mm). Curb ramps and ramps to be constructed on existing sites or in existing buildings or facilities may have slopes and rises as allowed in 4.1.6(3)(a) if space limitations prohibit the use of a 1:12 slope or less. Level Landing a Surface of Ramp _urf _ Level Landing Horizontal Projection or Run l Ntamm4m lint, 17aasmum H rr.:11-1.rl 1'71'),WLuvr. Siupe +r mat fs m 1;12 to < 1:16 3r'r 160 30 => 1:16to< 1:20 Y. -61) s0 != 4.8.3 Clear Width. The minimum clear width of a ramp shall be 36 in (915 mm). 4.8.4* Landings Ramps shall have level landings at bottom and top of each ramp and each ramp run. Landings shall have the following features: (1) The landing shall be at least as wide as the ramp run leading to it. (2) The landing length shall be a minimum of 60 in (1525 mm) clear. (3) If ramps change direction at landings, the minimum landing size shall be 60 in by 60 in (1525 mm by 1525 mm). (4) If a doorway is located at a landing, then the area in front of the doorway shall comps �- AMEN SEP 11 2019 4.8.5* Handrails DCM'WARO If a ramp run has a rise greater than 6 in (150 mm) or a horizontal projection greater than 72 in (1830 mm), then it shall have handrails on both sides. Handrails are not required on curb ramps or adjacent to seating in assembly areas. Handrails shall comply with 4.26 and shall have the following features: Permit Number 66-08 Permit Class RENEWAL STATE OF NORTH CAROLINA 7 Department of Environmental Quality "� and zf N C Coastal Resources Commission 912- Vermit � � 3 for e0 $Agg& 1C r ^rt t hd 1407 X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Bruce Carlson,150 Old Ferry Road, Sneads Ferry, NC 28460 Authorizing development in Beaufort County at adi. to Pungo Creek, 400 block off Huff Road, Lancaster Landing Belhaven , as requested in the permittee's application date letter dated 6/1/19. This permit, issued on June 19, 2019 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) This renewal shall be attached to Permit No. 66-08, which was issued to the permittee on 6/18/08, as well as all subsequent modifications, refinements, and renewals, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No 071100. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No. 2007-393-107. NOTE: A permit renewal application processing fee of $100 was received by DCM for this project. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on July 14, 2021 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee