Loading...
HomeMy WebLinkAbout20000374 Ver 1_COMPLETE FILE_20000801O?O? W A T 6?9?G 6 r -=f O ? Michael F. Easley Governor William G. Ross, Jr., Secretary Department of Environment and Natural Resources Gregory J. Thorpe, Ph.D., Acting Director Division of Water Quality February 19, 2002 Brawley Farms DW Q# 000374 Mecklenburg County Mr. Frank DeSimone Fieldstone Associates 3126 Milton Road, Suite 217 Charlotte, NC, 28215 APPROVAL of 401 Water Quality Certification with Additional Condition Dear Mr. DeSimone: You have our approval, in accordance with the attached conditions, to place fill in 0.73 acres of wetlands and 60 feet of stream in order to construct the Brawley Farms residential development in Mecklenburg County, as described in ycur application received by the Division of Water Quality on March 24, 2000 and revised August 10, 2000 and February 8, 2002. After reviewing your application, we have determined that this fill is covered by General Water Quality Certification Number 3108, which can be downloaded from our web site at http:Hh2o.enr.state. nc.us. This Certification allows you to use Nationwide Permit Number 26 when it is issued by the U.S. Army Corps of Engineers. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. You should send an application to the Division of Land Resources for their review of your project under dam safety rules as well as erosion and sediment control. Also this approval will expire when the accompanying 404 permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us in writing and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification and those listed below. The stormwater management plans including two extended wet detention ponds dated January 31, 2002 and submitted on February 14, 2002 shall be constructed and implemented according to the approved plans before any building in the area labeled Phase IV is occupied. The entire area labeled DA 4106 as well as 6.56 acres of Phase I will to drain to the forebay of pond # 1. The structural stormwater practices as approved by this Office as well as drainage patterns must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the Division of Water Quality. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Pete Colwell in our Mooresville Regional Office at 704-663-1699 or Todd St. John in Raleigh at 919-733-1786. _qinnorah/ 14 Attachments North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center. Raleigh, NC 27599-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) .. r. inn .-loc i..ti.,.-. ,.n.n ?n-? c,nn i....?......in. n .. .......... ... .... ..,. i.......,. a., .,..., Page 2 of 2 cc: Corps of Engineers Asheville Regulatory Field Office Mooresville DWQ Regional Office Central Files File Copy Brandon Pridemore; R. Joe Harris And Associates, PO Box 3086, Fort Mill, SC 29708 b6 W A T ?RQG o -c Michael F. Easley Governor William G. Ross, Jr., Secretary Department of Environment and Natural Resources Gregory J. Thorpe, Ph.D., Acting Director Division of Water Quality Memorandum To From: February 18, 2002 John Dorney Todd St. John 00 Subject: Brawley Farms Mecklenburg County DWQ# 000374 The 401 WQC for this project has not been issued. I spoke with Brandon Pridemore, the engineer, regarding the ponds. Pond #2 drains about 5.86 acres. The entire area labeled DA #106 as well as 6.56 acres of Phase I will to drain to the forebay of pond # 1. The 401 Water Quality Certification should be conditioned to require the entire area labeled DA #106 drain to the forebay of pond 41. 1 recommend that the 401 WQC specify that the stormwater management plans dated January 31, 2002 and submitted on February 14, 2002 be constructed and implemented. 6AIq)C North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), http:Hh2o.enr.state.nc.us/ncwetlands/ WET DETENTION POND (B.M.P.) CALCULATIONS for BRAWLEY FARMS SUBDIVISION PHASE IV Prepared for FIELDSTONE ASSOCIATES, L.P. 4508 East Independence Blvd., Suite 205 Charlotte, N.C. 28205 RJH Ref. No. 1041 Rev. January 31, 2002 Prepared by: ,\\1111111111Ito4 10 .?` O A CARD '•? -SS/ N9 ?'• 0 o •. c,FHAL 0107 : -? s \\ lIIWO% R. JOE HARRIS & ASSOCIATES, PLLC 1698 W. Highway 160, Suite 210 Fort Mill, South Carolina 29708 Phone: 803-802-1799 Fax: 803-802-0886 ,\\111111/1f,?, •?`?, i vk CA p??''•, FESS?? C7i y- -*0 L ???? ??IC.1111v \\ R. Joe Harris & Associates, L.L.C. P.O. Box 3086, Fort Mill, S.C. 29708 (803) 802-1799 Fax (803) 802-0886 FFR14. February 8, 2002 Mr. John Dorney Wetlands Unit Supervisor North Carolina Division of Water Quality 1650 Mail Service Center Raleigh, North Carolina 27699-1650 Re: Fieldstone at Brawley Farms (Brawley Farms Phase IV) Mecklenburg County, North Carolina DWQ Project No.: 000374 RJH Re£No.: 1041 Dear Mr. Dorney: In reference to your letter dated December 11, 2001, we are providing revised calculations and supporting data for the two (2) wet detention ponds conditioned upon the site for 401 certification and approval. The calculations have been revised to maintain consistency with that of the City of Charlotte Engineering Department's requirements for stormwater modeling. The HEC-1 program has been used to model the stormwater runoff in lieu of the previously submitted Drainedge program. The revised plans and calculations incorporate those comments noted on your letter and they have been addressed as follows: The draw down orifice for pond #2 has been revised to 2 inches, which will release the temporary water quality pool volume in approximately 5 days (120 hours). 2. The forebay for each pond is equal to or greater than 20% of the total basin volume. Total basin volume was described as the volume of the forebay and main pool at permanent pool level by Mr. Todd St. John. Detail sheet provided in the submittal book for pond cross-section and outlet structure information. Completed operation and maintenance agreements enclosed for each pond. We trust that the information provided will enable you to complete your review of this project and if you should have any additional comments or need additional information, please feel free to contact us. Sincerely, R. JOE HARRIS & ASSOCIATES, PLLC Brandon S. Pridemore Project Manager cc: Joe Floyd, Brigman Company WET [WETLAND] DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT [Wetland maintenance wording Is bracketed. Please modify the document as appropriate.] The wet [wetland] detention basin system is defined as the wet [wetland] detention basin, pretreatment including forebays and the vegetated filter if one is provided. Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: I /I a. Inspect the wet [wetland] detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet [wetland] detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet [wetland] detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads c.41' feet in the main pond, the sediment shall be removed. [For stormwater wetlands: If the elevation of the marsh areas exceed the permanent pool elevation, the sediment should be removed to design levels. This shall be performed by removing the upper 6 inches of soil and stockpiling it. Then the marsh area shall be excavated six inches below design elevations. Afterwards the stockpiled soil should be spread over the marsh surface. The soil should not be stockpiled for more than two weeks.] When the permanent pool depth reads c,,41.08' feet in the forebay [and micro-pool], the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation SO.oo• Sediment moval EI.44 . 75% ------------- - Sediment Removal Elevation .oo 75% Bottom E vation r5-%1. FOREBAY B.M.P. Pond #1 MAIN POND r _ _ . . _ f n 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. [For wetlands: Wetland planting densities in the marsh areas should be maintained by replanting bare areas as needed. Wetland plants should be encouraged to grow in the marsh areas.] 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet [wetland] detention basin system shall be maintained in good working order. 8. Level spreaders or other structures that provide diffuse flow shall be maintained every six months. All accumulated sediment and debris shall be removed from the structure, and a level elevation shall be maintained across the entire flow spreading structure. Any down gradient erosion must be repaired and/or replanted as necessary. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Frank DeSimone - Fiel dsf-a e_A-snci atP? T.P Title: Operatios Manager Address: 4508 E. Independence Blvd. , Suite 2050 Charlotte., NC 28205 Phone: SignatL Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, a Notary Public for the State of County of do hereby certify that -61tpNow ?1L"CAw.Z&E personally appeared before me this I a_ day of uaa , and acknowledge the due execution of the forgoing wet [wetland] detention basin maintenanirements. Witness my hand and official seal, J -- - EXPIFAta My commission expires MAAIEIA9ER a, 2W r_ _ _ n _Pn WET [WETLAND] DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT [Wetland maintenance wording is bracketed. Please modify the document as appropriate.] The wet [wetland] detention basin system is defined as the wet [wetland] detention basin, pretreatment including forebays and the vegetated filter if one is provided. Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet [wetland] detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet [wetland] detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet [wetland] detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 4 $5j 5 feet in the main pond, the sediment shall be removed. [For stormwater wetlands: If the elevation of the marsh areas exceed the permanent pool elevation, the sediment should be removed to design levels. This shall be performed by removing the upper 6 inches of soil and stockpiling it. Then the marsh area shall be excavated six inches below design elevations. Afterwards the stockpiled soil should be spread over the marsh surface. The soil should not be stockpiled for more than two weeks.] When the permanent pool depth reads y s 3.44 feet in the forebay [and micro-pool], the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation Sediment moval El. 75% ------------- - Sediment Removal Elev_ation.s _ _7_5_°_/0_ Bottom E vation re53.as15% A FOREBAY MAIN POND BM.P. Pond #2 T___ . _rn 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. [For wetlands: Wetland planting densities in the marsh areas should be maintained by replanting bare areas as needed. Wetland plants should be encouraged to grow in the marsh areas.] 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet [wetland] detention basin system shall be maintained in good working order. 8. Level spreaders or other structures that provide diffuse flow shall be maintained every six months. All accumulated sediment and debris shall be removed from the structure, and a level elevation shall be maintained across the entire flow spreading structure. Any down gradient erosion must be repaired and/or replanted as necessary. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name:. Frank DeSimone - Fieldstone Asso -ia s. L.P Title: Operations Manager Address: 4508 F TndQ ondQn6.e Blvd ,-S1Aa,t;e 205, Char-lott;e-r--NG 28205 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, . &K-1 )N ILLI , a Notary Public for the State of tVo,-44, . C c,-n ? , =C; County of , do hereby certify that BRAN coo '?.eta awyn." personally appeared before me this day of a, and acknowledge the due execution of the forgoing wet [wetland] detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires MYOO?M118810NEXPIREb r _ - - n - r n laotV. - • • • WET DETENTION POND (B.M.P.) CALCULATIONS for BRAWLEY FARMS SUBDIVISION PHASE IV Prepared for FIELDSTONE ASSOCIATES, L.P. 4508 East Independence Blvd., Suite 205 Charlotte, N.C. 28205 RJH Ref. No. 1041 Rev. January 31, 2002 Prepared by: ° °. N9 y: - '--AL C3 _,? i Q• •??'? 1?18"A' sO0 R. JOE HARRIS & ASSOCIATES, PLLC 1698 W. Highway 160, Suite 210 Fort Mill, South Carolina 29708 Phone: 803-802-1799 Fax: 803-802-0886 Q• l - Ov • Table of Contents 1. Project Summary (Pre & Post Development Conditions) Z. Topography Map (Field Run Topo w/Mecklenburg County Topo) 3. Soils Map and Information 4. Storm Drainage Calculations - Rational Method A. 2 Year Rainfall B. 10 Year Rainfall 5. Time of Concentration Calculations, Pre-Development A. 2 Year - Basin #101 B. 10 Year - Basin #101 C. 50 Year - Basin #101 *Includes contributing 7.00 acres from the Phase I development. 6. Time of Concentration Calculation, Post-Development A. 2 Year - Basin #101 Basin #102 • = Basin #104 - Basin #106* - Basin #156* B. 10 Year - Basin #101 - Basin #102 - Basin #104 - Basin #106* - Basin #156* C. 50 Year - Basin #101 - Basin #102 - Basin #104 - Basin #106* - Basin #156* * Assume Tc of S minutes from most remote point to nearest catch basin + time of travel through storm drain system. Use velocities from storm drainage calculations for respective storm frequency. 7 HEC-1 Model - 2, 10 & 50 Year Storm A. Input Data B. Output Data 0 8. B.M.P. Wet Pond Calculations A. Pond #1 B. Pond #2 G Outlet Structure Pipe Design 9. Pre & Post Development Drainage Maps 10. Grading Plan & B.M.P. Pond Detail Plan PROJECT SUMMARY Description: Brawley Farms Subdivision Phase IV will consist of the development of 90 lots on approximately 32.07 acres located within Mecklenburg County, North Carolina along Brawley Lane. The development will include a future Phase V, which is adjacent to the site and will consist ofapproximately 82 lots on 31.50 acres and is subject to change during the design and subdivision approval process. Drainage Features: The Phase IV and Phase V development sites will drain to an existing creek that divides the development and is the low point of'the sites. The creek is an unnamed tributary of Reedy Creek. The existing topography of the site is moderately sloped and contains forested vegetated cover ranging from fair to good hydrologic conditions. The dominant soils for the site are Cecil and Pacolet type soils and these soils are classified as Hydrologic Group "B ". • Stormwater Management: All ,stormwater collected by the proposed storm drainage system for the subdivision will be routed through one of the two wet detention ponds (B.M.P.) located on each side of the existing creek. Local stormwater management practices do not require on-site detention, but as agreed upon by the Owner and DENR as an acceptable condition of the State 401 Water Quality Certification to construct the proposed roadway crossing, the ponds have been designed in accordance with the latest edition of'the DENR °Stormwater Best Management Practices " guide (April 1999 version). The ponds have been sized for the development of Phase IV and the anticipated development of Phase V. Phase V will be subject to change during the design and subdivision approval process at a later date. Description: Pre-Development Post-Development * HEC-I used to compute flows. 2 Year: 10 Year. 16 efs. 130 cfs 15 c.f.'s. 127 cf. s. 40 '- 500' SCALE. 1" t t r t ti 'j ? t • • Y) 0 1e ,t?aI „ tett Cor 1 l t t -, [:yn, ? b.?' n c ar.:n:' ,r: "r.+ ? i ? p, •1 ,/n? r 1 thiri? rn a. .;r rt I n;, ' FI,.,I,nJ, h war. - ?11 'K ' ' t1 n a m m e :1 y I ? . i ._....; .. map ,ymbol I,)gi F: -q,len °/ Gt.u-7tlr?n '`trr,'Y ftpttt K I n I rih Cpl, ,fa '1- ;IJr,...,L,',I n;r'>•L., ? . ' ? In af:-3, ? i App I ing i i i et) -ifi? CwD": , 'lrhan Iand . aH. DaD, PAV ----- ; i _.. .. R Nnn?_._ __ ,,, __ ie r1 Davidson En H, fnfi --- --" '-, None ------- i -°- -- i ?HiKh iM? Eit on ;e B2, GeD2----- ; ft No ne-- --- ___ br1 --- 3 n . 17 , i ? --- ;High-----;Hiv,Yt- ;eorgeville oB, (,oD------- - None --- -- - --- --- --- -- ")--+!'l R i- ;p Mod _ .. rat_ H i v h Golrlston , pable; HeH ----------------- , ,None -------- ; , Perc,hod ;Jit n-^1ar;4')-6O;Rip- ;HiKh-----•;Iliv h. Helena pabI , iuB t: -'ena------------ ;None --------. -- -- Par"hed Jan-Mar 114 i)-riO;Ri Hi r ---- ;Ili onble ; . ; On tan and __ ._ -__._, IrA, IrB--- ; t, I4o n a____.---- I P rr,he,] Nn v - Yt a r ri o ; ;; > --- h w ------, .. Iredel.l IJBI: I ; I Iredel.I ----- ----- D ,Ngne --.------ -.. -_- , 1.0-?.(J;PercIt ed ;Nov - Moir - ?h0 -- ;iii ;h ----- IL:- w. Urban land. -gB° -------------- , (. ;None -----_-; --- 1 --- i l-U-.'.7,Appa rent;Dec:-M;,v?tiii -'/?;Hard ;High-----;lit.gh. Lignum , 1eB, MeD_ --------- ' ,None-------- , --- , --- I ?0.0 i --- i --- HUH - Fi;iiHar'd i!ligh---?`-iM,,der'.aY.e Mecklenburg 1kBM: Mecklenbur------ ' g ,None -------- ? --- --- ? >6.0 --- ; --- ;t1N-60;Harif ;Nigh-----.Moderate. Urban land. ; 10 - - - - - - - , ---------' r• ,Common ------;E3r:ef----- ?- - ;Nov-May2.OiApparent. ;Nu v-Mit y; ?6 0 --- ;Modest? ;hligh. Monacan 1v*: Monacan ----- - ---- , (. ,common ------ , Hrief----- ;Nov-May ;o.5-2.O;Apparent;Nov-May; '60 i --- . ;Moderate ;iltgh. Arents. , 'aE, Pal' ---------- ; H 1None --------; --- --- >6.0 --- >bo ; --- --- ;HIP,h-----;High . Pacolet ; , See footnote at end of table. • a A Ah STORM DRAINAGE CALCU NS - RATIONAL METHOD 'ROW Project: Brawley Farms Subdivision Phase 4 Designed By: B.S.P. Date: January 44, 2002 Location: City of Charlotte ETJ, North Carolina Checked By. R.J.H. Note: Ad storm drainage designed for 25 year storm. HW taken from centerline of the pipe to 0.5 ft. below weir. Marmcrg's "n' of 0.012 used for all RCP. QSUB CAP represents flow capacity assuming pipe open V is submerged. Rim/Top' Weir F. To C Tc I Q ds Pi Elewition Elevation Slope Dia cap HW QSUB CAP yeboWps) V TYPE COVER Elev Elev Area min Sub Cum. Length In Oul M. m CfS CFS Coro- Full Cap) (RCP) Above Pipe) Outfal 513 6 (Exist ing Storm D fro m Phase : 734.56 733.76 189 188 0.35 0.60 5.00 5.03 1.06 1.06 32.00 731.23 730.66 0.0178 15 9.34 1.40 7.58 3.68 7.61 Ciasslll 1.28 734.40 733.60 188 187 0.22 0.60 5.00 5.03 0.66 1.72 45.00 730.47 727.73 0.0609 15 17.26 2.01 9.06 6.52 14.08 Ctassill 1.88 730.90 730.10 187 186 0.04 0.60 5.00 5.03 0.12 1.84 172.00 727.44 725.76 0.0138 15 8.21 1.53 7.93 4.07 6.70 Classill 1.41 729.33 728.53 186 185 0.00 0.60 5.00 5.03 0.00 1.84 168.00 725.41 720.91 0.0268 15 11.45 2.00 9.04 5.08 9.34 Classill 1.87 725.05 725.05 185 142 0.61 0.60 5.00 5.03 1.84 3.68 13.00 720.62 720.31 0.0238 15 10.80 3.30 11.63 6.15 8.81 Classlll 3.18 723.61 723.53 142 139 0.49 0.60 5.00 5.03 1.48 5.16 135.00 719.64 711.69 0.0604 15 17.19 2.56 10.25 9.38 14.02 Classill 2.44 728.37 727.57 141 140 1.10 0.60 19.00 2.96 1.95 1.95 244.00 723.60 715.65 0.0326 15 12.63 2.85 10.79 5.53 10.30 Ctassill 2.72 720.16 719.36 140 139 1.34 0.60 28.00 2.38 1.91 3.87 208.00 714.02 712.04 0.0095 18 11.10 4.09 18.63 4.42 6.29 Classill 3.84 715.57 714.77 139 138 0.00 0.60 5.00 5.03 0.00 9.03 7.18 711.18 711.13 0.0070 24 20.44 2.09 23.68 4.96 6.51 Classill 1.59 718.36 717.56 145 144 0.39 0.60 5.00 5.03 1.18 1.18 32.00 714.08 713.84 0.0075 18 9.85 223 13.76 2.75 5.58 Classill 1.98 718.04 717.24 144 143 0.39 0.60 5.00 5.03 1.18 2.35 45.00 713.72 713.26 0.0102 18 11.50 2.27 13.88 3.84 6.51 CIaSSIII 2.02 717.23 716.43 143 138 0.17 0.60 5.00 5.03 0.51 2.87 124.73 71221 711.23 0.0079 18 10.08 2.97 15.88 3.75 5.71 Classill 2.72 715.50 714.70 138 137 1.46 0.60 9.00 4.16 3.64 15.54 38.61 710.54 710.24 0.0078 39.15 2.41 39.73 5.86 7.98 Classill 1.66 715.33 714.53 137 136 0.13 0.60 5.00 5.03 0.39 15.93 23.75 710.18 710.08 0.0042 28.82 2.60 4117 4.82 5.88 CIassili 1.85 Cumulative Q from drainage areas. Flow capacity of pipe for gven size and Pines were increased to carry the 25 year storm for desig n of the downstream site stor m Inverts, slopes and weir grades take n fro m curve as-twAfs and have not been changed. Manipulations are as follows: Run: True Pi Size: #138 to #137 2-24" RCP #137 to #146 2-24" RCP ' Connect Cumulative Discha to SD#136 2 Year Stor m paw Sf a Ah Ah STORM DRAINAGE CALCULAORONS - RATIONAL METHOD qMW Project Brawley Farms Subdh tsion Phase 4 Designed By: B.S.P. Dabe: January 14, 2002 Location: City of Charlotte ETJ, North Carolina Checked By: R.J.H. Note: AN storm drainage designed for 25 year storm. HW fatten from centerline of the pipe to 0.5 R below weir. Marmeigrs'n' of 0.012 used for all RCP. QSUB CAP represents flow capacity assuming pipe openirg is submerged. Rimrrop* weir From To Drautage C TC 1 Q ds Elevation Elevation Slope Die cap HW QSUa CAP v V TYPE COVER El. Elm Aree min Sub Cum. L in Od m CIS CF Condtion FUN cap) (RCP) Above Pipe) Mares" Court to S D0110: 716.75 715.75 136 135 0.00 0.60 5.00 5.03 0.00 15.93 81.40 709.68 708.05 0.0200 30 62.86 4.32 53.19 8.11 12.82 Classill 3.57 716.10 716.10 135 134 0.00 0.60 5.00 5.03 0.00 15.93 78.59 707.85 706.08 0.0225 30 66.66 6.50 65.25 8.43 13.59 Classill 5.75 711.68 710.88 146 134 0.26 0.60 5.00 5.03 0.78 0.78 26.50 707.38 707.11 0.0102 18 11.48 2.25 13.82 2.66 6.50 Classlll 2.00 711.68 710.88 134 133 0.19 0.60 5.00 5.03 0.57 17.29 150.00 705.88 697.44 0.0563 30 105.37 3.25 46.14 11.76 21.48 Classill 2.50 703.11 702.31 147 133 1.01 0.60 5.00 5.03 3.05 3.05 26.50 698.40 698.24 0.0060 18 8.84 2.66 15.03 3.51 5.01 Classlli 2.41 703.11 702.31 133 132 0.80 0.60 12.00 3.99 1.92 22.25 12678 697.24 691.10 0.0484 30 97.75 3.32 46.63 12.16 19.93 Classill 2.57 699.83 699.03 148A 148 0.28 0.60 5.00 5.03 0.85 0.85 62.50 695.03 692.26 0.0443 18 23.95 2.75 15.28 4.45 13.56 Classill 2.50 696.70 695.90 148 132 1.25 0.60 22.00 2.73 2.05 2.89 26.50 692.06 691.90 0.0060 18 8.84 2.59 14.83 3.45 5.01 Classlll 2.34 696.70 695.90 132 131 0.52 0.60 5.00 5.03 1.57 26.71 125.00 690.90 684.94 0.0477 30 96.99 3.25 46.14 12.86 19.78 Classill 2.50 693.83 693.03 149A 149 0.11 0.60 5.00 5.03 0.33 0.33 67.50 689.03 686.10 0.0434 18 23.70 2.75 15.28 3.23 13.42 Classill 2.50 691.08 691.00 151 150 1.85 0.60 18.00 3.04 3.37 3.37 40.00 687.85 687.45 0.0100 18 11.38 1.90 12.70 4.29 6.44 Ciasslll 1.65 692.00 692.00 150 149 0.00 0.60 5.00 5.03 0.00 3.37 116.75 687.25 686.10 0.0099 18 1129 3.50 17.24 4.27 6.39 Ciassill 3.25 690.54 689.74 149 131 0.12 0.60 5.00 5.03 0.36 4.07 26.50 685.90 685.63 0.0102 18 11.48 2.59 14.83 4.60 6.50 Classill 2.34 690.54 689.74 131 130 0.54 0.60 5.00 5.03 1.63 3241 160.50 684.74 680.80 0.0245 30 69.80 3.25 46.14 10.99 14.19 Ctasslll 2.50 687.39 686.59 155 152 0.50 0.60 8.00 4.34 1.30 1.30 52.50 682.71 681.66 0.0200 18 16.09 2.63 14.94 3.94 9.11 Ciassltl 2.38 688.44 687.64 154 153 0.11 0.60 5.00 5.03 0.33 0,33 26.50 684.14 683.61 0.0200 18 16.09 2.25 13.82 2.50 9.11 Gasslll 2.00 688.44 687.64 153 152 0.38 0.60 5.00 5.03 1.15 1.48 59.75 683.41 681.66 0.0293 18 19.47 2.98 15.90 4.67 11.03 Classllt 2.73 686.34 685.54 152 130 0.33 0.60 5.00 5.03 1.00 3.78 26.50 681.46 681.30 0.0060 18 8.84 2.83 15.50 3.77 5.01 Classill 2.58 686.34 685.54 130 129 0.81 0.60 5.00 5.03 2.44 38.63 69.18 680.30 679.12 0.0171 36 94.34 3.24 66.33 9.91 1136 Classill 2.24 684.76 683.96 129 128 0.47 0.60 5.00 5.03 1.42 40.05 26.50 678.92 678.62 0.0113 36 76.85 3.04 64.25 8.75 10.88 Classlli 2.04 684.76 683.96 128 127 0.15 0.60 5.00 5.03 0.45 40.50 113.75 678.42 677.05 0.0120 36 79.27 154 69.34 8.97 11.22 Ciasslil 2.54 691.02 690.22 167 166 0.19 0.60 5.00 5.03 0.57 0.57 26.50 686.72 685.39 0.0502 18 25.48 225 13.82 4.07 14.43 Classill 2.00 691.02 690.22 166 127 0.13 0.60 5.00 5.03 0.39 0.97 49.42 685.19 682.22 0.0601 18 27.89 3.78 17.91 5.15 1579 Classill 3.53 687.60 687.60 127 126 0.00 0.60 5.00 5.03 0.00 41.47 194.23 676.85 671.99 0.0250 36 11426 8.75 109.01 11.53 16.18 Classill 7.75 684.00 684.00 126 125 0.00 0.60 5.00 5.03 0.00 41.47 199.59 671.79 663.81 0.0400 36 144.43 10.21 117.76 13.48 20.45 Classill 9.21 668.75 668.75 125 124 0.00 0.60 5.00 5.03 0.00 41.47 125.53 663.31 661.80 0.0120 36 79.22 3.44 68.35 9.04 11.22 Classill 2.44 667.00 667.00 124 123 0.00 0.60 5.00 5.03 0.00 41.47 200.03 661.30 660.20 0.0055 42 80.80 3.45 93.17 6.73 8.40 Ctasslll 2.20 666.55 665.75 123 110 0.73 0.60 5.00 5.03 2.20 43.67 34.50 660.00 659.79 0.0061 42 85.01 3.50 93.84 7.08 8.84 Classlll 2.25 Cumulative Q from drairrage areas. Flow cap of pipe for ' given size and e. ' Connect Cumulative Discha toMM 10 2 Year Storm Page #2 A I? I- STORM DRAINAGE CALCU NS - RATIONAL METHOD Row Project Brawley Farms Subdivislon Phase 4 Designed By: B.S.P. Date: January 14, 2002 Location: City of Charlotte ETJ, North CaroMm Checked By: R.J.H. Note: AN storm drainage designed tar 25 year skim. HW taken from centerline of the pipe to 0.5 ft. below weir. Marmkgs W of 0.012 used for all RCP. QSUB CAP represents flow capacity assuming pipe opening is submerged. Rimrrop* Weir From To DraktWe C TC I Q cis pipe Elevation Elevation Slope Dia HW OSLO CAP V Vel TYPE COVER Elev El. Area min Sub Cum. Length In Out (ftin.) rn cis Condt- Full Cap) QrP) Above Rpe) West Brad street Commons to SD8108: 712.80 712.00 118 117 0.45 0.60 5.00 5.03 1.36 1.36 34.50 705.94 705.73 0.0061 18 8.88 4.81 20.21 2.69 5.03 Classlll 4.56 712.80 712.00 117 116 0.58 0.60 5.00 5.03 1.75 3.11 171.00 705.53 701.62 0.0229 18 17.20 5.22 21.05 5.51 9.74 Classlll 4.97 708.69 707.89 119 116 0.58 0.60 5.00 5.03 1.75 1.75 34.50 701.83 701.62 0.0061 18 8.88 4.81 20.21 2.92 5.03 Classlll 4.56 708.69 707.89 116 115 0.56 0.60 5.00 5.03 1.69 6.55 305.76 701.42 696.96 0.0146 18 13.74 5.22 21.05 6.08 7.78 Classill 4.97 704.08 703.28 120 115 1.00 0.60 5.00 5.03 3.02 3.02 34.50 696.78 696.57 0.0061 18 8.88 5.25 21.11 3.51 5.03 Ctasslll 5.00 704.08 703.28 115 114 0.74 0.60 5.00 5.03 2.23 11.80 157.24 695.03 689.53 0.0350 18 21.28 7.00 24.38 9.90 12.05 Classtil 6.75 696.88 696.08 114 113 0.49 0.60 5.00 5.03 1.48 13.28 168.50 689.33 678.98 0.0614 18 28.19 5.50 21.61 12.42 15.97 Classlll 5.25 684.28 683.48 121 113 0.72 0.60 5.00 5.03 2.17 2.17 34.50 676.98 676.77 0.0061 18 8.88 5.25 21.11 3.14 5.03 Classlll 5.00 68428 683.48 113 112 0.21 0.60 5.00 5.03 0.63 16.09 62.93 672.65 671.64 0.0160 24 31.04 9.33 50.03 7.94 9.89 Classill 8.83 679.99 679.19 112 111 0.54 0.60 5.00 5.03 1.63 17.72 26.50 671.44 671.04 0.0151 24 30.10 6.25 40.95 8.03 9.59 Classill 5.75 679.99 679.19 111 110 0.05 0.60 5.00 5.03 0.15 17.87 149.47 670.84 662.16 0.0581 24 59.04 6.85 42.87 12.62 18.81 Classill 6.35 666.55 665.75 110 109 0.34 0.60 5.00 5.03 1.03 62.56 183.38 659.29 655.70 0.0196 42 152.45 4.21 102.92 11.78 15.86 ClasslV 2.96 661.59 660.79 122 109 0.50 0.60 5.00 5.03 1.51 1.51 34.50 657.91 657.70 0.0061 18 8.88 1.63 11.76 2.78 5.03 Classill 1.38 661.59 660.79 109 108 0.32 0.60 5.00 5.03 0.97 65.04 150.62 655.20 654.40 0.0053 48 113.37 3.09 115.17 7.50 9.03 Classill 1.59 Cumulative Q from drain areas. Flow of pipe for ' en size and slope. • Connect Cumuia #ve Discha to SDi'108 2 Yew Stor m page 93 a a Ah STORM DRAINAGE CALCU NS - RATIONAL METHOD Project: Brawley Farms Subdivision Phase 4 Designed By: B.S.P. Date: January 14, 2002 Location: City of Charlotte ETJ, North Carona Checked By: R.J.H. Note: AO storm drainage designed for 25 year storm. HW Wm from centerline of the pipe to 0.5 ft. below weir. ManniVs W of 0.012 used for all RCP. QSUB CAP represents flow capacity assuming pipe opening is submerged. Rimlfo * Weir From To Drainage C T. 1 Q WS) pipe Elevation Elevation Slope Dia Cap HW QSUBCAP V Y TYPE COVER EW Elm Area Ac. min Sub Cum. Length In Out lm. m cfs CFS Condition Full Cap) 01M (Ab- Pipe) Hodmamg Ic Drive & Counselor B luff Drive to SD#107` 713.96 713.16 174 173 1158 0.60 5.00 5.03 1.75 1.75 26.50 709.66 709.13 0.0200 18 16.09 2.25 13.82 4.35 9.11 Classlli 2.00 713.96 713.16 173 172 0.52 0.60 5.00 5.03 1.57 3.32 95.54 708.93 701.49 0.0779 18 31.74 2.98 15.90 8.47 17.98 Chan 2.73 706.49 705.69 175 172 0.21 0.60 5.00 5.03 0.63 0.63 3138 702.29 701.76 0.0159 18 14.33 2.15 13.51 2.87 8.12 Classill 1.90 706.49 705.69 172 171 0.05 0.60 5.00 5.03 0.15 4.10 83.94 70129 691.96 0.1112 18 37.93 3.15 16.35 10.23 21.48 Classill 2.90 697.04 696.24 171 170 0.15 0.60 5.00 5.03 0.45 4.56 130.00 691.76 684.22 0.0580 18 27.40 3.23 16.56 8.53 15.52 Classill 2.98 690.04 689.24 176 170 0.28 0.60 5.00 5.03 0.85 0.85 40.69 685.64 684.22 0.0349 18 21.25 2.35 14.12 4.11 12.04 Classill 2.10 688.32 687.52 170 169 0.43 0.60 5.00 5.03 1.30 6.70 119.37 684.02 674.71 0.0780 18 31.77 2.25 13.82 10.70 17.99 Classill 2.00 680.12 679.32 177 169 0.25 0.60 5.00 5.03 0.75 0.75 38.43 675.86 674.71 0.0299 18 19.68 2.21 13.70 3.76 11.14 Classill 1.96 678.81 678.01 169 168 0.24 0.60 5.00 5.03 0.72 8.18 72.91 674.51 668.70 0.0797 18 32.11 2.25 13.82 11.52 18.19 Classlll 2.00 681.50 680.70 180 179 0.77 0.60 5.00 5.03 2.32 2.32 26.50 676.70 676.17 0.0200 18 16.09 2.75 15.28 4.78 9.11 Classill 2.50 681.50 680.70 179 178 21.89 0.60 5.00 5.03 65.46 67.78 177.48 672.70 668.50 0.0237 36 111.12 6.00 90.27 13.34 15.73 Classill 5.00 675.29 674.49 181 178 1.70 0.60 11.00 3.99 4.07 4.07 26.50 670.67 670.14 0.0200 18 16.09 2.57 14.77 5.76 9.11 Classill 2.32 675.29 674.49 178 168 0.34 0.60 5.00 5.03 1.03 72.88 49.73 668.30 666.91 0.0280 36 120.76 4.19 75.44 14.44 17.10 Ciasslli 3.19 672.70 672.70 168 108 0.00 0.60 5.00 5.03 0.00 81.06 140.40 666.71 655.40 0.0806 36 205.01 3.99 73.61 21.29 29.03 Classill 2.99 664.80 664.00 108 107 0.38 0.60 5.00 5.03 1.15 147.25 52.00 653.90 653.15 0.0144 54 255.55 7.35 224.80 16.08 Ctassill 5.60 Cumulative Q for drainag e areas. Flow capacity of pipe for " given size and slope Drainage areas used for calculations are the ated future drainage " areas incluftl fiutme Phase V. Actual post merit areas from merit of Phase IV are as follows: Structure: Drainage Area: #174 0.38 Ac. #173 0.28 Ac. #180 0.07 Ac. #179 0.06 Ac. Point of dischar?ie. Velocity > 10 fp s. as per SWDM 6.5.4 Discharge ve locities > 10 s penmn' for pipes > 48" diameter. 2 Year Stor m Ah i- STORM DRAINAGE CALCU - RATIONAL METHOD Project: Brawley Farms SubdWlslon Phase 4 Designed By. B.S.P. Date: January 14, 2002 Location: City of Charlotte ETJ, North Carolina Checked By: R.J.H. Note: AM storm drainage designed for 25 year storm. HW taken from centerline of the pipe to 0.5 R below weir. MannirWs'n' of 0.012 used for all RCP. QSUB CAP represents flow rapacity assuming pipe opening Is submerged. RimfTop* Weir F. To Drairage C Te I (ds) Pipe Elevation Elevation Slope Die Cap HW QSUSCAP V V TYPE COVER Elev Elev Area min Sub Cum, Length in Out AL m , ds CFS C-difi- Full Mansell Court to SD#157: 679.99 679.19 163 162 0.50 0.60 5.00 5.03 1.51 1.51 26.50 675.44 674.91 0.0200 18 16.09 2.50 14.57 4.14 9.11 Classlll 225 679.99 679.19 162 161 0.62 0.60 5.00 5.03 1.87 3.38 120.00 674.71 670.24 0.0373 18 21.96 3.23 16.56 6.66 12.43 Classtll 2.98 674.59 673.79 164 161 0.60 0.60 13.00 3.99 1.44 1.44 26.50 670.40 670.24 0.0060 18 8.84 2.14 13.48 2.73 5.01 Classlll 1.89 674.59 673.79 161 160 0.68 0.60 5.00 5.03 2.05 6.87 68.39 670.04 667.16 0.0421 18 23.34 2.50 14.57 8.79 13.22 Ciassill 2.25 671.51 670.71 165 160 0.47 0.60 5.00 5.03 1.42 1.42 26.50 667.32 667.16 0.0060 18 8.84 2.14 13.48 2.72 5.01 Classill 1.89 671.51 670.71 160 159 0.25 0.60 5.00 5.03 0.75 9.04 116.44 666.96 662.04 0.0423 18 23.38 2.50 14.57 9.64 13.24 Classill 2.25 667.20 666.40 159 158 0.98 0.60 5.00 5.03 2.96 12.00 13179 661.54 660.20 0.0100 24 24.52 3.36 30.02 6.15 7.81 Classllt 2.86 666.75 666.75 158 157 0.00 0.60 5.00 5.03 0.00 12.00 76.00 660.00 659.24 0.0100 24 24.50 5.25 37.53 7.80 Classlll 4.75 Cumulative Q from drain age areas. Flow capacity of pipe for dvwen size and SIODe. Point of dlschar . Val < 10 fp s. 2 Year Storm I Page #6 a a a STORM DRAINAGE CALCULATRM - RATIONAL METHOD Project. Brawley Farms Subdivision Phase 4 Designed By: B.S.P. Date: January 14, 2002 Location: City of Charlotte ETJ, North Carolina Checked By: R.J.H. Note: AN storm drainage designed for 25 yew storm. HW taken from oentedine of the pipe to 0.5 ft. below weir. tilenning's'n' of 0.012 used for aft RCP. QSUB CAP represents flow capacity assuming pipe opening is submerged. Rim/To * Weir F. To Dronage C Tc I Q ds Ewvadon Elevation Slope Dia Cap Hw OSUBCAP yebotlops) V TYPE COVER Elev Elev Area min Sub Cum. Length in Out (ftift.) m ds CFS Condition (Q Full Cap) (RCP) Qkbove Pipe) SD#184 to SDti182: 693.21 692.41 184 183 0.43 0.60 5.00 5.03 1.30 1.30 34.50 688.91 688.74 0.0049 18 7.99 2.25 13.82 2.47 4.52 Classlll 2.00 693.21 692.41 183 182 0.07 0.60 5.00 5.03 0.21 1.51 52.00 688.54 68823 0.0060 18 8.78 2.62 14.91 4.97 Ciasslll 2.37 Cumulative Q from dr ' areas. Flow cwacity of pipe for arven size and slope. Point of dischar V < 10 2 Year Stone AR" 118 Ah Am STORM DRAINAGE CALCU NS - RATIONAL METHOD Project; Brawley Farms Subdhdslon Phase 4 Designed By, B.S.P. Date: January 14, 2002 Location: City of Charlotte ETJ, North Carolina Checked By: R.J.H. Note: AN storm drainage designed for 25 year storm. HVY taken from c enterlir a of the pipe to 0.5 ft below weir. Marv*Vs'n" of 0.012 used for all RCP. QSUB CAP represents flow capacity assuming pipe opening is submerged. RIrYt/r Weir From To Drainage C Tc I Q ds Pipe Elevation Elevation S Die Ca liVV QSUB CAP V V TYPE COVER Elev Elev Area min Sub Cum. Length In Out JR. ur cfs CFS Condition Fug Cap) OCP) Above Pipe) Outfal 113 0 (ExW ng Storm Dr a Inage fro m Phase 1): 734.56 733.76 189 188 0.35 0.60 5.00 7.03 1.48 1.48 32.00 731.23 730.66 0.0178 15 9.34 1.40 7.58 4.12 7.61 Classlll 1.28 734.40 733.60 188 187 0.22 0.80 5.00 7.03 0.93 2.40 45.00 730.47 727.73 0.0609 15 17.26 2.01 9.06 7.29 14.08 Classill 1.88 730.90 730.10 187 186 0.04 0.60 5.00 7.03 0.17 2.57 122.00 727.44 725.76 0.0138 15 8.21 1.53 7.93 4.55 6.70 Classill 1.41 729.33 728.53 186 185 0.00 0.60 5.00 7.03 0.00 2.57 168.00 725.41 720.91 0.0268 15 11.45 2.00 9.04 5.67 9.34 Classlll 1.87 725.05 725.05 185 142 0.61 0.60 5.00 7.03 2.57 5.15 13.00 720.62 720.31 0.0238 15 10.80 3.30 11.63 6.88 8.81 Classill 3.18 723.61 723.53 142 139 0.49 0.60 5.00 7.03 2.07 7.21 135.00 719.84 711.69 0.0604 15 17.19 2.56 10.25 10.49 14.02 Classlll 2.44 728.37 727.57 141 140 1.10 0.60 16.00 4.89 3.23 3.23 244.00 723.60 715.65 0.0326 15 12.63 2.85 10.79 6.53 10.30 Classill 2.72 720.16 719.36 140 139 1.34 0.60 23.00 4.14 3.33 6.56 208.00 714.02 712.04 0.0095 18 11.10 4.09 18.63 5.27 6.29 Classlll 3.84 715.57 714.77 139 138 0.00 0.60 5.00 7.03 0.00 13.77 7.18 711.18 711.13 0.0070 24 20.44 2.09 23.68 5.71 6.51 Classill 1.59 718.36 717.56 145 144 0.39 0.60 5.00 7.03 1.65 1.65 32.00 714.08 713.84 0.0075 18 9.85 2.23 13.76 3.07 5.58 Classlll 1.98 718.04 717.24 144 143 0.39 0.60 5.00 7.03 1.65 3.29 45.00 713.72 713.26 0.0102 18 11.50 2.27 13.88 4.29 6.51 Classlil 2.02 717.23 716.43 143 138 0.17 0.60 5.00 7.03 0.72 4.01 124.73 712.21 711.23 0.0079 18 10.08 2.97 15.88 4.20 5.71 Classill 2.72 715.50 714.70 138 137 1.46 0.60 7.00 6.49 5.69 23.46 38.61 710.54 710.24 0.0078 39.15 2.41 39.73 6.73 7.98 Classlll 1.66 715.33 714.53 137 136 0.13 0.60 5.00 7.03 0.55 24.01 2175 710.18 710A8 0.0042 28.82 2.60 41.27 5.53 5.88 Classlll 1.85 Cumulative Q from drainage areas. Flow capacity of pipe for gryen s¢e and slope. Pines were increased to the 25 fear storm for desig n of the downstream site storm lrvverts? slopes and weir grades take n from sure as-butt and have not been changed. Manipulation s are as follows: Run: True Pi Size: #138 to #137 2-24" RCP #137 to #146 2-24" RCP • Connect Cumulative Discha to SD#138 10 Year Storm #1 a I? Ah Now STORM DRAINAGE CALCU NS - RATIONAL METHOD 'ROW Project Brawley Farms Subdivision Phase 4 Designed By: B.S.P. Date: January 14, 2002 Location: City of Charlotte ETJ, North Carolina Checked By: R-J.H. Note: AN storm draerage designed for 25 year storm. HW talm from centerline of the pipe to 0.5 ft. below weir. Mwv*Vs W of 0.012 used for all RCP. QSUB CAP represents flow capacity awArrring pipe operrrg is submerged. Rimlro * Weir From To M-nage C Tc 1 (ds) Pipe Elevation Elevation Slope Dia I Cap HW QSUB CAP V V TYPE COVER Elev Elev Aree min Sub Cum. Lengdi M Out (flift.) m ds Full Cap) (Rr^ Above Pipe) Mansell Court to SD#110: 716.75 715.75 136 135 0.00 0.60 5.00 7.03 0.00 24.01 81.40 709.68 708.05 0.0200 30 6286 4.32 53.19 9.29 12.82 Claud 3.57 716.10 716.10 135 134 0.00 0.60 5.00 7.03 0.00 24.01 78.59 707.85 706.08 0.0225 30 66.66 6.50 65.25 9.67 13.59 Classill 5.75 711.68 710.88 146 134 0.26 0.60 5.00 7.03 1.10 1.10 26.50 707.38 707.11 0.0102 18 11.48 2.25 13.82 2.97 6.50 Classlll 2.00 711.68 710.88 134 133 0.19 0.60 5.00 7.03 0.80 25.91 150.00 705.88 697.44 0.0563 30 10537 3.25 4614 13.45 21.48 Classlll 2.50 703.11 702.31 147 133 1.01 0.60 5.00 7.03 4.26 4.26 26.50 698.40 698.24 0.0060 18 8.84 2.66 15.03 3.92 5.01 Classill 2.41 703.11 702.31 133 132 0.80 0.60 10.00 5.84 280 32.97 126.78 697.24 691.10 0.0484 30 97.75 3.32 46.63 13.87 19.93 Classlll 2.57 699.83 699.03 148A 148 0.28 0.60 5.00 7.03 1.18 1.18 62.50 695.03 692.26 0.0443 18 23.95 2.75 15.28 4.97 13.56 Classlll 2.50 696.70 695.90 148 132 1.25 0.60 18.00 4.65 3.49 4.67 26.50 692.06 691.90 0.0060 18 8.84 2.59 14.83 4.04 5.01 Classill 2.34 696.70 695.90 132 131 0.52 0.60 5.00 7.03 2.19 39.83 125.00 690.90 684.94 0.0477 30 96.99 3.25 46.14 14.69 19.78 Classllf 2.50 693.83 693.03 149A 149 0.11 0.60 5.00 7.03 0.46 0.46 67.50 689.03 686.10 0.0434 18 2170 2.75 15.28 3.62 13.42 Classlll 2.50 691.08 691.00 151 150 1.85 0.60 15.00 5.03 5.58 5.58 40.00 687.85 687.45 0.0100 18 11.38 1.90 12.70 5.08 6.44 Classill 1.65 692.00 692.00 150 149 0.00 0.60 5.00 7.03 0.00 5.58 116.75 687.25 686.10 0.0099 18 11.29 3.50 17.24 5.05 6.39 Classill 3.25 690.54 689.74 149 131 0.12 0.60 5.00 7.03 0.51 6.55 26.50 685.90 685.63 0.0102 18 11.48 2.59 14.83 5.39 6.50 Classill 2.34 690.54 689.74 131 130 0.54 0.60 5.00 7.03 2.28 48.66 160.50 684.74 680.80 0.0245 30 69.60 3.25 46.14 12.59 14.19 Ctasslll 2.50 687.39 686.59 155 152 0.50 0.60 7.00 6.49 1.95 1.95 52.50 682.71 681.66 0.0200 18 16.09 2.63 14.94 4.50 9.11 Classlll 2.38 688.44 687.64 154 153 0.11 0.60 5.00 7.03 0.46 0.46 26.50 684.14 683.61 0.0200 18 16.09 2.25 13.82 279 9.11 Classill 2.00 688.44 687.64 153 152 0.38 0.60 5.00 7.03 1.60 2.07 59.75 683.41 681.66 0.0293 18 19.47 2.98 15.90 5.22 11.03 Classill 2.73 686.34 685.54 152 130 0.33 0.60 5.00 7.03 1.39 5.41 26.50 681.46 681.30 0.0060 18 8.84 2.83 15.50 4.25 5.01 Ctasslll 2.58 686.34 685.54 130 129 0.81 0.60 5.00 7.03 3.42 57.49 69.18 680.30 679.12 0.0171 36 94.34 3.24 66.33 11.32 13.36 Classill 2.24 684.76 683.96 129 128 0.47 0.60 5.00 7.03 1.98 59.47 2650 678.92 678.62 0.0113 36 76.85 3.04 64.25 9.99 10.88 Classill 2.04 684.76 683.96 128 127 0.15 0.60 5.00 7.03 0.63 60.10 113.75 678.42 677.05 0.0120 36 79.27 3.54 69.34 10.23 11.22 Classlll 2.54 691.02 690.22 167 166 0.19 0.60 5.00 7.03 0.80 0.80 26.50 686.72 685.39 0.0502 18 25.48 2.25 13.82 4.55 14.43 Classlll 2.00 691.02 690.22 166 127 0.13 0.60 5.00 7.03 0.55 1.35 49.42 685.19 682.22 0.0601 18 27.89 3.78 17.91 5.75 15.79 Classill 3.53 687.60 687.60 127 126 0.00 0.60 5.00 7.03 0.00 61.45 194.23 676.85 671.99 0.0250 36 114.26 8.75 109.01 13.15 16.18 Classlll 7.75 684.00 684.00 126 125 0.00 0.60 5.00 7.03 0.00 61.45 199.59 671.79 663.81 0.0400 36 144.43 10.21 117.76 15.37 20.45 Classill 9.21 668.75 668.75 125 124 0.00 0.60 5.00 7.03 0.00 61.45 125.53 663.31 661.80 0.0120 36 79.22 3.44 68.35 10.30 11.22 Classlll 2.44 667.00 667.00 124 123 0.00 0.60 5.00 7.03 0.00 61.45 200.03 661.30 660.20 0.0055 42 80.80 3.45 93.17 7.67 8.40 Classlll 2.20 666.55 665.75 123 110 0.73 0.60 5.00 7.03 3.08 64.53 34.50 660.00 659.79 0.0061 42 85.01 3.50 93.84 8.06 8.84 C asslll 2.25 CumulaWe Q from drainage areas. Flow cap of pipe for Pt Ken size and slope. ` Connect Cumutadve Discharg e to SD#I 10 1 0 Year Stor m Page #2 a Ah Ah STORM DRAINAGE CALCU - RATIONAL METHOD Project. Brawley Farms Subdivision Phase 4 Designed By: B.S.P. Date: January 14, 2002 Location: City of Charlotte ETJ, North Carolina Checked By: R.J.H. Note: AN storm drainage designed for 25 year storm. HW taken from cerdeftne of the pipe to 0.5 R. below weir. Mwrk4s'n' of 0.012 used for as RCP. QSUB CAP represerfs flow capacity assuming pipe openkg is submerged. Rimrro * Weir F. To D-tage C Tc 1 (ds) Pipe Elewtion Elevation Slope Die Cap HW QSUB CAP VeloWfps) V TYPE COVER Elm Elm Area Ac. min Sub Cum. Length in Out m I ds (CFS) (Condition) (C Fug Cap) (RCP) Above Pipe) West Brad street Commons to SD#108: 712.80 712.00 118 117 0.45 0.60 5.00 7.03 1.90 1.90 34.50 705.94 705.73 0.0061 18 8.88 4.81 20.21 3.00 5.03 Classlll 4.56 712.80 712.00 117 116 0.58 0.60 5.00 7.03 2.45 4.34 171.00 705.53 701.62 0.0229 18 17.20 5.22 21.05 6.16 9.74 Chasslli 4.97 708.69 707.89 119 116 0.58 0.60 5.00 7.03 2.45 2.45 34.50 701.83 701.62 0.0061 18 8.88 4.81 20.21 3.27 5.03 Classlll 4.56 708.69 707.89 116 115 0.56 0.60 5.00 7.03 2.36 9.15 305.76 701.42 696.96 0.0146 18 13.74 5.22 21.05 6.79 7.78 Classlll 4.97 704.08 703.28 120 115 1.00 0.60 5.00 7.03 4.22 4.22 34.50 696.78 696.57 0.0061 18 8.88 5.25 21.11 3.92 5.03 Classlll 5.00 704.08 703.28 115 114 0.74 0.60 5.00 7.03 3.12 16.49 157.24 695.03 689.53 0.0350 18 21.28 7.00 24.38 11.06 12.05 Classlll 6.75 696.88 696.08 114 113 0.49 0.60 5.00 7.03 2.07 18.56 168.50 689.33 678.98 0.0614 18 28.19 5.50 21.61 13.88 15.97 Classlll 5.25 684.28 68148 121 113 0.72 0.60 5.00 7.03 3.04 3.04 34.50 676.98 676.77 0.0061 18 8.88 5.25 21.11 3.51 5.03 Gasslll 5.00 684.28 683.48 113 112 021 0.60 5.00 7.03 0.89 22.48 62.93 672.65 671.64 0.0160 24 31.04 9.33 50.03 8.88 9.89 Classlll 8.83 679.99 679.19 112 111 0.54 0.60 5.00 7.03 2.28 24.76 26.50 671.44 671.04 0.0151 24 30.10 6.25 40.95 8.98 9.59 Classlll 5.75 679.99 679.19 111 110 0.05 0.60 5.00 7.03 0.21 24.97 149.47 670.84 662.16 0.0581 24 59.04 6.85 42.87 14.11 18.81 Ciasslll 6.35 666.55 665.75 110 109 0.34 0.60 5.00 7.03 1.43 90.93 183.38 659.29 655.70 0.0196 42 152.45 4.21 102.92 13.34 15.86 ClaSSIV 2.96 661.59 660.79 122 109 0.50 0.60 5.00 7.03 2.11 2.11 34.50 657.91 657.70 0.0061 18 8.88 1.63 11.76 3.11 5.03 Classill 1.38 661.59 660.79 109 108 0.32 0.60 5.00 7.03 1.35 94.39 150.62 655.20 654.40 0.0053 48 113.37 3.09 115.17 8.49 9.03 Classlll 1.59 Cumulative Q from drainage areas. Flow of pipe for givenn size and Sl ope. • Connect Cum Discharg e to SWOO 1 0 Year Storrs #Ki page dh dh Ah STORM DRAINAGE CALCULATIONS - RATMAL METHOD Project: Brawley Farms Subdivision Phase 4 Designed By: B.S.P. Date: January 14, 2002 Location: City of Charlotte ETJ, North Carolina Checked By: R.J.H. Note: AR storm drainage desWed for 25 year storm. HW taken from centerline of the pipe to 0.5 R below weir. Marv*Vs "n" of 0.012 used for all RCP. QSUB CAP represents flow capacity asmm*V pipe opening is submerged. Rim/To 7 Weir F. To Drai? C To I Q WS) Pipe Elevation Elevation Slope Dia HW QSUB CAP Velocftfts) V TYPE COVER El. Elev Area Ac. rain Sub Cum. Length in Out Rift. CHI) ds CF Condition Full Cap) (RM Qkb- Pipe) H Drhre & Counselor Bluff Drive to SD#107• 713.96 713.16 174 173 OM 0.60 5.00 7.03 2.45 2.45 26.50 709.66 709.13 0.0200 18 16.09 2.25 13.82 4.86 9.11 Classlil 2.00 713.96 713.16 173 172 0;52 0.60 5.00 7.03 2.19 4.64 95.54 708.93 701.49 0.0779 18 31.74 2.98 15.90 9.47 17.98 Classill 2.73 706.49 705.69 175 172 0.21 0.60 5.00 7.03 0.89 0.89 33.38 702.29 701.76 0.0159 18 14.33 2.15 13.51 3.21 8.12 Classlll 1.90 706.49 705.69 172 171 0.05 0.60 5.00 7.03 0.21 5.74 83.94 701.29 691.96 0.1112 18 37.93 3.15 16.35 11.44 21.48 Classill 2.90 697.04 696.24 171 170 0.15 0.60 5.00 7.03 0.63 6.37 130.00 691.76 684.22 0.0580 18 27.40 3.23 16.56 9.54 15.52 Classlll 2.98 690.04 689.24 176 170 0.28 0.60 5.00 7.03 1.18 1.18 40.69 685.64 684.22 0.0349 18 21.25 2.35 14.12 4.59 12.04 Classlll 2.10 688.32 687.52 170 169 0.43 0.60 5.00 7.03 1.81 9.36 119.37 684.02 674.71 0.0780 18 31.77 2.25 13.82 11.97 17.99 Classill 2.00 680.12 679.32 177 169 0.25 0.60 5.00 7.03 1.05 1.05 38.43 675.86 674.71 0.0299 18 19.68 2.21 13.70 4.20 11.14 Classill 1.96 678.81 678.01 169 168 0.24 0.60 5.00 7.03 1.01 11.43 72.91 674.51 668.70 0.0797 18 32.11 2.25 13.82 12.88 18.19 Classlli 2.00 681.50 680.70 180 179 0.77 0.60 5.00 7.03 3.25 3.25 26.50 676.70 676.17 0.0200 18 16.09 2.75 15.28 5.34 9.11 Classlll 2.50 681.50 680.70 179 178 21.09 0.60 5.00 7.03 91.49 94.74 177.48 672.70 668.50 0.0237 36 111.12 6.00 90.27 14.91 15.73 Classill 5.00 675.29 674.49 181 178 1.70 0.60 9.00 6.04 6.16 6.16 26.50 670.67 670.14 0.0200 18 16.09 2.57 14.77 6.61 9.11 Ciasslil 2.32 675.29 674.49 178 168 0.34 0.60 5.00 7.03 1.43 102.33 49.73 668.30 666.91 0.0280 36 120.76 4.19 75.44 16.17 17.10 Classlll 3.19 672.70 672.70 168 108 0.00 0.60 5.00 7.03 0.00 113.76 140.40 666.71 655.40 0.0806 36 205.01 3.99 73.61 23.84 29.03 Classlll 2.99 664.80 664.00 108 107 0.38 0.60 5400 7.03 1.60 209.75 52.00 653.90 653.15 0.0144 54 255.55 7.35 224.80 16.08 Classill 5.60 Cumulative Q for drarrag e areas. Flow capacity of pipe for given size and slope . Drainai?e areas used for calculations are the anfi ed future dreariage areas ffick? M- Phase V. Actual post development areas from meat of Phase IV are as follows: Structure: Drainage Area: #174 0.38 Ac. #173 0.28 Ac. #180 0.07 Ac. #179 0.06 Ac. Point of discharge. Veloc4 > 10 fp s. as per SWDM 6.5.4 Dischar a velocities > 10 fps issable for pip es > 48" diameter. 10 Year Stor m #4 a a STORM DRAINAGE CALCU S - RATIONAL METHOD Project: Brawfey Farms Subdivision Phase 4 Designed By: B.S.P. Date: January 14, 2002 Location: City of Charlotoe ETJ, North Carona Checked By: R.J.H. Note: All slam drainage designed for 25 year storm. HW taken from owterk* of the pipe to 0.5 ft. below weir . Manr*Vs' n" of 0.012 used for all RCP. QSUB CAP represents flow capacity assuming pipe opening is submerged. Rifn/TO ' Weir From To C TC t Q ds EWoaton Elevation Slope Dia Cap HW QSUB CAP V VelodWps) TYPE COVER Elev Bev Area min Sub Cum. Length in Oid MA) m ds CFS Condition Fug Cap) (RCP) More Pipe) Mansell Court to S DOI67: 679.99 679.19 163 162 0.50 0.60 5.00 7.03 2.11 2.11 26.50 675.44 674.91 0.0200 18 16.09 2.50 14.57 4.63 9.11 Classill 2.25 679.99 679.19 162 161 0.62 0.60 5.00 7.03 2.62 4.72 120.00 674.71 670.24 0.0373 18 21.96 3.23 16.56 7.45 12.43 Classill 2.98 674.59 673.79 164 161 0.60 0.60 10.00 5.84 2.10 2.10 26.50 670.40 670.24 0.0060 18 8.84 2.14 13.48 3.10 5.01 Classill 1.89 674.59 673.79 161 160 0.68 0.60 5.00 7.03 2.87 9.69 68.39 670.04 667.16 0.0421 18 23.34 2.50 14.57 9.86 13.22 Classlli 2.25 671.51 670.71 165 160 0.47 0.60 5.00 7.03 1.98 1.98 26.50 667.32 667.16 0.0060 18 8.84 2.14 13.48 3.04 5.01 Classill 1.89 671.51 670.71 160 159 0.25 0.60 5.00 7.03 1.05 12.73 116.44 666.96 662.04 0.0423 18 23.38 2.50 14.57 10.81 13.24 CWMA11 2.25 667.20 666.40 159 158 0.98 0.60 5.00 7.03 4.13 16.87 133.79 661.54 660.20 0.0100 24 24.52 3.36 30.02 6.89 7.81 Classill 2.86 666.75 666.75 158 157 0.00 0.60 5.00 7.03 0.00 16.87 76.00 660.00 659.24 0.0100 24 24.50 5.25 37.53 DONIM&N 7.80 Classill 4.75 Cumulative Q from drain s a areas. Flow capacity of pipe for given size artd slope. Point of dtschar Velo citv <I 0 fp s. 1 0 Year Stor m Page /5 Ah fik Ah STORM DRAINAGE CALC NS - RATIONAL METHOD -Now Project Brawley Farms Subdhrlslon Phase 4 Designed By: B.S.P. Date: January 14, 2002 Location: City of Charlotte ETJ, North Carolina Checked By: R.J.H. Note: AN stone drainage designed for 25 year stone. HW taken from one of the pipe to 0.5 ft. below weir. ManriVs'n' of 0.012 used for all RCP. QSUB CAP represents flow capacity assuming pipe opening is submerged. Rim/T weir F. To Drmmge C TC 1 Q (ds) Pipe Elevation Elevation Slope Dia cap FW QSU8 CAP yeWctifts) yebcqMn) TYPE COVER B. Elev Area min Sub Cum. Length in Out (ftA-) (in) ds CFS - Condition Full Cap) (RM Above Pipe) SD8184 to SD11182: 693.21 692.41 184 183 0.43 0.60 5.00 7.03 1.81 1.81 34.50 688.91 688.74 0.0049 18 7.99 2.25 13.82 2.76 4.52 Classill 2.00 693.21 692.41 183 182 0.07 0.60 5.00 7.03 0.30 2.11 52.00 688.54 688.23 0.0060 18 8.78 2.62 14.91 3.09 4.97 Classlli 2.37 Cunwistive Q from drairt age areas. Flow capacity of pipe for ' en size and slope. Point of V ' < 10 1 0 Year Stor m Page l16 • WATERSHED : Drainage Area #101 (Pre4)evelopment) Time of Concerrtratlon CaloulaNons Tcl Tc • Ttl+Tt2+Tt3...Tn where, Tc • time of concentratloin (hr), and n • number of flow segments 1) Sheet Flow Tt •(0.007(nL)10.8) / ((P2)10.5(S)A0.4 ) where: Tt • Travel Time (hro) n • Manning roughness coefficient L • Row length (R) P2.2-yr,24 hr relnfoll• 3 AZ Inches S • slope (ft/ft) Paved Segment: Mannings n • 0.011 Paved length - 0 Paved slope • 0.0001 Tt • 0.00 hrs Unpaved Segment: Mannings n • 0.40 Unpaved Length • 182 Unpaved Slope • 0.0385 Tt • 0.45 hrs ILL¦ DA 113 2) Shallow Concentrated Flow Tt a L / (3800 V) where: Tt • Travel Time (hrs) L • Row length (R) V • average velocity (R/s) and, 3800 • conversion from seconds to hours Paved Segment: V • 20.3282 (S)A0.5 Paved length • 0 Paved slope • 0.0001 Velocity • 0.20 ft/sec • Tt • 0.00 hrs Unpaved Segment: V • 18.1345 (S)AO.5 Unpaved Length • 2284 Unpaved Slope • 0.0385 Velocity • 3.17 R/sec Tt • 0.20 hrs ME QM b[! 3) Open Channel Flow Tt • L / (3800 V) where: Tt • Travel Time (hro) L • Row length (R) V • avenge velocity (ft/s) and, 3800 • conversion from seconds to hours Main Channel Dimensions: Width (Avenge • 8 R Depth (Avenge) • 3.5 R Side Slope • 0:01 ven. Wafted perimeter 15 R Average Slope • 1.25 % Manning's'n' • 0.035 Length of Channel 2490.7 R Using Manning's Equation: V • ((1.49)rw(s)rr2]/n (for bank-full elevation) V. average velocity (fps) r- hydraulic radius (R), also alpv 2. cross section flow area (11 ) pw • wetted perimeter (R) 5. slope of hydraulic grade line (ft/ft) n- Manning's roughness coef olent for open channel flow V. 7.215799 fps T, • 0.085881 hr M.' Qa1Q him T(I)•OAT© TC• 0.75 Hours LAO: 0.447978 HOURS T® 44.79783 MIN. l? u WATERSHED : Drainage Area #101 (Pre-Development) • Time oT Concentration Calculations TO Tc v Tt1+Tt2+Tt3...Tn where, Tc - time of concentratloin (hr), and n - number of flow segments 1) Sheet Flow Tt -(0.007(nL)10.8) / ((P2)10.5(8)10.4 ) where: Tt - Travel Time (hra) n - Manning roughness coefficient L - flow length (fl) P2-10-yr,24 hr rainfall- g,$ Inches S - slope (ft/ft) Paved Segment: Mannings n - 0.011 Paved length - 0 Paved slope - 0.0001 Tt - 0.00 hm Unpaved Segment: Mannings n - 0.40 Unpaved Length - 182 Unpaved Slope - 0.0385 Tt 0.38 hrs TVI 434 h[t 2) Shallow Concentrated Flaw Tt - L / (3800 V) where: Tt - Travel Time (hrs) L - flow length (fl) V - average velocity (fl/s) and, 3800 - conversion from seconds to hours Paved Segment: V • 20.3282 (S)A0.5 Paved length • 0 Paved slops - 0.0001 Velocity - 0.20 film • Tt 0.00 hra Unpaved Segment: V . 18.1345 (S)A0.5 Unpaved Length - 2284 Unpaved Slope - 0.0385 Velocity - 3.17 ft/sec Tt . 0.20 hra I12! QM hm 9) Open Channel Fbw Tt • L / (3800 V) where: Tt - Travel Time (hrs) L - flow length (fl) V - average velocity (fl/a) and, 3800 a conversion from seconds to hours Mein Channel Dimensions: Width (Average - 8 R Depth (Average) = 3.5 ft Side Slope = 0:01 vert. Wetted perimeter - 15 R Average Slope - 1.25 % Manning's "n" - 0.035 Length of Channel 2490.7 It Using Manning's Equation: V - )(1.49)r2*(s)rn]/n (for bank-full elevation) V- average velocity (fps) r- hydraulic radius (fl), also a/p,/ a. cross section flow area (fl) P. - wetted perimeter (fl) S. slope of hydraulic grade line (ft/fl) n- Manning's roughness coefficient for open channel flow V. 7.215799 fps Tr - 0.085881 hr Imo' 4.14 LIM T(I)-0.6T© TC- 0.88 Hours LAG: 0.395818 HOURS To 39.58178 MIN. / ?I • WATERSHED ; Drainage Area #101 (Pro-Development) Time of Concentration Calculations Tel Tc - Ttl+Tt2+Tt3...Tn where, Tc - time of concentratioin (hr), and n - number of flow segments 1) Shaet Flow Tt -(0.007(nL)10.8) / ((P2)^0.5(8)10.4 ) where: Tt - Travel Time (hre) n - Manning roughness coefficient L - flow length (ft) P2-50-yr,24 hr rainfall- 9.4§ Inches s - slope (ft/ft) Paved Segment: Manning* n - 0.011 Paved length - 0 Paved slope - 0.0001 Tt - 0.00 hre Unpaved Segment: Mannings n - 0.40 Unpaved Length - 182 Unpaved Slope - 0.0385 Tt - 0.31 hrs M-0 4,i1 L[! 2) Shallow Concentrated Flow Tt - L / (3800 V) where: Tt - Travel Time (hrs) L - flow length (R) V - average velocity (R/s) and, 3800 - conversion from seconds to hours Paved Segment: V - 20.3282 (8)^0.5 Paved length - 0 Paved slope - 0.0001 Velocity - 0.20 R/sec • Tt - 0.00 hre Unpaved Segment: V - 18.1345 (S)^0.5 Unpaved Length - 2284 Unpaved Slope - 0.0385 Velocity - 3.17 ft/sec Tt - 0.20 hm I3Z! RM ba 3) open Channel Flow Tt - L / (3800 V) where: Tt - Travel Time (hrs) L - flow length (R) V - average velocity (R/s) and, 3800 - conversion from seconds to hours Mein Channel Dimensions: Width (Average - 8 R Depth (Average) - 3.5 R Side Slope - 0:01 vert. Wetted perimeter- 15 R Avers"Slope - 125 % Manning's "n" - 0.035 Length of Channel 2490.7 R Using Manning's Equation: V - ((1.49)r2"(s)'2vn (for bank-full elevation) V- average velocity (fps) r- hydraulic radius (R), also a/,w a - cross section flow area (R) pw - welted perimeter (ft) a. slope of hydraulic grade line (ftM) n- Manning's roughness coefflclent for open channel flow V. 7.215799 fps T,- 0.095881 hr ]?! 4.14 heft T(I)-0.8T® TC- 0.81 Hours LAG: 0.385284 HOURS T® 38.52838 MIN. • WATERSHED : Drainage Area #101 (Post-Development) Time of Concentration Calculations Tcl Tc - Ttt+Tt2+Tt3...Tn where, Tc - time of concentratloln (hr), and n - number of flow segments 1) Sheet Flow Tt -(0.007(nL)10.8) / ((P2)10.5(S)A0.4 ) where: Tt - Travel Time (hrs) n - Manning roughness coefficient L - flow length (it) P2-2•yr,24 hr rainfall- ,LU Inches s - slope (Nit) Paved Segment: Mannings n - 0.011 Paved length - 0 Paved slope - 0.0001 Tt - 0.00 hre Unpaved Segment: Mannings n - 0.40 Unpaved Length - 100 Unpaved Slope - 0.1000 Tt - 0.19 hrs La ion 2) Shallow Concentrated Fbw Tt - L / (3800 V) where: Tt - Travel Time (hrs) L - flow length (fl) V - average velocity (fr/s) and, 3800 - conversion from seconds to hours Paved Segment: V - 20.3282 (S)A0.5 Paved length - 0 Paved slope - 0.0001 Velocity - 0.20 ft/sec • Tt - 0.00 hre Unpaved Segment: V - 16.1345 (S)A0.5 Unpaved Length - 1567 Unpaved Slope - 0.0498 Velocity - 3.60 R/eec Tt - 0.12 hrs =-A 4.11 18! 3) Open Channel Flow Tt - L / (3600 V) where: Tt - Travel Time (hrs) L - now length (fl) V - average velocity (fUs) and, 3600 - conversion from seconds to hours Main Channel Dimensions: Width (Average - 8 fl Depth (Average) - 3.5 R Side Slops - 0:1 ven. Wetted perimeter - 15 R Average Slope - 0.43 % Manning's "n" - 0.035 Length of Channel 231 ft Using Manning's Equation: V - [(1.49)rw(s)"nyn (for bank-full elevation) V- average velocity (fps) r- hydraulic radius (it), also a1w a. cross section flow area (ft) pw - wafted perimeter (fl) S. slope of hydraulic grade line (ft/fl) n- Manning's roughness coefficient for open channel flow V. 4.232175 fps T, - 0.015182 hr MAN 4.4111[! T(I)-0.13TO TC- 0.33 Hours LAG: 0.195872 HOURS To 19.58724 MIN. lI u • WATERSHED : Drainage Area #102 (Post-Development) Time of Concentration Calculations TO Tc a Tt1+Tt2+Tt3...Tn where, Tc - time of concentratioin (hr), and n - number of flow segments 1) Shoat Flow Tt -(0.007(nQA0.8) / ((P2)10.5(S)A0.4 ) where: Tt - Travel Time (hre) n n Manning roughness coefficient L - flow length (fl) P2-2-yr,24 hr rainfall- ;J2 Inches s - slope (fl/fl) Paved Segment: Mannings n - 0.011 Paved length - 0 Paved slope a 0.0001 Tt 0.00 hre Unpaved Segment: Mannings n . 0.40 Unpaved Length . 285 Unpaved Slope v 0.0755 Tt 0.48 hre 111-m QA bm 2) Shallow Concentrated Flow Tt - L / (3800 V) where: Tt - Trawl Time (hrs) L e flow length (fl) V - average velocity (ft/s) and, 3800 - conversion from seconds to hours Paved Segment: V m 20.3282 (S)A0.5 Paved length - 0 Paved slope - 0.0001 Velocity s 0.20 fl/sec • Tt = 0.00 hre Unpaved Segment: V - 18.1345 (S)A0.5 Unpaved Length 394 Unpaved Slope - 0.1193 Velocity - 5.57 fl/sec Tt . 0.02 hre im.! U& bm 3) Open Channel Flow Tt e L / (3800 V) where: Tt - Travel Time (hrs) L - flow length (it) V - average velocity (Ns) and, 3800 conversion from seconds to hours Main Channel Dimensions: Width (Average 8 R Depth (Average) 3.5 R Side Slope - 0:1 vert. Wetted perimeter - 15 It Average Slope 1.08 % Manning's "n" - 0.035 Length of Channel 744 it Using Manning's Equation: V ((1.49)r2f'(s)ravn (for bank-full elevation) V. average velocity (fps) r- hydraulic radius (fl), also al. a. cross section flow area (fl) pW - wetted perimeter (fl) 3. slope of hydraulic grade line (R/It) n- Manning's roughness coefficient for open channel flow V. 8.7072 fps Tt - 0.030813 hr M-N RM LIM T(I)-0.6T® TC- 0.52 Hours LAO: 0.309038 HOURS T® 30.90357 MIN. / ?I • WATERSHED : Drainage Area #104 (Post Development) Time of Concentration Calculations To Tc - Tt1+Tt2+Tt3...Tn where, Tc - time of concerdratloln (hr), and n - number of flow segments 1) Sheet Flow Tt -(0.007(nL)10.8) / ((P2)10.5(8)10.4 ) where: Tt - Travel Time (hrs) n - Manning roughness coefficient L e flow length (R) P2-2-yr,24 hr rainfall- U2 Inches S - slops (ft) Paved Segment: Mannings n - 0.011 Paved length - 0 Paved slope - 0.0001 Tt 0.00 hre Unpaved Segment: Mennings n - 0.24 Unpaved Length - 182 Unpaved Slope - 0.0385 Tt 0.30 hrs Id-1- 9M LIM 2) Shallow Concentrated Flow Tt - L / (3000 V) where: Tt - Travel Time (hrs) L - flow length (N) V - average velocity (lea) and, 3800 a conversion from seconds to hours Paved Segment: V + 20.3282 (8)A0.5 Paved length - 0 Paved slope - 0.0001 Velocity - 0.20 It/sec • Tt 0.00 fare Unpaved Segment: V - 18.1345 (8)-0.5 Unpaved Length - 2284 Unpaved Slope - 0.0385 Velocity - 3.17 1t/sec Tt . 0.20 hrs 112- 4,ZV I1[l 3) Open Channel Flow Tt e L / (3800 V) where: Tt - Travel Time (hre) L - flow length (N) V - average velocity (fl/s) and, 3800 conversion from seconds to hours Mein Channel Dimensions: Width (Average - 8 R Depth (Average) 3.5 R Side Slope - 0:01 van. Wetted perimeter 15 R Average Slope - 1.39 % Manning's "n' - 0.035 Length of Channel 1007.8 R Using Manning's Equation: V m [(1.49)r"(s)'pyn (for bank4ull elevation) V- average velocity (fps) r- hydraulic radius (R), also atpv a. cross section flow area (N) pw - wetted perimeter (N) 8. slope of hydraulic grade line (ft/ft) n- Manning's roughness coefflclord for open channel flow V. 7.809182 fps T, 0.03879 hr Its! QM LICE T(Q-0.870 TC- 0.54 Hours LAG: 0.321879 HOURS TO 32.18788 MIN. I1 u • • Project: Brawley Farms Phase IV Date: January 22, 2002 Re: T, Calculations for Hec-1 Model By: Brandon Pridemore Drainage Area Size (in.) Length Velocity Tt Tr To From (RCP) (ft) (fps) (min.) (min.) Find T, for Drainage Area #106, Including Phase I Drainage Area: DA#189 SD#189 " From remote drainage point to nearest storm structure 5.00 5.00 SD#189 SD#188 15 32.00 3.68 0.14 5.14 SD#188 SD#187 15 45.00 6.52 0.12 5.26 SD#187 SD#186 15 122.00 4.07 0.50 5.76 SD#186 SD#185 15 168.00 5.08 0.55 6.31 SD#185 SD#142 15 13.00 6.15 0.04 6.35 SD#142 SD#139 15 135.00 9.38 0.24 6.59 SD#139 SD#138 24 7.18 4.96 0.02 6.61 SD#138 SD#137 30 38.61 5.86 0.11 6.72 SD#137 SD#136 30 23.75 4.82 0.08 6.80 SD#136 SD#135 30 81.40 8.11 0.17 6.97 SD#135 SD#134 30 78.59 8.43 0.16 7.12 SD#134 SD#133 30 150.00 11.76 0.21 7.34 SD#133 SD#132 30 126.78 12.16 0.17 7.51 SD#132 SD#131 30 125.00 12.86 0.16 7.67 SD#131 SD#130 30 160.50 10.99 0.24 7.92 SD#130 SD#129 36 69.18 9.91 0.12 8.03 SD#129 SD#128 36 26.50 8.75 0.05 8.08 SD#128 SD#127 38 113.75 8.97 0.21 8.29 SD#127 SD#126 36 194.23 11.53 0.28 8.58 SD#126 SD#125 36 199.59 13.48 0.25 8.82 SD#125 SD#124 36 125.53 9.04 0.23 9.05 SD#124 SD#123 42 200.03 6.73 0.50 9.55 SD#123 SD#110 42 34.50 7.08 0.08 9.63 SD#110 SD#109 42 183.38 11.78 0.26 9.89 SD#109 SD#108 48 150.62 7.50 0.33 10.22 SD#108 POND 54 52.00 13.38 0.06 10.29 Tlme of Concentration (T,) 10.29 Lag Time(TI) in Hours 0.103 Included Area for D.A. #106 57.14 Ac. Development Full Build-Out T, for Drainage Area #106 Post Develo ment 2 Yea P e #1 " Velocities taken from Storm Drainage Calculations. 30" specified for modeling purposes. Dual 24" • RCP actually installed. • CJ Pro/eft' Brawley Farms Phase IV Date: January 22, 2002 Re: T, Calculations for Hec-1 Model BY Brandon Pridemore Draina ge Area Size (in.) Length Velocity Tt T, To From (RCP) ft) (fps) (min.) (min.) Find T e for Drainage Area 0106, Including Phase I Drainage Area: DA#163 SD#163 " From remote drainage point to nearest storm structure 5.00 5.00 SD#163 SD#162 15 32.00 4.14 0.13 5.13 SD#162 SD#161 15 45.00 6.66 0.11 5.24 SD#161 SD#160 15 122.00 8.79 0.23 5.47 SD#160 SD#159 15 168.00 9.64 0.29 5.76 SD#159 SD#158 15 13.00 6.15 0.04 5.80 SD#158 POND 15 135.00 6.15 0.37 6.16 Time of Concentration (T c) 6.16 Lag Time(TI) In Hours 0.062 Included Area for D.A. #106 5.87 Ac. T, for Drainage Area #156 Post Development (2 Pa a #1 " Velocities taken from Storm Drainage Calculations. 0 • WATERSHED : Drainage Area 0101 (Post-Development) Time of Concentration Calou[atlons To) Tc . Ttl+Tt2+Tt3 ... Tn where, To + time of concentration (hr), and n - number of flow segments 1) Sheet Flow Tt -(0.007(nQ10.8) / ((P2)A0.5(S)10.4 ) where: Tt - Travel Time (hrs) n - Manning roughness coef0ciant L . flow length (R) P2=10-yr,24 hr rainfall- 4M Inches s - slope Oft) Paved Segment: Mannings n - 0.011 Paved length - 0 Paved slope - 0.0001 Tt 0.00 hrs Unpaved Segment: Mannings n - 0.40 Unpaved Length - 100 Unpaved Slope - 0.1000 Tt 0.15 hrs 2) Shallow Concentrated Flow Tt - L / (3800 V) where: Tt a Travel Time (hrs) L - flow length (R) V . average velocity (ff/s) and, 3800 a conversion from seconds to hours Paved Segment: V - 20.3282 (S)A0.5 Paved length - 0 Paved slope - 0.0001 Velocity - 0.20 It/sec • Tt 0.00 hrs Unpaved Segment: V - 18.1345 (S)A0.5 Unpaved Length - 1587 Unpaved Slope - 0.0498 Velocity - 3.80 ft/sec Tt . 0.12 hrs ?t2• b[! 3) Open Channel Flow Tt . L / (3800 V) where: Tt - Travel Time (hrs) L - flow length (R) V - average velocity (ft/s) and, 3800 - conversion from seconds to hours Main Channel Dimensions: Width (Average - 8 R Depth (Average) - 3.5 R Side Slope - 0:1 vert. Waited perimeter - 15 R Average Slope - 0.43 % Manning's "n" . 0.035 Length of Channel 231 It Using Manning's Equation: V = [(1.49)r213(s)rnyn (for bank-full elevation) V- average velocity (fps) r- hydraulic radius (ft), also a/W a. cross section flow area (R) pw - wetted perimeter (R) a. slope of hydraulic grade fine (ft/ft) n- Manning's roughness coefficient for open channel flow V. 4.232175 fps T,- 0.015102 hr QM LIM T(Q-0.870 TG 0.29 Hours LAG: 0.173738 HOURS T® 17.37358 MIN. u • WATERSHED : Drainage Area #102 (Post43eveiopment) Time of Concentration Calculations Tcl Tc - Tt1+Tt2+Tt3...Tn where, Tc - time of concentretioin (hr), and n - number of flow segments 1) Sheet Flow Tt a(0.007(nL)A0.8) / ((P2)A0.5(S)A0.4 ) where: Tt - Travel Time (hre) n - Manning roughness coefficient L - flow length (ft) P2-10-yr,24 hr rainfall- q,$4 Inches s - slope (ft/ft) Paved Segment: Manning* n - 0.011 Paved length - 0 Paved slope - 0.0001 Tt - 0.00 hrs Unpaved Segment: Mennings n - 0.40 Unpaved Length - 285 Unpaved Slope - 0.0755 Tt - 0.37 hrs Th-1- 4S bu 2) Shallow Concentrated Flow Tt - L / (3800 V) where: Tt - Travel Time (hrs) L - flow length (it) V - average velocity (Ns) and, 3800 - conversion from seconds to hours Paved Segment: V - 20.3282 (S)A0.5 Paved length - 0 Paved slope - 0.0001 Velocity - 0.20 fl/sec • Tt - 0.00 hre Unpaved Segment: V - 18.1345 (S)A0.5 Unpaved Length - 394 Unpaved Slope - 0.1193 Velocity - 5.57 ft/sec Tt - 0.02 hrs I322 4..42 btx 3) Open Channel Flow Tt - L / (3800 V) where: Tt - Trawl Time (hrs) L - flow length (fl) V - average velocity (fi/s) and, 3800 - conversion from seconds to hours Main Channel Dimensions: Width (Average - 8 It Depth (Average) - 3.5 R Skis Slope - 0:1 vert. Wetted perimeter- 15 R Average Slope - 1.08 % Manning's "n" - 0.035 Length of Channel 744 R Using Manning's Equation: V - ((1.49)r2*(s)rnyn (for bank-full elevation) V- average velocity (fps) r- hydraulic radius (fl), also alpv a. cross section flow area (fl) p« - wetted perimeter (fl) S. slope of hydraulic grade line (fl/fl) n- Manning's roughness coefficient for open channel flow V. 8.7072 fps Tr - 0.030813 hr ia! LU LIM T(n-0.6T© TC- 0.43 Hours LAO: 0.255018 HOURS T® 25.50183 MIN. J • WATERSHED : Drainage Area #104 (Post Development) Time of Concentration Calculations Tc) Tc - Ttl+Tt2+Tt3...Tn where, Tc - time of concentratioin (hr), and n - number of flow segments 1) Sheet Flow Tt -(0.007(nL)40.8) / ((P2)A0.5(S)A0.4 ) where: Tt - Travel Time (hrs) n - Manning roughness coefficient L - flow length (11) P2-10-yr,24 hr rainfall- 4_@Q Inches s - slope (11/11) Paved Segment: Mannings n - 0.011 Paved length - 0 Paved slope - 0.0001 Tt = 0.00 hrs Unpaved Segment: Mannings n - 0.24 Unpaved Length - 182 Unpaved Slope - 0.0385 Tt - 0.24 hrs Ii7 ¦ 4,1d hn 2) Shallow Concentrated Flow Tt - L / (3800 V) where: Tt - Travel Time (hrs) L - flow length (11) V - average velocity, (11/s) and, 3800 - conversion from seconds to hours Paved Segment: V - 20.3282 (S)A0.5 Paved length - 0 Paved slope - 0.0001 Velocity - 0.20 111sec • Tt - 0.00 hrc Unpaved Segment: V - 18.1345 (S)A0.5 Unpaved Length - 2284 Unpaved Slops - 0.0385 Velocity - 3.17 11/sec Tt - 0.20 hrs ?! 4,24 h[! 3) Open Channel Flow Tt - L / (3800 V) where: Tt - Travel Time (hrs) L - flow length (11) V - average velocity (11/s) and, 3800 - conversion from seconds to hours Main Channel Dimensions: Width (Average - It Depth (Average) - 3.5 It Side Slope - 0:01 ven. Wetted perimeter • 1s 11 Avenge Slope = 1.39 % Manning's "n" - 0.035 Length of Channel 1007.8 11 Using Manning's Equation: V = [(1.49)r23(s)rnvn (for bank-full elevation) V- average velocity (fps) r- hydraulic radius (11), also a/pw a. cross section flow area (112) P. - wetted perimeter (11) S. slope of hydraulic grade line (ft/ft) n- Manning's roughness coefficient for open channel flow V. 7.809182 fps T, - 0.03879 hr TO 4.44 hli T(Q-0.8T® TC- 0.48 Hours LAO: 0.287084 HOURS To 28.70843 MIN. u r1 ?J U Project: Brawley Farms Phase IV Date: January 22, 2002 Re: T, Calculations for Hsc-1 Model By: Brandon Pridemore Draina ge Area Size (in.) Length Velocity Tt Te To From (RCP) (ft) (fps) min.) (min.) Find T, for Drainage Area #106, Including Phase I Drainage Area: DA#189 SD#189 " From remote drainage point to nearest storm structure 5.00 5.00 SD#189 SD#188 15 32.00 4.12 0.13 5.13 SD#188 SD#187 15 45.00 7.29 0.10 5.23 SD#187 SD#186 15 122.00 4.55 0.45 5.68 SD#186 SD#185 15 168.00 5.67 0.49 6.17 SD#185 SD#142 15 13.00 6.88 0.03 6.20 SD#142 SD#139 15 135.00 10.49 0.21 6.42 SD#139 SD#138 24 7.18 5.71 0.02 6.44 SD#138 SD#137 30 38.61 6.73 0.10 6.54 SD#137 SD#136 30 23.75 5.53 0.07 6.61 SD#136 SD#135 30 81.40 9.29 0.15 6.75 SD#135 SD#134 30 78.59 9.67 0.14 6.89 SD#134 SD#133 30 150.00 13.45 0.19 7.07 SD#133 SD#132 30 126.78 13.87 0.15 7.23 SD#132 SD#131 30 125.00 14.69 0.14 7.37 SD#131 SD#130 30 160.50 12.59 0.21 7.58 SD#130 SD#129 36 69.18 11.32 0.10 7.68 SD#129 SD#128 36 26.50 9.99 0.04 7.73 SD#128 SD#127 36 113.75 10.23 0.19 7.91 SD#127 SD#126 36 194.23 13.15 0.25 8.16 SD#126 SD#125 36 199.59 15.37 0.22 8.38 SD#125 SD#124 36 125.53 10.30 0.20 8.58 SD#124 SD#123 42 200.03 7.67 0.43 9.01 SD#123 SD#110 42 34.50 8.06 0.07 9.08 SD#110 SD#109 42 183.38 13.34 0.23 9.31 SD#109 SD#108 48 150.62 8.49 0.30 9.61 SD#108 POND 54 52.00 15.05 0.06 9.67 Time of Concentration (T j 9.67 Lag Time(T l) In Hours 0.097 Included Area for D.A. 0106 57.14 Ac. Development Full Build-Out T c for Drainage Area #106 Post Development 10 Yea tale #2 " Velocities taken from Storm Drainage Calculations. 30" specified for modeling purposes. Dual 24" • RCP actually installed. • • Project: Brawley Farts Phase IV Date: January 22, 2002 Re: T, Calculations for Hec-1 Model By: Brandon Pridemore Drainage Area Size (in.) Length Velocity Tt T? To From (RCP) (ft) fps) (min.) (min.) Find T, for Drainage Area #108, Including Phase I Drainage Area: DA#163 SD#163 " From remote dr ainage point to nearest storm structure 5.00 5.00 SD#163 SD#162 15 32.00 4.63 0.12 5.12 SD#162 SD#161 15 45.00 7.45 0.10 5.22 SD#161 SD#160 15 122.00 9.66 0.21 5.42 SD#160 SD#159 15 168.00 10.81 0.26 5.68 SD#159 SD#158 15 13.00 6.89 0.03 5.71 SD#158 POND 15 135.00 6.89 0.33 6.04 Time of Concentration (T J 6.04 Lag Time(TI) in Hours 0.060 Included Area for D.A. 0106 5.87 Ac. T, for Drainage Area #156 Post Development (10 yead El Le #2 " Velocities taken from Storm Drainage Calculations. 9 • WATERSHED : Drainage Area #101 (Post-Development) Time of Concentration Calculations Tcl Tc - Ttl +Tt2+Tt3 ... Tn where, Tc - time of concentratloln (hr), and n v number of flow segments 1) Sheet Flow Tt -(0.007(nQ10.8) / ((P2)10.5(S)10.4 ) where: Tt - Travel Time (hro) n - Manning roughness coefficient L - Row length (R) P2-50-yr,24 hr rainfall- ¢,48 Inches s - slope (ft/ft) Paved Segment: Monnings n - 0.011 Paved length - 0 Paved slope - 0.0001 Tt 0.00 hm Unpaved Segment: Mannings n - 0.40 Unpaved Length - 100 Unpaved Slope - 0.1000 Tt 0.13 hre W-1 2a hu 2) Shallow Concentrated Fbw Tt - L / (3800 V) where: Tt - Travel Time (hre) L - Row length (R) V - average velocity (ft/s) and, 3800 - conversion from seconds to hours Paved Segment: V - 20.3282 (S)"0.5 Paved length - 0 Paved slope n 0.0001 Velocity - 0.20 ft/sec • Tt 0.00 hra Unpaved Segment: V - 18.1345 (S)"0.5 Unpaved Lengths 1507 Unpaved Slope - 0.0498 Velocity - 3.80 ft/sec Tt . 0.12 hrs ia_! 4,,72 bQ 3) Open Channel Flow Tt - L / (3800 V) where: Tt - Travel Time (hrs) L e Row length (R) V - average velocity (R/s) and, 3800 conversion from seconds to hours Main Channel Dimensions: Width (Avenge 8 R Depth (Avenge) 3.5 R Side Slope - 0:1 vert. Wetted perimeter 15 R Average Slope v 0.43 % Manning's'n' - 0.035 Length of Channel 231 R Using Manning's Equation: V [(1.49)r2(s)'n)/n (for bank-full elevation) V- average velocity (fps) r- hydraulic radius (ft), also alpw 0. cross section flow area (Its) pw - wafted perimeter (R) S. slope of hydraulic grade line (ft/ft) n- Manning's roughness coefficient for open channel flow V. 4.232175 fps T, - 0.015182 hr MIN 4,42 bra T(I)-O.ST® TG 0.27 Hours LAO: 0.180902 HOURS T© 15.09021 MIN. / -I • WATERSHED : Drainage Area #102 (Post-Development) Time of Concentratlon Calculations Tc1 Tc • Ttl +Tt2+Tt3 ... Tn where, Tc • time of concentratloin (hr), and n • number of flow segments 1) Sheet Flow Tt •(0.007(nQ10.8) / ((P2)10.5(S)"0.4 ) where: Tt = Travel Time (hrs) n • Manning roughness coefficient L • flow length (ft) P2.50-yr,24 hr rainfall= 6,4$ Inches s • slope (ft/ft) Paved Segment: Monnings n = 0.011 Paved length = 0 Paved slope • 0.0001 Tt = 0.00 hrs Unpaved Segment: Manning* n = 0.40 Unpaved Length • 285 Unpaved Slope = 0.0755 Tt • 0.32 hrs ILL¦ M bM 2) Shallow Concentrated Flow Tt • L / (3800 V) where: Tt • Travel Time (hrs) L • flow length (ft) V • average velocity (ft/s) and, 3800 • conversion from seconds to hours Paved Segment: V = 20.3282 (S)"0.5 Paved length = 0 Paved slope • 0.0001 Velocity • 0.20 ft/sec • Tt = 0.00 hrs Unpaved Segment: V • 18.1345 (S)"0.5 Unpaved Length = 394 Unpaved Slope = 0.1193 Velocity • 5.57 ft/sec Tt = 0.02 hrs TYL 9M ba 3) Ohm Channel Fbw Tt • L / (3800 V) where: Tt • Travel Time (hrs) L • flow length (ft) V • average velocity (ft/s) and, 3800 • conversion from seconds to hours Main Channel Dimensions: Width (Average = 8 ft Depth (Average) = 3.5 ft Side Slope = 0:1 vart. Wetted perimeter • 15 ft Average Slope = 1.08 % Manning's'n' • 0.035 Length of Channel 744 ft Using Manning's Equation: V = [(1.49)r2r'(s)'r1Vn (for bank-full elevation) V- average velocity (fps) r- hydraulic radius (ft), also alp,,,. a. cross section flow area (ft) pw • wetted perimeter (ft) S. slope of hydraulic grade line (ftM) n- Manning's roughness coeRlcient for open channel flow V. 8.7072 fps Tt • 0.030813 hr Its 2a bu T(I)•0.8T® TC= 0.37 Hours LAO: 0.223703 HOURS T© 22.37027 MIN. lI u . WATERSHED : Drainage Area 0104 (Post Development) Time of Concentration Calculations Tc) Tc - Ttl+Tt2+Tt3...Tn where, Tc - time of concentratloin (hr), and n - number of flow segments 1) Sheet Flow Tt -(0.007(nL)60.8) / ((P2)AO.5(S)AO.4 ) where: Tt - Travel Time (hre) n - Manning roughness coefficient L - flow length (ft) P2-50-yr,24 hr rainfall- ¢,48 Inches S - slope (ft/ft) Paved Segment: Mannings n e 0.011 Paved length - 0 Paved slope - 0.0001 Tt . 0.00 hrs Unpaved Segment: Manning* n - 0.24 Unpaved Length - 182 Unpaved Slope - 0.0385 Tt 0.21 hrs I1[! M -N 2) Shallow Concentrated Flow Tt - L / (3800 V) where: Tt - Travel Time (hrs) L - flow length (ft) V - average velocity (ft/s) and, 3800 - conversion from seconds to hours Paved Segment: V - 20.3282 (S)AO.5 Paved length 0 Paved slope - 0.0001 Velocity a 0.20 ft/sec • Tt 0.00 hrs Unpaved Segment: V - 18.1345 (S)AO.5 Unpaved Length 2284 Unpaved Slope - 0.0385 Velocity - 3.17 ft/sec Tt a 0.20 hrs M! QM III! 3) Open Channel Flow Tt - L / (3500 V) where: Tt a Travel Time (hrs) L - flow length (ft) V - average velocity (fl/s) and, 3800 conversion from seconds to hours Main Channel Dimensions: Width (Avenge - 8 R Depth (Avenge) 3.5 R Side Slope a 0:01 vart, Wetted perimeter * 15 It Avenge Slope 1.39 % Manning's "n" . 0.035 Length of Channel 1007.8 ft Using Manning's Equation: V I(1.49)r"3(s)'nyn (for bank-full elevation) V- avenge velocity (fps) r. hydraulic radius (ft), also a/W a. cross section flow area (ft) pw a waded perimeter (ft) S. slope of hydraulic grade line (ft(ft) n- Manning's roughness coefficient for open channel flow V. 7.808182 fps Tt 0.03879 hr IU3_ Lb III! T0)-OAT® TC• 0.44 Hours LAG: 0.288913 HOURS T® 28.89129 MIN. `I u • • Project: Brawley Farms Phase IV Date: January 22, 2002 Re: T, Calculations for Hec-1 Model By: Brandon Pridemore Draina ge Area Size (in.) Length Velocity Tt TC To From (RCP) (ft) (fps) (min.) (min.) Find T c for Drainage Area #106, Including Phase I Drainage Area: DA#189 SD#189 " From remote drainage point to nearest storm structure 5.00 5.00 SD#189 SD#188 15 32.00 4.47 0.12 5.12 SD#188 SD#187 15 45.00 7.92 0.09 5.21 SD#187 SD#186 15 122.00 4.94 0.41 5.63 SD#186 SD#185 15 168.00 6.16 0.45 6.08 SD#185 SD#142 15 13.00 7.47 0.03 6.11 SD#142 SD#139 15 135.00 11.39 0.20 6.31 SD#139 SD#138 24 7.18 6.33 0.02 6.33 SD#138 SD#137 30 38.61 7.40 0.09 6.41 SD#137 SD#136 30 23.75 5.88 0.07 6.48 SD#136 SD#135 30 81.40 9.88 0.14 6.62 SD#135 SD#134 30 78.59 10.27 0.13 6.74 SD#134 SD#133 30 150.00 14.77 0.17 6.91 SD#133 SD#132 30 126.78 15.21 0.14 7.05 SD#132 SD#131 30 125.00 16.12 0.13 7.18 SD#131 SD#130 30 160.50 13.87 0.19 7.38 SD#130 SD#129 36 69.18 12.45 0.09 7.47 SD#129 SD#128 36 26.50 10.88 0.04 7.51 SD#128 SD#127 36 113.75 11.22 0.17 7.68 SD#127 SD#126 36 194.23 14.42 0.22 7.90 SD#126 SD#125 36 199.59 16.86 0.20 8.10 SD#125 SD#124 36 125.53 11.22 0.19 8.29 SD#124 SD#123 42 200.03 8.40 0.40 8.68 SD#123 SD#110 42 34.50 8.84 0.07 8.75 SD#110 SD#109 42 183.38 14.58 0.21 8.98 SD#109 SD#108 48 150.62 9.03 0.28 9.24 SD#108 POND 54 52.00 16.08 0.05 9.29 Time of Concentration (T,) 9.29 Lag Time(T1) In Hours 0.093 Included Area for D.A. #106 57.14 Ac. Development Full Build-Out T, for Drainage Area #106 Post Development 50 Yea Pa a #4 " Velocities taken from Storm Drainage Calculations. 30" specified for modeling purposes. Dual 24" • RCP actually installed. r? L J • Project Brawley Farms Phase IV Date: January 22, 2002 Re: T, Calculations for Hec-1 Model By: Brandon Pridemore Draina ge Area Size (in.) Length Velocity Tt T, To From (RCP) (ft) (fps) (min.) (min.) Find T c for Drainage Area #106, Including Phase I Drainage Area: DA#163 SD#163 " From remote drainage point to nearest storm structure 5.00 5.00 SD#163 SD#162 15 32.00 5.02 0.11 5.11 SD#162 SD#161 15 45.00 8.35 0.09 5.20 SD#161 SD#160 15 122.00 10.91 0.19 5.38 SD#160 SD#159 15 168.00 11.90 0.24 5.62 SD#159 SD#158 15 13.00 7.56 0.03 5.65 SD#158 POND 15 135.00 7.56 0.30 5.94 Time of Concentration (T J 5.94 Lag TimefTl) in Hours 0.059 Included Area for D.A. #106 5.87 Ac. T, for Drainage Area #158 Post Development 50 Yea Pa a #4 " Velocities taken from Storm Drainage Calculations. 0 Crn Y .S rx+] x (x] x d uri 001-1 7C bMb W OOll 0 En pp77 Q ,x '1 x n F? x x 3 x b m ?yN I O S M A x b3 ^1 S? W H x x C W x x r+ t r HH10 10 po IV 10 10 HHHHH H H ro x x 1 3 u F l7 d 0 H 0 h1 x C7 W b 0 o '=7 t7 n z W 1=] ro 10 ro ro b 10 ca V] w to W W rn 0000000 Ic, Nro ro O IVro K H n ow Nro K F-, m ;n l<ro N mro KH n O w Jb K H m IC 10 CD Oro KF,-C, ID OOOOOCD OO NKH 0M mO C•1 O O to O aO C'] O (n O Cif ykO w0 C1 O O to N m0 C•1 O N O L'7 akm w0 McnIM mO N1--,m W NO N M 0 H4 O(n in O co HN H(a0mW 0w 2 0001--' ?0 WO W Cn C3 mN y N O•P Cn O Cn 200\ OH C 0 0 NON W 0 Wm00 o(n-1 CD w OCn C9K Ul H H H H H H H m A m H 2) t7 z l7 61 N t7 z u w tl ry O (r O [?] [7 K x C'1 M p1 ?< ik C?7 OOOoOOOo 4 oikW <l] C LI] < ro O 1--' C] b- mar F' (n ?' [1 to ?' ro O N m co t1 y• - F-• L' m H H (n r cn r to w(nOt=1 m J r ? m t m r m N(nHM Ln a) J r ooOOOOOO m 0Or(nall rOO z•40 5 o[n.np O O O ro co O O to co HmC ` O N O O ro O O O w NJ(nC O N O O O J(omna(nIOJ O ONSJF-C1 10 =w 10 10 a F-3 V F: C 7 m w yk t'1 N t-j l71 x C] Ft I Cpl O t7 3 ,a H t7 Z1 t7 K] r Q ro o Q, ro C 00000000 rtv0 x1 C 3k X1 C ik .? W H mJm •a ?o C 7k :O yk O (n C N rnmrn {p x1 C 00000000 N o O 10 r- o: y z r z --(n(nCOCn Q, z H z `-cn-mcn z CD 0N• Lcn -ro otn E 0 00 0 0 00 OD N,co 0 0 00 0 0 00 MCX)MM nO o 0o O JwONJ0m0J rh 0o trz ?'+1 N '-1 :w 11 M h1 H n7 w ti7 m H R] o ,'+7 n7 z 1?1 0 l< m 0 O O m O N 0 0000000 n1 ;a Li J mF= W U1C? y x w O J ?o ;a m N J to O ;a 00000000 rn ? O r 40-0 4k0 N W W 'a O 41- C) (n =w <D m(ow O aO 0H W cn Hr0 0(oUw m JOm O 333 O m r H C F? F r r I-1 O o o o (n OroO H N l0 [a m .? N F' W m 0 0 0 0 0 0 0 H x7 H rnn N t'1 co K1 co 0 0 0 O O 0 C'1 N N m (n m z N N N m m N N 0 0 0 H H H co /--`•G H N F' mO N H N (a ?w ?o o0 co z H C nCa1 H tr w F? Li H F' J 0 0 0 0 0 0 0 C7 O m H m [?] m m m J O O OHO 0 0 G, .A(nN JmN OF N HN F'O C8 N (n -I W-0 CO N J IS co F r O F' m ? ro N w 0 0 0 0 0 0 0 m z m H O O O N C) O 0 y N N m O H N N) N N O W mm 07 N(nNNHco W 0 0 0 0 0 0 0 0 0 o N) 0 0 0 O - NNNF-,O CA m r w o? rW n1 0000000 o0 0 0 0 0 OHNmNHO mrH mrQw 0 0 0 0 ?F 0 000 F+000 O ~ O N F O W 0 O co 0 co ? l0 7 x w N x H x x x x?u ow 0 x0 x t7 w T?30 JN?o M>w 0'-17,o nT Oh]xO No ca 0 Im x10[' W 011 x 0cn ' 0 Y H H H H H H H H z t1 m x b ro ( '1 x 3 t7 3x ro ro ro IV ro ro w W o7 cn m W m 0000000 ;u O y H 10 . o H 3: • O y ro N H O y w• • •. •. • w M ro• Nro K r 0 0 Na rro Kr m x1 K roO m ro Kr n ON -j 'V 'Gr m K7 KroO Oro KrW iD000r0000 r r ?F OO r J m0 h? o O tncn a0 too cn O [»?o X0 0 [7o O w00 m0 t?O Ln O t•7akm 100 cn?o mrrNr(nNr• J0 0 * O W aONWOCA rN y fnO my O Cn NOOOry O VI rJ0 W H OCA mN y JO ay O m aO0) Ory OCn NOO Ny O cn mm0(nrm mNaa J, r *N g m H .-. CJ H -- th (D x H t7 z CJ b7 N d z C7 ro u W z m C ro rt1? o m < ?< zw roo N[qr < OOOOOOOo n th b7 M mar Ln tf Ctl t+7 ?y mm t. Cn tl OOOOOOOO m ?F d C cn r x <n r wcnom0) J r 3 m r tn?vLnrm J r m rrNIDJNrr » . CC) o0 ro co Oo mmrm<- o N Oo 10 O 00 wtQJ(n< o N Oo o rcnJCn?otnar x 10 10 t-3 r m ttl a C+] N Ch W x C'1 G t7 d a r d C7 d ri \ P O ro P C. ro 0 0 0 0 0 0 0 0 r z w C~ r m J m z G N m m m Cf 7 z 0 0 0 0 0 0 0 0 9i N z r z - N UnC z r z ?-(n O MN z r r N m m N r r H. O O O O O O O m t) a 0 O O O O O O O O O cl) m m m m W O O O O O r (J t t n 1 D m (n r P 1-1 r1l) 1-1 1-1 1-1 H ft3 ''9 ^7 r "] M z h] a ac m o r r ro ro r m by 11 r ro 0000000 r o O O W J O O J .o N O r xo ?o mr y ,ro ;27 mN :j OOOOr 000 W Ln x JNN rN)0 CD r iC0 40: C> r W W ?7 O ikO Yko meow O 7ko oaa .1 W J(Tr r r C? r r r O O O O (n r N ID w m a r r m co Tl N O 000 00 O co r ?f] W N ' M a H m co O O O r 0 0 0 N N m (n m z N N N co m w N N r N (n m N r r r r r a co r r r m 0 N r r a w r r'o m N r w r w r r J 0 0 0 0 0 0 0 O m r m m m m J O O O N O O O a L n N J m N r r a 0 W r r NCnJ W r 0 W lOJrmmN r m a N 0 0 0 0 0 0 0 m W mr OOOwOOo Ncnm rra?o w rr (n co Wco W Ln ?o JN 0 0 0 0 0 0 0 O O O (n O O O rra?oarr N J O O N m W 0 0 F F 0 0 0 O O ON) O O O rrwJarr N JmCn (nm W 0 0 0 0 0 0 0 0 0 0 x 0 0 0 r r W J a N r N m 0 ?] lp W W 7.•y On77C c) xt7 cn S? 0 1-]xbmb zn O h] r, o cn r*+ o^7 xA Nt0 q7in p7?xy O hl 7i xiOm v? 01-1 N t7 m? 0 O ?w HHHH H HHHH z w W ?G 7s x Y 3 Iy x b M x b 3?.T. 10 ro ron In ro ro W Cn H . ti7 ro O ro• O y cn 000000 3• O H ro• N y W off Nro F<H C70N r MH ? MroO mro F? r) ON Jro KH •tb-1 Oro FC W IDOOOr-1000 ?0~ # (n O- w0 O (n t..) m 0 rQ Ln O (n 4t ?D w (OO M C9 o 0 0 O V1 01 co 0 Ln 0 En N O n r)( ADO o W a, J W N • 1D00 0 W * O VI y HO(P13 O w m HN y ?061y c (n m NOOOHy Om H W O W ?Om OIN y JO.G-3Om ?ODNOH-3 O En NIDONy ? O to U161 Ln0 Ln (nJ to NmOI W NOO(nN H N *3 y d ttl H N GH1 t7 Z N L'7 t'7 C'] K it [?7 C•7 ['1 CAS yF C'7 0 0 0 0 0 0 0 0 FS * C 7 G G ro O H m H G G cc t) m H G t? b rn?r n (n py to rnmrcn th ooorHOOO rn Ln t"? 3 Ln W W Cn o m o) J t' 3 01 t-? N N H m DN J t- M H N W N O W N H s m o O ro m O0 VI mH O)G` O N O o ro o O O UI NJ CnG O N O O O TH m ?wJ. Om x ro C`1 m W x M N M 03 x C J C d t7 r C7 C7 3 ,?7 C7 Fs R+ ro O P ro C cc o 0 0 0 0 0 H z 7o 4t. n w 7' ac c 0 ? z O c c r- D Ja c c N• moo mtrl c oooHHOOO N z H z --o CD nm z H z --(n(nmcnb z HN W OH W NH N- 0 O c O o oo mtj C 0 c O c 0 o 00 mm a, a) o o O o o mHA ID m w Hm zs rr+ ray N 1-1 yF F'7 a 11 H r:] M '•J 1-7 r -1 r J z '] W O H r r m 1-I ^h H as Ky o0000cc H c O O w J O O J (D N O H a)H y ,77 ;U rnN :O o o c c o c o W Ln X? ."? JU'iN NwJ W w N H Yk0 yk0 H W W ;O O it0 zt0 (3) (D W O ?k0 co w JC? JNm H H H H H O O O O n H N i0 p1 O? .G H H D? W ! V 0 0 0 0 0 0 0 ?•? H CO ElOOONO00 N N D) L, m z N N N m m W N N N W rn 0 W N H H H F- 'N co H H H a%O N H H 0H(D co IDN J H W H W H 0 0 0 0 0 0 r J C, rn 0 r o) Q co Q 1 J O O O N o 0 0 'a (r N J 61 N H N m (n o N H N 0 J W H O lD Q\ W ID O W m H N 0 0 0 0 0 0 0 61 W a, "' ooo(nooo Ln D1 HNNo Ln NH W mM ID N IDm w ?w 0 0 0 0 0 0 0 0 0 0 J O 0 0 HN Cn Ln VINH m .?Cn 0M Cn(D 0 0 0 0 0 0 0 O O O W O O O r N Ln NM NH m .C H .P H Q1 lD 0 0 0 0 0 0 0 O O O N O O O H N C N p 1 W H J W O lD D? H lD 1++++++++++++**+**+*++++++++++++++++++*+++ + + * FLOOD HYDROGRAPH PACKAGE (HEC-1) * JUN 1998 * VERSION 4.1 + + * RUN DATE 06FEB02 TIME 09:22:20 x + ++++++*++*++++++++*+++*++*+*+++++++++++++ +**+++*++++++++++**++++***+++++++++++++ * + * U.S. ARMY CORPS OF ENGINEERS * HYDROLOGIC ENGINEERING CENTER * 609 SECOND STREET * DAVIS, CALIFORNIA 95616 * (916) 756-1104 X X XXXXXXX XXXXX X X X X X X XX X X X X X XXXXXXX XXXX X XXXXX X X X X X X X X X X X X X X XXXXXXX XXXXX XXX THIS PROGRAM REPLACES ALL PREVIOUS VERSIONS OF HEC-1 KNOWN AS HEC1 (JAN 73), HECIGS, HECIDB, AND HECIKW. THE DEFINITIONS OF VARIABLES -RTIMP- AND -RTIOR- HAVE CHANGED FROM THOSE USED WITH THE 1973-STYLE INPUT STRUCTURE. THE DEFINITION CF -AMSKK- ON RM-CARD WAS CHANGED WITH REVISIONS DATED 28 SEP 81. THIS IS THE FORTRAN77 VERSION NEW OPTIONS: DAMBREAK OUTFLOW SUBMERGENCE , SINGLE EVENT DAMAGE CALCULATION, DSS:WRITE STAGE FREQUENCY, DSS:READ TIME SERIES AT DESIRED CALCULATION INTERVAL LOSS RATE:GREEN AND AMPT INFILTRATION KINEMATIC WAVE: NEW FINITE DIFFERENCE ALGORITHM 1 HEC-1 INPUT PAGE 1 LINE ID ....... 1. ...... 2....... 3....... 4....... 5....... 6 ....... 7... .... 8.. ..... 9 ...... 10 1 ID PRE 6 POST DEVELOPMENT EVAL. FOR FUTURE DEVELOPMENT (BF4 S BF5) 2 ID PROJEC T #1041 - BRAWLEY FARMS PHASE IV 3 ID 2, 10, 50 YEAR FLOWS FOR CHARLOTTE, NC 4 IT 1 28JAN02 0000 1000 5 IO 4 0 0 6 KK PRE101 7 KF YES 8 KM 2 Ye ar 6 Hour Rainfall 9 PB 2.28 10 IN 5 11 PI 0.0 0.007 0.007 0.008 0.008 0.008 0.008 0.009 0.009 0.009 12 PI 0.009 0.009 0.010 0.010 0.010 0.011 0.011 0.011 0.012 0.014 13 PI 0.014 0.015 0.016 0.017 0.018 0.021 0.022 0.024 0.026 0.028 14 PI 0.031 0.044 0.050 0.058 0.089 0.115 0.242 0.420 0.168 0.100 15 PI 0.064 0.054 0.047 0.033 0.029 0.027 0.025 0.023 0.021 0.018 16 PI 0.017 0.016 0.016 0.015 0.014 0.012 0.012 0.011 0.011 0.010 1 • • 150 KO 0 0 0 0 21 151 KM POST DEVELOPED RUNOFF FOR #101 152 BA .0285 153 LS 0 58 0 154 UD .174 155 KK POST 156 KM COMBINE BMP#1/ 102 6 #101 157 HC 2 158 KM ********** 159 KK PRE101 160 KM 50 Year 6 Hour Rainfall 161 PB 4.92 162 IN 5 163 PI 0.0 0.016 0.016 0.016 0.017 0.018 0.018 0.019 0.019 0.019 164 PI 0.020 0.020 0.021 0.022 0.022 0.023 0.024 0.025 0.026 0.031 165 PI 0.032 0.034 0.035 0.037 0.039 0.050 0.053 0.056 0.061 0.066 166 PI 0.073 0.103 0.116 0.134 0.208 0.259 0.508 0.750 0.354 0.229 167 PI 0.146 0.124 0.109 0.077 0.069 0.063 0.059 0.055 0.051 0.040 168 PI 0.038 0.036 0.034 0.033 0.031 0.026 0.025 0.024 0.024 0.023 169 PI 0.022 0.021 0.021 0.020 0.020 0.019 0.019 0.018 0.018 0.017 170 PI 0.017 0.016 0.016 0.0 171 BA .3965 172 LS 0 60 0 173 UD .365 174 KK PST156 175 KF YES 176 KO 0 0 0 0 21 177 KM POST DEVELOPED RUNOFF FOR #156 178 BA .0092 179 LS 0 72 0 180 UD .059 HEC-1 INPUT LINE ID....... 1....... 2....... 3....... 4....... 5....... 6....... 7....... 8....... 9...... 10 181 KK BMP#2 182 KF YES 183 KO 0 0 0 0 21 184 KM ROUT E #156 THRU BASIN #2 185 RS 1 ELEV 656 186 SA 0 .2815 .5886 .9223 1.2832 1.6720 187 SE 656 657 658 659 660 661 188 SQ 0 0.22 0.58 17.76 123.86 371.73 189 KK PST104 (BYPASS BMP#2) 190 KF YES 191 KO 0 0 0 0 21 192 KM POST DEVELOPED RUNOFF FOR #104 193 BA .2784 194 LS 0 60 0 195 UD .267 PAGE 5 • • x x * RUN DATE 06FEB02 TIME 09:22:20 x x .xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx PRE 6 POST DEVELOPMENT EVAL. FOR FUTURE DEVELOPMENT (BF4 6 BF5) PROJECT #1041 - BRAWLEY FARMS PHASE IV 2, 10, 50 YEAR FLOWS FOR CHARLOTTE, NC 5 IO OUTPUT CONTROL VARIABLES IPRNT 4 IPLOT 0 QSCAL 0. IT HYDROGRAPH TIME DATA NMIN 1 IDATE 28JAN 2 ITIME 0000 NQ 1000 NDDATE 28JAN 2 NDTIME 1639 ICENT 19 PRINT CONTROL PLOT CONTROL HYDROGRAPH PLOT SCALE MINUTES IN COMPUTATION INTERVAL STARTING DATE STARTING TIME NUMBER OF HYDROGRAPH ORDINATES ENDING DATE ENDING TIME CENTURY MARK COMPUTATION INTERVAL .02 HOURS TOTAL TIME BASE 16.65 HOURS ENGLISH UNITS DRAINAGE AREA PRECIPITATION DEPTH LENGTH, ELEVATION FLOW STORAGE VOLUME SURFACE AREA TEMPERATURE SQUARE MILES INCHES FEET CUBIC FEET PER SECOND ACRE-FEET ACRES DEGREES FAHRENHEIT * DAVIS, CALIFORNIA 95616 * (916) 756-1104 x x xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx xxx x** xxx xxx xxx xxx xxx xxx xxx xxx xxx 6 KK xxxxxxxxxxxxxx x x * PRE101 x x xxxxxxxxxxx*xx 2 Year 6 Hour Rainfall 10 IN TIME DATA FOR INPUT TIME SERIES JXMIN 5 TIME INTERVAL IN MINUTES JXDATE 28JAN 2 STARTING DATE JXTIME 0 STARTING TIME • • 0 0 0 SUBBASIN RUNOFF DATA 19 BA SUBBASIN CHARACTERISTICS TAREA .40 SUBBASIN AREA PRECIPITATION DATA 9 PB STORM 2.28 BASIN TOTAL PRECIPITATION 11 PI INCREMENTAL PRECIPITATION PATTERN .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 .05 .05 .05 .05 .05 .03 .03 .03 .03 .03 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 20 LS SCS LOSS RATE STRTL 1.33 INITIAL ABSTRACTION CRVNBR 60.00 CURVE NUMBER RTIMP .00 PERCENT IMPERVIOUS AREA 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 01 .01 .01 .01 .01 01 .01 .01 .01 .01 01 .01 .01 .01 .01 02 .02 .02 .02 .02 08 .08 .08 .08 .08 02 .02 .02 .02 .02 01 .01 .01 .01 .01 01 .01 .01 .01 .01 01 .01 .01 .01 .01 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 21 UD SCS DIMENSIONLESS UNITGRAPH r i • TLAG .45 LAG UNIT HYDROGRAP H 136 END-OF-PERIOD OR DINATES 5. 9. 15. 26. 37. 49. 63. 77. 94. 113. 131. 156. 180. 206. 235. 265. 291. 316. 340. 358. 375. 391. 400. 410. 416. 418. 419. 419. 417. 416. 407. 398. 389. 378. 367. 356. 344. 331. 317. 302. 286. 268. 250. 232. 217. 201. 188. 177. 167. 157. 148. 139. 131. 123. 116. 111. 105. 99. 94. 88. 83. 79. 74. 70. 65. 61. 58. 55. 52. 49. 45. 43. 41. 38. 36. 34. 32. 30. 28. 27. 25. 23. 22. 21. 20. 19. 17. 16. 16. 15. 14. 13. 12. 12. 11. 10. 10. 9. 9. 8. 8. 7. 7. 6. 6. 6. 5. 5. 5. 5. 4. 4. 4. 4. 4. 3. 3. 3. 3. 3. 3. 2. 2. 2. 2. 2. 2. 1. 1. 1. 1. 1. 1. 0. 0. 0. 22 KK * * ** * PST156 * ************ 24 KO OUTPUT CONTROL VARIABLES IPRNT 4 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVE D ISAV2 1000 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS POST DEVELOPED RUNOFF FOR #156 SUBBASIN RUNOFF DATA 26 BA SUBBASIN CHARACTERISTICS TAREA .01 SUBBASIN AREA PRECIPITATION DATA 9 PB STORM 2.28 BASIN TOTAL PRECIPITATION 11 PI INCREMENTAL PRECIPITATION PATTERN .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 27 LS 28 UD .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .05 .05 .05 .05 .05 .08 .08 .08 .08 .08 .03 .03 .03 .03 .03 .02 .02 .02 .02 .02 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 SCS LOSS RATE STRTL .78 INITIAL ABSTRACTION CRVNBR 72.00 CURVE NU MBER RTIMP .00 PERCENT IMPERVIOUS AREA SCS DIMENSIONLESS UNITGRAPH TLAG .06 LAG UNIT HYDROGRAPH 21 END-OF- PERIOD ORDINATES 8. 27. 53. 63. 59. 48. 32. 21. 15. 10. 7. 5. 3. 2. 1. 1. 1. 0. 0. 0. 0. 0 0 0 29 KK ************** * * * BMP#2 * * ************** 31 KO OUTPUT CONTROL VARIABLES IPRNT 4 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1000 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS ROU TE #156 T HRU BASIN #2 HYDROGRAPH ROUTING DATA 33 RS STORAGE ROUTING NSTPS 1 NUMBER OF SUBREACHES ITYP ELEV TYPE OF INITIAL CONDITION RSVRIC 656.00 INITIAL CONDITION X .00 WORKING R AND D COEFFICIENT 34 SA AREA .0 .3 .6 .9 1.3 1.7 35 SE ELEVATION 656.00 657.00 658.00 659.00 660.00 661.00 36 SQ DISCHARGE 0. 0. 1. 18. 124. 372. *** COMPUTED STORAGE-ELEVATION DATA STORAGE .00 .09 .52 1.27 2.37 3.84 ELEVATION 656.00 657.00 658.00 659.00 660.00 661.00 37 KK * * * PST104 * * * ************** (BYPASS BMP#2) 39 KO OUTPUT CONTROL VARIABLES IPRNT 4 PRINT CONTROL 41 BA 9 PB 11 PI IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1000 LAST ORDINATE P UNCHED OR SAVED TIMINT .017 TIME INTERVAL, I N HOURS POST DEVELOPED RUNOFF FOR #1 04 SUBBASIN RUNOFF DATA SUBBASIN CHARACTERISTICS TAREA .28 SUBBASIN AREA PRECIPITATION DATA STORM 2.28 BASIN TOTAL PRE CIPITATION INCREMENTAL PRECIPITATION PATTERN .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .O1 .01 .O1 .01 .01 .01 .01 .01 .01 .01 .O1 .O1 .01 .01 .O1 .O1 .O1 .01 .01 .01 .O1 .01 .O1 .01 .01 .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .05 .05 .05 .05 .05 .08 .08 .08 .06 .08 .03 .03 .03 .03 .03 .02 .02 .02 .02 .02 .01 .01 .01 .O1 .01 .01 .O1 .01 .01 .O1 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .O1 .01 .01 .01 .01 .01 .O1 .01 .O1 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 • 0 • • IPRNT 4 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1000 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS POST DEVELOPED RUNOFF FOR #106 SUBBASIN RUNOFF DATA 51 BA SUBBASIN CHARACTERISTICS TAREA .09 SUBBASIN AREA PRECIPITATION DATA 9 PB STORM 2.28 BASIN TOTAL PRECIPITATION 11 PI INCREMENTAL PRECIPITATION PATTERN .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .O1 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .05 .05 .05 .05 .05 .08 .08 .06 .08 .08 .03 .03 .03 .03 .03 .02 .02 .02 .02 .02 .01 .01 .O1 .O1 .01 .01 .01 .01 .01 .01 .01 .01 .01 .O1 .01 .01 .01 .O1 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 • • 0 .00 .00 .00 52 LS SCS LOSS RATE STRTL CRVNBR RTIMP 53 UD SCS DIMENSION] TLAG .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .78 INITIAL ABSTRACTION 72.00 CURVE NUMBER .00 PERCENT IMPERVIOUS AREA ,ESS UNITGRAPH .10 LAG *** UNIT HYDROGRAPH 33 END-OF-PERIOD ORDINATES 25. 73. 150. 255. 338. 383. 385. 361. 318. 265. 199. 152. 119. 95. 75. 57. 46. 36. 28. 22. 17. 14. 11. 8. 6. 5. 4. 3. 3. 2. 1. 1. 0. 54 KK ************** * * BMP#1 * * ************** 56 KO OUTPUT CONTROL VARIABLES IPRNT 4 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1000 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS ROUTE #156, #104 & #106 THRU BASIN HYDROGRAPH ROUTING DATA 58 RS STORAGE ROUTING NSTPS 1 NUMBER OF SUBREACHES ITYP ELEV TYPE OF INITIAL CONDITION RSVRIC 650.00 INITIAL CONDITION X .00 WORKING R AND D COEFFICIENT 59 SA AREA .0 2.1 4.4 6.7 9.1 11.7 14.3 60 SE ELEVATION 650.00 651.00 652.00 653.00 654 .00 655.00 656.00 • • • 61 SQ DISCHARGE 0. 0. 5. 13. xxx 89. 310. 626. COMPUTED STORAGE-ELEVAT ION DATA STORAGE .00 .71 3.91 9.41 17.31 27.70 40.68 xxx xxx ELEVATION 650.00 *** xxx *** xxx xxx xxx 651.00 652.00 653.00 654.00 xxx xxx *xx x** xxx xxx xxx xxx xxx xxx 655.00 xxx *xx xxx 656.00 xxx xxx xxx xxx *xx xxx xxx xxx xxx xxx xxx xxx 62 KK xxxxx*xxxxxxxx * * * PST102 * x x xxxxxxxxxxxxxx (BYPASS BMP#1) 64 KO OUTPUT CONTROL VARIABLES IPRNT 4 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVE D ISAV2 1000 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS PO ST DEVELOPED RUNOFF FOR #102 SUBBASIN RUNOFF DATA 66 BA SUBBASIN CHARACTERISTICS TAREA .01 SUBBASIN AREA PRECIPITATION DATA 9 PB STORM 2.28 BASIN TOTAL PRECIPITATION 11 PI INCREMENTAL PRECIPITATION PATTERN .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 • .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 .05 .05 .05 .05 .05 .03 .03 .03 .03 .03 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 67 LS SCS LOSS RATE STRTL 1.45 INITIAL ABSTRACTION CRVNBR 58.00 CURVE NUMBER RTIMP .00 PERCENT IMPERVIOUS AREA 68 UD SCS DIMENSIONLESS UNITGRAPH TLAG .31 LAG • • .00 .00 .01 .01 .00 .00 .01 .01 .00 .00 .01 .01 .00 .00 .01 .01 .00 .00 .01 .01 .01 .02 .08 .02 .01 .02 .08 .02 .01 .02 .08 .02 .01 .02 .08 .02 .01 .02 .08 .02 .01 .01 .01 .00 .01 .01 .01 .00 .01 .01 .01 .00 .01 .01 .01 .00 .01 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 UNIT HYDROGRAPH 95 END-OF-PERIOD ORDINATES 0. 1. 2. 2. 3. 5. 6. 8. 9. 12. 14. 16. 18. 15. 20. 21. 22. 22. 22. 22. 22. 21. 21. 20. 19. 18. 17. 16. 14. 13. 12. 11. 10. 9. 8. 7. 7. 6. 6. 5. 5. 5. 4. 4. 4. 3. 3. 3. 2. 2. 2. 2. 2. 2. 1. 1. 1. 1. 1. 1. 1. 1. 1. 1. 1. 1. 1. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0 0 * * 69 KK * POST * * COMBINE BMP#1 6 #102 71 HC HYDROGRAPH COMBINATION ICOMP 2 NUMBER OF HYDROGRAPHS TO COMBINE *** ************** * * 72 KK * PST101 * * ************** 74 KO OUTPUT CONTROL VARIABLES IPRNT 4 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1000 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS PO ST DEVELOPED RUNOFF FOR #101 SUBBASIN RUNOFF DATA 76 BA SUBBASIN CHARA CTERISTICS TAREA .03 SUBBASIN AREA PRECIPITATION DATA 9 PB STORM 2.28 BASIN TOTAL PRECIPITATION 11 PI INCREMENTAL PRECIPITATION PATTERN .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 • • • .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .05 .05 .05 .05 .05 .08 .08 .08 .08 .08 .03 .03 .03 .03 .03 .02 .02 .02 .02 .02 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 77 LS SCS LOSS RATE STRTL 1.45 INITIAL ABSTRACTION CRVNBR 58.00 CURVE NUMBER RTIMP .00 PERCENT IMPERVIOUS AREA 78 UD SCS DIMENSIONLESS UNITGRAPH TLAG .20 LAG +++ UNIT HYDROGRAPH 61 END-OF- PERIOD ORDINATES 2. 5. 9. 15. 22. 31. 41. 50. 58. 63. 67. 67. 67. 65. 62. 58. 53. 48. 42. 36. 30. 27. 23. 20. 18. 16. 14. 12. 11. 9. 8. 7. 6. 5. 5. 4. 4. 3. 3. 2. 2. 2. 2. 1. 1. 1. 1. 1. 1. 1. 1. 1. 0. 0. 0. 0. 0. 0. 0. 0. 0. 79 KK *+++++++++++++ + + * POST x + ++xxxx+xxxxxxx COMBINE BMP#1/102 & #101 +x+++++++x 81 HC HYDROGRAPH COMBINATION ICOMP 2 NUMBER OF HYDROGRAPHS TO COMBINE +++ xxxxxxxxxxx+x+ x x 83 KK * PRE101 x + xxxxxxxxxxxxx+ 10 Year 6 Hour Rainfall 86 IN TIME DATA FOR INPUT TIME SERIES JXMIN 5 TIME INTERVAL IN MINUTES JXDATE 28JAN 2 STARTING DATE JXTIME 0 STARTING TIME SUBBASIN RUNOFF DATA 95 BA SUBBASIN CHARACTERISTICS TAREA .40 SUBBASIN AREA PRECIPITATION DATA 85 PB STORM 3.72 BASIN TOTAL PRECIPITATION 87 PI INCREMENTAL PRECIPITATION PATTERN .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 .03 .03 .03 .03 .03 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .01 .00 .00 01 .01 .01 .01 .01 01 .01 .01 .01 .01 01 .01 .01 .01 .01 01 .01 .01 .01 .01 02 .02 .02 .02 .02 02 .02 .02 .02 .02 04 .04 .04 .04 .04 96 LS 97 UD .08 .08 .08 .08 .08 .06 .06 .05 .06 .06 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .01 .00 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 SCS LOSS RATE STRTL 1.33 INITIAL ABSTRACTION CRVNBR 60.00 CURVE NUMBER RTIMP .00 PERCENT IMPERVIOUS AREA SCS DIMENSIONLESS UNITGRAPH TLAG .40 LAG *** • • 12 .12 .12 .12 .12 04 .04 .04 .04 .04 02 .02 .02 .02 .02 01 .01 .01 .01 .01 01 .01 .01 .01 .01 01 .01 .01 .01 .01 01 .01 .01 .01 .01 01 .01 .01 .01 .01 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 UNIT HYDROGRAPH 121 END-OF-PERIOD ORDINATES 6. 12. 22. 36. 50. 68. 85. 107. 130. 156. 187. 219. 255. 292. 327. 358. 389. 410. 432. 447. 459. 469. 471. 473. 472. 470. 465. 454. 442. 428. 415. 400. 385. 369. 349. 330. 308. 284. 262. 242. 223. 208. 194. 181. 169. 157. 147. 138. 129. 122. 115. i08. 101. 94. 89. 83. 77. 71. 67. 63. 59. 55. 51. 48. 45. 42. 39. 36. 34. 32. 30. 28. 26. 24. 23. 21. 20. 19. 17. 16. 15. 14. 13. 13. 12. 11. 10. 10. 9. 8. 8. 7. 7. 6. 6. 6. 5. S. 5. 5. 4. 4. 4. 4. 3. 3. 3. 3. 2. 2. 2. 2. 2. 1. 1. 1. 1. 1. 0. 0. 0. 98 KK * PST156 * * • • • 100 KO OUTPUT CONTROL VARIABLES IPRNT 4 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1000 LAST ORDINATE P UNCHED OR SAVED TIMINT .017 TIME INTERVAL I N HOURS POST DEVELOPED RUNOFF FOR #1 56 SUBBASIN RUNOFF DATA 102 BA SUBBASIN CHARACTERISTICS TAREA .01 SUBBASIN AREA PRECIPITATION DATA 85 PB STORM 3.72 BASIN TOTAL PRE CIPITATION 87 PI INCREMENTAL PRECIPITATION PATTERN .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .O1 .00 .00 .01 .O1 .01 .O1 .O1 .O1 .01 .01 .01 .O1 .01 .O1 .01 .01 .O1 .O1 .01 .01 .O1 .01 .O1 .01 .01 .01 .O1 .01 .01 .01 .01 .01 .01 .01 .01 .O1 .O1 .O1 .01 .01 .O1 .01 .01 .01 .01 .01 .O1 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .03 .03 .03 .03 .03 .04 .04 .04 .04 .04 .08 .08 .08 .08 .O8 .12 .12 .12 .12 .12 .06 .06 .05 .06 .06 .04 .04 .04 .04 .04 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .O1 .O1 .01 .01 .01 .01 .01 .01 .O1 .O1 .O1 .O1 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .O1 .01 .O1 .01 .01 .01 .O1 .01 .01 .01 .O1 .O1 .01 .01 .01 .01 .O1 .00 .01 .00 .O1 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 • . • .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 103 LS SCS LOSS RATE STRTL .78 INITIAL ABSTRACTION CRVNBR 72.00 CURVE NUMBER RTIMP .00 PERCENT IMPERVIOUS AREA 104 UD SCS DIMENSIONLESS UNITGRAPH TLAG .06 LAG *** UNIT HYDROGRAPH 20 END-OF-PERIOD ORDINATES 9. 29. 56. 65. 60. 47. 30. 20. 14. 9. 6. 4. 3. 2. 1. 1. 1. 0. 0. 0. 105 KK ************** * * * SMP#2 * * ************** 107 KO OUTPUT CONTROL VA RIABLES IPRNT 4 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1000 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS ROUTE #156 THRU BASIN #2 HYDROGRAPH ROUTING DATA 109 RS STORAGE ROUTING NSTPS 1 NUMBER OF SUBREACHES ITYP ELEV TYPE OF INITIAL CONDITION RSVRIC 656.00 INITIAL CONDITION X .00 WORKING R AND D COEFFICIENT 110 SA AREA .0 .3 .6 .9 1.3 1.7 111 SE ELEVATION 656.00 657.00 658.00 659.00 660.00 661.00 112 SQ DISCHARGE 0. 0. 1. 18. +++ 124. 372. COMPUTED STORAGE-ELEVAT ION DATA STORAGE .00 .09 .52 1.27 2.37 3.84 ELEVATION 656.00 657.00 658.00 659.00 660.00 661.00 113 KK ++++++++++++++ + * * PST104 * + + (BYPASS BMP#2) 115 KO OUTPUT CONTROL VARIABLES IPRNT 4 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVE D ISAV2 1000 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS PO ST DEVELOPED RUNOFF FOR #104 SUBBASIN RUNOFF DATA 117 BA SUBBASIN CHARACTERISTICS TAREA .28 SUBBASIN AREA PRECIPITATION DATA 85 PB STORM 3.72 BASIN TOTAL PRECIPITATION 87 PI INCREMENTAL PRECIPITATION PATTERN .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .00 .00 C] .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 .03 .03 .03 .03 .03 .08 .08 .08 .08 .08 .06 .06 .05 .06 .06 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .01 .00 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 118 LS SCS LOSS RATE STRTL 1.33 INITIAL ABSTRACTION CRVNBR 60.00 CURVE NUMBER RTIMP .00 PERCENT IMPERVIOUS AREA 119 UD SCS DIMENSIONLESS UNITGRAPH TLAG .29 LAG • • 01 .01 .01 .01 .01 01 .01 .01 .01 .01 01 .01 .01 .01 .01 01 .01 .01 .01 .01 02 .02 .02 .02 .02 02 .02 .02 .02 .02 04 .04 .04 .04 .04 12 .12 .12 .12 .12 04 .04 .04 .04 .04 02 .02 .02 .02 .02 01 .01 .01 .01 .01 01 .01 .01 .01 .01 01 .01 .01 .01 .01 01 .01 .01 .01 .01 01 .01 .01 .01 .01 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 UNIT HYDROGRAPH 88 END-OF-PERIOD ORDINATES 8. 18. 36. 56. 79. 108. 138. 179. 221. 270. 316. 357. 390. 419. 436. 451. 454. 455. 452. 443. 428. 410. 392. 372. 350. 325. 297. 266. 238. 213. 194. 176. 161. 146. 133. 122. 113. 104. 94. 86. 79. 71. 65. 59. 54. 49. 45. 41. 37. 34. 31. 28. 25. 23. 22. 20. 18. 16. 15. 14. 12. 11. 10. 9. 9. 8. 7. 6. 6. 5. 5. 5. 4. 4. 4. 3. 3. 3. 3. 2. 2. 2. 1. 1. 1. 1. 0. 0. 0 0 0 + + 120 KK * POST + + ++++++++++++++ COMBINE BMP#2 6 #104 122 HC HYDROGRAPH COMBINATION ICOMP 2 NUMBER OF HYDROGRAPHS TO COMBINE +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ ++++++++++++++ + + 123 KK * PST106 + + ++++++++++++++ 125 KO OUTPUT CONTROL VARIABLES IPRNT 4 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1000 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS PO ST DEVELOPED RUNOFF FOR #106 SUBBASIN RUNOFF DATA 127 BA SUBBASIN CHARACTERISTICS TAREA .09 SUBBASIN AREA PRECIPITATION DATA 85 PB STORM 3.72 BASIN TOTAL PRECIPITATION 87 PI INCREMENTAL PRECIPITATION PATTERN .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .00 .00 .00 00 .00 .01 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .03 .03 .03 .03 .03 .04 .04 .04 .04 .04 .08 .08 .08 .08 .08 .12 .12 .12 .12 .12 .06 .06 .05 .06 .06 .04 .04 .04 .04 .04 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .01 .00 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 128 LS SCS LOSS RATE STRTL .78 INITIAL ABSTRACTION CRVNBR 72.00 CURVE NUMBER RTIMP .00 PERCENT IMPERVIOUS AREA 129 UD SCS DIMENSIONLESS UNITGRAPH TLAG .10 LAG +++ UNIT HYDROGRAPH 31 END-OF-PERIOD ORDINATES 29. 86. 176. 292. 377. 407. 404. 362. 310. 238. 177. 135. 106. 83. 63. 49. 38. 29. 22. 17. 14. 11. 8. 6. 5. 4. 3. 2. 2. 1. 0. +++ +++ +++ +++ +++ +++ +++ +*+ +++ +++ +++ +++ +++ +++ +++ *++ +++ +++ *++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ +++ ++* **+ ++++++*+++++++ + + 130 KK * BMP#1 + + ++++++++++++++ 0 • • 132 KO OUTPUT CONTROL VARIABLES IPRNT 4 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1000 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS ROUTE #156, #104 & #106 THRU BASIN HYDROGRAPH ROUTING DATA 134 RS STORAGE ROUTING NSTPS 1 NUMBER OF SUBREACHES ITYP ELEV TYPE OF INITIAL CONDITION RSVRIC 650.00 INITIAL CONDITION X .00 WORKING R AND D COEFFICIENT 135 SA AREA .0 2.1 4.4 6.7 9.1 11.7 14.3 136 SE ELEVATION 650.00 651.00 652.00 653.00 654.00 655.00 656.00 137 SQ DISCHARGE 0. 0. 5. 13. 89. 310. 626. COMPUTED STORAGE-ELEVATION DATA STORAGE .00 .71 3.91 9.41 17.31 27.70 40.68 ELEVATION 650.00 651.00 652.00 653.00 654.00 655.00 656.00 138 KK ************** * * * PST102 * (BYPASS BMP#1) * * 140 KO OUTPUT CONTROL VARIABLES IPRNT 4 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1000 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS POST DEVELOPED RUNOFF FOR #102 • • • SUBBASIN RUNOFF DATA 142 BA SUBBASIN CHARACTERISTICS TAREA .01 SUBBASIN AREA PRECIPITATION DATA 85 PB STORM 3.72 BASIN TOTAL PRECIPITATION 87 PI INCREMENTAL PRECIPITATION PATTERN .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 .03 .03 .03 .03 .03 .08 .08 .08 .08 .08 .06 .06 .05 .06 .06 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .0i .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .01 .00 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 143 LS SCS LOSS RATE STRTL 1.45 INITIAL ABSTRACTION CRVNBR 58.00 CURVE NUMBER RTIMP .00 PERCENT IMPERVIOUS AREA .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .04 .04 .04 .04 .04 .12 .12 .12 .12 .12 .04 .04 .04 .04 .04 .02 .02 .02 .02 .02 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 144 UD SCS DIMENSIONLESS UNITGRAPH • • • SUBBASIN RUNOFF DATA 152 BA SUBBASIN CHARACTERISTICS TAREA .03 SUBBASIN AREA PRECIPITATION DATA 85 PB STORM 3.72 BASIN TOTAL PRECIPITATION 87 PI INCREMENTAL PRECIPITATION PATTERN .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 .03 .03 .03 .03 .03 .08 .08 .08 .08 .08 .06 .06 .05 .06 .06 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .01 .00 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 153 LS SCS LOSS RATE STRTL 1.45 INITIAL ABSTRACTION CRVNBR 58.00 CURVE NUMBER RTIMP .00 PERCENT IMPERVIOUS AREA 154 UD SCS DIMENSIONLESS UNITGRAPH TLAG .17 LAG .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .04 .04 .04 .04 .04 .12 .12 .12 .12 .12 .04 .04 .04 .04 .04 .02 .02 .02 .02 .02 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 0 0 0 163 PI 172 LS 173 UD INCREMENTAL PRECIPITATION PATTERN .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .03 .03 .03 .03 .03 .04 .04 .04 .04 .04 .05 .05 .05 .05 .05 .10 .10 .10 .10 .10 .15 .15 .15 .15 .15 .07 .07 .07 .07 .07 .05 .05 .05 .05 .05 .03 .03 .03 .03 .03 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 _01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 SCS LOSS RATE STRTL 1.33 INITIAL ABSTRACTION CRVNBR 60.00 CURVE N UMBER RTIMP .00 PERCENT IMPERVIOUS AREA SCS DIMENSIONLESS UNITGRAPH TLAG .37 LAG UNIT HYDROGRAPH 111 END-OF -PERIOD ORDINATES 7. 14. 28. 44. 62. 83. 105. 133. 161. 197. 234. 276. 319. 359. 396. 429. 454. 478. 492. 506. 510. 512. 512. 509. 503. 489. 475. 459. 443. 425. 0 0 0 407. 386. 363. 338. 310. 284. 261. 238. 221. 205. 191. 177. 164. 153. 142. 134. 125. 117. 109. 101. 94. 88. 81. 74. 70. 65. 61. 56. 52. 49. 45. 42. 39. 36. 34. 31. 29. 27. 25. 23. 22. 20. 19. 18. 16. 15. 14. 13. 12. 11. 11. 10. 9. 8. 8. 7. 7. 6. 6. 6. 5. S. S. 4. 4. 4. 4. 3. 3. 3. 3. 2. 2. 2. 2. 1. 1. 1. 1. 0. 0. 174 KK ************** * * PST156 * * ************** 176 KO OUTPUT CONTROL VARIABLES IPRNT 4 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVE D ISAV2 1000 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS PO ST DEVELOPED RUNOFF FOR #156 SUBBASIN RUNOFF DATA 178 BA SUBBASIN CHARACTERISTICS TAREA .01 SUBBASIN AREA PRECIPITATION DATA 161 PB STORM 4.92 BASIN TOTAL PRECIPITATION 163 PI INCREMENTAL PRECIPITATION PATTERN .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 • • .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .03 .03 .03 .03 .03 .04 .04 .04 .04 .04 .05 .05 .05 .05 .05 .10 .10 .10 .10 .10 .15 .15 .15 .15 .15 .07 .07 .07 .07 .07 .05 .05 .05 .05 .05 .03 .03 .03 .03 .03 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 179 LS SCS LOSS RATE STRTL .78 INITIAL ABSTRACTION CRVNBR 72.00 CURVE NUMBER RTIMP .00 PERCENT IMPERVIOUS AREA 180 UD SCS DIMENSIONLESS UNITGRAPH TLAG .06 LAG *** UNIT HYDROGRAPH 20 END-OF- PERIOD ORDINATES 9. 31. 57. 66. 60. 46. 29. 19. 13. 9. 6. 4. 3. 2. 1. 1. 1. 0. 0. 0. *** *** *** *** *** *** *** *** * *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** 181 KK * * BMP#2 * * ************** 183 KO OUTPUT CONTROL VARIABLES IPRNT 4 PRINT CONTROL IPLOT 0 PLOT CONTROL • • • • QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1000 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS ROUTE #156 THRU BASIN #2 HYDROGRAPH ROUTING DATA 185 RS STORAGE ROUTING NSTPS 1 NUMBER OF SUBREACHES ITYP ELEV TYPE OF INITIAL CONDITION RSVRIC 656.00 INITIAL CONDITION X .00 WORKING R AND D COEFFICIENT 186 SA AREA .0 .3 .6 .9 1.3 1.7 187 SE ELEVATION 656.00 657.00 658.00 659.00 660.00 661.00 188 SQ DISCHARGE 0. 0. 1. 18. 124. 372. *** COMPUTED STORAGE-ELEVATION DATA STORAGE .00 .09 .52 1.27 2.37 3.84 ELEVATION 656.00 657.00 658.00 659.00 660.00 661.00 189 KK ************** * * * PST104 * * * (BYPASS BMP#2) 191 KO OUTPUT CONTROL VARIABLES IPRNT 4 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1000 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS PO ST DEVELOPED RUNOFF FOR #104 SUBBASIN RUNOFF DATA • • • 193 BA SUBBASIN CHARACTERISTICS TAREA .28 SUBBASIN AREA PRECIPITATION DATA 161 PB STORM 4.92 BASIN TOTAL, PRECIPITATION 163 PI INCREMENTAL PRECIPITATION PATTERN .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 .04 .04 .04 .04 .04 .10 .10 .10 .10 .10 .07 .07 .07 .07 .07 .03 .03 .03 .03 .03 .02 .02 .02 .02 .02 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 194 LS SCS LOSS RATE STRTL 1.33 INITIAL ABSTRACTION CRVNBR 60.00 CURVE NUMBER RTIMP .00 PERCENT IMPERVIOUS AREA 195 UD SCS DIMENSIONLESS UNITGRAPH TLAG .27 LAG .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 .03 .03 .03 .03 .03 .05 .05 .05 .05 .05 .15 .15 .15 .15 .15 .05 .05 .05 .05 .05 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 • • 203 BA SUBBASIN CHARACTERISTICS TAREA .09 SUBBASIN AREA PRECIPITATION DATA 161 PB STORM 4.92 BASIN TOTAL PRECIPITATION 163 PI INCREMENTAL PRECIPITATION PATTERN .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 .04 .04 .04 .04 .04 .10 .10 .10 .10 .10 .07 .07 .07 .07 .07 .03 .03 .03 .03 .03 .02 .02 .02 .02 .02 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 204 LS SCS LOSS RATE STRTL .78 INITIAL ABSTRACTION CRVNBR 72.00 CURVE NUMBER RTIMP .00 PERCENT IMPERVIOUS AREA 205 UD SCS DIMENSIONLESS UNITGRAPH TLAG .09 LAG .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 .03 .03 .03 .03 .03 .05 .05 .05 .05 .05 .15 .15 .15 .15 .15 .05 .05 .05 .05 .05 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 0 0 0 UNIT HYDROGRAPH 30 END-OF-PERIOD ORDINATES 32. 96. 196. 321. 402. 425. 409. 361. 298. 219. 164. 125. 98. 75. 57. 44. 33. 25. 19. 15. 11. 9. 7. 5. 4. 3. 2. 2. 1. 0. 206 KK ************** * * * BMP#1 * * 208 KO OUTPUT CONTROL VARIABLES IPRNT 4 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1000 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS ROUTE #156, #104 & #106 THRU BASIN HYDROGRAPH ROUTING DATA 210 RS STORAGE ROUTING NSTPS 1 NUMBER OF SUBREACHES ITYP ELEV TYPE OF INITIAL CONDITION RSVRIC 650.00 INITIAL CONDITION X .00 WORKING R AND D COEFFICIENT 211 SA AREA .0 2.1 4.4 6.7 9.1 11.7 14.3 212 SE ELEVATION 650.00 651.00 652.00 653.00 654 .00 655.00 656.00 213 SQ DISCHARGE 0. 0. 5. 13. 89. 310. 626. *** COMPUTED STORAGE-ELEVATION DATA STORAGE .00 .71 3.91 9.41 17.31 27.70 40.68 ELEVATION 650.00 651.00 652.00 653.00 654.00 655.00 656.00 0 0 0 214 KK * PST102 * * * ************** (BYPASS BMP#1) 216 KO OUTPUT CONTROL VARIABLES IPRNT 4 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1000 LAST ORDINATE P UNCHED OR SAVED TIMINT .017 TIME INTERVAL I N HOURS POST DEVELOPED RUNOFF FOR #1 02 SUBBASIN RUNOFF DATA 218 BA SUBBASIN CHARACTERISTICS TAREA .01 SUBBASIN AREA PRECIPITATION DATA 161 PB STORM 4.92 BASIN TOTAL PRE CIPITATION 163 PI INCREMENTAL PRECIPITATION PATTERN .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 .04 .04 .04 .04 .04 .10 .10 .10 .10 .10 .07 .07 .07 .07 .07 .03 .03 .03 .03 .03 .02 .02 .02 .02 .02 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .Oi .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 .03 .03 .03 .03 .03 .05 .05 .05 .05 .05 .15 .15 .15 .15 .15 .05 .05 .05 .05 .05 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 • • • * * 224 KK * PST101 * * ************** 226 KO OUTPUT CONTROL VARIABLES IPRNT 4 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1000 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL, IN HOURS PO ST DEVELOPED RUNOFF FOR #1 01 SUBBASIN RUNOFF DATA 228 BA SUBBASIN CHARACTERISTICS TAREA .03 SUBBASIN AREA PRECIPITATION DATA 161 PB STORM 4.92 BASIN TOTAL PRE CIPITATION 163 PI INCREMENTAL PRECIPITATION PATTERN .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 .04 .04 .04 .04 .04 .10 .10 .10 .10 .10 .07 .07 .07 .07 .07 .03 .03 .03 .03 .03 .02 .02 .02 .02 .02 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 .03 .03 .03 .03 .03 .05 .05 .05 .05 .05 .15 .15 .15 .15 .15 .05 .05 .05 .05 .05 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 0 0 0 .01 .01 .00 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 229 LS SCS LOSS RATE STRTL 1.45 INITIAL ABSTRACTION CRVNBR 58.00 CURVE NUMBER RTIMP .00 PERCENT IMPERVIOUS AREA 230 UD SCS DIMENSIONLESS UNITGRAPH TLAG .16 LAG *++ UNIT HYDROGRAPH 50 END-OF-PERIOD ORDINATES 2. 8. 15. 25. 37. 52. 65. 75. 80. 81. 81. 77. 71. 65. 57. 48. 40. 33. 28. 24. 21. 18. 15. 13. 11. 9. 8. 7. 6. 5. 4. 4. 3. 3. 2. 2. 2. 1. 1. 1. 1. 1. 1. 1. 0. 0. 0. 0. 0. 0. + 231 KK * POST + + * ++*++++++++ +++ COMBINE BMP#1/102 & #101 233 HC HYDROG RAPH COMBINATION ICOMP 2 NUMBER OF HYDROGRAPHS TO COMBINE 1 +++ RUNOFF SUMMARY FLOW IN CUBIC FEET PER SECOND TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD BASIN MAXIMUM TIME OF OPERATION STATION FLOW PEAK AREA STAGE MAX STAGE + 6-HOUR 24-HOUR 72-HOUR HYDROGRAPH AT + PRE101 16. 3.93 5. 2. 2. .40 • Brawley Farms Subdivision Phase IV & V Wet Detention Pond #1 Pond Stage Surface Areas: Description Elevation Surface Area Incr. Volume Accum. Volume Bottom 646 52,363 0 0 647 54,728 53,541 53,541 648 57,092 55,906 109,447 649 64,553 60,784 170,231 Finished Pond (4" Orifice) 650 91,132 68,131 238,481 Two (2) 10" Orifices 651 95,370 652 99,607 Four (4) 4.0' X .5' Weirs 652.75 Weir Flow Data (Outlet Structu re) 653 103,906 Emergency Spillway 653.75 30' Length Emergency Spillway @ 1.00% 654 108,205 655 112,566 Top of Embankment 656 116,926 Drainage Area: 57.14 Acres Project Area: 31.51 Acres % Impervious: 40 Percent Pond Depth: 4 Feet SA/DA: 1.43 Required Surface Area (1.43/100) X 57.14Acres X 43,560 S.F./Ac. 35,593 Sq.Ft. (OK - See Surface Area of Finished Pond = 71,921 sq.ft.) • Runoff Volume = 0.05 +.009 (% Impervious) = 0.41 in./in. Volume (To Be Controlled) = Design Rainfall X Runoff Volume X Drainage Area _ (1" Rainfall) X (.41 in./in.) X (1/12 feet/in.) X (57.14 acres) X (43,560 sq.ft/acre) 85,042 cu.ft. (OK - Stage Storage From 650' to 651' is 92,344 cu.ft.) Release Rate = (85,042 cu.ft.)/((2 days) X (86,400 sec./day)) 0.49 cu.ft./sec. (OK - Average Rate of Release 0.19 cfs will drain in approx. 5.00 days) Required Forebay Volume = (20%) X (Water Quality Pool Volume + Forebay Volume) " At permanent pool level _ (20%) X (238,481 cu.ft. + 60,119 cu.ft.) 59,720 cu.ft. Forebay Volume Provided See Attached Forebay Volume Chart = 60,119 cu.ft. 0 171 • PROJECT NAME: Brawley Farms Phase IV PROJECT #: 1041 DESCRIPTION: Wet Pond #1 POND STORAGE VOLUME: DATE: 1/18/2002 DESIGNER: B.S.P. ENGINEER: R.J.H. CONTOUR ELEVATION INCREMENTAL ACCUM ELEV. AREA DIFFERENTL 1 VOLUME VOLUME FT. S.F. C.F. (CA) 2 650.00 91,132 0.0 0 0 651.00 95,370 1.0 93,243 93,243 652.00 99,607 2.0 97,481 190,724 653.00 103,906 3.0 101,749 292,473 654.00 108,205 4.0 106,048 398,521 655.00 112,566 5.0 110,378 508,899 656.00 110,920 6.0 114,739 623,638 ORIFICE FLOW DATA: ORIFICE NO. DIA. aNa AREA 8.11. 'C' INVERT ELEV. NTIL ELEV. DESCRII''TION 1 4 0.087 0.6 650 650.17 4 " DIAMETER 1 0.545 0.6 651 651.4 10" DIAMETER L!3 10 0.545 0.6 651 651.42 10" DIAMETER WEIR FLOW DATA: WEIR NO. CREST ELEV. LENGTH 'C' 1 652.75 16 3.0 2 0.00 0 3.0 3 0.00 o 3.o SPILLWAY FLOW DATA: EMERGENCY SPILLWAY CREST ELEV. = 653.75 WIDTH = 30 Z = 10 'C' = VARIES C] • • 0 PROJECT NAME: PROJECT #: DESCRIPTION: COMBINED FLOW: Brawley Farms Phase IV 1041 Wet Pond #1 DATE: 1/18/2002 DESIGNER: B.S.P. ENGINEER: R.J.A. ORIFICES WEIRS PILLWAY T T ELEV. Qf C.F.S. Q2 C.F.S. Q3 C.F.S. Ql C.F,a Q2 C.F.S. Q3 C.F.S. Ql C.F S. FLW, C.F.S. 650.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 651.00 0.38 0.00 0.00 0.00 0.00 0.00 0.00 0.38 652.00 0.57 101 2.01 0.00 0.00 0.00 0.00 4.58 653.00 0.71 3.30 3.30 6.00 0.00 0.00 0.00 13.31 654.00 0.82 4.22 4.22 67.08 0.00 0.00 12.27 88.61 655.00 0.92 4.97 4.97 162.00 0.00 0.00 137.56 310.42 656,00 1.01 5.62 5.62 281.23 0.00 0.00 332.74 626.23 FINAL RESULTS: STAGE STORAGE DISCHARGE UZI . C.F. C.F.S. 650.00 0 0.00 651.00 93,243 0.38 652.00 190,724 4.58 653.00 292,473 13.31 654.00 398,521 88.61 655.00 508,899 310.42 656.00 623,638 626.23 • • PROJECT NAME: Brawley Farms Phase IV PROJECT #: 1041 DESCRIPTION: Wet Pond #1 PERMANENT POOL STORAGE VOLUME: DATE: 1/18/2002 DESIGNER: B.S.P. ENGINEER: R.J.A. CONTOUR ELEVATION INCREMENT L - ACCiJ'M. ELEV. AREA DII nnN%UL` VOLUME ' VOLUME S.F. :. (C.F.) MY 646.00 52,363 0.0 0 0 647.00 54,728 1.0 53,541 53,541 648.00 57,092 2.0 55,906 109,447 649.00 64,553 3.0 60,784 170,231 650.00 72,014 4.0 68,250 238,481 0 • • PROJECT NAME: Brawley Farms Phase IV PROJECT #: 1041 DESCRIPTION: Wet Pond #1 FOREBAY STORAGE VOLUME: DATE: 1/18/2002 DESIGNER: B.S.P. ENGINEER: R.J.H. CONTOUR ELEVATION INCREMENTAL`. ACCVM ELEV. AREA DIFFLREN'FlA` L, VOLUME VOLUME FT. 9.F. . C.F. C.E. 646.00 11,370 0.0 0 0 647.00 13,183 1.0 12,265 12,265 048.00 14,995 2.0 14,079 26,345 649.00 16,896 3.0 15,936 42,281 650.00 18,797 4.0 17,838 60,119 0 Trapezoidal Channel Analysis & Design Open Channel - Uniform flow E • Worksheet Name: Brawley Farms Ph.4 Comment: Spillway Control For BMP Pond #1 Solve For Depth Given Input Data: Bottom Width..... Left Side Slope.. Right Side Slope. Manning's n...... Channel Slope.... Discharge........ 30.00 ft 3.00:1 (H:V) 3.00:1 (H:V) 0.030 0.0100 ft/ft 216.00 cfs Computed Results: Depth............ Velocity......... Flow Area........ Flow Top Width... Wetted Perimeter. Critical Depth... Critical Slope... Froude Number.... 1.22 ft 5.25 fps 41.15 sf 37.33 ft 37.73 ft 1.13 ft 0.01 ft/ft 0.88 (flow is Subcritical) ?a?n NAG- I , Q.. Caro 1?ao {+1 a 2?6.0o Cts Toy pown - 05(.,00 Fievnoes -o c *2.L5' - I.ZZ' I. o3 -v As%vmL mo Puxo T?l?V?.N MONO 0 rrLer Sr"c-T%4q. Open Channel Flow Module, Version 2.01 (c) 1990 Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 40 Brawiey Farms Subdivision Phase IV & V • Wet Detention Pond #2 Pond Stage Surface Areas: Description Elevation Surface Area Incr. Volume Accum. Volume Bottom 653 3,793 0 0 654 4,359 4,073 4,073 655 6,391 5,343 9,415 Finished Pond (2" Orifice) 656 11,704 7,383 16,799 4" Orifice 656.75 Discharge Outlet Above 1" Rainfall Pool 657 12,825 658 13,945 Four (4) 4.0' X .5' Weirs 658.50 Weir Flow Data (Outlet Structure) 659 15,131 Emergency Spillway 659.50 30' Length Emergency Spillway C 1.00% 660 16,316 Top of Embankment 661 17,563 Drainage Area: 5.87 Acres Project Area: 31.51 Acres % Impervious: 30 Percent Pond Depth: 3 Feet SA/DA: 1.34 • Required Surface Area (1.24/100) X 5.87Acres X 43,560 S.F./Ac. = 3,171 Sq.Ft. (OK - See Surface Area of Finished Pond a 8,422 sq.ft.) Runoff Volume 0.05 +.009 (% Impervious) 0.32 in.An. Volume (To Be Controlled) = Design Rainfall X Runoff Volume X Drainage Area _ (1" Rainfall) X (.32 in.fin.) X (1/12 feetrn.) X (5.87 acres) X (43,560 sq.ft/acre) = 6,819 cu.tt. (OK - Stage Storage From 656' to 656.75' is 9,195 cu.ft.) Release Rate a (6,819 cu.ft.)/((2 days) X (86,400 sec./day)) 0.04 cu.ft./sec. (OK - Average Rate of Release 0.04 cfs will drain in approx. 2.00 days) Required Forebay Volume (20%) X (Water Quality Pool Volume + Forebay Volume) ' At permanent pool level (20%) X (16,799 cu.ft. + 7,064 cu.ft.) = 4,773 cu.tt. Forebay Volume Provided See Attached Forebay Volume Chart = 7,064 cu.ft. 9 • PROJECT NAME: Brawley Farms Phase IV PROJECT #: 1041 DESCRIPTION: Wet Pond #2 POND STORAGE VOLUME: DATE: 1/18/2002 DESIGNER: B.S.P. ENGINEER: R.J.H. CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DOTERENI7AL VOLUME VOLUME FT. S.F. C.F. C.F. 656.00 11,704 0.0 0 0 657.00 12,825 1.0 12,260 12,260 658.00 13,94.5 2.0 13,381 25,641 659.00 15,131 3.0 14,534 40,175 660.00 10,316 4.0 15,720 55,895 661.00 17,563 5.0 16,936 72,831 ORIFICE FLOW DATA: ORIFICE NO. DIA. IN. AREA S.F. 'C' INVERT ELEV. CENTR. ILEV. DESCRIPTION 1 2 0.022 0.6 656 656.08 2" DIAMETER 2 4 0.087 0.6 656.75 65692 4" DIAMETER 3 0 0.000 0.6 0 0.00 N/A WEIR FLOW DATA: WEIR NO. CREST ELEV. LENGTH . 'C' 1 658.50 16 3.0 2 0.00 0 3.0 3 0.00 0 30 SPH,LWAY FLOW DATA: EMERGENCY SPILLWAY CREST ELEV. = 659.50 WIDTH = 30 Z = 10 'C' = VARIES 9 • • 9 PROJECT NAME: PROJECT #: DESCRIPTION: COMBINED FLOW: Brawley Farms Phase IV 1041 Wet Pond #2 DATE: 1/18/2002 DESIGNER: B.S.P. ENGINEER: R.J.H. ORIFICES WEIRS SPILL A TOTAL ELEV. 0.1 Ql C.F.S. Q2 C.F.S. Q3 C.F.S. Ql C.F.S. Q2 C.F.S. Q3 C.F.S. Ql C.F.. FLOW C.F.S. 656.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 657.00 0.10 0.12 0.00 0.00 0.00 0.00 0.00 0.22 658.00 0.15 0.44 0.00 0.00 0.00 0.00 0.00 0.58 659.00 0.18 0.61 0.00 16.97 0.00 0.00 0.00 17.76 660.00 0.21 0.74 0.00 88.18 0.00 0.00 34.74 123.86 661.00 0.23 0.85 0.00 189.74 0.00 0.00 180.91 371.73 FINAL RESULTS: STAGE STO GE DISCHARGE C.F. C.F.S. 656.00 0 0.00 657.00 12,260 0.22 658.00 25,641 0.58 659.00 40,175 17.76 660.00 55,895 123.86 661.00 72,831 371.73 PROJECT NAME: Brawley Farms Phase IV DATE: 1/18/2002 PROJECT #: 1041 DESIGNER: B.S.P. DESCRIPTION: Wet Pond #2 ENGINEER: R.J.H. • r? PERMANENT POOL STORAGE VOLUME: CONTOUR ELEVATI N INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME FT. S.F. C.F. C.F. 653.00 3,793 0.0 0 0 654.00 4,359 1.0 4,073 4,073 655.00 6,391 2.0 5,343 9,415 656.00 8,422 3.0 7,383 16,799 9 9 • PROJECT NAME: PROJECT #: DESCRIPTION: Brawley Farms Phase IV 1041 Wet Pond #2 FOREBAY STORAGE VOLUME: DATE: 1/18/2002 DESIGNER: B.S.P. ENGINEER: R.J.H. CONTOUR EL19A - N INCREMENTAIL AC CUM. ELEV. AREA DIFFEREN tiAL VOLUME VOLUME S.F. C.F. C.F. 653.00 1,695 0.0 0 0 654.00 2,109 1.0 1,898 1,898 655,00 2,587 10 2,344 4,242 656.00 3,064 3.0 2,822 7,064 0 Trapezoidal Channel Analysis & Design Open Channel - Uniform flow • • Worksheet Name: Brawley Farms Ph.4 Comment: Spillway Control For BMP Pond #2 Solve For Depth Given Input Data: Bottom Width..... Left Side Slope.. Right Side Slope. Manning's n...... Channel Slope.... Discharge........ 30.00 ft 3.00:1 (H:V) 3.00:1 (H:V) 0.030 0.0100 ft/ft 25.00 cf s Computed Results: Depth............ Velocity......... Flow Area........ Flow Top Width... Wetted Perimeter. Critical Depth... Critical Slope... Froude Number.... 0.34 ft 2.36 fps 10.59 sf 32.05 ft 32.16 ft 0.28 ft 0.02 ft/ft 0.72 (flow is Subcritical) Fuom KEc- t , CQ., t*?ro PtWo IM _ ;L'S.Ob CPS, S P ? ?1.w ?'`Y - Ce S 9.5 b ,FC)f BMlK. - C041-06 AVAIL.. Focwiscw o a 1.Sd' - 0.34' : 1•Ilo? 0 • • • STORM DRAINAGE CALCULATIONS - RATIONAL METHOD Project: Brawley Farms Subdhdsion Phase 4 Designed By: B.S.P. Date: January 14, 2002 Location: City of Charlotte ETJ, North Carolk Checked By: R.J.H. Note: Pond outlet pipe smed to carry 10 year storm. HW Wm from cetterlne of the pipe to 0.5 ft. below weir . Mannirls'nf of 0.012 used for all RCP. QSUB CAP repress flow capacity assuming pipe opening is submerged. Rimrr Weir From To Dramage C Tc 1 Q (CIS) Pk)e Elevation Elevation Slope Die Cap Hw QSW CAP V VbdKfps) TYPE COVER Elev Elm Area Ac. (min) Sub Cum. Length tn Out , AL m crs CFS Corgi Fug BMP Pond #1: 653.75 652.75 106 102 From HEC-1 Model 127.00 127.00 60.00 645.72 645.42 0.0050 54 150.59 4.28 171.54 8.95 9.48 Class III 2.53 BMP Pond #2: 659.50 658.50 156 105 From HEC-1 Model 15.00 15.00 68.00 652.74 652.06 0.0100 24 24.50 4.26 33.81 6.62 7.80 Gass III 3.76 ' Aft flows compute d using ration al method for sin storm drain age pipe unless otherwise noted. Cumulative Q for drainage areas. Flow of m for en size and sl Pond Outlets 10 Year Storm #1 0? WA A o -c Michael F. Easley Governor William G. Ross, Jr., Secretary Department of Environment and Natural Resources Gregory J. Thorpe, Ph.D., Acting Director Division of Water Quality Certified Mail- Return Receipt Requested C-acember 11, 2001 Mr. Frank DeSimone Fieldstone Associates Suite 217, 3126 Milton Road Charlotte, NC 28215 Subject: fieldstone at Brawley Farms D?NO Project No. 000374 t?Pck$enburg County Dear Mr. DeSimone: The Wetlands Unit staff reviewed the stormwa---r manaoe-ent plars for the subject project and determined that additional information is necessary to complete the technk;? review :rocess. The required additional information is as follows: 1. Draw Down Orifice Diameter The diameter of the orifice for pond 2 mist be sizet 17 a r-w O^tan the temporary water quality pool volume in 48 to 120 hours. (The proposed orifice size is taiven as 0_5 rtes.) 2. Forebay The forebays for each pond should be apmxirrl -,:fly 2D'Z of Brie ital basin volume. Reference NCDENR Stormwater Best Management Practices d?f=.nua4 Ap-il 1 Please revise the engineering plans to meet this requirement. 3. Outlet Structure Location Please provide the design detail for the a t=-4 stnu- u--s- 4. Operation and Maintenance Agreement An operation and maintenance agreement: "i3 re-czui-,e:. Trs okra=ion and maintenance agreement must also be signed by the responsible party and notarized Art -2)arrr q -- aeg a- - t for an extended detention wet pond is available on line at http://h2o.enr.state.ncLz tncw--Iia-ds?..nci,, Ld©c. Division wetlands unit staff will strive to complete a final >?z±`tnrrl ww4ew within 10 working days of receipt of the requested information. If you have any questkxl s or vm d lire b d"iiis--t.rss this project, please contact me at (919) 733- 9584. Also, please note that the NCDENR Storrrnr"Eo-es? Managerln" Practices Manual, April 1999, and other documents and information can be downloaded torn %w'1N=-jtIarAds Unitlrreb site at http://h2o.ehnr.state.nc.us/ncwetlands/. Until this information is received, I will place #is project vn 4hob due Iv i complete information (15A NCAC 2H .0507(a)(4)). Y 1' We Unid Su entsor cc: Mooresville Regional Office File Joseph Floyd, Brigman Company, PO 66% 1532, .mrraY, SC2S528 North Carolina Division of Water Ouariry;. 401 Mrertttr fm VArlficatrcm try 165o Mail Service Center, Raleigh, NC Wilr-9 Add--W) 2321 Crabtree Blvd., Raleigh, NC 27%A-22E G jLzrftr "l, 919-733-1786 (phone), 919-733-689r' fri,. hMJh2r-*r-ra.2te: r_.m--mebands/ Project Name: Brawley Project No. DWQ 000374 pond 2 SUBMITTED DESIGN: REQUIRED DESIGN: elevations 2.0 average depth status Bottom of Basin (ft) 653 Permanent Pool (ft) 656 3 ft. depth ok Temporary Pool (ft) 656.75 0.75 ft. depth ok areas Permanent Pool SA (sq ft) 8422 3523 sq. ft. ok Drainage Area (ac) 5.86 Impervious Area (ac) 1.758 30.0% volumes Permanent Pool (cu ft) 16799 Temporary Pool (cu ft) 9195 6807 cu. ft. ok Forebay (cu ft) 7064 42.1 % check forebt other parameters SA/DA 0 1.38 Orifice Diameter (in) 0.5 0.00 cfs drawdown Design Rainfall (in) 1 26.5 day drawdown check drawe Linear Interpolation of Correct SAIDA*** % Impervious Next Lowest 50 Project Impervious 30.0 Next Highest 60 3 ft. Permanent Pool Depth SA/DA from Table 2.06 1.38 2.4 J ?? Project Name: Brawley Project No. DWQ 000374 pond 1 SUBMITTED DESIGN: elevations Bottom of Basin (ft) Permanent Pool (ft) Temporary Pool (ft) 646 650 651 areas Permanent Pool SA (sq ft) Drainage Area (ac) Impervious Area (ac) volumes Permanent Pool (cu ft) Temporary Pool (cu ft) Forebay (cu ft) other parameters SA/DA Orifice Diameter (in) Design Rainfall (in) 71921 57.17 237778 92344 0 4 1 REQUIRED DESIGN: 3.3 average depth 4 ft. depth 1 ft. depth 55633 sq. ft. r 11313^20 cu. ft. / ` o 2.23 0.30 cfs drawdown 3.6 day drawdown Linear Interpolation of Correct SAIDA*** % Impervious Next Lowest 50 Project Impervious 55.1 Next Highest 60 4 ft. Permanent Pool Depth SA/DA from Table 2.06 2.23 2.4 status ok ok ok check tempt ok /G a ok 4 ?3)Of? B RW__)IAYAAN November 12, 2001 Mr. John R. Dorney NC DENR 1621 Mail Service Center Raleigh, NC 27669-1621 RE: DWQ Project #000374 Brawley Farms Subdivision Mecklenburg County, North Carolina Dear Mr. Dorney: As a follow up to our August 10, 2001 correspondence concerning the referenced project, we are enclosing the wet detention pond BMP calculations and a plan depicting the footprint of these ponds on the site. The wet detention ponds are to serve as mitigation for the loss of on-site water retention and habitat losses resulting from the proposed impacts to an existing pond and associated stream. With the completion of the wet detention pond calculations and associated plans we are hereby requesting the issuance of 401 water quality certification for the project. Should you have any questions or require additional information please advise. Sincerely, Y'0'4'Y ? e - itJ Joseph C. Floyd Project Manager JCF/alj cc: Brandon Pridemore Pete Colewell CAMy Documents\LETTERS\00152-99137b.doc WET DETENTION POND (B.M.P.) CALCULATIONS for BRAWLEY FARMS SUBDIVISION PHASE IV Prepared for FIELDSTONE ASSOCIATES, L.P. 4508 East Independence Blvd., Suite 205 Charlotte, N.C. 28205 RJH Ref No. 1041 October 22, 2001 Prepared by: •••• Q?H CARp??N •.?. `,,? ?O •••. •.•. ••• 0, •? •;OFESS/o Q' 9`•? t a SEAL • P-0197 -' o: • i J ? GIN Jij; R. JOE HARRIS & ASSOCIATES, PLLC 1698 W. Highway 160, Suite 210 Fort Mill, South Carolina 29708 Phone: 803-802-1799 Fax: 803-802-0886 folio %•` H R ? •.....•0(? 0,? ; y a 9? i L 620 11110- \D • WET DETENTION POND (B.M.P.) CALCULATIONS for BRAWLEY FARMS SUBDIVISION PHASE IV Prepared for FIELDSTONE ASSOCIATES, L.P. 4508 East Independence Blvd., Suite 205 Charlotte, N.C. 28205 RJH Ref No. 1041 • October 22, 2001 Prepared by: • e N Brawley Farms Subdivision Phase IV & V • Wet Detention Pond #1 Pond Stage Surface Areas: Description Elevation Surface Area Incr. Volume Accum. Volume Bottom 646 52,138 0 0 647 54,519 53,324 53,324 648 56,900 55,705 109,029 649 64,411 60,617 169,646 Finished Pond (4" Orifice) 650 90,243 68,131 237,778 Two (2) 10" Orifices 651 94,461 652 98,679 Four (4) 4.0' X .5' Weirs 652.75 Weir Flow Data (Outlet Structure) 653 102,959 Emergency Spillway 653.75 30' Length Emergency Spillway @ 1.00% 654 107,239 655 111,580 Top of Embankment 656 115,921 Drainage Area: 57.17 Acres Project Area: 31.51 Acres % Impervious: 40 Percent Pond Depth: 4 Feet SA/DA: 1.43 • Required Surface Area = (1.431100) X 57.17Acres X 43,560 S.F./Ac. = 35,612 Sq.Ft. (OK - See Surface Area of Finished Pond = 71,921 sq.ft.) Runoff Volume 0.05 +.009 (% Impervious) 0.41 in./in. Volume (To Be Controlled) = Design Rainfall X Runoff Volume X Drainage Area _ (1" Rainfall) X (.41 in.rn.) X (1/12 feet/in.) X (57.17 acres) X (43,560 sq.ft/acre) 85,086 cu.ft. (OK - Stage Storage From 650' to 651' is 92,344 cu.ft.) Release Rate (85,086 cu.ft.)/((2 days) X (86,400 sec./day)) 0.49 cu.ft./sec. (OK - Average Rate of Release 0.19 cfs will drain in approx. 2.59 days) Required Forebay Volume (20%) X Permanent Pool Volume (20%) X 237,778 cu.ft. 47,556 cu.ft. Forebay Volume Provided = See Attached Forebay Volume Chart 57,339 cu.ft. 0 PROJECT NAME: Brawley Farms Phase IV DATE: 10/7/2001 PROJECT #: 1041 DESIGNER: B.S.P. DESCRIPTION: Wet Pond #1 ENGINEER: R.J.H. • • POND STORAGE VOLUME: CONTOUR ELEVATION INCREMENT AC U. ELEV. AREA DOTERENTL41 VOLUME' VOLUME UZI S.F. C.F. C.F. 650.00 90,243 0.0 0 0 651.00 94,461 1.0 92,344 92,344 652.00 98,679 2.0 96,562 188,906 653.00 102,959 3.0 100,811 289,718 654.00 107,239 4.0 105,092 394,809 655.00 111,590 5.0 109,402 504,212 656.00 115,921 6.0 113,744 617,955 ORIFICE FLOW DATA: ORIFICE NO. DIA. AREA S.F. 'C' INVERT ELEV. NTIt. LLEV. DESCAtMON 1 4 0.087 0.6 650 650.17 4 " DIAMETER 2 10 0.545 0.6 651 651.42 10" DIAMETER 3 3 10 0.545 0.6 651 651.42 10" DIAMETER WEIR FLOW DATA: WEIR NO CRMST ELEV. LENGTH 'C' 1 652.75 16 3.0 2 0.00 0 3.0 3 0.00 0 3.0 SPILLWAY FLOW DATA: EMERGENCY SPILLWAY CREST ELEV. = 653.75 WIDTH = 30 z = 10 'C' = VARIES .7 0 PROJECT NAME: PROJECT #: DESCRIPTION: COMBINED FLOW: Brawley Farms Phase IV 1041 Wet Pond #1 DATE: 10/22/2001 DESIGNER: B.S.P. ENGINEER: R.J.H. O CES IRS S . L AY TOTAL ELEV. Ql O.F.S. Q2 C.F.S. Q3 C.F.S. Ql C.F.S. Q2 C.F.S. Q3 U.S. Q1 C.F.S FLOW C.F.S. 650.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 651.00 0.38 0.00 0.00 0.00 0.00 0.00 0.00 0.38 652.00 0.57 2.01 2.01 0.00 0.00 0.00 0.00 4.58 653.00 0.71 3.30 3.30 6.00 0.00 0.00 0.00 13.31 654.00 0.82 4.22 4.22 67.08 0.00 0.00 12.27 88.61 655.00 0.92 4.97 4.97 162.00 0.00 0.00 137.56 310.42 656.00 1.01 5.62 5.62 281.23 0.00 0.00 332.74 626.23 FINAL RESULTS: STAGE STORAGE DISCHARGE C.F. C.F.S. 650.00 0 0.00 651.00 92,344 0.38 652.00 188,906 4.58 653.00 289,718 13.31 654.00 394,809 88.61 655.00 504,212 310.42 656.00 617,955 626.23 Forebay Storaee Volume: • • CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME FT. S.F. C.F. C.F. 040,00 10,700 0.0 0 0 047,00 12,533 LO 11,638 11,638 048.00 14,300 2.0 13,407 25,045 049 00 16,150 3.0 15,219 40,264 (60 00 18,01 1 4.0 17,075 57,339 E Trapezoidal Channel Analysis & Design Open Channel - Uniform flow 0 Worksheet Name: Brawley Farms Ph. 4 Comment: Emergency Spillway-B.M.P. Pond #1 (50 Year) Solve For Depth Given Input Data: Bottom Width..... Left Side Slope.. Right Side Slope. Manning's n...... Channel Slope.... Discharge........ 30.00 ft 3.00:1 (H:V) 3.00:1 (H:V) 0.030 0.0100 ft/ft 139.50 cfs Computed Results: Depth............ Velocity......... Flow Area........ Flow Top Width... Wetted Perimeter. Critical Depth... Critical Slope... Froude Number.... 0.95 ft 4.49 fps 31.06 sf 35.68 ft 35.98 ft 0.85 ft 0.01 ft/ft 0.85 (flow is Subcritical) Open Channel Flow Module, Version 2.01 (c) 1990 Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708 Brawley Farms Subdivision Phase IV & V • Wet Detention Pond #2 Pond Stage Surface Areas: Description Elevation Surface Area Incr. Volume Accum. Volume Bottom 653 3,793 0 0 654 4,359 4,073 4,073 655 6,391 5,343 9,415 Finished Pond (1/2" Orifice) 656 11,704 7,383 16,799 4" Orifice 656.75 Discharge Outlet Above 1" Rainfall Pool 657 12,825 658 13,945 Four (4) 4.0' X .5' Weirs 658.50 Weir Flow Data (Outlet Structure) 659 15,131 Emergency Spillway 659.50 30' Length Emergency Spillway C 1.00% 660 16,316 Top of Embankment 661 17,563 Drainage Area: 5.86 Acres Project Area: 31.51 Acres % Impervious: 30 Percent Pond Depth: 3 Feet SAIDA: 1.34 .7 Required Surface Area = (1.24/100) X 5.86Acres X 43,560 S.F./Ac. 3,421 Sq.Ft. (OK - See Surface Area of Finished Pond = 8,422 sq.ft.) Runoff Volume = 0.05 +.009 (% Impervious) = 0.32 in./in. Volume (To Be Controlled) = Design Rainfall X Runoff Volume X Drainage Area _ (1" Rainfall) X (.32 in.fin.) X (1/12 feetfin.) X (5.86 acres) X (43,560 sq.ft/acre) 6,807 cu.ft. (OK - Stage Storage From 656 to 656.75' is 9,195 cu.ft.) Release Rate = (6,807 cu.ft.)/((2 days) X (86,400 sec./day)) 0.04 cu.ft./sec. (OK - Average Rate of Release 0.04 cfs will drain in approx. 2.00 days) Required Forebay Volume (20%) X Permanent Pool Volume _ (20%) X 16,799 cu.ft. = 3,360 cu.ft. Forebay Volume Provided See Attached Forebay Volume Chart 7,064 cu.ft. 0 • • PROJECT NAME: Brawley Farms Phase IV PROJECT #: 1041 DESCRIPTION: Wet Pond #2 POND STORAGE VOLUME: DATE: 10/22/2001 DESIGNER: B.S.P. ENGINEER: R.J.H. CONTOUR ELEV , ON INCREMENTAL A . ELEV. AREA DWFERE*TIAL VOLUME VOL NZ S.F. C.F. C., Ml (FT-y- 656.00 1 1, 704 0.0 0 0 657.00 12,925 1.0 12,260 12,260 658.00 13,945 2.0 13,381 25,641 659.00 15,131 3.0 14,534 40,175 660.00 16,316 4.0 15,720 55,895 661.00 17,563 5.0 16,936 72,831 ORIFICE FLOW DATA: ORIFICE NO. RSA. (IN.) AREA .F. 'C' INVERT ELEV. alm -ELEV. . DESCRWTION 1 0.5 0.001 0.6 656 656.02 0.50 " DIAMETER 2 4 0,087 0.6 656.75 656.92 4" DIAMETER 3 0 0.000 0.6 0 0.00 N/A WEIR FLOW DATA: WEIR NO: ELEV. wt) LENGTH 'C' 1 65870 16 3.0 2 0.00 0 3.0 3 3 0.00 0 3.0 SPILLWAY FLOW DATA: EMERGENCY SPILLWAY CREST ELEV. = 659.50 WIDTH = 30 z = 10 'C' = VARIES is C] 0 PROJECT NAME: PROJECT #: DESCRIPTION: COMBINED FLOW: Brawley Farms Phase IV 1041 Wet Pond #2 DATE: 10/22/2001 DESIGNER: B.S.P. ENGINEER: R.J.H. ORIFICES WEIRS SPILLWAY TOTAL ELEV. ej QI C.F.S. Q2 Q3 C.F.S. () Ql C.F.S Q2 C.F.S. Q3 C.F.S. Q1 C.F,S. FLOW` AS 656.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 657.00 0.01 0.12 0.00 0.00 0.00 0.00 0.00 0.13 658.00 0.01 0.44 0.00 0.00 0.00 0.00 0.00 0.45 659.00 0.01 0.61 0.00 16.97 0.00 0.00 0.00 17.59 660.00 0.01 0.74 0.00 88.18 0.00 0.00 34.74 123.67 661.00 0.01 0.85 0.00 189.74 0.00 0.00 180.91 371.51 FINAL RESULTS: STAGE STORAGE DISCHARGE FT, C.F. C.F.S. 656.00 0 0.00 657.00 12,260 0.13 658.00 25,641 0.45 659.00 40,175 17.59 660.00 55,895 123.67 661.00 72,831 371.51 Forebay Storase Volume: U • CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME FT. S.F. FT. C.F. C.F. 0S-3 .00 1,695 0.0 0 0 654 00 2,100 1.0 1,898 1,898 055 00 2,587 2.0 2,344 4,242 0"o,00 3,064 3.0 2,822 7,064 0 Trapezoidal Channel Analysis & Design Open Channel - Uniform flow • Worksheet Name: Brawley Farms Ph. 4 Comment: Emergency Spillway-B.M.P. Pond #2 (50 Year) Solve For Depth Given Input Data: Bottom Width..... Left Side Slope.. Right Side Slope. Manning's n...... Channel Slope.... Discharge........ 30.00 ft 3.00:1 (H:V) 3.00:1 (H:V) 0.030 0.0100 ft/ft 19. 50 cf s Computed Results: Depth............ Velocity......... Flow Area........ Flow Top Width... Wetted Perimeter. Critical Depth... Critical Slope... Froude Number.... 0.29 ft 2.15 fps 9.09 sf 31.77 ft 31.86 ft 0.23 ft 0.02 ft/ft 0.71 (flow is Subcritical) Open Channel Flow Module, Version 2.01 (c) 1990 Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708 State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director Certified Mail Return Receipt Requested Mr. Frank Desimone Suite 217, 3126 Milton Road Charlotte, NC 28215 Dear Mr. Desimone: MAI NCDENR August 31, 2000 Re: Fieldstone at Brawley Farms Mecklenburg County DWQ # 000374 The Division of Water Quality has reviewed your submittal for a 401 Certification for the subject project. Your application was not complete since the revised application is not signed and specific plans for the stormwater retention have not been received and reviewed. This information is needed by DWQ in order for us to decide whether this project is approvable. The stormwater retention must be designed to remove 85% TSS per the NC DENR Stormwater Best Management Practices Manual, April 1999. It is recommended that you propose extended detention wetlands as described in the Manual to meet the above requirement. These devices will best replace the lost uses of the streams and ponds that you proposed to impact. Please submit a signed copy of the application with plans, specifications, and calculations for the proposed stormwater retention. Also, please note that the NCDENR Storrnwater Best Management Practices Manual, April 1999, and other documents and information can be downloaded from the Wetlands Unit web site at http://h2o.ehnr.state.nc.us/ncwetlands/. I can be reached at 919-733-1786 if you have any questions. Until this information is received, I will place this project on hold due to incomplete information (15A NCAC 2H .0507(a)(4)). Y, cc: Mooresville DWQ Regional Office Todd St. John Central Files PnR. y ater Quality Certifi ation Program 4401 Reedy Creek Road, Raleigh, NC 27607 Telephone 919-733-1896 FAX 919-733-9959 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper MEMORANDUM TO: John Dorney Regional Contact: Non-Discharge Branch WQ Supervisor: Date: SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS Facility Name Fieldstone at Brawley Farms c/o Frank DeSimone County Mecklenburg Project Number 00 0374 County2 Recvd From APP Received Date 3/24/00 Recvd By Region Project Type residential Region Mooresville Certificates Stream Permit Wetland Wetland Wetland Stream Class Acres Feet Type Type Impact Score Index Prim. Supp. Basin Req. Req. FT-0 26 F__ N ? 11-19-8 WSIV ?- 30,830. 0.73 60.00 I-_I_- o Y O N F_F-F_F_I-F_F_ Mitigation Wetland MitigationType Type Acres Feet Is Wetland Rating Sheet Attached? Q Y 0 N Did you request more info?Q Y O N Have Project Changes/Conditions Been Discussed With Applicant?Q Y O N Is Mitigation required? Q Y O N Recommendation: Q Issue O Issue/fond QQ Deny Provided by Region: Latitude (ddmmss) 351454 Longitude (ddmmss) 803955 Comments: The applicant is imposing to impact 60 feet of stream and fill 0.72 acres of wetlands (0.13 ac. near the stream and 6.59 ar. near a ml-de-sac) during the development of a sing] family _amily residential s ihd'y*cion Field investigations revealed that the 0.60 ac. of wetlands were actually approximately 500 feet of stream that discharges into a pond ( not wetlands as set forth in the application). It is recommended that the application he returned to the applicant due to its inaccuracies. cc: Regional Office Central Office Page Number 1 Facility Name Fieldstone at Brawley Farms c/o Frank DeSimone County Mecklenburg Project Number 00 0374 Regional Contact: Pete Colwell Date: 4/26/2000 Comments (continued from page 1): cc: Regional Office Central Office Page Number 2 i ,I f 1 R C-MAr\J In n August 10, 2000 Mr. John R. Dorney NCDENR Division of Water Quality Wetlands/401 Unit 1621 Mail Service Center Raleigh, NC 27669-1621 Orb ?tG,; RE: DWQ Project #000374 Brawley Farms Subdivision Mecklenburg County, North Carolina Dear Mr. Dorney: In response to your June 29, 2000 letter requesting additional information in order to complete the 401 review process, and in conjunction with a site meeting with Mr. Pete Colwell of the Mooresville Regional Office on July 20, 2000, we wish to modify the current 401 application for the referenced project. We propose to make the following modifications to bring both proposed and existing impacts to waters/wetlands on-site in compliance with current 401 water quality guidelines. 1. The manhole constructed within 2' of the stream will be retrofitted with a waterproof seal to insure there will be no leakage into the adjacent stream. Furthermore, the small stream will be diverted by hand tools to outfall into the adjacent perennial stream at a point at least 40' away from the sewer manhole. 2. To mitigate for both the loss of on-site storm-water retention and habitat losses resulting from the proposed impacts to the existing pond and associated stream, the applicant proposes to construct storm- water retention basins within the remaining undeveloped phases of the project. The applicant will not be able to provide any additional storm- water retention within the phase II portion of the project since the construction has been conducted in accordance with the plans that were approved by Mecklenburg County and is now very near completion. Mr. John R. Dorney Page 2 Furthermore, the applicant would like to retain the right to mitigate for the loss of streams/wetlands through a financial donation to the Stream Restoration Program, should the implementation of the ponds not be feasible. 3. The existing utility line crossing will be modified to insure the rock and stone bedding does not interfere with natural flow or movement of aquatic species. 4. Recent land disturbance activities resulting from efforts to restore bank of stream to original contour will be over-seeded to stabilize as soon as possible. Attached are revised permit drawings and a pre-construction notification application reflecting the proposed modifications and including the additional information requested in your June 29, 2000 letter and by Mr. Pete Colwell.' We are very interested in reconciling the violations that have occurred on-site and in bringing our project in compliance with current 401 water quality guidelines. Should you have any questions or require additional information, please advise. Sincerely, Joseph C. Floyd Project Manager JCF/alj cc: Frank DeSimone - Applicant Brandon Pridemore - Project Manager Pete Colwell - NCDENR CAMy DocumentsIETTERM00152-99137a.doc EXISTING MANHOLE WITHIN 2' OF STREAM TO BE RETROFITTED WITH WATER- PROOF SEAL LIMITS OF USACOE APPROVED STREAM & ASSOCIATED WETLAND a WETLAND FILL (EXIST.) 0.127 ACRES I TOTAL AREA 207.58 AC. POND FILL 0.60 AC. EXIST. WETLAND FILL .13 AC. UPLAND BUFFER 3.61 AC. STREAM & ASSOC. WET. 0.50 AC. STREA M IMPACT 530 L. F. EXIST. STREAM IMP. 12 L. F. EXISTI) DI VER1 W L IN it SM VI EAM 0 BE TOO S TOO 0 TFALLE _P AL/ PROPOSED GRADE EXISTING GRADE SECTION VIEW N.T.S PLAN/SECTION VIEW FIELDSTONE AT BRAWLEY FARMS S/D 11 NATIONWIDE PERMIT #26 APPLICATION z DATE: 3/1 /00 PAGE t APPLICATION NO. PROPOSED WETLAND FILL ACTIVITY: STREAM IMPACT PURPOSE: RESIDENTIAL DEVELOPEMENT CHARLOTTE, NC APPLICANT: MR. FRANK DESIMONE , INC., P.O. BOX 1532, UPLAND BUFFER ESTABLISHMENT 0.64 ACRES UPLAND BUFFER ESTABLISHMENT 0.27 ACRES _ WETLAND FILL (F)(IST.1 .127 ACRES TOTAL AREA 207.58 AC. r~ POND FILL EXIST. WETLAND FILL 0.48 AC. .13 AC. UPLAND BUFFER 3.81 AC. WET. PRESERVATION 0.50 AC. -^?--- STREAM IMPACT S30 LF. EXIST. STREAM IMP. 12 LF. DRAWINGS 214, 314, & 414 REVISED 7127100 TO DIS77NGUISH VARIOUS IMPACTS TO WATER/WETLANDS AND SHOW APPROXIMATE FOOTPRINT OF PROPOSED RE7EN770N BASINS TO M177GATE FOR LOSS OF EXISTING ON-SITE RETENTION. THE WETLAND DELINEATIONS USED IN PREPARING THIS WETLAND MASTER PLAN HAVE BEEN DONE IN ACCORDANCE WITH CORPS. OF ENGINEERS METHODS AND TECHNIQUES AND ARE AN ACCURATE REPRESENTATION OF ALL JURISDICTIONAL WETLANDS WITHIN THE PROJECT. THE DELINEATION HAS BEEN REVIEWED AND APPROVED BY THE CORPS. AND ASSIGNED THE FOLLOWING DELINEATION NUMBER. ACTION,': 199831171 "TLA" MASTER PLC FIELDSTONE AT BRAWLEY FARMS SID LF. t IN VII! I h ',f,O !1 rKUP% StD WETIMD FILL ACTIVITY: STREAM IMPACT PURPOSE: RESIDENTIAL DEVELOPEMENT NATIONWIDE PERMIT = APPI.K`.ATION CHARLOTTE, NC DATE: 3MIi00 PAGE ?J APPLICANT: MR. FRANK DESIMONE APPLICATION NO. ENT: THE BRI MAN COMPANY. INC.. P.O. X 1532. AY (8431248-9388 FAX: (M3) TO PROP. RETENTION BASIN 17 Ht ;iZFD A( CCNS/ ~-? l SEC710N A -`1 M N v N. TS E LA=A P TIN 61 %i D FI cR. TOTAL AREA 207.58 AC. POND FILL 0.60 AC. EXIST. WETLAND FILL .13 AC. UPLAND BUFFER 3.61 AC. WET. PRESERVATION 0.50 AC. STREAM IMPACT 530 L.F. - EXIST. STREAM IMP. 12 L.F. PLAN/SECTION VIEW FIELDSTONE AT BRAWLEY FARMS SID g NATIONWIDE PERMIT #26 APPLICATION DATE: 311/00 PAGE s APPLICATION NO. A : THE B I MAN COMPANY. INC.. P.O. X 11M UM i r -- ¦ i? PROP. RETENTION 1 BASIN PROPO SFD CRAOF \ :gSTIN( GRAM L ?/////( SECTION VIEW V. r.s PROPOSED WETLAND FILL ACTIVITY: STREAM IMPACT PURPOSE: RESIDENTIAL DEVELOPEMENT LOCATION: CHARLOTTE, NC APPLICANT. MR. FRANK DESIMONE OEM ID : CORPS ACTION ID: 1 Q Q R ,2 1 17 1 NATIONWIDE PERMIT REQUESTED (PROVIDE NATIONWIDE PERMIT #): PRE-CONSTRUCTION NOTIFICATION APPLICATION FOR NATIONWIDE PERMITS THAT REQUIRE: 1) NOTIFICATION TO THE CORPS OF ENGINEERS 2) APPLICATION FOR SECTION 901 CERTIFICATION 3) COORDINATION WITH THE NC DIVISION OF COASTAL MANAGEMENT SEND THE ORIGINAL AND (1) COPY OF THIS COMPLETED FORM TO THE APPROPRIATE FIELD OF7 CE OF THE CORPS OF ENGINEERS (SEE AGENCY ADDRESSES SHEET`. SEVEN (7) COPIES SHOULD BE SENT TO THE N.C. DIVISION OF ENVIRONMENTAL MANAGEMENT (SEE AGENCY ADDRESSES SHEET; PLEASE PRINT. OWNERS NAME: Frank OPSimnnP Suite 2173126, Milton Road ?^.AILING ADDRESS - (.}?arln++o_ - 715 -- <C,TE! _ C°.. ION ?DDR -'1CI? r ^r_-? ??2? Markonhiir, minty N 5-62-2840 me The grigman Cnm?)an 14 900-B Main Street r.nnwii S( 2A?7ti C.._ION CF tiCRK (°RCV7DE a '^A_ iE:.IP_L IC CG?A??? :v- CALL . MacklPhur? `IEA.REST TOWN ^R SPECIFIC'_ LCC=_"_-CN (=NCL'?7CE ZGi VC??EERS, A:Cr"?riRK CnmmPncinn at tha intarcar+jnn of Ste-_ 2226 and S_R_ 2-822 At the southwestern corner of Charlotte Memorial Gardens, travel east approximately 1.1 mile, then turn left (north) onto Castle ar en ane. en rave approximately is situated on the right (east) side to the road. ')R NEAREST S REAM/RIVE..: Reedy Cree 31IVER BASIN: PROJECT LOCATED NEAR WATER LASSIFIED AS TROUT, "!DAL SALTWATER (SA), HIGH QUALITY WATERS 'HQW), OUTSTANDING RESOURCE WATERS (ORW), WATER SUPPL`_' (WS-I OR WS-II) ? YES [ ] NO [ Xl IF YES, EXPLAIN: 7b. IF THE PROJECT IS LOCATED WITHIN A NORTH CAROLINA DIVISION OF COASTAL MANAGEMENT ARE OF ENVIRONMENTAL CONCERN (AEC)? YES( ] NO [X ] 7c. IF THE PROJECT IS LOCATED WITHIN A COASTAL COUNTY (SEE PAGE 7 FOR LIST OF COASTAL COUNTIES), WHAT IS THE LAND USE PLAN (LUP) DESIGNATION: 8a. HAVE ANY SECTION 404 PERMITS BEEN PREVIOUSLY REQUESTED FOR USE ON THIS PROPERTY? YES [ ] NO [ X ] IF YES, PROVIDE ACTION I .D. NUMBER :;F ^RE'7ICUS PE m= AND AN`: ADDITIONAL INFORMATION '-INCLUDE PHOTOCOPY OF -COI C_RT17ICAT'_C1]': ADDIT ONAL PERMIT =i:7--_DS FOP. -... .ROF= - - -. YE NC X IF ESC:IBE --N=:-- ---- WCF.ri: 9A. ESTIMATED TOTAL NUMBER OF ACRES IN :'RAC': OF LAND: 207.58 9B. ESTIMATED TOTAL NUMBER OF ACRES OF WETLANDS LOCATED ON -ROJECT S=TE: .85 1JA. NUMBER OF ACRES OF WETT ANDS IMPACTED BY THE PROPOSED !'ROJECT BY: EXCAVATION: FILLING: X59 Ac FLOODING: OTHER: .13 Ac. isolated water DRAINAGE: TOTAL ACRES TO BE IMPACTED: . 4 6 A c . o pe n w a t e r p o n d IJB. (i) STREAM CHANNEL TO BE IMPACTED BY THE PROPOSED PROJECT (IF RELOCATED, PROVIDE DISTANCE BOTH BEFORE AND AFTER RELOCATION): LENGTH BEFORE: FT AFTER: FT_ WIDTH BEFORE (based on normal high water contours): FT WIDTH AFTER: FT AVERAGE DEPTH BEFORE: FT AFTER: FT (2) STREAM CHANNEL IMPACTS WILL RESULT FROM: (CHECK ALL THAT APPLY) OPEN CHANNEL RELOCATION: ?X) PLACEMENT OF PIPE IN CHANNEL: (X) CHANNEL ELEVATION: CONSTRUCTION OF A DAM/FLOODING: OTHER: (60' culverted for road crossing) (20'+1- relocated) 11. IF CONSTRUCTION OF A POND IS PROPOSED, WHAT IS THE SIZE OF THE WATERSHED DRAINING TO THE POND? WHAT IS THE EXPECTED POND SURFACE AREA? 1 2 . DESCRIPTION OF PROPOSED WORK INCLUDING DISCUSSION OF TYPE OF MECHANICAL EQUIPME117- TO BE USED (ATTACH PLANS : 8;" x 11" DRAWINGS ONLY) : U t i l i z a t i o n of S i t e as a residential development will require the crossing of a. 0.01 ac. intermittent stream approximately 60'x10' (0.01 ac.) Q . u, a an a 1171!7 o open water habitat - pond. SE OF PRCPOSED WORC: Th- lurpoc P of the nr?oosPd ar+ivit;°a in wetland, and watarc of tha it C is to p=f;riantiv tit4lize the site as a residential development 14. STATE REASONS WHY IT IS BELIEVED THAT THIS ACTIVITY MUST BE CARRIED OUT :N WETLANDS. (INCLUDE ANY MEASURES TAKEN TO MINI`^I ZE WE-7-LAND IMPACTS) : D u e t 0 t1 - location and distribution of wetlands and waters of the U.S. within the project area and the inherent design characteristics a residential subdivision, complete avoidance was not practica) ?. The western half of the property is unaccessable. Also impacts are imi e o one cree crossing and one iso a e we an . 15. YOU ARE REQUIRED TO CONTACT THE STATE HISTORIC P?ESERVATION OFFICER (.SHPO) (SEE AGENCY ADDRESSES SHEET) REGARDING THE PRESENCE OF HISTORIC PROPERTIES IN THE PERMIT AREA WHICH MAY BE AFFECTED BY THE PROPOSED PROJECT. DATE CONTACTED: 212-1100 16. DOES THE PROJECT INVOLVE AN EXPENDITURE OF PUBLIC FJNDS OR THE USE OF PUBLIC (STATE) LAND? YES [ ] NO [X ] (IF NO, GO TO L8) a. IF YES, DOES THE PROJECT REQUIRE PREPARATION OF AN ENVIRONMENTAL DOCUMENT PURSUANT TO THE REQUIREMENTS OF THE NORTH CAROLINA ENVIRONMENTAL POLICY ACT? YES [ 1 NO [ 1 b. IF YES, HAS THE DOCUMENT BEEN REVIEWED THROUGH THE NORTH CAROLINA DEPARTMENT OF ADMINISTRATION STATE CLEARINGHOUSE? YES r ] NO [ ) IF ANSWER TO 17b IS YES, THEN SUBMIT APPROPRIATE DOCUMENTATION FROM THE STATE CLEARINGHOUSE TO DIVISION OF ENVIRONMENTAL MANAGEMENT REGARDING COMPLIANCE WITH THE NORTH CAROLINA ENVIRONMENTAL POLICY ACT. i QUESTIONS REGARDING THE STATE CLEARINGHOUSE REVIEW PROCESS SHOULD BE DIRECTED TO MS. CHRYS BAGGETT, DIRECTOR STATE CLEARINGHOUSE, NORTH CAROLINA DEPARTMENT OF ADMINISTRATION, 116 WEST JONES STREET, RALEIGH, NORTH CAROLINA 27603-8003, TELEPHONE (919) 733-6369. 17. THE FOLLOWING ITEMS SHOULD BE INCLUDED WIT, THIS ZPPLICATION IF PROPOSED ACTIVIT'_' NVOLVES THE DISCHARGE OF EXCAVATED OR FILL MATER-a- INTO WETLANDS: WETLAND DELINEATION MAP SHOWING L:. WE TL ND . _P.=AMS, AKES AND PONDS 0,,1 PROPERTY (FOR NATIONWIDE PERMIT NUMBERS ?9, ANC TL STREAMS (INTERMITTENT AND PERMANENT` ON .'HE = RCPERTY MGS T BE SHOWN ")N THE ?n r;- MAP SCALES SHOULD BE 1 INCH EQUALS 50 __ET NC EQUALS '_CO 777- OR EQUIVALENT. -F AVAILABLE, REPRESENTATIVE PUCTOGRAPH ;7E_L_.`,-S -0 BE 7?? PACT_- 3Y PROJECT IF DELINEATION WAS PERFORMED BY A CONSULTANT, -'ICL'JDE ALL DATA SHEETS RELEVA';- TO THE PLACEMENT OF THE DELINEATION LINE. d. ATTACH A COPY OF THE STORMWATER MANAGEMENT PLAN :.F REQUIRED. WHAT IS LAND USE OF SURROUNDING PROPERTY? R e s i d e n t i a l D e v e l o p m e n t s . IF APPLICABLE, WHAT IS PROPOSED METHOD OF SEWAGE DISPOSAL? g. SIGNED AND DATED BY AGENT AUTHORIZATION LETTER, IF APPLICABLE. I i 1 I ,j B OG M AN >M PAr\] Y II,?< r;l?P I'AI1 I> July 26, 2000 Mr. John R. Dorney NCDENR Division of Water Quality Wetlands/401 Unit 1621 Mail Service Center Raleigh, NC 27669-1621 RE: DWQ Project #000374 Brawley Farms Subdivision Mecklenburg County, North Carolina Dear Mr. Dorney: WETLANDS GROUP WATER Ul',LIrY StC1'1" In response to your June 29, 2000 letter requesting additional information in order to complete the 401 review process, and in conjunction with a site meeting with Mr. Pete Colwell of the Mooresville Regional Office on July 20, 2000, we wish to modify the current 401 application for the referenced project. We propose to make the following modifications to bring both proposed and existing impacts to waters/wetlands on-site in compliance with current 401 water quality guidelines. The manhole constructed within 2' of the stream will be retrofitted with a waterproof seal to insure there will be no leakage into the adjacent stream. Furthermore, the small stream will be diverted by hand tools to outfall into the adjacent perennial stream at a point at least 40' away from the sewer manhole. 2. To mitigate for both the loss of on-site storm-water retention and habitat losses resulting from the proposed impacts to the existing pond and associated stream, the applicant proposes to construct storm- water retention basins within the remaining undeveloped phases of the project. The applicant will not be able to provide any additional storm- water retention within the phase II portion of the project since the construction has been conducted in accordance with the plans that were approved by Mecklenburg County and is now very near completion. Mr. John R. Dorney Page 2 Furthermore, the applicant would like to retain the right to mitigate for the loss of streams/wetlands through a financial donation to the Stream Restoration Program, should the implementation of the ponds not be feasible. 3. The existing utility line crossing will be modified to insure the rock and stone bedding does not interfere with natural flow. 4. Recent land disturbance activities resulting from efforts to restore bank of stream to original contour will be over-seeded to stabilize as soon as possible. Attached are revised permit drawings and a pre-construction notification application reflecting the proposed modifications and including the additional information requested in your June 29, 2000 letter and by Mr. Pete Colwell. We are very interested in reconciling the violations that have occurred on-site and in bringing our project in compliance with current 401 water quality guidelines. Should you have any questions or require additional information, please advise. Sincerely, *,4 C Joseph C. Floyd Project Manager JCF/alj cc: Frank DeSimone - Applicant Brandon Pridemore - Project Manager Pete Colwell - NCDENR C:\My Documents\LETTERS\00152-99137a.doc ?I I II I I I l_ I i l jj 1 I ? 1 i B ISHMENT / !.12 ACRES FIRM RETEN7110 UPLAND BUFFER ESTABLISHMENT i / 0.84 ACRES UPLAND BUFFER ESTABLISHMENT 0.27 ACRES MIETLAND FILL (EXIST. .127 ACRES 't TOTAL AREA 207.58 AC. r POND FILL EXIST. WETLAND FILL 0.48 AC. .13 AC. UPLAND BUFFER WET. PRESERVATION 3.81 AC. 0.50 AC. STREAM IMPACT 530 LF. EXIST. STREAM IMP. 12 LF. DRAWINGS 214, 314, & 414 REVISED 7127100 TO DISTINGUISH VARIOUS IMPACTS TO WATER/WETLANDS AND SHOW APPROXIMATE FOOTPRINT OF PROPOSED RETENT70N BASINS TO M177GA7F FOR LOSS OF EXIS77NG ON-SITE RE7EN77ON. THE WETLAND DELINEATIONS USED IN PREPARING THIS WETLAND MASTER PLAN HAVE BEEN DONE IN ACCORDANCE WITH CORPS. OF ENGINEERS METHODS AND TECHNIQUES AND ARE AN ACCURATE REPRESENTA71ON OF ALL JURISDIC71ONAL WETLANDS WITHIN THE PROJIECT. THE DELINEATION HAS BEEN REVIEWED AND APPROVED BY THE CORPS. AND ASSIGNED THE FOLLOWING DELINEATION NUMBER. ACTION/: 199831171 WETLAND MASTER PL FIELDSTONE AT BRAWLEY FARMS SID NATIONWIDE PERMIT #25 APPLICATION DATE: 3/1100 PAGE APPLICATION NO. THE BRIGMAN COMM. I NC.. P.O. BOX 1 ( IN rvmr ) I nn 6 - 600 fI PROPOSED WETLAND FILL ACTIVITY: STREAM IMPACT PURPOSE: RESIDENTIAL DEVELOPEMENT CHARLOTTE, NC MR. FRANK DESIMONE f PROP. RETENTION BASIN 100 Uf ROAD-1 LIMAS 'f {Vn if l'l IIIF il' Ir)' 10* l/ Jo ' 0 I to i3F wEn r, N.TNY nt coNSr SFY.'!!O/V_ A-A MIN SIZC 64'. ,.._,._.../ J A E PR ED C I P TIN 60 L ---OF EA M FI 4 CR (PROP Fl r r ROP. RETENTION BASIN TOTAL AREA 207.58 AC. POND FILL 0.60 AC. EXIST. WETLAND FILL .13 AC. PROPOSi D GRADE UPLAND BUFFER 3.61 AC. 01MING GRADE WET. PRESERVATION 0.50 AC. ^ -? STREAM IMPACT 530 L.F. 5h'( TION VIEW EXIST. STREAM IMP. 12 L.F. N. TS POWER ENOMIERING PLAN/SECTION VIEW PROPOSED MP CT FIELDSTONE AT BRAWLEY FARMS SM PURPOSE: RESIDENTIAL DEVELOPEMENT NATIONWIDE PERMIT #25 APPLICATION LOCATION: CHARLOTTE, NC DATE: 3/1/00 PAGE 3/4 JAPPLICANT: MR. FRANK DESIMONE 3 APPLICATION NO. kGENT: THE B MI = COMPANY. INC.. P. 1532 Y (W) 2:( 12 EXISTING MANHOLE WITHIN 2' OF STREAM TO BE RETROFITTED WITH WATER- PROOF SEAL WETLAND FILL (EXIST.) 0.127 ACRES TOTAL AREA 207.58 AC. ::.: POND FILL ...................... 0.60 AC. EXIST. WETLAND FILL .13 AC. UPLAND BUFFER 3.61 AC. WET. PRESERVATION 0.50 AC. STREAM IMPACT 530 L.F. EXIST. STREAM IMP. 12 L.F. EXIST] G SM LL DIVER D \AA H LO � -IN S EAM YO BE TOOVS T00 S T00 4 -OUTFALLS PROPO'll a GRAU [XIS]ING GRADF SECTION VIEW N, KS PL"ISE CTION WE FIELDSTONE AT BRAWLEY FARMS SID NATKXMDE PERMIT MIAPPLICATION 1 i i PAG �APPLICATION• Td�:iiia:l�c]:1'd�n:[«•:�I]1:1�I:I•��ia •SaF�%�r•`.:�': PROPOSED WETLAND FILL ACTIVITY: STREAM IMPACT PURPOSE: RESIDENTIAL DEVELOPEMENT LOCATION: CHARLOTTE, NC APPLICANT: MR. FRANK DESIMONE DEM ID : CORPS ACTION ID: I Q 9,q -1 l l 71 NATIONWIDE PERMIT REQUESTED (PROVIDE NATIONWIDE PERMIT #): 26 PRE-CONSTRUCTION NOTIFICATION APPLICATION FOR NATIONWIDE PERMITS THAT REQUIRE: 1) NOTIFICATION TO THE CORPS OF ENGINEERS 2) APPLICATION FOR SECTION 401 CERTIFICATION 3) COORDINATION WITH THE NC DIVISION OF COASTAL MANAGEMENT SEND THE ORIGINAL AND (1) COPY OF THIS COMPLETED FORM TO THE APPROPRIATE FIELD OFFICE OF THE CORPS OF ENGINEERS (SEE AGENCY ADDRESSES SHEET). SEVEN (7) COPIES SHOULD BE SENT TO THE N.C. DIVISION OF ENVIRONMENTAL MANAGEMENT (SEE AGENCY ADDRESSES SHEET). PLEASE PRINT. OWNERS NAME: Frank OaSimnna 2 MAILING ADDRESS: Suite 2173126, Milton Road . SUBDIVISION NAME: CITY: rgarl nt+o STATE: Nr ZIP C:DE: 22215 PROJECT LOCATION ADDRESS, INCLUDING SUBDIVISION N L??E DI7FERENT FROM MAILING ADDRESS ABOVEI : S R ?R22 MerkPnhurg County, N C _ TELEPHONE NUMBER ( HOYSE WCRK' ?7 Q4) X4_2 2 4 0 4. IF APPLICABLE: AGENT'. NAME OR. RESPONSIBLE R.P R?._ _ _AL, ADDRESS, PHONE NUMBER: The Rrigman Comnan Tnr 900-B Main Street Cnnway, SC 2q.S2F LOCATION OF WORK (PROVIDE A MAP, PREFERABLY A COPY OF JSGS TOPOGRAPHIC MAP OR AERIAL PHOTOGRAPHY WITH SCALE) : COUNTY: M er k I e n h u r n NEAREST TOWN OR CITY : SPECIFIC LOCATION (INCLUDE ROAD NUMBERS, LANDMARKS, ETC.) f nmmanrina at the intarcartio Of S_R _ 2226 and S,R, 2822 at the southwestern corner of Charlotte Memorial Gardens, travel east approximately 1.1 mile, then turn left (north) onto Castle Garden Lane. en travel . situated on the right (east) side to the road. 6 . IMPACTED OR NEAREST STREAM/ RIVER: R e e d y C r e e k RIVER BASIN: 7a. IS PROJECT LOCATED NEAR WATER CLASSIFIED AS TROUT, TIDAL SALTWATER (SA), HIGH QUALITY WATERS (HQW), OUTSTANDING RESOURCE WATERS (ORW), WATER SUPPLY (WS-I OR WS-II)? YES [ ] NO [ X] IF YES, EXPLAIN: 7b. IF THE PROJECT IS LOCATED WITHIN A NORTH CAROLINA DIVISION OF COASTAL MANAGEMENT ARE OF ENVIRONMENTAL CONCERN (AEC)? YES [ ] NO [X ] 7c. IF THE PROJECT IS LOCATED WITHIN A COASTAL COUNTY (SEE PAGE 7 FOR LIST OF COASTAL COUNTIES), WHAT IS THE LAND USE PLAN (LUP) DESIGNATION: 8a. HAVE ANY SECTION 404 PERMITS BEEN PREVIOUSLY REQUESTED FOR USE ON THIS PROPERTY? YES [ ] NO [ X] IF YES, PROVIDE ACTION I.D. NUMBER OF PREVIOUS PERMIT AND ANY ADDITIONAL INFORMATION (INCLUDE PHOTOCOPY OF 401 CERTIFICATION): 8b. ARE ADDITIONAL PERMIT REQUESTS EXPECTED FOR THIS PROPERTY IN THE FUTURE? YES [ ] NO [ X] IF YES, DESCRIBE ANTICIPATED WORK: 9A. ESTIMATED TOTAL NUMBER OF ACRES IN TRACT OF LAND: 207.58 9B. ESTIMATED TOTAL NUMBER OF ACRES OF WETLANDS LOCATED ON PROJECT SITE: .85 10A. NUMBER OF ACRES OF WETLANDS IMPACTED BY THE PROPOSED PROJECT BY: FILLING: J) EXCAVATION: FLOODING: OTHER: DRAINAGE: TOTAL ACRES TO BE IMPACTED: X61 r?`% 10B. (1) STREAM CHANNEL TO BE IMPACTED BY THE PROPOSED PROJECT (IF RELOCATED, PROVIDE DISTANCE BOTH BEFORE AND AFTER RELOCATION): LENGTH BEFORE: FT AFTER: FT WIDTH BEFORE (based on normal high water contours): FT WIDTH AFTER: FT AVERAGE DEPTH BEFORE: FT AFTER: FT (2) STREAM CHANNEL IMPACTS WILL RESULT FROM: (CHECK ALL THAT APPLY) OPEN CHANNEL RELOCATION: PLACEMENT OF PIPE IN CHANNEL: X- CHANNEL ELEVATION: CONSTRUCTION OF A DAM/FLOODING: OTHER: 11. IF CONSTRUCTION OF A POND IS PROPOSED, WHAT IS THE SIZE OF THE WATERSHED DRAINING TO THE POND? WHAT IS THE EXPECTED POND SURFACE AREA? 12. DESCRIPTION OF PROPOSED WORK INCLUDING DISCUSSION OF TYPE OF MECHANICAL EQUIPMENT TO BE USED (ATTACH PLANS: 81-" x 11" DRAWINGS ONLY) : U t i l i z a t i o n of s i t e as a residential development will require the crossing of a 0.01 ac. intermittent stream approximately 60'x10' (0.01 ac.) 13. PURPOSE OF PROPOSED WORK: The purpose of the Proposed activities, in wetlands and waters of the U S is to efficiently utilize the site as a residential development 14. STATE REASONS WHY IT IS BELIEVED THAT THIS ACTIVITY MUST BE CARRIED OUT IN WETLANDS. (INCLUDE ANY MEASURES TAKEN TO MINIMIZE WETLAND IMPACTS) :Due t o t h a location and distribution of wetlands and waters of the U.S. within the project area and the inherent design characteristics a residential subdivision, complete avoidance was not practicable. The western half of the property is unaccessable. Also impacts are imi e o one cree crossing an one isolated wetland. 15. YOU ARE REQUIRED TO CONTACT THE STATE HISTORIC PRESERVATION OFFICER (SHPO) (SEE AGENCY ADDRESSES SHEET) REGARDING THE PRESENCE OF HISTORIC PROPERTIES IN THE PERMIT AREA WHICH MAY BE AFFECTED BY THE PROPOSED PROJECT. DATE CONTACTED: 2 121 100 16. DOES THE PROJECT INVOLVE AN EXPENDITURE OF PUBLIC FUNDS OR THE USE OF PUBLIC (STATE) LAND? YES [ 1 NO [X 1 (IF NO, GO TO 18) a. IF YES, DOES THE PROJECT REQUIRE PREPARATION OF AN ENVIRONMENTAL DOCUMENT PURSUANT TO THE REQUIREMENTS OF THE NORTH CAROLINA ENVIRONMENTAL POLICY ACT? YES [ 1 NO [ 1 b. IF YES, HAS THE DOCUMENT BEEN REVIEWED THROUGH THE NORTH CAROLINA DEPARTMENT OF ADMINISTRATION STATE CLEARINGHOUSE? YES [ 1 NO [ 1 IF ANSWER TO 17b IS YES, THEN SUBMIT APPROPRIATE DOCUMENTATION FROM THE STATE CLEARINGHOUSE TO DIVISION OF ENVIRONMENTAL MANAGEMENT REGARDING COMPLIANCE WITH THE NORTH CAROLINA ENVIRONMENTAL POLICY ACT. QUESTIONS REGARDING THE STATE CLEARINGHOUSE REVIEW PROCESS SHOULD BE DIRECTED TO MS. CHRYS BAGGETT, DIRECTOR STATE CLEARINGHOUSE, NORTH CAROLINA DEPARTMENT OF ADMINISTRATION, 116 WEST JONES STREET, RALEIGH, NORTH CAROLINA 27603-8003, TELEPHONE (919) 733-6369. 17. THE FOLLOWING ITEMS SHOULD BE INCLUDED WITH THIS APPLICATION IF PROPOSED ACTIVITY INVOLVES THE DISCHARGE OF EXCAVATED OR FILL MATERIAL INTO WETLANDS: a. WETLAND DELINEATION MAP SHOWING ALL WETLANDS, STREAMS, LAKES AND PONDS ON THE PROPERTY (FOR NATIONWIDE PERMIT NUMBERS 14, i8, 21, 26, 29, AND 38). ALL STREAMS (INTERMITTENT AND PERMANENT) ON THE PROPERTY MUST BE SHOWN ON THE MAP. MAP SCALES SHOULD BE 1 INCH EQUALS 50 FEET OR 1 INCH EQUALS 100 FEET OR THEIR EQUIVALENT. b. IF AVAILABLE, REPRESENTATIVE PHOTOGRAPH OF WETLANDS TO BE IMPACTED BY PROJECT. c. IF DELINEATION WAS PERFORMED BY A CONSULTANT, INCLUDE ALL DATA SHEETS RELEVANT TO THE PLACEMENT OF THE DELINEATION LINE. d. ATTACH A COPY OF THE STORMWATER MANAGEMENT PLAN IF REQUIRED. e . WHAT IS LAND USE OF SURROUNDING PROPERTY? R e s i d e n t i a l D e v e l o p m e n t s - f . IF APPLICABLE, WHAT IS PROPOSED METHOD OF SEWAGE DISPOSAL? g. SIGNED AND DATED BY AGENT AUTHORIZATION LETTER, IF APPLICABLE. POWER ENGINEERING COMPANY, INC. 9731-A Southern Pine Boulevard Charlotte North Carolina 2H273 (704) 52 5-72 75 fax (704) 525-2515 .,.-J; July 13, 2000 Mr. John Dorney Wetlands Division North Carolina Department of Environment & Natural Resources 401 Unit 1621 Mail Service Center Raleigh, North Carolina 27669-1621 Re: Brawley Farms Subdivision PEC Ref.No.: 5582 Dear Mr. Dorney: On behalf of Fieldstone Associates, we have received your letter dated June 29, 2000 which outlines the State's concerns regarding the fill of wetlands and the notice of violations for the above referenced project (DWQ #000374). We have reviewed the site with the Contractor and outlined your concerns on the project and appropriate action has been taken to incorporate Best Management Practices along the Reedy Creek Tributary. We have spoken with Pete Colwell with the Mooresville Regional Office and scheduled a meeting for July 21, 2000, to review the project site and address the concerns outlined on the letter. This letter shall serve as notice that we will continue to seek the necessary 401 Certification as described in the application submitted by the Brigman Company on behalf of Fieldstone Associates dated May 22, 2000. It is our intent to satisfy your concerns regarding the violations noted on your letter and to continually progress on seeking approval of the 401 Certification. If you should have any questions or require additional information, please feel free to contact us. Sincerely, POWER ENGINEERING COMPANY, INC. Brandon S. Pridemore Project Manager xc: Frank De Simone, Fieldstone Associates Joe Floyd, Brigman Company ENGINEERS ¦ SURVEYORS ¦ PLANNERS COLUMBIA CHARLOTTE Brawley farms Subject: Brawley farms Date: Mon, 24 Jul 2000 12:32:46 -0400 From: Peter Colwell <Peter.ColwelI@ncmail.net> Organization: NC DENR - Mooresville Regional Office To: Cyndi Karoly <cyndi.karoly@ncmail.net> Cyndi, I met with these guys last Thursday and have A letter going out to them to summarize w continuing the project on hold. They still have some issues to resolve and will be re- Pete Cyndi Karoly wrote: > ------------------------------------------------------------ > Subject: Delivery Status Notification > Date: Fri, 21 Jul 2000 14:16:38 -0400 > From: Mail Delivery Service <administrator@ncmail.net> > To: cyndi.karoly@ncmail.net > - These recipients of your message have been processed by the mail server: > pete.colwell@ncmail.net; Action: Failed; Status: 5.1.1 (bad destination mailbox addr > Remote MTA mailhost.ncmail.net: SMTP diagnostic: 550 Invalid recipient <pete.col > ----------------------------------------------------------- ------ > Reporting-MTA: dns; scc037.sips.state.nc.us > Received-from-MTA: dns; ncmail.net (207.4.102.102) > Arrival-Date: Fri, 21 Jul 2000 14:16:38 -0400 > Final-Recipient: rfc822; pete.colwell@ncmail.net > Action: Failed > Status: 5.1.1 (bad destination mailbox address) > Remote-MTA: dns; mailhost.ncmail.net > Diagnostic-Code: smtp; 550 Invalid recipient <pete.colwell@ncmail.net> > - ------------------------------------------------------------- > Subject: Brawley Farms > Date: Fri, 21 Jul 2000 14:31:57 -0400 > From: Cyndi Karoly <cyndi.karoly@ncmail.net> > To: pete.colwell@ncmail.net > I have the Fieldstone at Brawley Farms file in case we ever catch up > with each other on the phone. This thing is on hold as of 6129100 with > a long laundry list of issues. Pete Colwell - Pete.Colwell@ncmail.net %TITLE% North Carolina Dept. of Environment & Natural Resources Div. of Water Quality 919 N. Main St. Mooresville, NC 28115 Ph: 704.663.1699 Fax: 704.663.6040 1 of 2 7/25/00 11:52 AP4 MEMORANDUM TO: John Dorney Regional Contact: Samar Bou-ghazale Non-Discharge Branch WO Supervisor: Bex Gleason Date: ,12512000 SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS Facility Name Fieldstone at Brawley Farms c/o Frank DeSimone County Mecklenburg Project Number 00 0374 County2 Recvd From APP Region Mooresville Received Date 3/24/00 Recvd By Region Project Type residential Certificates Stream Permit Wetland Wetland Wetland Stream Class Acres Feet Type Type Impact Score Index Prim. Supp. Basin Req. Req. 26 F - WT ON F-11-19-8 Wsly _- 30,830. 0.73 60.00 I--?- o Y o Nr-r-f ?-f -(-_ f Mitigation Wetland MitigationType Type Acres Feet Is Wetland Rating Sheet Attached? O Y (ON Did you request more info? O Y ON Have Project Changes/Conditions Been Discussed With Applicant?O Y O N Is Mitigation required? Q Y O N Recommendation: Olssue Olssue/fond OO Deny Provided by Region: Latitude (ddmmss) 351454 Longitude (ddmmss) 803955 Comments: The applicant two impact 60 feet of stream and fill 0.72 acres of wetlands (.0-13 ac, near .,. ar a i-de-sac) the development of a single family residential the str, ,mni i ? and o.56 d n..?' 5n ac, i ?cn? a ?.... the u c subdivision, Field investigations revealed that the 0.59 ac of wetlands w r actually approximately 500 feet ? of .?msc oes into a pond ( not wetlands as eat forth in the application), _?,.., ,f m ? ?? str? ?a? ? that ?a+ ? ..I? gar It is recommended that the annlicatlnn he returned to the applicant due to its inaccuracies. cc: Regional Office Page Number 1 Central Office Facility Name Fieldstone at Brawley Farms c/o Frank DeSimone County Mecklenburg Project Number 00 0374 Regional Contact: Date: Samar 4/26/2000 Comments (continued from page 1): cc: Regional Office Central Office Page Number 2 State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director WAA IT 1 fflk1 ? • A;12 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES June 29, 2000 DWQ Project # 000374 Mecklenburg County CERTIFIED MAIL-RETURN RECEIPT REQUESTED Mr. Frank De Simone 3126 Milton Road, Ste 217 Charlotte, NC 28215 Dear Mr. Simone: The Division of Water Quality has reviewed your plans for the discharge of fill material into 0.72 acres of wetlands and 60 linear feet of streams located at SR2826 and SR2822 in Mecklenburg County for development of Fieldstone at Brawley Farms subdivision as described in your application dated May 22, 2000. Insufficient evidence is present in our files to conclude that your project must be built as planned in waters and/or wetlands in accordance with 15A NCAC 2H .0506. Therefore, unless modifications of the proposal are made as described below, we will have to move toward denial of your 401 Certification as required by 15A NCAC 2H .0507(e) and will place this project on hold as incomplete until we receive this additional information, we are requesting (by copy of this letter) that the U.S. Army Corps of Engineers place your project on administrative hold. Please provide us with information supporting your position that states your project must be constructed as planned and that you have no practicable alternative to placing fill in these waters and/or wetlands. Specifically can you explain wl the following violations were found on site: 1. A sewer line and manhole were constructed within two feet of a stream while the Certification requires a 10 foot separation?, f 2. The pond will need to be retrofitted to ensure that downstream flow is retained, and 3. Mitigation may be needed depending on the biological nature of the stream to be impacted. Any documentation such as maps and narrative that you can supply to address alternative designs for your project may be helpful in our review of your 401 Certification. 4. Violations of the NW12 Certification requiring that the sewer line and construction corridor be kept 10 ft off the stream banks. Specifically, disturbed areas along the stream should be stabilized; fill material, including the rock check dam and sediment, should be removed from the stream; and the sewer line relocated to maintain the IOft separation before the 401 WQC will be issued. 5. The 401 application should be revised to show the 0.59 acre wetland as stream channel, pond, and wetlands as discussed with Mr. Floyd. 6. In order to compensate for the loss of the above system, and because of the density of the development, the project should include permanent stormwater detention facilities. Also this project will require compensatory mitigation as described in 15A NCAC 2H .0506(h). Please respond within three weeks of the date of this letter by sending a copy of this information to me and to Mr. Pete Colwell for the Mooresville Regional Office at (704) 663-6040. If we do not hear from you in three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. I can be reached at 919-733-9646 if you have any questions. Sincerely, Jo n R. Dorney Wetlands/401 Unit 1621 Mail Service Center Raleigh, North Carolina 27669-1621 Telephone 919-733-1786FAX # 733-9959 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post consumer paper J - I. Jun 27 '00 15.34 P.01i02 From: e Division: Fax Number Number of :pages (inelgding cover):- Z i ,-? D , NCDEHR North Carolina Department of Environment and Natural Resources Mooresville Regional Office 919 North Main Street -°- •• Mooresville, North Carofina 26116 Phone; 704!663-1699 Fax; 7D4/663-6D40 Section Date: IInn To: CVkdt- M ?/rliY.?r Jun 27 '00 15.35 P.02i02 ..7un-2_%-4o o1:ssp P-01 r M POWER ENGINEERING COMPANY, INC. 011N A Umalxlrn Wnl- fln11lQV? d t,11AVO North r,',imJ1m ZRIM 17061 524,7175 Nx U04! 57:7 1515 June 23, 2000 Mr. Putoc Colwell Division of Water Quality NW& caroling D"AM of of Ravironnunt and Natural Resources 919 North Main Street. Mooresville, NC 28115 Re: Brawley Farms Subdivi:im PLC ROM & 5382 Door Mr. Colwell: it was broulllrt to our aWsaticn by Mr. he. Floyd, with tha Brigman Company, th dwe were a number of ooncems needing to be addreaaad regprding tha ImplannWitauand 1711144 wul non of the erosion and sediment control ftweilres oil the abm re&rWoed projaot rite, belied u0m your mesons with the Brigrnsn Company at June 21, 2000. Mr. Floyd also had pointed ovt that it Appeared the Car?vacwr has not boon inVIemerting Bost Management Prireom (B_M.P.'s) during oonSmotion. We are oonoerned that the Contractor has not neaiataiaoo - .,...w.g uiusion and tedhnot control measures not implownted B.M,P,'e to aid in mpintir* and minbuisi"g negative ingm0ta to the environment that are inherent wish con tructim alagg envieenmmtslly eaesit "Oran &. Wo have met with the Contractor W review She site and illustrated your totems with the work needing to be oddr=W and rectified. 'ilte CaMraetor her baps to repair all ditUgM SW ti not end lnftli "row Elk PonCe at the tae of all disturbed alopee. 1n addition, suvlam ogees that have been partially blocked by debris and/of adimentation will bo opened. Planes note that condruction along the areas of ooncem has not beat Hilly completed, but 1ho c:ontraator expects to Grade, aCaetMd and seed t11e easement whhin 3-3 weeks, pending continued bvorebl• weeder. Ilia Contraaor and Owner has expressed their williwese to rectify all inouflE'icimt work and implQmQnt any additional maimim PBNR may require. We would like to shoat with you in 10.14 days to review the pmgm of the work and address any additialal tweems that you may have, if you should have any questions or need additional infbm "tion, Please Poet free to caitetct us. Sinoarely, _ POWEK ENGIN1SEPINtl 0 ,INC. 7 7.. Brondnn S. Pridemore Project Manager f.NrINCLRS M SUKyi.y()K, ¦ ?FANNtR5 01111 MelA CHANI 11111 i Feildstone at Brawley Farms Subject: Feildstone at Brawley Farms Date: Fri, 23 Jun 2000 10:17:28 -0400 From: Peter Colwell <Peter.Colwell@ncmail.net> Organization: NC DENR - Mooresville Regional Office To: John Dorney <john.dorney@ncmail.net> Hey John, I guess my slow start is over. Things are wide open now. I can't find violations on my own Land Quality is sending them to me. Fieldstone DWQ# 000374, Meck. I will be sending a letter to these guys about what I found on Wed. They have WQ violations on site now dealing with stream impacts from the installation of a sewer line and other fill on the main trib. Quetsion: They have a man hole 2 ft off the small perennial stream, should we make them move it? As far as the stream question Samar raised, it is at least a strong intermittent and likely a small perennial. It flows into an old pond that only has an intermittent outflow. I think the pond is discharging subsurface. I want to get them to put in stormwater measures to compensate for the proposed stream and pond impacts. They need to revise their 401 application and clean up their violations before we issue. Stream question: Are we still requiring 2:1 mitigation for the burial of streams and just 1:1 for the relocation or other impacts. For stream mitigation I assume we are still looking for presence of fish, crayfish etc. If we do not find these critters then stream mit. is not an option. And for pond creation: the flooding is an impact requiring authorization but not mitigation. I just want confirm what I am telling folks. I hope I don't need retraining. Thanks Pete Pete Colwell - Pete.Colwell@ncmail.net %TITLE% North Carolina Dept. of Environment & Natural Resources Div. of Water Quality 919 N. Main St. Mooresville, NC 28115 Ph: 704.663.1699 Fax: 704.663.6040 Pete Colwell <Peter.Colwell @ncmail.net> %TITLE%v NC DENR - Mooresville Div. of Water Quality 1 of 2 6/23/00 2:30 PM w May-22-00 11:10A r i 7 May 22, 2000 P.02 Mr_ John R. Dorney NCDENR Wetlands/401 Unit 1621 Mail Service Center Raleigh, NC 27669-1621 RE: Fieldstone at Brawley Farms S/D 404/401 Permit Application DWQ #000374 Mecklenburg County, North Carolina Dear Mr. Dorney: This letter is in response to your May 1, 2000 letter requesting additional information concerning Issues related to the proposed waters/wetland impacts for the referenced project. Complete avoidance of impacts to waters/wetland resources was not practicable because of the location and distribution of the jurisdictional areas throughout the project site and the adherent physical characteristics of a well designed single family residential development. The following basic design criteria and construction techniques have been incorporated into the master plan in order to minimize all unavoidable impacts to waters/wetland resources. 1. All unique wetland resources, outstanding resource waters and perennial streams should be buffered from the construction envelope, if possible. 2. All roadway and utility crossings should be oriented perpendicular to aquatic resources or be aligned to cross wetland resources at the narrowest point when required. 3. Project construction shall strictly adhere to sediment and erosion control plan. Best management practice shall be employed during construction to minimize erosion and migration of sediment off-site. May-22-00 11:10A Mr. John R. Dorney Page 2 These practices may include, but not be limited to, the use of mulches, hay bails, silt fences, and other devices capable of preventing erosion and migration of sediments off-site. It was not possible to simultaneously achieve optimum conditions for each of these design criteria, but the construction plan was developed so that a reasonable balance is achieved between avoidance of waters/wetland resources and the various logistical economic and safety parameters that must be met in a project of this type. The 0.59 acre jurisdictional area, which has been incorporated into the development plan, is a result of the construction of a coffer dam at the end of the divide between two hills. Approximately 0.30 acres of this area is a deep water habitat or a pond. No surface water connection exist between this jurisdictional area and the perennial stream on-site. Additionally, this area is classified as a pond on the U.S.G.S. topographic quadrangle (see attached figure). The only stream having perennial characteristics on-site transects from North to South in the center of the tract and is a tributary of Reedy Creek. As mitigation for the unavoidable impacts to waters/wetland the applicant proposes to preserve and enhance the remaining undisturbed portions of the on- site perennial creek, which fall within the limits of the project area by establishing variable width upland buffers ranging from 25' to 75' and totaling 3.61 areas. This area will be preserved and protected in perpetuity by the establishment of restrictive covenants and the posting of conservation area "Do Not Disturb" signs along the perimeter of this area. Should you have any questions or require any additional information in order to complete the review and certification process, please advise. Sincerely, *?O? C. 4_J31,_O Joseph C_ Floyd Project Manager JCF/alj cc: B. Pridemore P. 03 CAMy Documents\LETTERS100152-99137e.doc 1 4Tant t y _.,rr ?.i?0 $?. ?0 fim 670 ?i1 676 I I ; l8,'?6 S i l \i -II %@d,o T?wer ;h SR 631 1 r <L J n? dU GT k' r Charlotte - ,, MBmonafGardel'l t" 1 t 4 f . Camp $lewart "? Ph {? •' Co1P .tug V, 1 762 GRAPHIC SCALE t o -n z000(t USGS MINT HILL & HARRISBURG 7.5 MIN QUADRANGLES) ACTIVITY: WETLAND FILL LOCATION MAP PROPOSED FIELDSTONE AT BRAWLEY FARMS S/D PURPOSE: RESIDENTIAL DEVELOPEMENT LOCATION: NATIONWIDE PERMIT #26 APPLICATION CHARLOTTE, NC DATE: 2/16/00 PAGE 1/4 APPLICANT: APPLICATION \C. MR. FRANK DESIMONE AGENT: HE BRIGMAN COMPANY, INC., P.O. BOX 1532, CON AY 29526 (843) 248-9366 FAX: (843) 248-9596 4nsite pond and associated wetland. State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director 1 ocma? • AOM" IL NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES May 1, 2000 DWQ Project # 000374 Mecklenburg County CERTIFIED MAIL-RETURN RECEIPT REQUESTED Mr. Frank DeSimone 3126 Milton Road, Ste 217 Charlotte, NC 28215 Dear Mr. DeSimone: The Division of Water Quality has reviewed your plans for the discharge of fill material into 0.72 acres of wetlands and 60 linear feet of streams located in Mecklenburg County for Fieldstone at Brawley Fields subdivision as described in your application dated March 21, 2000. Insufficient evidence is present in our files to conclude that your project must be built as planned in waters and/or wetlands in accordance with 15A NCAC 2H.0506. Therefore, unless modifications of the proposal are made as described below, we will have to move toward denial of your 401 Certification as required by 15A NCAC 2H .0507(e) and will place this project on hold as incomplete until we receive this additional information, we are requesting (by copy of this letter) that the U.S. Army Corps of Engineers place your project on administrative hold. Please provide us with information supporting your position that states your project must be constructed as planned and that you have no practicable alternative to placing fill in these waters and/or wetlands. Specifically can you correct your application to show the true extent of streams rather than wetlands? From DWQ's field visit about 0.59 acres of "wetlands" are actually streams. Any documentation such as maps and narrative that you can supply to address alternative designs for your project may be helpful in our review of your 401 Certification. Also this project will require compensatory mitigation as described in 15A NCAC 2H .0506(h), if the streams have perennial characteristics which were not discussed in the application. Your mitigation proposal is insufficient because none was proposed. Please respond within three weeks of the date of this letter by sending a copy of this information to me and to the Mr. Samar Bou-ghazade, Mooresville Regional Office at (704) 663-6040. If we do not hear from you in three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. I can be reached at 919-733-9646 if you have any questions. inc r n R. D ey cc: Mooresville DWQ Regional Office Central Files 4ile Copy Asheville Field Office Corps of Engineers James Floyd; Brigman Co. Inc. Wetlands/401 Unit 1621 Mail Service Center Raleigh, North Carolina 27669-1621 Telephone 919-733-1786FAX # 733-9959 An Equal opportunity Affirmative Action Employer 50% recycled/10% post consumer paper MEMORANDUM TO: John Dorney Regional Contact: Samar Bou-ghazale Non-Discharge Branch WO Supervisor: Rex Gleason Date: SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS Facility Name Fieldstone at Brawlev Farms c/o Frank DeSimone Project Number 00 0374 Recvd From APP Received Date 3/24/00 Recvd By Region Project Type residential County Mecklenburg County2 Region Mooresville Certificates Stream Permit Wetland Wetland Wetland • Stream Class Acres Feet Type Type Impact Score Index Prim. Supp. Basin Req. Req. 26 F O Y O N ?- 11-19-8 WSIV F- 30,830. 0.73 60.00 F_ F0 _Y F Mitigation Wetland MitigationType Type Acres Feet Is Wetland Rating Sheet Attached? Q Y pO N Did you request more info? Q Y O N Have Project Changes/Conditions Been Discussed With Applicant? Q Y O N Is Mitigation required? QQ Y O N Recommendation: Q Issue O Issue/fond O Deny Provided by Region: Latitude (ddmmss) 351454 Longitude (ddmmss) 803955 Comments: The i nosing to Impact Fn feat of stream and fill 0.72 acres of wetlands (0.13 ac, near the stream and o ,5Q ar near a cul-de-sac) during the development of a single family residential s! IJdivis'on. Field investigations revealed that the 0.55) ac. of wetlands were actually approxjmately_ 500 feet of stream that discharges into a pond ( not wetlands as set forth in the ap ation). It is recommended that the apnllcation by reti rued to the applicant due to Its InaceLlraGles. cc: Regional Office Page Number 1 Central Office Facility Name Fieldstone at Brawley Farms c/o Frank DeSimone County Mecklenburg Project Number 00 0374 Regional Contact: Samar Date: 4/26/2000 Comments (continued from page 1): cc: Regional Office Central Office Page Number 2 II AA A r? May 22, 2000 MAY 2 4 2000 11 I ATE GROUSECTPION Mr. John R. Dorney NCDENR Wetlands/401 Unit 1621 Mail Service Center Raleigh, NC 27669-1621 RE: Fieldstone at Brawley Farms S/D 404/401 Permit Application DWQ #000374 Mecklenburg County, North Carolina Dear Mr. Dorney: This letter is in response to your May 1, 2000 letter requesting additional information concerning issues related to the proposed waters/wetland impacts for the referenced project. Complete avoidance of impacts to waters/wetland resources was not practicable because of the location and distribution of the jurisdictional areas throughout the project site and the adherent physical characteristics of a well designed single family residential development. The following basic design criteria and construction techniques have been incorporated into the master plan in order to minimize all unavoidable impacts to waters/wetland resources. 1. All unique wetland resources, outstanding resource waters and perennial streams should be buffered from the construction envelope, if possible. 2. All roadway and utility crossings should be oriented perpendicular to aquatic resources or be aligned to cross wetland resources at the narrowest point when required. 3. Project construction shall strictly adhere to sediment and erosion control plan. Best management practice shall be employed during construction to minimize erosion and migration of sediment off-site. 't'? Mr. John R. Dorney Page 2 These practices may include, but not be limited to, the use of mulches, hay bails, silt fences, and other devices capable of preventing erosion and migration of sediments off-site. It was not possible to simultaneously achieve optimum conditions for each of these design criteria, but the construction plan was developed so that a reasonable balance is achieved between avoidance of waters/wetland resources and the various logistical economic and safety parameters that must be met in a project of this type. The 0.59 acre jurisdictional area, which has been incorporated into the development plan, is a result of the construction of a coffer dam at the end of the divide between two hills. Approximately 0.30 acres of this area is a deep water habitat or a pond. No surface water connection exist between this jurisdictional area and the perennial stream on-site. Additionally, this area is classified as a pond on the U.S.G.S. topographic quadrangle (see attached figure). The only stream having perennial characteristics on-site transects from North to South in the center of the tract and is a tributary of Reedy Creek. As mitigation for the unavoidable impacts to waters/wetland the applicant proposes to preserve and enhance the remaining undisturbed portions of the on- site perennial creek, which fall within the limits of the project area by establishing variable width upland buffers ranging from 25' to 75' and totaling 3.61 areas. This area will be preserved and protected in perpetuity by the establishment of restrictive covenants and the posting of conservation area "Do Not Disturb" signs along the perimeter of this area. Should you have any questions or require any additional information in order to complete the review and certification process, please advise. Sincerely, *?O? C. 4_z? Joseph C. Floyd Project Manager JCF/alj cc: B. Pridemore CAMy Documents\LETTERS\00152-99137a.doc y f ? 4 fir N J ? f ?? f? t S I? ?•\y• 1 •?' 1 i ? :?? kaaw ? _? ?u .. _ ,. ? ?? ? i ? err ? ?• ?F i 6 i i Bm, ) i,`I i ? ? ? • ? 18(15 ? 1?1ioTRI ,( ) { Tu ?h acd?r? y, f N ?. ? ? I / ' . ? taw • ,?, s I,x, s ?`..`'??-'?``,?- "" i. "\ I t?..: rye" ?? MBmhn ??!G de/f (a rnp otewart' bin- /Got r; , \1 1 r 1 _ ?' :1 ?? ?' ` <r• ?? / ?? 'CRAPHIC SC LE ??. LOCATION MAP m PROPOSED ACTIVITY: WETLAND FILL FIELDSTONE AT BRAWLEY FARMS S/D m m PURPOSE: RESIDENTIAL DEVELOPEMENT z LOCATION: < NATIOMMDE PERMIT 626 APPLICATION CHARLOTTE, NC x DATE: 2/16/00 PAGE 1/4 ApP?/W; MR. FRANK DESIMONE APPLICATION N0. . THE BRIGMAN COMPANY. INC.. P.O. BOX 1532, (843) FAX: 843 2 9586 ? I I I i Onsite pond and associated wetland. State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director AA 1 • NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES May 1, 2000 DWQ Project # 000374 Mecklenburg County CERTIFIED MAIL-RETURN RECEIPT REQUESTED Mr. Frank DeSimone 3126 Milton Road, Ste 217 Charlotte, NC 28215 Dear Mr. DeSimone: The Division of Water Quality has reviewed your plans for the discharge of fill material into 0.72 acres of wetlands and 60 linear feet of streams located in Mecklenburg County for Fieldstone at Brawley Fields subdivision as described in your application dated March 21, 2000. Insufficient evidence is present in our files to conclude that your project must be built as planned in waters and/or wetlands in accordance with 15A NCAC 2H .0506. Therefore, unless modifications of the proposal are made as described below, we will have to move toward denial of your 401 Certification as required by 15A NCAC 2H .0507(e) and will place this project on hold as incomplete until we receive this additional information, we are requesting (by copy of this letter) that the U.S. Army Corps of Engineers place your project on administrative hold. Please provide us with information supporting your position that states your project must be constructed as planned and that you have no practicable alternative to placing fill in these waters and/or wetlands. Specifically can you correct your application to show the true extent of streams rather than wetlands? From DWQ's field visit about 0.59 acres of "wetlands" are actually streams. Any documentation such as maps and narrative that you can supply to address alternative designs for your project may be helpful in our review of your 401 Certification. Also this project will require compensatory mitigation as described in 15A NCAC 2H .0506(h), if the streams have perennial characteristics which were not discussed in the application. Your mitigation proposal is insufficient because none was proposed. Please respond within three weeks of the date of this letter by sending a copy of this information to me and to the Mr. Samar Bou-ghazade, Mooresville Regional Office at (704) 663-6040. If we do not hear from you in three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. I can be reached at 919-733-9646 if you have any questions. FRRnn r .D D e y cc: Mooresville DWQ Regional Office Central Files File Copy Asheville Field Office Corps of Engineers James Floyd; Brigman Co. Inc. Wetlands/401 Unit 1621 Mail Service Center Raleigh, North Carolina 27669-1621 Telephone 919-733-1786FAX # 733-9959 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post consumer paper MEMORANDUM TO: SUBJECT: John Dorney Non-Discharge Branch Regional Contact: Samar Bou-ghazale WQ Supervisor: Rex Gleason Date: WETLAND STAFF REPORT AND RECOMMENDATIONS Facility Name Fieldstone at Brawlev Farms c/o Frank DeSimone Project Number 00 0374 Recvd From APP Received Date 3/24/00 Recvd By Region Project Type residential County Mecklenburg County2 Region Mooresville Certificates Stream Stream Impacts (ft.) Permit Wetland Wetland Wetland Stream Class Acres Feet Type Type Impact Score Index Prim. Supp. Basin Req. Req. BE 26 F_O Y O N F__ 11-19-8 WStV F__ 30,830. 0.73 60.00 F- F_- r ? Mitigation Wetland MitigationType Type Acres Feet Is Wetland Rating Sheet Attached? Q Y 6 N Did you request more info? 0 Y O N Have Project Changes/Conditions Been Discussed With Applicant?Q Y O N Is Mitigation required? QQ Y O N Recommendation: Q Issue O Issue/fond # Deny Provided by Region: Latitude (ddmmss) 351454 Longitude (ddmmss) 803955 Comments: The applicant iproposoug to imps t Fn feet of stream and fill 0.79 acres of wetlands (0.13 ac. near the stmam and 0.56 ar± near a mkde-sac) during the development of a single family residential subdivision Field investigations revealed that the 0.59 ac, of wetlands were actually approximately cation). 500 feat of stream that discharges into a pond ( not wetlands as set forth in the application), It is recommended that the annli cation be r _t urn .d to the applicant due to its ina .. era .i .s. cc: Regional Office Central Office Page Number 1 Facllity Name Fieldstone at Brawley Farms c/o Frank DeSimone County Mecklenburg Project Number 00 0374 Regional Contact: Samar Bou-ghazale Date: 4/26/2000 Comments (continued from page 1): cc: Regional Office Page Number 2 Central Office TH+GMAN B C NY I N C O R P O R A T E D PAYMENT RECEIVED ? u ? ?? », n c rr Fsr I ? ? r?ct ?r.c', ?F e X TO: Ai. C. ?e o. ,•,?' t,.1ui,onMF r1? kk?+-u(al VGS?u? CLS ADDRESS: //-21 IL4m,l S5 ,-u;cc; CITY: Pate, i,:4 i, . JJ C 2.7.E G Gt - I L, 2 ATTENTION: Ot `T'oln n ??o ??? c PLEASE BE ADVISED: ENVIRONMENTAI SERVICES P o.BOX isa7 ,i C()NWAY, SC 7952£3 I WETLANDS GROUP (8,u)2489388 WATER QUALITY SECTION DATE: --? - 21 JOB NO: Af? -I RE: 5-? WE ARE SENDING YOU a--ATTACHED ? UNDER SEPARATE COVER VIA ?Yl,2 ,' THE FOLLOWING: ? MAPS ? PLANS ? PROPOSALS ? CONTRACT ? REPORT ? C.O.E. PACKAGE ? PHOTOGRAPHS ? COPY OF LETTER ? N oc t o w? 6 e d 2 <i pat,v? ( o v I NO. DATE COPIES DESCRIPTION a ES - 2 3 4 5 THESE ARE BEING TRANSMITTED AS INDICATED BELOW: ? AS REQUESTED ? APPROVED AS-IS ? SUBMIT COPIES FOR DISTRIBUTION 0-FOR APPROVAL ? APPROVED WITH CORRECTIONS ? RETURN CORRECTED ? FOR YOUR USE ? RETURNED WITH CORRECTIONS ? RETURNED AFTER LOAN TO US ? FOR YOUR COMMENTS ? RESUBMIT COPIES FOR APPROVAL ? ? FOR BID(S) DUE COMME I v SIGNED: t... 'B +GMAN COMPANY I N C O R P O R A T E D March 14, 2000 Mr. Steve Chapin U.S. Army Corps of Engineers Asheville Regulatory Field Office 151 Patton Avenue Asheville, NC 28801 RE: Fieldstone at Brawley Farms S/D Mecklenburg County, North Carolina Dear Mr. Chapin: Pursuant to your request, The Brigman Company, Inc., acting as agent for the applicant, has completed a Nationwide Permit #26 Pre-Construction Notification Application. Enclosed herewith the application is the following supporting information: ¦ Project Narrative PAYMENT ¦ Project Location Map RECEIVED ¦ Wetland Master Plan ¦ Plan & Section View of Project ¦ N.C. Dept. of Cultural Resources Information Request Should you have any questions concerning the application or require additional information to complete the approval process, please advise. Sincerely, )1414? 0.` yl 0 . Joseph C. Floyd Wetland Ecologist JCF/alj cc: John Dorney - NCDENR Frank DeSimone - Applicant CAMy Documents\LETTERS\00254-98138a.doc U.S. ARMY CORPS OF ENGINEERS NATIONWIDE PERMIT #26 SUBMITTAL Fieldstone at Brawley Farms Mecklenburg County, Crab Orchid Township, North Carolina PREPARED FOR: Mr. Frank DeSimone c/o Power Engineering P.O. Box 411491 Charlotte, NC 28241 DATE PREPARED: March 14, 2000 PREPARED BY: The Brigman Company, Inc. P.O. Box 1532 Conway, SC 29528 (843) 248-9388 C:\My Documents\PERMITS\00152-99137.doc NMI 42N Wt:T'_,?NUS GRDIJt' 'TER 01IAI ITY SECT10N DEM ID : CORPS ACTION ID: i g 9 8 31 171 NATIONWIDE PERMIT REQUESTED (PROVIDE NATIONWIDE PERMIT #): 26 PRE-CONSTRUCTION NOTIFICATION APPLICATION FOR NATIONWIDE PERMITS THAT REQUIRE: 1) NOTIFICATION TO THE CORPS OF ENGINEERS 2) APPLICATION FOR SECTION 401 CERTIFICATION 3) COORDINATION WITH THE NC DIVISION OF COASTAL MANAGEMENT SEND THE ORIGINAL AND (1) COPY OF THIS COMPLETED FORM TO THE APPROPRIATE FIELD OFFICE OF THE CORPS OF ENGINEERS (SEE AGENCY ADDRESSES SHEET). SEVEN (7) COPIES SHOULD BE SENT TO THE N.C. DIVISION OF ENVIRONMENTAL, MANAGEMENT (SEE AGENCY ADDRESSES SHEET) PLEASE PRINT. 1. OWNERS NAME: Frank OPSimnnP 2. MAILING ADDRESS: Su i to 217.) M(o Mi 1 ton Road SUBDIVISION NAME: CITY: rharl attc STATE: NC ZIP CODE: ?R21 r, PROJECT LOCATION ADDRESS, INCLUDING SUBDIVISION NAME (IF DIFFERENT FROM MAILING ADDRESS ABOVE) : S R 2822 MPrkanhiirg County, N (r _77EPHONE NUMBER (HOME) : (WORK) : (7_c56R2Qne APPLICABLE.: AGENT'S NAME CR RESPONSIBLE CORPORATE OEEICIA?, ADDRESS, PHONE NUMBER: T h e R r i g m a n C o m pa n y, T n r_ 900-B Main Street Conway' Sr 2gs2F LOCATION OF WORK (PROVIDE A MAP, PREFERABLY A COPY OF USGS TOPOGRA.PH7C MAP OR AERIAL PHOTOGRAPHY WITH SCAiE) COUNTY: M P r k 1 p_n h i? i r g NEAREST TOWN OR CITY: Charlotte SPECIFIC LOCATION (INCLUCE ROAD NUMBERS, LANDMARKS, ETC.) Commencing at the intercprtinn of S.-R. 2226 aid S R 2222 at the southwestern corner of Charlotte Memorial Gardens, travel east approximately 1.1 mile, then turn left (north) onto(3rawlay Lane. hen rave app oK1maLe l y 0.3 miles. ine size is situated on the right (east) side to the road. IMPACT?? cR NEAREST sTREA?ii RT%E... Reedy C r e e k Via. IS P!?OJE?. ?JCATED NEAR dATER _- SI'_IED A: TROUT, TIDAL SA--TWA=-7. ,SA, , H»Y. ?UAL;_Y WATER:. \"iQW' , GU-STANDING RESOURCE 'WAT'ER CRW' (WS-I OR WS-II)? YES [ ] NO [ X] IF YES, EXPLAIN: 7b. IF THE PROJECT IS LOCATED WITHIN A NORTH CAROLINA DIVISION OF COASTAL MANAGEMENT ARE OF ENVIRONMENTAL CONCERN (AEC)? YES [ ] NO [X ] 7c. IF THE PROJECT IS LOCATED WITHIN A COASTAL COUNTY (SEE PAGE 7 FOR LIST OF COASTAL COUNTIES), WHAT IS THE LAND USE PLAN (LUP) DESIGNATION: 8a. HAVE ANY SECTION 404 PERMITS BEEN PREVIOUSLY REQUESTED FOR USE ON THIS PROPERTY? YES [ ] NO [ X] IF YES, PROVIDE ACTION I.D. NUMBER OF PREVIOUS PERMIT AND ANY ADDITIONAL INFORMATION (INCLUDE PHOTOCOPY OF 401 CERTIFICATION): 8b. ARE ADDITIONAL PERMIT REQUESTS EXPECTED FOR THIS PROPERTY IN THE FUTURE? YES [ ] NO [ X] IF YES, DESCRIBE ANTICIPATED WORK: 9A. ESTIMATED TOTAL NUMBER OF ACRES IN TRACT OF LAND: 207.58 9B. ESTIMATED TOTAL NUMBER OF ACRES OF WETLANDS LOCATED ON PROJECT SITE: ,85 10A. NUMBER OF ACRES OF WETLANDS IMPACTED BY THE PROPOSED PROJECT BY: FILLING: EXCAVATION: FLOODING: OTHER: Croamok .01 A-r-, DRAINAGE: TOTAL ACRES TO BE IMP. CTED: 0,13 10B. (1) STREAM CHANNEL TO BE IMPACTED BY THE PROPOSED PROJECT (IF RELOCATED, PROVIDE DISTANCE BOTH BEFORE AND AFTER RELOCATION): LENGTH BEFORE: FT AFTER: WIDTH BEFORE :based on normal h-:n wac°r ooccourS, WIDTH AFTER: AVERAGE DEPTH BEFORE: FT AFTER: FT (2) STREAM CHANNEL IMPACTS WILL RESULT FROM: (CHECK ALL THAT APPLY) OPEN CHANNEL RELOCATION: PLACEMENT OF PIPE IN CHANNEL: X CHANNEL ELEVATION: CONSTRUCTION OF A DAM/FLOODING: OTHER: 11. IF CONSTRUCTION OF A POND IS PROPOSED, WHAT IS THE SIZE OF THE WATERSHED DRAINING TO THE POND? WHAT IS THE EXPECTED POND SURFACE AREA? 12. DESCRIPTION OF PROPOSED WORK INCLUDING DISCUSSION OF TYPE OF MECHANICAL EQUIPMENT TO BE USED (ATTACH PLANS : 8'w' x 11" DRAWINGS ONLY) : U t i l i z a t i o n of s i t e as a residential development will require the crossing of a 0.01 ac. intermittent stream approximately 60'x10' (0.01 ac.) 13. PURPOSE OF PROPOSED WORK: The purpose of the Proposed activities in wetlandc and waters of the U.S. is to PfficiPntly utili7P h site as a residential development. 14. STATE REASONS WHY IT IS BELIEVED THAT THIS ACTIVITY MUST BE CARRIED OUT IN WETLANDS. (INCLUDE ANY MEASURES TAKEN TO MINIMIZE WETLAND IMPACTS) :Due to t h 2 location and distribution of wetlands and waters of the U.S. within the project area and the inherent design characteristics of F the l 1 f the : ha the + vc$+ ?'? v^ "' r- v??rr-r+ c?=c-awn -- ert-?l-fh' - within - rrp'r=-o-,re'e?a-r2-u , a residential subdivision, complete avoidance was not practica.)12. The western half of the property is unaccessable. Also impacts are limited to one creek crossing an one isolated wetland. 15. YOU ARE REQUIRED TO CONTACT THE STATE HISTORIC PRESERVATION OFFICER (SHPO) (SEE AGENCY ADDRESSES SHEET) REGARDING THE PRESENCE OF HISTORLC PROPERTIES IN THE PERMIT AREA WHICH MAY BE AFFECTED BY THE PROPOSED PROJECT. DATE CONTACTED: 2/ 2 1 n n Ib. DOES THE PROJECT INVOLVE AN EXPENDITURE CF PUBLIC FUNDS OR THE E OF or?BLI% (STATE) LAND? YES [ ] NO [X ] (IF NO, GO TO 18) a. IF YES, DOES THE PROJECT REQUIRE PREPARATION OF AN ENVIRONMENTAL DOCUMENT PURSUANT TO THE REQUIREMENTS OF THE NORTH CAROLINA ENVIRONMENTAL POLICY ACT? YES [ ] NO [ ] b. IF YES, HAS THE DOCUMENT BEEN REVIEWED THROUGH THE NORTH CAROLINA DEPARTMENT OF ADMINISTRATION STATE CLEARINGHOUSE? YES [ ] NO [ ] IF ANSWER TO 17b IS YES, THEN SUBMIT APPROPRIATE DOCUMENTATION FROM THE STATE CLEARINGHOUSE TO DIVISION OF ENVIRONMENTAL MANAGEMENT REGARDING COMPLIANCE WITH THE NORTH CAROLINA ENVIRONMENTAL POLICY ACT. QUESTIONS REGARDING THE STATE CLEARINGHOUSE REVIEW PROCESS SHOULD BE DIRECTED TO MS. CHRYS BAGGETT, DIRECTOR STATE CLEARINGHOUSE, NORTH CAROLINA DEPARTMENT OF ADMINISTRATION, 116 WEST JONES STREET, RALEIGH, NORTH CAROLINA 27603-8003, TELEPHONE (919) 733-6369. 17. THE FOLLOWING ITEMS SHOULD BE INCLUDED WITH THIS APPLICATION IF PROPOSED ACTIVITY INVOLVES THE DISCHARGE OF EXCAVATED OR FILL MATERIAL INTO WETLANDS: a. WETLAND DELINEATION MAP SHOWING ALL WETLANDS, STREAMS, LAKES AND PONDS ON THE PROPERTY (FOR NATIONWIDE PERMIT NUMBERS 14, 18, 21, 26, 29, AND 38). ALL STREAMS (INTERMITTENT AND PERMANENT) ON THE PROPERTY MUST BE SHOWN ON THE MAP. MAP SCALES SHOULD BE 1 INCH EQUALS 50 FEET OR 1 INCH EQUALS 100 FEET OR THEIR EQUIVALENT. b. IF AVAILABLE, REPRESENTATIVE PHOTOGRAPH OF WETLANDS TO BE IMPACTED BY PROJECT. c. IF DELINEATION WAS PERFORMED BY A CONSULTANT, INCLUDE ALL DATA SHEETS RELEVANT TO THE PLACEMENT OF THE DELINEATION LINE. d. ATTACH A COPY OF THE STORMWATER MANAGEMENT PLAN IF REQUIRED. e . WHAT IS LAND USE OF SURROUNDING PROPERTY? R e s i d e n t i a l D e v e l o p m e n t s i. IF APPLICABLE, WHAT IS PROPOSED METHOD OF SEWAGE DISPOSAL? g. SIGNED AND DATED BY AGENT AUTECRIZAT_ON LETTER, _F APPLI,Ca_B'_,E. PROJECT NARRATIVE Fieldstone at Brawley Farms Mecklenburg County, Crab Orchid Township, North Carolina BACKGROUND: Fieldstone Associates, L.P. is planning to develop phases II & III of Fieldstone at Brawley Farms Subdivision located east of and adjacent to Brawley Lane approximately 0.3 miles north of Robinson Church Road in the Crab Orchid Township of Mecklenburg County, North Carolina (see Project Location Map - Sheet 1 of 3). The project will require the filling of 0.73 acres of isolated and above the headwater freshwater wetlands. The Brigman Company, Inc. has been contracted by the applicant to specifically review the proposed project objectives, assess the impacts of these activities on freshwater wetland functions and to suggest project revisions which will minimize the impacts and insure the project is consistent with the U.S. Army Corps of Engineers and North Carolina Department of Environment & Natural Resources (NCDENR) guidelines and regulations. PROJECT SITE DESCRIPTION: The project site is presently owned by Fieldstone Associates, L.P.. The 207.58 acre site is characterized by gently sloping ridges and strongly sloping, broken side slopes. Mixed upland hardwood stands and abandoned agricultural fields occupy the non-jurisdictional portions of the tract. The project site contains a total of 1.23 acres of isolated and "above the headwater wetlands". Jurisdictional waters/wetlands occurring on-site consist of a bed and bank tributary of Reedy Creek and a small pond with associated wetlands. Dominant species occurring within wetland ecosystems on-site include: Speckled alder (Alrus regosa), Privet (Ligustrum sinense), False nettle (Boehmeria cylindrica) and Virginia creeper (Parthenocessus quinquefolia). PROJECT DEVELOPMENT DESCRIPTION: The project site has been selected for a Planned Unit Development due to the proximity to the city of Charlotte and the great demand for residential property in the area. Development of the site will require the filing of two isolated wetlands, resulting in 0.717 acres of impact, a road crossing resulting in 0.01 acres of impact and a utility crossing resulting in 0.003 acres of impact. PROPOSED MITIGATION: Due to the location and distribution of the isolated wetland within the subject property, it is impossible to simultaneously avoid impacts to wetlands on-site and meet the project objectives. The applicant proposes to mitigate for the unavoidable impacts to wetlands on-site by preserving the remaining acres of on-site wetlands and enhancing them through the use of upland buffers. PROTECTED SPECIES: TBC has completed a literature review and field survey of the project site for the potential occurrence of endangered and threatened (E/T) flora and fauna pursuant to Section 7 of the Endangered Species Act, as amended (16 U.S.C. 1531-1543). This study involved a review of the current literature and a collection of scientific data related to the distribution and occurrence of both plants and animals. Information relative to E/T species in this section of Mecklenburg County was provided by the U.S. Fish and Wildlife Service (USFWS) office and by the Heritage Trust Section of N.C. Wildlife and Marine Resources Department. Based on visual surveys of the property and known occurrences of endangered and threatened species in Mecklenburg County and ranges in habitat of endangered and threatened species in this area, we feel that the potential for any of the listed species occurring on this property is low. CULTURAL RESOURCES: The N.C. Department of Archives and History has been contacted relative to known significant historic and archeological resources within or near the proposed project site. This information has been combined with a brief site reconnaissance to reach a non-effect conclusion. SUMMARY: The 207.58 acre site is situated of Brawley Lane in the Crab Orchid Township of Mecklenburg County. The scope of this project is the development of 220 +/- single family lots along with associated roads and utilities. There are 1.23 acres of verified jurisdictional wetlands on the site. In order to fulfill the project objectives it will be necessary to impact 0.73 acres isolated wetlands and waters of the U.S. The applicant proposes mitigation by wetland enhancement and preservation. 3.61 acres of upland buffers will be established around the perimeter of the remaining wetlands on-site. The proposed preserved upland buffer will protect and enhance the remaining 0.50 acres of preserved wetlands. Construction of the proposed development will occur using available best management practices to insure no unnecessary impacts occur. C:Wy Documents\PERMITS\00152-99137.doc ' ? ' . ?(. .??? tiy`• ? it ?,??'? ,..f•, r 1 ';!'., `, ? ". f 4 i { 1' 'i. y'Q• kfiM 670 f.. '. ( 1 ,.v? ..r i,l rat •. a X. ^. , iI ? ? ti i r ? }} ? lJ6op?dw TylWer an eari?* i 4 eedy y? 4 ? . r a I? ' 1 1 r k y, r tf a LOCATIONAL4P T A RELDSTONE AT BRAWLEY FARMS SID r I Lrll?TIOMIYLDE IMBOW M APPLICATION Wit, f 77P W p'. `11 .r "g v+ . . Camp 111 ? ? (IN noT tnae ACTIVITY: WETLAND FILL PURPOSE. RESIDENTIAL DEVELOPMENT CHARLOTTE, NC nl DATE: ?11QJ00 PAGE 1/1 -APPLICANT: APPLICATION N0. I MR. FRANK DESMME , INC., P.O. BOX 1532, ,1PLAND f3ori [ R F',TABI_I,IIMCNT J c ROAD CROSSNG_(1'ROP) 014 ACRE`. FIII ?/, -, ? 14 . ,/ V 11[ `I X1 11 P1111 ! ! I iI it'll t11 WETLAND FILL. (PROP,) / -"< 0 59 ACRES UPLAND _[3UADR L`_,IAILI>HMLNI UPLAND OUFFFR FS,TABLIHMFNT _.-- WETLA2-F1jL-LF-M,Ta_ t - I'7 ACRES TOTAL AREA 207.58 AC. PROP.WETLAND FILL 0.60 AC. EXIST. WETLAND FILL .13 AC. UPLAND BUFFER 3.61 AC. WET. PRESERVATION 0.50 AC. THE WETLAND DELINEATIONS USED IN PREPARING THIS WETLAND MASTER PLAN HAVE BEEN DONE IN ACCORDANCE WITH CORPS. OF ENGINEERS METHODS AND TECHNIQUES AND ARE AN ACCURATE REPRESENTATION OF ALL JURISDICTIONAL WETLANDS WITHIN THE PROJECT. THE DELINEATION HAS BEEN REVIEWED AND APPROVED BY THE CORPS. AND ASSIGNED THE FOLLOWING DELINEATION NUMBER. ACTIONA 199831171 UTILITY ?ROSSINO SEXIST ? 003 ACRES FILL UPLAND BUFFLR_ E`,TAB1-I HMENT 0 i9 ACRES - RTTLA AM S'TER PE FIELDSTONE AT BRAWLEY FARMS S/D r NATIONWIDE PE FO T #26 APPLICATION s DATE: 31'1100 PAGE s APPLICATION NO. . 1532, / 1. GRAPHIC SCALE a o o a a ?ararl I mm - 600 R PROPMED WETLAND FILL ACTWITY- ROAD CROSSING PURPOSE. RESIDENTIAL DEVELOPEMENT LOCATION: CHARLOTTE, NC 1APPLICANT' MR. FRANK DESIMONE I TOP OF OF WATERS OF THE US 10' _ I 70 BE a AT CONST. SECTION - ?A- ? e+- -_.._.?? N. To ROnll.;F'l,),, ZINC 14 C TOTAL AREA 207.58 AC. ?s: PROP.WETLAND FILL 0.60 AC. EXIST. WETLAND FILL .13 AC. UPLAND BUFFER 3.61 AC. WET. PRESERVATION 0.50 AC. I I 00. ACRE , _ / fF PROPOSED GRADE / E)WING GRADE +se cu. ras Fxt l J / SECTION VIEW N. 9 - WETLAND PE4N)(SECTION VIEW ?TM FIIOAD Iwo a PURPOGE: A FIELDSTONE AT BRAWLEY FARMS SID p6SIpENT1AL DEVELAPEMENT M E LOCATION. r NATIONWIDE PEIA STM APPLICATION CHARLDTT1E. NC DATE: 911100 PAGE APPLICANT: MR. FRANK DE811AONE APPLICATION NO. EMP THE =MAN COMPANY, WC., P.37937WCONWAYSC (843) 248-OW (W) ER 00-8946 Received 2/24/00 ?'4s Due 3/10/00 m, , „o• ?n 171OD North Carolina Department of Cultural Resources James B. Hunt )r., Governor NATIONWIDE PERMIT REVIEW Division of Archives and History Betty Ray McCain, Secretary Jeffrey J. Crow, Director APPLICANT: Joseph C. Floyd Brigman Company, Inc. PO Box 1532 Conway, SC 28528 Project Location: Mecklenburg County Proposed Project: Fieldstone at Brawley Farms SD We have received the application for the above project from the Di rision of Environmental Management and our comments are noted below. Additional information is needed (maps, photographs, other). Xi No comment. We have reviewed the requested information and have no comment. - (-- Signed ?E ) 1 )?? Renee ledhi I- ar ey Environmental Review Coordinator Historic Preservation Office 919/733-4763 FAX 919/733-8653 Date r- 2000 FEB 2 A 2000 1no V-t I-- CGS--e n C O ~O O _.1 O t7 CL0_ZrQM 8' MAX, ~ U) '7 ~ ~ -c. STEEL POST „„yF 8' E11 10' vARrf:s i2' vARit~ 12' 4' vARrES - - - - sreEL PosT p . p 111 p WIRE FENI;ING Z r ~ ITl tY r f~ r - ~ ,f_._..-_-------._~,__ WIAE FENGNG _ _ - - - - - _ f -/5 WASHED STONE CONCXEFE SLAB 10!' _ _ W/MANF1l7LE ACCESS' x ~ FILTER FaDR~c GENERAL NOTES: W covLTa CLASS 1 RIP-RAP WOKEN FILTER FABRIC T „ „ 24" MIN. HEIGHT ' d rc B T.:>EDIMENT SHALT. BE REMOVED AND TRAP RE51OI2EO TO I'T5 ORIf,INAL UIMF:NSIONS - ' a ~ WFIE'N 1HE SEITIMEN'1' VIAS ACCUMIIIATI:O 'IO T/2 THE OE51CN UEP'TN OF 111E TRAP. SILT FENf.E \ ~ TOP OF EMBANKMEN A PEI?MANE:NT WATER 2, REM(TVED SEDIMENT 5HAt1 DE UEPOSIT'ED IN A SI/1TABLE AREA ANI> IN 511CH ~ 0 ~ A MANNER THAT IT Wll.l. NO'F ERODE. ~ d (j ~ „ Q 3. 'THE'. STNIICTIIRE SITALL BE INSPECTED AFTCR EACN STORM EVENT NY TEIE W " U.l LIl EMERGENCY SPILLWAY "B„ OUALrfY POOL TER FWANGALI.Y RE5P(RVSIBLE PARTV OR HIS AGENT AND N['PAIRS MADE A5 NECESSARY, i W ~ ~ Y W ANCIItb7 SKIRT 6" M!NIMIIM ~ 1~ . ~ U ~ LL I- ® ?x~5~ WEIR EACH Sl0£ _C` STORMWA y ET INS 4. CONS"g2UCTI0N OPERARONS SIiALL BE: CARI2IEO (A)T IN 511CF1 A MANNER T11A"F A A Q H Q W O Q IN I1EU OF BI1RY)NG 5KIRE 6" OF kROSION AND WA'IE:k POLLUTT(Nl ARE: MINIMIZE U. ~5 WASIIlU STONE MAY DE USED Q Ell (Y ~ ~ Q "r 12' LITTORAL SHELF - ~ W/AO(lAT1C VEGETATION OVER TUNHUOWN. 5. THE SEDIMENT iNAP STIALI. Bfl REMOUEU ANU THE AREA STABILIZED WFIEN RTE UNAINA(k HASIN NAS HF:ETI PROPERLY STAUII.III'U. Q - c~ ~ ` GENERAL. NOTES; 0 ORIFICE D" a x> STORAf,F: 51EE1. P05f 6. SILT FENCE INSTALLATION 511N1 FlE IN ACCURUANf,E WINI STD, N0, 30d)fi NtEA \ ~V 1. FILTER FABRIC FENCE SIULL BE A 41NM%UAI OF 32' IN WIDT'N AND SHAI.I HAVE A LIINIMIIM OF B LINE WIRES WITH 12" STAY SPACING. ~ ~,_~i v~~.~~...~~.~~~~_,1~__r~f__._.. _.~.~s.__~._ 12' W WIDT'N AND - 2" STAY SPACING. WIRE FENCING ."~~~~6. l -"E'----'-•- INVERTED SIPHON • ~ 2. WOVEN FILTER FAANIC BE USED WHERE SILT FENCE IS TO RENAiN J" BELOW PERM, 5• ~ FOR A PERIOD OF LIORE THAN 30 DAYS. :E IS TO REMAIN ~ FILTER FABRX: POOL F1EV. ("F ~ ~ ~ ' 3. STEEL POSTS SIWL BE 5'-0" IN HEIGHF AND BE OF THE 3E OF THE ~ ~'WASNEO SFDNE RIP-RAP APRON 12' LITTORAL SHELL p N ~ ; SELF-FASreNEA ANC1E sreEL TTPE. SEE DETAIL W AQUATIC VEGET TION ~ ; • ~ V ; r 4. WIRE FENCING SHALL BE AT LEAST X10 GAGE WfFH A MINILIUA OF cjf- DASTN ~ - e- 4 _ 1 'H A MINIMUM OF ~ SLT FENCE ( ) / ~ . I ~ FORFBAY ~ IA nl T2' srnv sPACINC. ~ s LaHE w Es Yn I ~ ~ 5. TURN SILT FENCE I1P SLOPE AT ENDS. ICI ~ Ll. 6. WIRE NESH SHALL BE NIN. 13 CAGE WITH AN%IMUM 12" OPENINGS. - PLAN VIEW (n JM 12' OPENWGS. 20~---g5 WA91F'O STONE W , PROVIDE RIP-RAP 7. WIRE AND WASHED STONE WILL BE AEOUIRED AND FK)TED ON PLANS WI1Et, ANCHOR SKIRT ) FATED ON PLANS WREN: FIoWW T `KOHL Z D° MINIMUM ..,1 4L_. I 1 H ~ ~ „Gn APRON FROM DISCFARGE A. AT TOE OF SLOPES GREATER TIUN TO FEET VERDCAl (2d SLOPE) SLOPE TTO DRAIN ~ D, AT DENUDED LIMRS WHEAE AN UNDISTIIADED BUFFER IS 50 FEET PIPE TO FOREBAY BOTTOM OR LESS AWAY VERTICAL (2:7 SLOPE) 1~ ~ ~(IFa / .l BUFFER IS 50 FEET - -I ~ MAINTENANCE NOTES: (10'WIDE, 18 ~EPTN) L, 8. ORANGE SAFELY FENCE IS REQLIWED AT BACK Of SkT FENCE _ W SkT FENCE 1. FILTER BARRIERS SHALL BE WSPECTED BY THE FWANCIeLLY N 6'HOFA~ 57QNET O ~ ~ ` ,,I ` ~ ~ ~ (WITHIN 5 RJ WHEN GRADING 5 ADIACEM TO SWW BUFFERS i~ j' (REFER TO SNIA1 BUFFER GUIDELINES). WW BUFFERS PARTY OR H5 AGENT WYEDIATELY AFFER EACH RAWFALL MID AT IEASF DAR.Y DIIRWG PROLONGED RNNFALL. -~r"' (n ~ •c.~ S. 7 i { !tom ANT!-SEEP EMF.RGF_NCY f'FRM. POOL 2. ANY REPARtS NEEDED SHALL BE MADE MAMEaATEI.Y. ~ ~ r 2. SHOULD THE FABRIC DECOMPOSE OR BECOME INEFFECTAf PRIOR T° THE END W COLLARS EMERGENCY FOREBAY DRAIN. DRAIN W/WATERMAN OF' THE EXPECTED USABLE UFE PND TIC OMRIEN 51111 IS NECESSARY, THE ~ FABPoC SFW L BE REPIaCED PROMPTLY. W 3. C10/C110 CANAL VALVE 3. SEDMENT OEPOSRS SIWULD BE Rk:MOVED Wk1EN DEPOSITS REACFI APPROX. SECT10N A-A ~ FW.F TIIE NEIGIU OF THE BW2f21FR. ANY SEfRMENT OFPOSOS REMMNINI; IN DISNCARGE PlPf SLUICE GATE PLACE AF1ER THE SILT FENCE IS REM(YVED SHALL BE DRE55E0 TO CONFORM ~ 10 TIIE EXISTWG GRADE, PAEPMED ANU SEEDED. ZO SILT FENCE STORM INLET SEDIMENT TRAP W TEMPORARY SILT FENCE a! WET DETENTION BASIN D.E.N.R. WASHED STONE 30.09 30.06 _ _ _ N O POND °4 0 0 0° n rr°a°o°~¢.._a°-~a•'°Q~- W Q M ELEV. ELEV ELEV. SIZE INV SIZE INV. DEPTW SIZE SLOPE SIZE SLOPE SIZE SLOPE °o°o°° "o r - o°o°o°o°n°o 0 0°0" "'o" ~1 656.00' 653 75' 652.75_ 2-JO" 651.00' 4" 650.00' 4'- 18"_ 0.507 36" 0.5090 54" 0.50% ooooonoooop4no opo°4,goo~ O p 0 0 0 0 0 4 0 0 0 0 ~2 661.00' 659.50' 658.50' 4" 656.75' 2" 656.00' 3' - 12" 0.507 18" 0.507 24" 1.007 eo °o°oooaoooo 0000°00°0 0 0 0 0 t~- STREAM BANK ° o °4 o n °40 n o ° WASFIED S70NE NOTES.' n n ° WASFIED S70P 1. AQUATIC VEGETATION L1ST.• • r 1 ~ aJ o' ARROW ARUM COONTAILS P1L'KEREL WEED SMARTWEED WATERWEF.D RIP RAP o' 0 O TOP BANK C, o ARROWHEAD/DUCK POTATO COMMON THREE'-SOIIARE POND WEED S()FT RASH WILD G'ELERY ° ° CONSTRUCTION ~f_.QUENCE ~.,,j o ~ a~ BROOMSEDGE DUL'KWEED RIL'E' CUTGRASS SPATTERDOL'K WILD RICE 1 1 ~-I m F"~'1 ~ BUSHY BEARDGRASS LIZARD'S TAIL SEDGE'S SWITCFIGRASS CATTAILS MARCEI h!lB1SCUS SOFT-STEM BULRil511 SWEET FLAG _ RIP RAP 1, QDTAIN GRADING/EROSION CONTROL PLAN APPROVAL FROM ThIE C[TY CIF CFIARL.ETT'TE ENGINEERING . ~ DEPARTME-N I. ~ ~ cc3 w . - SET LIP AN ON-SITE PRE:CCINSTRl1CTI[lN CCINI EI7ENCE WITH EI~E]SIf1N C[1NTRllI. INSPECICIR [7F 711E ~ ~ ~ 2 SIX TO SEVEN DIFFERENT PLANTS ARE TD BE PROVIDED TO GIVE A GOOD VARIETY OF SPECIES IN POND. PLANTS TO BE PLANTED APPROXIMATE~1 Y 3' ON CENTER, - - - - CITY ENGINE:F RING DEPARTME:NT (PI If.1NEl 336 -4P58) TEI IIISC(1SS Er~r1SIE1N Cf1Nl RC.11_ MEASURES, E AILURE TO SCIIEDUL.E SUC;H Cf:1NE-ERE.NCE 4Ei FICAIRS PRIIIR TCI ANY I..AND IIIST(1(2DINfi ACTIVITY IS A VIOLATION ~ ro' OF CHAPTER lE1 CIF- TIIE: CITY CODE AND IS Sl1DJECT TC1 F-INE, ~ 0D 3. EMBANKMENT BETWEEN FUREBAY AND POND .SHALL HAVE AQUATIC VEGETATON fRUM ABOVE AQUATIC VEGETATION LIST, • o 4. ANNUAL INSPECTION: ANNUAL INSPECTIONS SNAI.f. ElE PERFORMED 8Y TF1E' OWNER AND SHALL BE PERFORMED C1N TflE FIRST OF 3, INSTALL SILT FENCE, TEMPORARY STREAM CROSSING, TEMP[IRARY DIVERSION llITChIES, TEMPE7RARY ~ ~ s1zE PIPE (FOR 2 vEAR uES1r,N STDRN) CI:lNSTRUCTICIN ENTRANCE, SEDIMENT BASINS ((:iRAllED I'EIl WET DETENTICIN I'(1ND) AND CITHER EROSI[IN by JUNE EACH YEAR. OWNER SfIALL PROVIDE. NOTIFICATION TO D.E.N.R. AND/OR MECK(.ENBURG COUNTY PRIOR TO SCFIEDULED fNSPECTION. C[1NTR[TL ME:ASIJRE:S SHCIWN ON THE PLANS, CL.EAR[NG C1NI_Y AS NECESSARY TCl INSTALL TFIESE SEDIMENT ©t..,l'' co r PIPE MAY DE LEFT DUT IF CRDSSINO BE USED AS CHECK INSPECTION ACITNITIES' PIPE OPTIONAL, TD BE IISEDF fRDSSING ]N PLACE LONGER : USER AS CHECK DAM, AND EROSION CONTRC'lE. 1'IEVICES, EXTEI'2I017 SLIIPES AND THP 01 EMI3ANKMENTS FOR EACEI SE11IMf.:NT BASIN VI SHFlLL BE 7CMPL7I~ARII_Y SEEDED IMMEI)IAl-ELY AF TER CCINS11a1C7IHN, C/O ~ N THAN 12 MLINTHS, TO AE SIZED BY ENGINEER, ]N PLACE LONGER ~ iEER, 4. CALL 336-2291 FOR AN ON-SITE TNSPEI;TIfIN BY ENGINEERING INSPECTOR CINCE SEDIMENT AND EROSION CCINTRCIL ,_„i A) TESTING OF THE EMERGENCY DRAIN PIPE VALVES. B) VISUAL INSPECTION OF DRAWDOWN 017/FILE: f MATURE-.S hIAVE: B~:EN INSTALLED, WHEN Af'PREIVE':11, ENGINEE:RING INSPEC~ffIR WILL ISSLIF '11IE GRADING PERMIT, ~ c) VISUAL INSPECTION OF THE EMERGENCY sPIL1.wAY. TEMPORARY STREAM CROSSIP BEGIN CLEARING AND (if2lJDBING AFTER PEIdMI7 ISSUANCE. ~ CROSSING o D) VISUAL INSPECTION OF THE POND RIM AND SLOPES. 5. MAINTAIN EROSION CCINTRf1L DEVICES AS NEEDED. SEDIMENT BASIN SHALL BE INSPECTED AFTER EACN RAIN T4 C/~ w ENSURE OUTLET PIPE REMAINS UNOBSTRUCTED AND BASIN EXCAVATEll AS NEEDED, ALL EROSION CONTROL FEATl1RES dip o E MEASUREMENT OF THE WET POND DEPTH AT THE DAM END OF THE DETENTION POND DISTANCE FROM PERMANENT POND ORAWDOWN 30. ~ ~ ~ ORIFICE WVERT TO BOTTOM OF 1NE POND). SHALL BE INSPECTED WEEKLY AND/OR /TF7ER EACEI RAINFAL.L.. •r~' N F) VISUAL INSPECTION OF ALL STORMWATER STRUCTURES ON THE SERVED SITE FEEDING TILE DE]ENTION POND. b. FOR PHASED EROSIDN CONTROL PLANS, t;ONTRACTIIR SHALL MEET WITH ERI]SIUN L'NNTRQL INSPECI"OR PRIOR 7Q ~ a G) VISUAL INSPECTION OF THE TOTAL SITE DRAINAGE BASIN fOR ADEQUATE GROUND COVER LEADING TO THE STABILIZED SITE Flu SLOPE H) VISUAL INSPECTION OF UPSTREAM (OFF-SITE) AREAS FEEDING INTO THE S11E DRAINAGE BASIN FUR POTENTIAL OFF-SITE SEDIMENTATION TCI COMMENCING WITIi EACH PHASE OF EROSION CONTRCII-. MEASURES, ~ o N ~ SOURCES. 7, S7ADIL.IZE SITE AS ARF,AS ARE DROUGHT TO FINISFIED GRADE, 4.,1 ~ MAINTENANCE ACTIVITIES x D, ALL EROSION CQNTRrII_ MEASURES SHALL. DE CONSTRUCTED IN ACCORIIANCE WITLT THE N,C, EROSION AND SEDIMENT © z' wN CONTROL PLANNING AND DESIGN MANLIAI_, IJ.S, DE:PT. OI` AGRICUL~TEIrlE, U,S. SOIL CONSERVATION SE:RVICE, CITY CIE' ~ ~ ~ A) !F TFIE PERMANENT POND DF_PTFi 1S MEASURED TO BE LESS TF1AN DESIGNED PERMANENT PUUE. DEPTH, THE POND SHALL BE DRAINED COMPACTED BERM CHARLOTTE EROSION CONTROL. ORDINANCE AND 'rITE: CITY I1F CIiARl.OT"TE E:NCiINEERINCi DEE'ARTMENT, ~ $ CLEARED OF SEDIMENT TO HALF" TFIE DESIGNED DENIFI AND DISPOSED OF OFF--BILE AND RESEEDED AS REQUIRED TO PREVENT EROSION. FINISH G IF THE FOREBAY 1S MEASURED TO BE LESS THAN FIALF THE DESIGNED DEPTH, THE SEDIMENT SWALL BE CLEANED OUT TO THE REQUIRED NaTU~L aou 9, TLIE CONTRACTOR SFIAI_I_ DILIGENTLY AND CQNTINUOUSL-Y MAINTAIN Al-I_ EROSION CONTRCiI. DEVICES AND STRl.1C,TURES TI:I MINIMIZE;: EROSION. ~IIIE CONTRACTOR SHALL MAINTAIN CI_ClSE CCINTACT WIl"11 THE CITY EIF~ CitARLOTTE EROSION HEIGHT AND DISPOSED OF OFF- Sl7E. RIP-RAP !N FOREBAY FROM DISNCARGE PIPE MAY NEED 7p BE REMOVED AND REPLACED DURING CIIN7RQL INSPECTOR SCI TFIAT PERIODIC ODSERVATIONS CAN ITE PERMFORMED AT APPROPRIATE STAGE: QF CONSTRUCTION, CLEANUUT, WNII,'H WILL REMOVE SEDIMENT F"ROM RIP--RAP APRON. 5E'DIMENT RE'MUVAL MUST BE PERFORMED AFTER EACH STORM EVENT fOREBAY WILL REQUIRE SEDIMENT REMOVAL MORF_ FREQl1ENT THAN PON11, ~ j-- 10, STCIRM INLET PROTECTI(]N SHALL BE INSTALLED AS EACEI STCIRM STRICTURE IS INSTALLED. STCIRM DRAINAGE SYSTEM B) RISER MECHANISM SHALL BE REPAIRED AND CLEANED AS NECESSARY TO BRING THE MECHANISM UP TO FULLY FUNCTIONAL CONDITION CANNU~( BE INS~TA(_L.ED l1NTIL TIIE GRADING PEI.MIT I~IAS })EE:N ISSULII BY THE CITY EROSI[IN CI7NTROL INSPECTOR, AS ORIGINALLY DESIGNED AND SPECIFIED. .I C) UNIFORMLY GRADE AND STABILIZE ANY DISTURBEf) AREAS COMPROMISING THE DETENTION POND RIM _ WIDTH ANi A1p~L D) UNIFORMLY GRADE AND STABILIZE ANY DISTUREIEO AREAS ON THE REMAINDETi OF TFIE SITE. DEPTH TD WIDTH AND \`~N() Uf:PTH TO ~ DESIGNED E) CLEANOUT STAKES SFIALL BE PROVIDE IN TFIE POND AND FORE-BAY INDlCAT1NG HALF AND FlI1.L DEPTH. eY ENIAN~ F) POND SHALL BE: 1NSPE~CTED Af7E1? EACF! STOP?M EVENT: BY ENl;1NEER (1' MIN) \ NarF: 1. DITCH SLLOIILD HAVE LONGITUDINAL SLOPE OF 1B. 2. SILT FENCE IAAY BE REOUINEO BELIIND BERM IAL SLOPE OF 1~. 3EFIIND HERM TEMPORARY SILT DITCH T DITCH 30.05 CLASS TRIP-RAP TO BE _ J _ _ ~ ADDED AFTER POND NAS BEEN CONVERTED INTO A ?~WATER WET DETE TION BASIN STUR T 2 MIN. N INLE WASHED STO NE GENERAL NOTES. NOTES: CLASS 1 1. AREA UNDER EMEiANKMENT SHALL BE CLEARED GRUBBED RIP-RAP I~ ' EARED, GRUBBED, AND STRIPPED OF ANY VEGETATION AND ROOT MAT, THE. POOL AREA SHALL BE CLEARED. i'. A STABILIZED ENTRANCE PAT) OF #5 WASHE:C) STONE OR RAIL. ROAD BALLAST SHALL. BE LOCATED WEIF.RE rn - ` r 2. THE FILL MATERIAL FOR THE EMBANKMENT SHALL BE FREE IT SHALL BE FREE OF ROOTS OR OTHER WOODY VEGETATION A5 WELL AS OVERSIZED STONES, ROCI(S, TRAFFIC WILL ENfER OR LEAVE THE: CONSTRUCTION SffE ONTO A PUBLIC STLtEEI. V I Y ~I ORGANIC MATERIAL OR OTHER OBJECTIONABLE MATERIAL. ` ~ ~ CONSTRUCTED. SPILLWAYS SHOULD NOT BE CONSTRICTED ABLE MATERIAL THE EMBANKMENT SNALL RE COMPACTED BY TRAVERSING WITH EQUIPMENT WHILE BEING 2 FILTER FABRIC OR COMPACTED CRASHER RUN STONE SNALL BE: USED AS A BASE FOR THE CONSTRUCTION ENTRANCE. Q.. J 3E CONSTRl1CTED THROUGH FILL SEC110N5, AI_L SPILLWAYS SEIOULD DE LINEI'1 AND/OR RIPRAPPED. W _ Q 3. SEDIMENT SHALL BE REMOVED AND TRAP RESTORED TO rl' ' OR TO ffS 0 IGI UI 10 HEN THE SEDIMENT HAS ACCl1MUlATED TO ONE-HALF TIIE DESIGN 3. THE ENTRANCE SHALE. BE MAINTAINED IN A CONDITION WIIICEI WILL PREVENT TRACIQNG OR FLOWING OF SEDIMENT J Z REST ED R NAL MENS N5 W ONTO PUBLIC STREETS OR EXtSIING PAVEMENT. THIS MAY NE:QUIRE PERIODIC TOP DRESSING WITH ADDITIONAL ~ ~ - i, tv DEPTH OF THE TRAP. REMOVED SEDIMENT SPIALL BE DEP NT SEIALL BE DEPOSITED IN A SUITABLE AREA IN Sl1CEl A MANNER TI1AT 17 WILL NOT ERODE. STONE AS CONDITIONS WARRANT AND REPAIR OR CLEANOl1T OF ANY MEASURES USED TO TRAP SEDIMENT. ~ O II 4. THE TRAP SHALL BE INSPECTED AFTER EACH RAIN AND RE Q :ACH RAIN AND REPAIRS MADE AS NECESSARY. ~ ~ ~1 ~ 4. ANY SEDIMENT .:PILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY. V i LLJ Q N ~ ` r. \ 5. CONSTRUCTION OPERATION SHALL BE CARRIED OUT IN SU( ~ , ~ I RRIED OUT IN SUCH A MANNER THAT EROSION AND WATER POLLUTION IS MINIMIZED. ~ W U 5. WREN APPROPRIATE, WHEELS MUST 8E CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. WHEN Q ~ \ 6. ALL CUT AND FILL SLOPES SHALL BE 2:1 OR FLATTER, UP 1 OR FLATTER, UNLESS CERTIFIED BY REGISTERED GEOTECHICAL ENGINEER. WASHING IS REQUIRED, IT SHAL.I. BE DONE IN AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN ~ ~ I T APPROVED SEOIME:NT BASIN 5FE 5fD. N0. 30.11D. ~ w~ 7. SEDIMENT BASIN EMBANKMENTS SHOULD 8E PROVIDED WIl 8E PROVIDED WITH EROSION CONTROL AND STABN.ZA ION. _J 6. COOT MAY REOIIIRE A STANDARD COMMERCIAL. DRIVEWAY (S`fD. 10,2h & 10.25) TO ~ ~,~.T----,--,- , ,n 8. STORAGE AREA IS SHOWN AS RECTANGULAR FOR ILLUSTRA 1 r STORAGE VOLUME REQUIREMENT IS MET. TfIE BASIN SHOT AR FOR ILLUSTRATIVE PURPOSES ONLY AND MAY BE CONSTRUCTED IN ANY SHAPE PROVIDED THE MINIMUM I W Z ACCESS THE CONSTRUCTION SITE IF THE DRIVEWAY IS UN A IIOROUCHIAKE. ~ U Q l:. ; y.. ~ SEDIMENT ARE ON OPPOSITE ENDS ON THE LONGER BASIN TEIE BASIN SHOULD ALSO BE ORIENTED SUCH THAT THE FILTER AND THE MAIN FLOW OF WATER AND nn// F- - O LL O d HE LONGER BASIN DIMENSIONS. ~ - ANTI-SEEP 9. REQUIRED STORAGE IS 1800 CUBIC FEET OF STORAGE VOr 100 _ MIN. OF STORAGE VOLUME PER ACRES OF DRAINAGE AREA. IF CLEAR WATf.R FROM UNDISTURBED AREAS IN ~ ~ ~ - - - PUEIUC STREET L1- ~ Q COLLARS -EMERGENCY PERM. POOL EMERGENCY FOREBAY DRNPJAGE BASIN ARE TAKEN AROUND OR THROUGH TI1E DI " DETAIN. DRAIN W/WATERMAN RECOMMENDED STORAGE IS 1800 L'UBIC FEET OF STORAGE THROUGH TIIE DENUDED AREA BY NON EROSIVE MEASURES TI1EN BASINS MAY BE ~IZLD BY DENUDED ACRES, z =3 C10/C1.10 CANAL VALVE 10. THE LENGTH Of THE STONE OUTLET (SPILLWAY} I5 TO BE FEET OF STORAGE PER ACRE OF DRAINAGE AREA. THE LENGTH OF THE STONE OUTLET (SPILLWAY) 15 TO BE ~ 'CC U EXISTING GRUIIND~ O O ILLWAY} I5 TO BE BASED ON A 10 YEAR STORM, - ~ W ~ SLUICE GATE 11. WHENEVER TOPOGRAPHY ALLOWS, THE BASIN LENGTH SHOT SI WIDTH TO ALLOW FOR SETTLING. BAFFLES SOIL STABILIZATION FABRIC W U O~ (SIN LENGTH SHOULD BE TWICE (2X) THE BA N UNDER ~5 WASHED STONE TEMP 0 RARY SEDIMENT BASIN SHOULD BE PROVIDED IN THE BASIN WHERE THE LENGTH ERE THE LENGTIT IS LESS TITAN TWICE THE WIDTH. ~ Q h_ 12. CLEANOl1T STAKES SHALL BE PLACED IN ALL SEDIMENT BA ALL SEDIMENT BA51N5 AT THE LOW POINT IN TEIE BASIN. TEIE STAKES SEIALL BE MARKED too' MW, o ~ EAU SHOWING THE. HALF FULL, CLEANOUT POINT, OF THE BASIP NT, OF THE BASIN. ~__--.--------------.V-,_~ 1 . I ~ D' L,1J ~ O BASIN W Z Z/2 REQ. STORAGE'` PROVIDED Z)}~ 13. SAFETY FENCING 3' NIGH SHOULD BE PLACED AROUND ALI ACED AROUND AE.L SEDIMENT DA51N5. F- ~ //1 7, 50' 4, 00' 2, 00' 7,9,118 CF 238, 481 CF 14. FOR DESIGN OF RISER TYPE SEDIMENT BASINS, REFER TO FIEALTFI, AND NATURAL RESOl1RCES, ,LION ANp~~Ll~1~ ~ASINS, REFER TO THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, _ ~ w ~ V / ~ i4i~f±NDD~ELkEP1T~N71?Q~1'J~l+.t~N!NSr~NI>_f?I~!~_MPrIDA.I:. ~ ~ //2 6.50' S. 50'- Z 75' .53,100 CF ~ 56, 771 CF 15. FOR SLOPES GREATER THAN 10' IN LENGTH AND PROTECT' O )TH AND PROTECTED BY SILT FENCE AT TEIE TOE OF THE SLOPE, SLOPE TERRACING WILIBE REQUIRED, z Q W U ~ c~ _ LARGEST DRAINAGE AREAS USED FOR REQUIRED STORAGE (FINAL OflA1NAGE/BASIN#1, INI1(AL DRAINAGE/BASIN#2) 16. THE DERM ON SEDIMENT BASINS SHALL BE SEEDED ONCE BE SEEDED ONCE FINAL GRADE HAS BEEN REACITED. TLIE SILT FENCE MAY BE REMOVED IF PERMISSION I0 ~ ~ ~ W m BASIN~'1 DOES NOT INCLUDE FOREBAY STORAGE VOLUME ETAS BEEN GRANTED BY THE CITY/COUNTY LAND DEVELUPP, Y LAND DEVELOPMENT INSPE:C"FOR ~EII.f? THE GRASS HAS GEfiMINAIED AND STADLL GROUND ITAS BE.LN ~ ~y'~ BASIN~l2 STORAGE VOLUME INCLUDES FOREBAY ANU PERMANENT FOOL VOf UME. E:5TA8LISHED. ~ W 17. WASHED STONE AND WIRE BACKING SHALL BE USED WITH N0~ TILE TOE OF A SLOPE 10' VERTICAL OR ALONG ANY CHAT L BE USED WITH ILT FENCE WHENEVER SILT FENCE IS PLACE AT IS NOT PROVIDED. 'ALONG ANY CHA NEL OR WATER COURSE WHERE 50' OF BUFFER 1, INSTALL BASINS AS PER WET DETENTION PONDS, INCLUDING OUTLET STRUCTURE; EMERGENCY DRAINS, OUTLET BEFORE YOU DIGI PIPES AND RIP--RAP APRONS, (SEDIMENT BASIN WILL BE CLEANED Olll UPON STAB1L17ATION OF THE PROJECT - STAE3ILIZED CONSTRUCTION ENTRANCE - GENERAL N AND CONVERTED fNTO WET DETENTION PONDS'-PLANTING OF AQ(IATIC VEGETATION SHALL BE PERFORMED CALL 1-800 X32-4949 T - IMCNT QASINS ERAL NO ES SED unnnr nnnnicocrnnn r ~ r r~.r ~r w ~ ~ ~rw ~°r'r-'r'~ z n ~ ~ n „ ,n., ur-t./tv ui tvvLti.fVIY IV.t_.. l,?IVC CrHLL ~.+CIV 1 C 2. INSTALL RIP-RAP FILTER BERM AS SHOWN ON TEMPORARY SEDIMENT BASIN DETAIL AND ALL EMERGENCY 30.03 ti1ll. I I fi rrcvjr.vi a w,4i DRAIN VALVES AND SLUICE GATES SNALL REMAIN OPEN. IT'S THE LAWI 3. SEE GENERAL NOTES FOR SEDIMENT BASINS FOR OPERATION AND MAINTENANCE. 4. PROVIDE CLEANOUT STAKES IN CENTER OF POND (Z12). SHEET 27OF 32 o 00 00 ~ o Nr~a.a-y~wr~ vi vi ~ d- rn Q 0 z w O p~ W ..W(~Wd Z Z ~'•~3cYi~~Lr QIW-~QwOOp UQWIC~CYQJ UtC]0[~Ua.U(L r i i i' j ' ~ . , e } - j j i ~ ~ ~ 4S } ` ~ r' ~ ~ ~ i ~ ~ ~ ' 10 ~ ' 6 , r Z _l o ~ i ; 5 4 _ • ~ a , ~ ~s, 5 1 ~ ~ _ ~ b i ~ irp r , j~ro q, v~~ ~ ~ ~ ~ 1 ' '~ri, + ~ o~ ~~i i , ~ ~ t ~ i v - , , 1 ~ ~ ~ i,l~`-.r` ~ ~ i ~ ~ ~ ~ t~ ~ , ~ A V. ~ , ~ . ~ i I i , P ti i ~ ' / ) r r ~ ~ l / ~ V i s r i a. ,f, _ ~ I~ i~h ~t _ ' I ~ ~ r ~ i t., ~ ~ `~I1 ~ ~ ~ ~ r t Al ~ Etl It ~;;c„% d i i ~i t ~ ~ F ~ j~~ ~ ~ ~ i S~ x F i s j ,t , : s ~ ~ j~'~~'\\\ - i 1 \ i 1 i~ ~ 'q ~ ` E ~ ~ ~ ~ , f ~ . ii`I ~ , I ~ ~ ~ 1 ~ ~ ~ J~__ ~ ~ ~ ~ - ~ l . p ; ~ ~ I ~ ~ v 4 a ~ ~ e ~ , s ~ i; ~ r# i, , - ~ ~ L i ~ } Iii ~ 1 ~ A ~ ~ ~ ~ F ~ ~ ! , ` „Ei a !~.~,~;j , 3 ~ ~ .9,z ~ f ~ 1~ ~ ~ ~ ~ - - - i~ 1 r ~ ~ 5, l A i P ! 1 1 t i ~.;e~ . ~ r ~ i j I ~ ~ / ~ / 1. ~ ~ ' ~ 1 , r tF ki f( t 't i ~ i ~n i ~ r / v \ ""~~v . o . ~ , , , r ~ r.;i a 1 ~ ~ / I i- _ ~ ~ ~ / ~ F~ ~ 1~ , t r - ~ / W I ~ / 1 r ~ l i it ~ ~ ~ ~ ~ / , r y / ~ ~ ~ ~ , ~ ~ Q i ~ ~ ~ ~ i , ~ i i ~ t~ ~ 7 ~ J h ~ ~ ~ ~ . T.w i , ~ _ ~ ~ , ~ ~ ~ , ~ l i .r i ` 4 ~ ~ - ~ i i x ~ , r I 11 , v t ~ ~ , ~ f ; r ~ ~ ~ , : ti r r _ 1 ~ ?i~~ ` ~ ~ ~ / 1 i F ~ i P ~ ? ~ ~i~ ! .rrb: ~ t tai. ` Y ~ ~ r ~ 1 F j ~ ~ t ~ r_ d ~ 4 ~ f i F K _a. ~ ~ 0 0, o ~ ~ i ~ ! ~:pV. to ~ ~ I ~ t ~ 5 ~ , o v „ ` . ~ 4 r r - ~ F ~ ~ ~ . Nor 1 ~ f, ~OF r k l ; i ~ ~i t l 1 1 ~ ti ~ ~ My ~ V f ~ It ~ ~ ~ ~ p ~ ) ,P `r i ~ ,r ~ ~ j r 1 t~ 1 ')i! ? ~ i` f i ti. r,~ ~ a c 7 > ; ~ ; ~ ~ , , r E l a ~ i. i ~ , , ~ f i I t, ~ , ~ ~ ~ ~ ~ - ~ 9 ~ I ~ ~ . 1 1 ~ r ~ f i' ~ 1 ~ C. i ~~11~., r~ t, ~ l~ ~ I I, ~ 00 i I ~ ; ~ . t . , ~ ' ~ ~ ~ 1 - ~ ~ A i' ; ~ r . r,~ j i i ~ ~ 1 6gp ~ ~ c~ ~1 1 1 ~ t ] , , ~ ~ ~ ~ ~ ~ oi. 1-. t ~ 7a ~ ~ _ 4 ~ ~ ~ M ~ / ~ , i / 1 t ~ j ~ ~ l ~ 1 ~ . r'" r N_ ~ , I ~ F ~ o ~ i 1 ~ ~ : _ f ~ ~ 1 ~ ~ ~ ? ~ ~ I ~ ~ ~i r. f ~ \ _ i ~ t ~ r f r ~ Sd ~ I - I I r ~ ~ ! : ~ ~ s~, ~ , 1 t r. i ~ ~ ~ n ai '1 , t \ I 4 r' •d d y, 1 i ~ ~ y ~ _f r i 1,,E~C~ 1 i 114 r ~ ~ ~ I; F; r,.y,~ i ' ~ 1 ~ ~ W ....^s ~g ~ i ~ ~ , ~ _ ~ ,i Iii C _ ~ t ~ _ ~ s r ~ J ~ ~ , t ` { ~ r ~ ~ i ~ ~ - , < ~ ; ~ a ~ : ~ t. t . i - ~ ~ \ / 1 ,q f r _ ti ~ ~ ~j ClY l ~ ~ d ~ - ~ ~ r 4 _ .r 7, 1 ~ ~ - r i ~ 1 ~ ~ a i~ ~ i r ~ ~ ~ ~ t, ~ ~ ~ i,: ~ ~ S ~ ,1 t ~ ! .~~1 .r „ t ~ ~ a ~ ~ ~ ~ s r ~ ' • G ~ l 4.; ~f- - ~ \ 1 ~ ~ ~ o-., ~ ~ ~ ~ ~ - i i i ~f } t i ~ N - ~ /p r ~ ~ - 1 ; t e ~ v t ~ ~ 1 ` 4 ~ ~ , i ~ ~ t d ,~i . _ ~ ~ '4 ' t ~ f r ~ 1 J ,?f~~ l' ! ~ g80~ ~ ~ ~i ~ ~ r , , ~ . ~ ~ , z ~ , ~ , l ~ , ,t ~ \ 1 i'1 r.'~ ~ ~ x ` _ / / a \ i t it ~ e ~ ~ I ~ , _ - ~J.= ~1-- ~ ~ y ~ , C t..y t ~ , ~~r i ~ ~ o ~ ,.y It ~x4 ~ S ~ 7 / Jr/ ~ ( ~ ~ , ~ ~ c F _ - ~ ~ i . - . ~ ~ ~ ~ r p a - I rj • ~i 7 .J ~ ~ ti, f r ? - ~ u^ . . , r l ~ ` ,.J: ~ E I ~ r w ~ j ° Q.~rF lV`i 0!\. ~ ~ i y ~ n ~ tY ~ p r. I f. f , , w ~ a, t , _ ~ = l _ _ ~ ~ a : < < r ~ ~ ~ ~ i t ~ ~ t . ~ ~ ( i ~ ~ t ~ f f 1...N JF ~ E i y i eii f j j 'F ~ WA, a i ~ j r r' ~ _ ,z ~ _ p ",w ~r~ ~ ''t ~ r , . - ` ' ' f f t { ~ ~ ~ ~ r , ~ 1 ~ ~ ,l ~ _ ' ~ ~ S ~ ~i D' ~ ~ as t;~ _ ~ ~ i ~ ~ , ~ ~ ~ r S I ~ i s \ i i ' a x r 1 , , y.a i l i l x ~ ' i 1 r r' ~ / ti t l ( ~ J 1 It l t Dl t ~ ( ~ Y / ~ ~ ~ f ;ti , ~ s ~ ~ 1 i b ~ r y ` _ k p ` U - 1 ~~~i t ~ i ~ ~ - z s 'y V i i 7 ti 1 S , F ~ s `.i ~ } i i a 7 ~ i 1. - w~^ \ _ _ ~ ~ f 3 .,p t i y' i ~ ~ i r",' i ~ i i ~ ~ ~ i ~i f r I ~ J f ~1 i {i \ e . , ~ F f w i 1~ i ,9 1 E j ~ o. ~i / T. ~ o r, ~ r , i ~ s ~ ~ r ~ _ ~ ~ 3 ~ ~ f ~ _ , r f _ i i { ~'"'\_l ' ~ I ~ ~ r I ~ , ` 1 t yy ~i r / i ~a ~ ~ f ~ ~ ~ ~ t + < F , r. ~ ~ ~ v ~ ~ 4 5 t rF ~ i i / ~ ~ I Fa. ~ r t' J j I ' , ~ r - , ~ f i ~ t ~ i tN , v r [ i i ~ / . _ ~ ~ , i ~ w 1 i ~ ~ h~; ~z'~~ I ~ a` ~ ~ t ~ r h E i ~ ~ i ~ r a ~ ~ fp, ~ ~ ~.m~. i ~ ~ `r r ~ ~ r'y 4 t t ~ ~ ~ i;, c ~ ' i i E i~ i t s ~ ~ s - 'ti ~ ~ ~ _ ~ ~ r t ~ r` F ~ ~ 5 s i" r 7 i 4 ~ a ~ ~ e ' i 4 ~ j ~ ; ; , ~ ~ , r , t t~. ~ ~ i i { s s ~ ~ ,P ~ r e ,.I t a~ ~ tai i ~ _~,°r ~ _ t ~ ~ ~ ~ r E t ' << ,y . ~ . ~ ~ .7 } ~a yM F rA .f z , y .f, ,k ~ _ y ~ E ~ ~~~;d ; ~ ~ ~ t ~ ~ 3 ~ ~ ~ i- - ~ , ~ ~ ( 3 1~ ~ ~s f, ~ ~ - ~ ~ i i ~ ~ i ' i , I t. r- / 3 r ~ ~ ~ ~ 1 t it 4 s j. 3~t ~ ~I( i, ~ ~'i ~ ~ r.: ~ , r ~ i ~ . , ~ ~ ~ ~ „ i _ , p ~ ~ , ~ ~ ti ~ ~ ;d~a a ~ ~ , \ , E ~ ~ ~l 1 0 4 ~ ~ ~ a i- r 1 ,.,.a`. ~ h 3 r t ~ ~ ~ k i 4 ~ r ~ ! ; t ~ _ ~ ~ - : , t ~ ~ s _ ~ ~ ~ ~ ~ ~ ~ ~ t = h , r 6 i t t ~ ~ r r ~ , rE~~ ~ , ~d f 2 k c i ~ i , } ~ ~ ~ ~ + ~ S i ~ ~ i ~ ~ I i r r~ v j t j ~ I~ ti r t ~ 4 e} i? r i i 1 t ,;i ~I r t ? r; ~'1 V ~ / i r } i ~ ~ r 1 s ~l t ~ ~ s 1 ! r i r t f { j t ; Y 3 ~ ~ t ~ - ~ ~ d ~ y r ~ ~ 1 ~ + 3 t. y ~ h9. ~s. o~u. r i~ ~ i ~ ~ ~ ~ t ~ ~ i. t / s i I ~ i \ : „i 3 ~ f I ~ ° ; ~ ( r \ ~ ~ r ~ ! 1, ~ ~ ~ A ~ ~ i I ~wti E.~ ; i ~ ~ ~ ~ ~ 1 ~ ~ t ~ S a f ~ > ~ ~ i i r ~ ~ ' ~ f.._~ ~ ~ ; , kr ; i. ~ ; r , ~ > i ~ ~ _ - ~ ~ .r t - ~ ~ ~ , . i C^ m. ~ ~ , t,. , ~ ~ ~ Q i 't ~ t t ~ ~ ~ ~ n ! Z \ , . i ~ ti ~ _ ?r s/ t~ t i w ~si y' + ~ J E ' F F ; ~ ~ ~ ~ r"~ 1 i ~ ~ ~ ~ ~ ~ _ , t ~ a : ~ r i ~ j 1~ Q' t 1 ~ ~ j ~ ~ 1- w ~ ~ ' I 1 / 1. _ _'v. ~ ll r' 1 ~ W a r r l 1 ~ I 1 ~ ~ U n _ ~ , . ~ ' \ ~ ~ ~ t_l_. ~ r _ . \ l ~ ~ ~ ~ ~ ! ' ~ ~ ~ ~ to ~i V ~ _ ~ ~ ~ i . ~ Z 1 ~f~ o y~w~~ 't"` , ~ , ~ _ ~ i ~ ~E~ ttia ~ r ~ t~~ ~ + ~ ' 1 b._ T . i _ . t i b~~ ~ A.. - f ~ 7 i , , s \ \ ~ ~ ~ ~ ti,- ; r r 1 r I r ~ ~ E ~ ~ _ e~~. ~r ~ i P' i f r ~ ' ~ i~ ' E q >,;t w z ~ / is~~ y v- _ - ~d \ - ~ ~ ~ ~ ; 1 ~ i!~ \ r~~ ~ t i t ,a s a ~ - ~ ~ ~ ~ t, ~ t _ ~ ~ .i s~;, V 1 S t ~ . a ~ Y ~ ; , ~ j ~ ~ 1 ~ ' ~ ; : ~ t. l i r i S. ` a~ . ~ ~ ~z . ~ . ~ ~ r ~ ~ ~ ~ ~ ~ ~ - , ~ ~ ~ ~t ~ i ~ ~ a Q t i p , - \ U ','r'~ ~ V ~ O t ~ ~ f , ~ ~A,~ ~ ~ Z \ e, I ` _ J 1 i ~ ' LL - o ~ i,~, ~ W d ~ ~ ~ - ~ i i. r f t~ 1 t f\ 4 ~ i / Q ~ ~sj 1 \ ~ ~ ~ t ~ ~ f~ ~ ~ - - a t ~ ~ A ~ } \ V. r ~ ; y ~ z " U t ~w , ~ ~ DW ~ i , i t ~ ~ ~ ~ ? i ~ ~ rt 1 _ t ,i~ ~ ~ ~ ~ ~ F ~ ~ i / ~ ~ a. ..~i ~ ~ ~ ~ f E ' ~ f ,r { { ~ i f ~ ~ A F s! 1 ~ j t ° s r i r, ~ ' t e, i ~ ~i ~ ~ ) ,1 ~ ~ ~ ESP( ~ ~ ° ~ i i y , ~ ~ ~ r r' i ~ ~ .r ` l F f ~ ~ ~ "l/ e 't r i t. b ~ i, nt ~ fi1i V~ o~ 1 I ~ ~ r d f ~ 4 t ~ d +r; t n r, . ~ i ~ ~ i i ~ 4 ; ~ 1' i ~ J ' ~ ~ ; r• ~ r t W r^r, W rxRAF'HI~ SCAI.~E 3os o Aso 3cx~ soo ~20o BEFORE YOU DIG! CALL 1-800-632-4949 PROJECT # 1041 - N.C. ONE-CALL CENTER ( IN FEET } !T'S THE LAW! PRE i 1 inch = 300 ft. o Qo o to MME-a-Yr-WM II vivi~~~ Q -~CC]Ql~~ftl~ O Z lil ~j ~ ~ W Q 'WUWa //I J "U~U~~. Q~~~QWoao ~ , i C ~aW~=~ea~ (~aaaUdUtL - ~ °q ~ ~ ~ ' / ' r ~ j~ - , ~ / 3 E ~ ? ~ ~ ~ ~ '~-,~.-bj0- - ~ 4` rt ~ , .r. ~ ` 1 E t \ ~ i f C f i li Pi i 6 ~ \ ~"'Y' r t.•u ~ ~ ''3' ~ ~ ~ ` ~ 1 t ~ `1` ~ f o i I '~u ~ i~ . ~ . _ ~ , ~I I i , „ , , ~4~ i N , ~ t - ~ ~ ~ - r i,~'s ~ u O ~~q ~ ~ 1 i, 't~i.~ { ~ 1 s i l~iR~\0~~ s ?r'` l ~ s i i~ i l~~~r'_r t+;sl s • ,!l - s : ~ i ~ 5.--? : ~ % ~ 0_ f 1 s v ~ f i } ~ ..M _ , ~ r, r ~s~'~ ~i; \ 111 ~f(' r - 4 i ~y ~ ci ~ ~11~ tl i N W 1 I ~ J 1 ' ` y ~ ~ 'r i s,. ~ „i :,st 1. ~ I t r' ' ~ ~ ~ , . _ i ti i i i , ~ i s - ~ s ~T,1 ~ , ~ ~ _ Z ' ' ~ ~ ~ ~ ~ 1 ` r t ~ ~ _ , , ,~_y i`~ i-'1 rid ~ r>•'. i, E S~t1 ;if {t ~r' ~ / 'Ia ~ I ~ ~ _ ~ . i t ` ti~~ b ~ ~ ~ y`, ~ • '~l~t ~ _ ~ E ~ t ~i ~i a s i' . i i. i _ . i ~ , ~ 1 r v... 4. - ~ ~,.i, YJ A. ~',~tO~a ~ , , fi ~ ;1~ ~ ~ A ~ S ;r }ss '-4 .iii 'aa .r 14 i ~ : ~t i ~ ~ % ~ ( ~i ~r 1117 7 ~ ll js r ~ e si ~ i~~kl Q7~ t t _ £ ~ } d f ~ , ~ , ~ , ~ ~ o r ~ i ~ ~ - i ~ psi t ° d 6 ~ l~~l ~ i • .z i d' - i . s ~ a` S ~ s i -i tl. ( r r ~1~ ~ J d. ,1 1 f _ is\11i 1~~4s r 't t ± i r ligg~ E ~ ~ ~t j ~ ~ j ~ 11 ~ ~ m. - r ~ i i ~ i ~ t } ~i 1 f~, i ,r E y'1 t f ~ i, rl ~ [ I ~ ~ u ' i r . \ : ~ c l~ I • • , . ~ - ~ s ~ A, ~ ~ i ~ i 1 ~ ~ 4 1 ~ ~i l • 1/, i r t,, i t ~ - i ~ ~ - ; t {t; rf , ~ i r ~ , i, ; i y' y, :r i i / h. ~ ~ i ; . 1; a;. ~ w:i' s t f `x ,1`,~ Ii~~ I ~ ;t ~ 1 i F., r ; , . ~ ~ ~ j ~ ,n ~ s i ~ t „ i „ , ~ . j f r ~ .3 ~ : ~ ~ , : ~'v h~ ~ r I ~.-1 ! S. t 7~ 1 ~ 1 1 i _...a.. ~ ~ ~ ss . I 1. ~ . ~ f ~ ' W i - i 'i ? f, _ ~ ~ 1 t S : ~ ~~a ~ j ! _ _ ~ J'•' i .J i r - a s ~ ~ 0 0~ /1 S - ~ / 1 r . ~ ~ ~ - , i ~ . i i~ r,~ f D i ~ i ~ : , ~.m. ~ i ryl I ~ `1 ~ - ! ~ ~ 'Y~ i _ . ,a. ~ . 1 r, - t 1 ' , , ~ r r , ~ ~ ` ~ ~ ! ~ ~ r , s ~ 1 ~ ~ ; ~ii' ii 1 z _ r I ` v ~ a 1 ; ~ ~ ~ . ~ , I ~ f I' ~ f. - ~ 1 ~ t e. ~ ! : i / 1 I e : , i ~ t 1 ~ i `t ~ . ti ~ t r 1 , , 36 ~ ` - . ~ F a j~ ~ ~ ~ 1 i J 1 \ ~ , ~ t , ~ ~ ~ t,. i : . , . ~ ~ 6_..56. AG, ~ ; ~ ~ ~ 1 ~ . .f y.• , % ~ ~ r ::.fir ? rn, 1 Y ~ .a I r ~ ~ `1`~ s w CN 7~ . v ~ e ~ ~a : 7 3 ~p ~ ~ i t ~ / r ~ i I ! P ~ / ~ ~s~~{ ` .fir ~ ~ ~ a f .r ~ ~ ~ ~ i 4 ~ _ ~ , ~a` ~ / ~ r''`te ~ ~ ~ s~',' / ~ ~ ~ N til O ~ ~ 4J , d a ~ t . t r •.r' 1 s 1 ~ P s . ~ ' ~ ~ 1 ,~:d ~ , / ~ r ~ ~ ~ I ~ ~ ~ I ~ , ~ r ~ ~i( i'. ~ r~ _ ~ ~ ~ ~ ,Z a d ' ~ • ..z _ ~ - N ,i s „ t p 7 ! ~ ? `yi~./~ \ ~ r i t u a ~ \ , r . i i i A ` \ \ 1 t 1 yy _ 7 t ~ I } ltl ~ ~ \ i ' ~ ~ ~ - ~ ~ r - } ~ i - ~ Q+ ~ _ _ ~ r ~ , ; ~ ! ~ ~ t ! ~ F ~a ~ \M1 ~ . ~ , v \ ~ \ ' r.. ~ ~ a r r s +LP' \ . : , ' ~ 1 ,wem w. ~ ~ ti, \ ~ I ~ i r f ~ - l { \ ~ ~ ~ ; t ~ t ~ t s-~ { t / 1 y C ~ _ ~ ! a • ~ a t1 ' • ~ - ~ ~ ~ t ~ 6°~. I - j 1, ~ ~ ~ i i , i x F k~i~' ~ 4~~1 ~ is (i ~ \ ~ ~ ~ t 1 :~ir' ~ I ~;.J / ,tl~ :~,r ~ ~ ~ ~ . ~ t 1 ~ ` ~ ,A- ~ ti~ti. Z~ l~ 1z'4 ~ ~ ~ ~ ~ ~ / - . ~ s ~ / ~ t ~ ~ / ~ ~ i ~ / ~ ~ C/1 ° ~ : ~ • b . ~ ~ ~ ~ , ~ ~ t, ~ / A ~ ~ ~ t _ Y h_ ~ ,y 1 ~ y ~ / ' r ~ rn ~ _ ~ l , ~ ccs ~ , . ~ ~ ~ , ~ i~~- ~ ~ ~ ~ J ~ is i ~ ' i i~ /i _ • i ~ , - _ ~ ~ ~ ~ _ ~ t ~ ~ ~ > . ~ ~ ~ r~ r ._.r ~ ~ ~ f ~A J j <i; ~ - i:~ ~ .e r ~ r i s . ~ ; o ~ h r ~ ~ ~ ~ ~ t v . ~ a o a r t y h'k. t S~ t F i _ ' 1 ~ ~ v. . ~ tt t t ~,~~5 1 F !7 . . A 3 t ~ f J r - ~ , d 1 f ,E i t ~ ~ ~ - ~ ~,3 ~a / . J s+ ~ i ~ l „ Y _ - ~ ti s t j l i ~ ~ , i r r ' . s ~ ; ~ , ~ tri f i i:. , ~ t r 4 ~ ° - ~ ~ . ~ N ~ ` i r z F' ~ 4 E`~ i ~ ~ ~ ~ , t i ~ ~ v r Y 1 ~F er ~ i ~ ~n' z' ~ d t . ~ 1 f~ P.x f,. ( r ~ c ( i / e ! ~ i. ~ ~ r t r t ~ , . r ~ ~ i [ ' ~ ~ 1. ' a . _ ~ i . > > .N ~ t i. 5 n ` 1 1 i V f d v~ i 1 1 . rl 9 ~ a r ~ t ~ _w~ ~ ~ ey ~ ~ ~ 1 1 t 7 n, - I ~ 1 t 'i ~ ~ ~ ly ~i c~ s F a" ~ r ~ E ~ + # t r i ~ ~ v i, .1 y ~ Q 4, ~ ~ . .v ~ y r i 4 ' 1 t s ~ ~ ~ 4 i i• a r w 'r ~ t' ~ , a t° ~ ~ ,r ~ i s a . i ' ~ 7 t ~ ~[/r~i i t , ~ s r ~ ~ 'i i y f A F ! c~ / ~ 1 ~ ~ s 0 ~ t i < ~ ~ .1 , ~ ~ ~ ~ , ~ ~ CN- ~ , ~ . s ~ itE ~ f z 1 c t ~ ~ ,1, t ',i ~l i a r ~,t'~ ',l~ .r s a. = ~ ~S ~ ~ f • rn ' ~ ` ~ ~ ~ 1, i. t 3 ~ _ , i `i' k ~ , E ~ ~ ' ~ ~ ~ ~ ~ } ~ , i~ s ~ ~ ; ~ f r. ~ ~ i i _ t a } 1 ~ ~ ~ ~ , . ;~t 6 ~ l r ' . ~ i i ~ ~ ~ ~ ~ ~ at j / / ` . ~ ~ ~ ~ ~ _ q . - • ~ a / 1 a ~ ~ ~ 7 r r { ~ 1 r ~ ~ j 1 x ~ ~ ~ ~ o i t t r - ~ > 1 ~ ~ i , - ~ ~ ~ ~ , • ~ ti t _ r ~ C i 7 t 1 ~ ~ ~ f i ~ 1 . ti r • ~a 1 a - ` f ~ ~ \ i ~ ~ ~ ~ < ' ~ ~ ~ t 1 r = ' I'i~ ~ ~ ~ ~r~ r ~ ~ ~ i 4 ~ ~ ~ ~ r \ ~ ~ 1 r ~ ~ ~ ~ 0 s V 'n • .~i ~ ~ t i~ i ~ ~ ~ti 4j 7 t ~ ~ ~ ~ ~ ~ ~ v i ' - A t ~ ~ ~ Y S I r` ~ ( 2 i r ~ - ~ i 1 h ~ , 1 i - Y o ~ _ ~ ~ ~ ~ ~ sr c ~ , ~ , r E3 Fdl t ~ ~ ~ ' t t j i ~ r r i r ~ ~ ? / i ~ ~ ~4 z s :y ti ; L ~ x i ~ ~~i , a; ~ 4 ~ + i , , , 4. ~i, ~ ~ ~ ~ _ a ~ ~ i a~ . _ I - ~ ~ ~ ~ a ~ ~ r, ~ ~ . , 1 ~ t i E ~ t 1 by ! ~ . ~ S l~ ? ~ V I i f ~ - ~ - ~ ~ . , i . 1 ~ i F ~ i / ' `~y~..,~ ~ ~ ~ ~ ~ ~ t r` ! ~ ~ ~ ~ \ i ~ : \ , - - ~ / a ~ ~ s ~ t kk ~ ~ ~ ~ - y~ ~ ~ i j i ` ~ i I' < i t ~ j- - r / ~ ~ i , i r i ~ ~ j ~ ~ ti 1 7• ii i ' / ! 1 r.: ~ R ~ r : ~ / , + ~i k r ~ ~ ~ `E ~ f ~ / ~ _ r ~ { , § ~ , r t ,F ~ i t' r' s l t o t t r ~ t s Y i'- , t i--~,.--v---' 4 i 'a , v ~ y ` i E iii 1 l 'i`i` o ~ i I , ~ , - V a 2 s \ Y i _ , i i r i 5 ~ ~ ~ ~ , s ~ lk i - _ ~ i r ~ t ~ i y ~ r s ~ , / E ti ~ f t i ~ ~ ~ f ~ ~ r t r,, I' i _ E ~ ' ~ ' 3. A ~ I I V ~ ~ ~ ~ . ~ , ~ ~ ~ j $ ~ ~ _ / _ _ 1 , ~ ~ . I , ~ ~ ~ l ; t ~ - ~ ply ~ ~ ~ , ` ~ ~ M _ ~ ~ ~ ~ 4 tat: 1 I - ~ ~ ~ ~ 3 ~ ~ / ~ , ~ ~ti ~ ~ ~ s F i z ~ ~ i - _ y J~1 L . i i s- t \ i~. f / l , i ' ~ 2 ~ r Q i ~ ~ ~ ~ ~ ~ ~ ~ V 1 ' i , i ~ Z i ~ , , , _ _ 4 l ~ C ,w 3 , F ~ s. ~ ~ 1 i~ w ~ ~ , _ _a ~ ~ O r ~ i J ~ ~ i , i i o~,, ~ ~ , ~ ~ 1 s 1 ti i - ~ ~ . s ~ ~ ~ t r A s 1 , ~ f r ~ i - ~ a ~y ~ ~ ~ _y 'y y ~ ~ t ~ W ~ Q ~ ~ ~ ~ , ~ ~ ~ U i e- - , ti 1 ~ : ~ ~ r I ' sE~~ I i ....~r.. = - ~ ff v / ; ; ~__r._ a~, ;(I, l ~ f ~ ;z:, . ~ _ ~ DRAINAGE' BASINS 106 & 156 ASSUMES ~ ~ 0 I ! Z 13~ rt~~ ~ t~ ° V w 4 ~ 1 ) w r r ' \ / ' ~ . 1. ~ ~ ~ , , ; ~ Tc OF 5.00 MINUTES FROM MOST REMOTE POINT ~ ' t ~ i ~ : , ' ' ~ ' ` ' TO NEAREST STORY BASIN + TIME OF TRAVEL a: ~ f ~ ry. , . ~ \ . ~ . t 4 _ ~ ! ~ r 1 t { ~ i ' ;r s t ~ ,,G i - / , ` _ \ V _ _ . , - , THROUCA STORM DRAINAGE TO ANALYSIS POINT z ~ i t ' _ . ~ ~ r ` ~ ~ ~ ` ' FOR RESPECTIVE RAINFALL EVENT (SEE STORM ~ U) QZ , I ~ r ~ ~ r ~ ~ ~ DRAINAGE CALCULATIONS & Tc CALCS. FOR HEC-1 ~ v~ ~ \ ~ p a ~ ~i, e i t ~ ~ }3t ii ~ ~ } i ~ i M ~ q s { t 55 ff • i:_ i ~j r~ ~ ~ - f j+. ~ MODEL . SEF. POWER ENGINEERING GRADING PLAN Z O ~ \ S T j t ~ - ~ V ` ~ ` ~ ~ - ` FOB Slll~'-BASIN DRAINAGE AREAS FOR PHASE L LL - o t j ~ ~ ~ _ s ~ i ~ / . ~ ~ 1 ~ ~ 4 _ v a/ ~ ~ ~ i v r.. . , r a. ~ ~ ~ a , ~ r d _ ' ~,t,i - ~ ~ ~ ~ ~ 'r i i,, . _ i ~ ~ - ~ ~ L ti 1 e ! l 1 Y ~ ~ ~ ti ~ J / ~ ~ ~ ~ r ,E a V i ~ i 1 ~ s l ~ \ y; ~ ~ ~ _ Fs ~ ~ > r i UC.) . ~ ~ t ~ r" _ ~ ~ ~ ~ + - ~ - - : . ' ~ r ~ ~ A , : ~ i r ~ r~~ ~ -a ~ i , ~ ~ ~ ~ _ . sir a ~ ~ i O t _ ~ J ~ z Z , ~ _ r` s 'l r ~ ~ ~ 4~, ii ~ fi'~ m i ~ ~ i~l ~ ~ A f ~t ! 14 i 1 ~ _ ~ ~ i ~ ,r.~ ~ . ~ ~ ~ _ t i i ~7 ( f ~ 1 ~ 1 it r , 4 - ~ i I ~ ;~i ~ ~ - : ' i ~a + ~ S I i , i C d . ~ t i' o ti s / , f' , i.. I . , . ...-•v,l~ 'v~, t I i. S ~ ~u 1 e 1 ~ 3 ~-'i r ~ i ~ r 3 , ~ , (^r~ l~ L.LI GRAPHIC ~CAL,~a San o ~5n xx~ son izcw BEFORE YOU DIG! %Nor I--- CALL 1-800-632-4949 PROJECT # 1041 - N.C. ONE-CALL CENTER ( IN FEET IT'S THE LAW! POST DA 1 inch = 300 ft. FUTURE „_W - o Qa , ~ - ,r . °o ~ o -._w,-_. a T ~ y,- ovivi~aQ - _ ~ ~ , o m _ ~ ~ ~ / x ~ ~ ~ y rr. O , e ~ -ti F t i ~i - e . ~ , , u.__ Z W _ ti ~ _ 0 ~ ~ ~ ~ _ w U . E t - - 4~ °`4 11 W Z v... ~ . s o ~ ; O ~ ~ a. ,i ~ I ~ UQw~ Q~ 3' _ i S . t. _ , . w ~ a ~ _ l~ _-.~w _ : ~ o _ ~ , ~ . I ~I J _ m~ . _ ~ . Y. ~ I o E k _ . ~ ~ , - . . ~ ~ ~ ~ i ~ ' ~Z ~ ~ ~ 1 I . . _ - . , n _ _ 1 ® I~ x = ~ ~ ~ , ~ " i ~ ~ ~ 1 y I ~ t i k% ~ ~ I ~ ~ ~ ~ i a , r I ~ ~ I ~ ~ _ ` 1 1 1 1 s. ~ ~ I F I ` i Z I ~ I r ~ - ~ . - - - ~ t ~ ` ~ I _ ~ _ ~ ~ - _r t ! / - ~ _ ~ ~ j.... _ 1 {r 1 + ~ t _ - i - , I / 1.t. ~ 1 I' ~ v~ ~ I : z r a s ~ I i~ ~ ~ ~ } l i a+ e 5 ~ i a v' ~ ~ ~ ~ / f . 1 - . w., ~ . • „ - " 1 , . . , . F ~ . ,..,d . F ~ ' r~ , ~ ~ f r r G ~ r ~r .i r , ~ I ,,I i ; I . _ - z . ._,.aF r + .r l r 9' r 6 r r' ~ r 11 k1~ ~ ~ I ~ r ~yl 1 ~ ~ I - I ~ - t I ~ - ,1 ~ I 1 1 ~ I ~ r f F ~ - f, 3 i - t a i F F ~ r t ~ l : , , ~'v e ! f ti` s ' G~ M r i / f'~ i e...__.., t _ ~ ! s - } , - r- _ ti 1 ! I ~ ~ I 4. \ ~ . ' r - ~ _ ~ ~ , r ~ r I.. l 3 ~ 7 I ,r s » .r - \ ~ ~ r ' y 1 ~I ~ ~ ~ r; - 1 + _ ~ ~ ~ ~ ' \ t V J 1 ~ ~ ~ Q + _ ~ - , - , ~ r: , ~ ~ _ - . ~ ~ I 1 / 1 0 ! ~ ~ I I ~ I 1 ~ . ~ . F r i a i . m~,.. i ~ A~ ' ~ ~ I ~I" ` I _ ~ 7 : ~ _ - t : 1 e i - ~ \ . . r - + r + ~ - ~ I. i I a I ~ ` ~ V I I I ~ l . . 1 r ~ ~ i r 1 I 1 I ~ ~ _ i x a \ - k . ~ I' , . . ' ( r ` i - a i s x 1 t t v~ . ~ ~ ~ s i - , , I Y _ 1 ~ ~ ~ ~ f ~ ~ / ~ z ~ ' ~ ~ _.r, x ~ .W. ~ + w~ . ~ - V I ~ ~ - ~ ~ ~ ~ ~ Z ~ ~ ~L` ~r ~ r r 't _ t. e f j ! ' i r ,.3 r _ ~ ~ i ~t ~ ~ ii . . ~ . r ~ ~ ~ ~ ~ - ~ .F ~ I ~ I r F '1 t i i M ' _ _ w e \ :i ~ a r t 1 F ~ i CC3 u, r i i I < _ ....y i i ~ ~ / ~ ~ ~ ~ ~ . . - r r + ! - ~ ` I . w., ~ ~ ~ I i - i i ~ ~ ~ _ / ~L/ ~ 1 ! 1 ! ! i i i ~ ' ~ ! _ _ ~ I 1 ~ ~ t ` r ~ ~ r t ~ ~ ~ ti t 1 ` - ~ + i f _ V / ! i e. ~ ~ ~ P.e~ ~ a r , • ~ r _ . - r\ i ~ 4 ..a ~ f 1 \ e 1, ~ V_ 1 ) ~ ~ ,i / _ i f y....-- \ , ~ I w~~ 89 ~ _ _ yr: r r , ~ z ` i _ 88 , ~ _ E ~ i s ~.y 1 ` 1 1 ~ , N I ' r r. _ _ m.._. _ y _ ti. ~ l r „ E I . 1 w t ~ 1; ~ l r r ~ I 1 / - ~ 1'r'~1 ~ ~ I~ ' ,7 / t / f~ S~ ~ s T. ;r _ F ,,j ~ I ~ i ~ ~ ~ _ { o. . r ~ - r ~ p \ \ k t¢E ~ . \ - E i; ~ ~ i ~ F ~ r , ry t s,. ~ a ;F ! v ti r ! : ~ ! + . ~ , ~r n ~ ~ t + ! ~ ! i l CC3 i - - _ r, ~ 'a 83 _ ~ t / I i t n 1 ` I ~ i ' i _ g 7.6" ; ~ ~ ~ ' 1:. , r' I r I ~ _ _-2 i v~ i ~ ~ r ~ ~ ~ `1 r ~ ! r 1 _ ti - ~ , I ~ ~ Q ~I - e ~ ! ~ ~ ~ ~ O ~ ~ e i . 8 ` ~ = + r . I > r - < ~ ~ I _ ~ i ~ • ~ i re 79. ~ + , ! l - 5 _ o ~ ~ ~y , z I ~ I ~ ~ u,... ~ / r : I I - ~ ~ ~ J ~ ~ e / / = w r s l . ' ~ l 1 .,,w I ~ i~- ~I I ~ i ' ~ > 1 ~ ~ s 1 ~ ! ~ p~ . , I t I t l w.r.:_. . ~ ~ ~ a r f: /r ~ B I I ' ' ' ` ! I ! ...d_ , . n , F ~ r x 9 I ~ . x ~ , Ins ! r I I I I ~ ~ I , ry ' I t ~ - r~ ~ _ I ~ 7,"_ . _ ~ I . ~ w_ ~ r r . 71• 1., 11 ~ ~ l~., l.. 1 ~ I i R I ` w, i ~ C~ ! I ~ r u r ~ ~ I ~ . t ~ I I , 18 . I _ r . 48 .~ti ; . - w ~ ~ _ _ r. ~ ` > i ' ~ S - , / 22 . , 17 ~ _ 9, A _ _ G~ ~ ~ - _ - - 66 f ~i9 _ . ,4 r ` ! r i ! + 16 e ~ : z ! ~ - - S1 ` r ff .68.~ ~ .._~._a_ i, . i E , _ ~c ryry k 52. q i ~ ` i r . ~ ~ ~ ~ - - ~ t I ' _ < _ ~ C 5~ r ~ ~ ~ r ; J € r i Y I ` ~ t i ,h f i v, F, ~ ~ ~ ~ ; ~ , ~ ~ J \ ~ ~ ; _ w.. r 2~ 1 a.... _ a , ~ ' , I ~ I ~ ~ ~ ; .I ~ t r~ m..,r ~ ~ e~: 2a ~ / ~ t ~ ) , ~ CO I 64 _ \ ~ 4, t , _ t I . - a,. I ~ ~ ~ ~ ~ wl ! I , _ . I ~ 26 ~ l _ ' ~ - ~.t 1 { , ~ ~ v 1 w \ o 4. ~ - i ~ ~ s ! - ~ ~ ~ ! ! ~ . ~ . a _e ~ ~ , /1 i' ! r -1'- ~ , ,:F _ CL r,. F. 28 ~ ~ _ _ ~ - ~ - l , I ~ 1 ! r ? ~ ~ ~ i _ ~ a _..W F~ ~ J ~ t ~ ~ I , I s° ~ ~ . . Q 4 ~ Z ~ ; 7 4 1 4 I V w ~ ~ . r„ ~ J . _ , i _ ~ t I ~ . . . s ~ ~ ~~t 1 ~a~. _ ~ f ~ ~ ~ w 5 ~ /1 - ~ , . 3 ~ ~ e I ~'u + 1 f LL V ti ~ ~ . ~ - ~ _ I i - I ~ , ~ i _ 4 a .T - _ , ..._P_. b ~ _ _ / - ~ t 'i. ~ ,v . i ~ l' .o ti ~ . _ wo 4 v e ~ _ ~ _ t . -..4 . _ - Q WZ ~ 1 1 ~ - d , , y ~ - ' ,I \ . 1 t u / . 4 _ i ~ ~ 1 i /IA I ~ ~ s ~ ~ ~ ' ! i k , 1,..:1 ~ ~ ~ - - ` V ! J I _ ~ I ~ ~ ~ i e. ~ ~ . ~ _ _ , 1 ~ 40 ,.e.... <<_- . r , ' - r t M., ~ ~ - V . ~ rb.. e 1 w. 4 _ ~t i _ , i , ~ Z a-- . e,~ w _ ~ t• > = f `36 ~ ~ a . y. v. ~ ~ - - ~ v . ~ _ `e ~ r r ~ i~~ r . + ~.A ~r 4 ~ , _ W t ~ L ` _W_ r (yy S ! I ~ E ~ r. E . I ) I r ~ ~~1~ w. E . _ _ ' ~ - ~ . i ~ t~ } J i r / u._. w, v.. ~ ~ ~ _ ~ _.~-A a _ .,ti r , - _ ~ ~ / t ` ` + + ~ ~ ~ / ~ z 4 ~ E u. O -..d I < ~ ~ ~ I t' ' A_ _ , ~ w.' ~ / ~ . - F - ~.lJ i r . ~..w r._ _,._.m_~ . _r.. = f~ i I Ij ` r I ! i w~ . _ ti ~ri __w. ,.w. ; ;,n : , _d..m.. ..u., . ~ ~ 1 ~ ,F U __.w~m ,~d....~_ . . r ~ ~.r. ~ . . ~1..~ ~ i rr ~ 1 - . J / < / i ' w i + ~m. __t~ e e Y . i _ ~ - / r . r ~ ~ / ` ! ~ ~ r y s ' ' , " ~ i~ I ~ ' ~ l i 'I ''i i _ + v 1 l i~ ..M _ ~ G:I~APHIC S ; r' S + t t ~ ~ i _ ` F ~ . . . , e ~ i s a ) i . _ ~ ~ _ v ' 0 50 3 100 _ _ ~ ;BEFORE YOU r.._ ~ - - - - - - - N.C. U32~4949 -ONE-CALL C LATER PROJECT # 1041 - - ~ IN FEET j IT'S THE LAW! 1 inch = 100 ft. BMP o ao °op ~o _ wll ovivi~aQo 1 - , o 0 _ ~1 ~ I a 1 ~ I \ I J O ~ ~ 1 I ~ I ~ ~ . ~ _ m 1 \ ~ ~ I ZZyUJ~ 1 I I ~ W ..U W_ ~ ~ JW_~U~IiF- I I ~1 QE-(nQwOOp I ~ ~ Q ~ I UQw~z~Q~ I I (n~~DUdUW . / ~ ~ I I ~ , I / I' 1 ~ _ 1 ~ , , i v I l w-_ ~ r \ 1 I I I . _ _ _ / / r I " i I I ~ i . _ _ , r I I ; / I I 1 o - d v_ ~ ,i / / I ~ / 1 / I t r I 1. 4` , / r I , , - t- r 1- _ ~l A x / f 1 / I ~ ~ f / r I ~ it j I _ ~ _ - _ s - j w : _ i f i i 1 I / I 'I - - /r I _ a._... 1 / I pl / I I ~ I A~ I ~ I I~ ~ ~ / I 11 I I l/ 1 1 I A r 11 I \ d i. 1 , .....n..: t ~Y l I i\ r I ~ ~ 11 I ~ ~ I S - j _ I 1 : - I 1 r I W F. ~ 1 1 11 1 ~ _ Y , ~ i _ 4 , . , , ~ ~ t ~ \ I I 1 \ D.A: 1DI - a , r \ I _ p ~ \ 1 I I 21:8 i AC. ~ r 1 ~ I, 1 1 r ' ? ' 1 8 I \ \ I 1 i f - - ~ _ - 1 I / / 1 1~ \ 1 f P i , . w . _ t ~ r ~ ~ 1 / ~ ~ ~ , r r ~ _ / ~ ~ / = a ' s ~ ~ ~ ( ( / r s ~ / ~ / J t t ~ - ~ - ~ , i / l - - , ,...,e. v ~ _ I / z i / t - / _ r i - ~ ~ _ I r , r / _ _ ~ i r ~ 11 / ¢ ~ y - , t z , t r ; , a' w, . i _ , r ~ R ~ I , - ' i fl , ~ - - - F t.~ v ' i r 4 r / / - ~ _ , A, s t i " I t r r ~ / / ; T _ „ / w r a , . ( , I r / ~r y ~ i~ < - , ' I . f ' . , 9.69A. . / 1 ~ ~ / ' ~ ~ ~ - 1 ~ ~ t / ° ~-,j ~ ~0 a \ - ` 1 ~ ~ 4 , _ ~ i C i i \ ~ r. . 1 ~ _ - I r , _ ~ \1 \ ~ ` ~ _ . ~ ~ ~ e , 8 _ - ~ 88 - ~ ~ - ..,t _ I I ~ - ~ - / s . • Q, 00 . _ .v . _ s ` ro I (D.r1: 154 / ~ 1 _ C~ I ~ _ ~ r r ~ I r ~°T~ AC. ~ o~, -~D . ` ~ - . w r I ~ ~ - . W ~ , ` ~ , , . - i CJ1 G~ ~ ;;{k . E / _ ~ / - ° ' , ,r I , ~ I ~ 4 " J E r ~ ~ , ,f t r , , ( 1 i e + = - fill!! _ ' t ~ r ~ ~ ~ I 3 - U / bA ~l. , , r-. D ~ a _ _ - - ~ ~ ~ ~ ~ .A. 1582 I I ~..1 . B AC.' 0.7 AC. ti E / . ~ 2 ~ $1 ~ ~ ~ ~ 1 1 ~ - Y ° 4. ,t i t I I " ~ ~ N 0 ' ._w - - 4 r - D.A. 1 \ - / i _ r - ` r' 0.49 A / r i ~ ` R 0. AC~ ~ + r ~ ~ ~ ~ ~ ~ I ~ b~~ I r r I / _ ^ rn f ; ~ I 3 ' I ~ t , 1 ~ ` ` L c _ 5 ~ ~ 0.54 ~ ' , ti AG. ' ~ I ~ I 1 ~ • I I I <D.i1."47 _ r ~ c i ti / I /r I'-' rF V nu " . , _ l; ~ r ~ , o 81 ac. - , r ~ " I I r 1 Ii.R. 148 / ~ ~ . I r 1 i i i ~ a _ I ~ e_ 0 58 AC. i„~ v a , - o , ~ D.A. 139 ~ , 9 I I I~ ' ~ € ~ - fj a , r - ~ - - ~ . ~ f r I,. i I ti - 28 - ~ ri ~ ~Y ~ - - - - R l r I I , N . V ~ ~ c , r ~1 ~ 10' ~ r~ I ti ~ / I r D . I ~ • . - N_..h__ ~ b ~ ~ - i r 1,. , I D ~1 .j I I f l ~ ~ x ,r.- I i fl i ` 32 G a, i 4 ,i ~ - i - ~ b,, _ ~ ~ . , \ \ G ~ 144 ~ a ~ ~ a 1 ~ ~ ` ~ /Y AC. - 0~ $ ' \ t 1 ~ ~ \ ` p fir.. v C , ~ , t ~ ~ , . \ p i , \ v 8 0~:~ , r i ~1 . . t _ - , I ~ s - - ,I, i A\ s .F ~ _ - ' 5 1 - ~ \ _ " I ~ " 6?? I~/~F 6 I I a.,~ `i \ ? r ~ D..4. ~13~8 / 130 _ ° I8"' 1 V^ t o., t E \ i i _ I elf r / t } ~ ~.s«.... ~ i " I r ' ` 0.84 AC. ~ I ~ 0 AC. . _ _ i ~ ~ j ;'D.A. 04 I E . a , ~ , t L r ~ i ~ I ~ ~ - E - ~ r 1 . ` ~ _ X04 I ~ - ~ ' " _ _ ~ ,r 13 11.7g~c. ti ; _ , - m . ~ z.,:j\ I ~ i 1~ I t~' i~ ~ ~ , : 7 . .--64 4 - I , .a:. " . e.....~- ~ f ~ I ~ , ~ ' 2~ ; _ r ~ I ~ ~ , 1 _ , _ ~ ; 6 , - r _ , n~ ~ t' ~ / , 1 D e / . e. .r , ~ ~ - , 1 6 I ~ , ~ r: . 4 , \ - , a _ I ~ r ~ , ~ w ; i I " f _ ~ I l I ~ i. s n - / R ~ I i / i r ~ - / ~ , / ~ r. ~ ~ I y/.,~ , / I ~ r / r 1 ' D [ 8 ~ i ~ / .A. ~ 7 I 1:40 AC. ~ s O.BB A / l ~ i v ~ . , . " ~ _ y ~ 2 ~ . I i ~ r r / r I~ n.. _ . ~y r ~ i ~ ~ ~ ~ E. ~f , ; I ~ oao 8' u. _ , _ 4 ~ a / r , ~ ~ _ - ~ ~ _ - _ ~ .A Iso,'~ l d. _..m~ r ~ ~ - o P. - - v ~ y ~ I D t t,. 3 .A 5 ~ I . : , . , : , . u ~ " ~ -r t " ti 4 ~ ~ I :r r\ „ ~ - w , E - _ _ ~ ~ I ~r~/ _ . - / ~ ~ ~ ~ / ' - ~ ~ ' ~ , _ - ~ t D.A. - 179 _ , , , , ~ / ~ ~ i ~i ' r '~z 1.48 AC. _ ~ ~ ~ ~ i : ~ • ~ - ~ / / L / r o ~ t ~ . I ~ , y . , _ F. _ / d - / f _ > ° - _.y~- / o _a_.._._.. ~ - I . . ~ , ~ i F ;D ' 198 - ~ , - - ~ r - w.. - Q / y 0.7A~ ~ ~ ` r _ ti , d. ( .~s v Q Z I - _ _ / F - _ . A ' ~ ~ A~ 18 - _ f - - r . _ l-. r z , ~ , ~ r .,t a - ~ r - .v ~ ~ - ~ ~ s - . - - ~ r I i ~ ~l ~r , ~ _ r ~ ~ t ~ I ~ ~(I - w - ~ ~ , a.~ . p ~ / i 7 / ~ - - A _ _,w_ i , -,w .Y- C r ~ _ I / 1 1~ ~ / ~ I / ..b-,, r - - ~ . r ~ ~ - - ~ z ~ ~ e. G WO s ~ ` ~ r w_ ~Z y i' : ,1 w . r F , . - ~ ~ ~ ~ E ~ / ~ I e I ~ ~ ~ - r. t i a I r ~ _ - / `r ' / _ r 1 1 r i ' / - x 7 / I / 1 ? / ` I ry _ - / _ ~T _ _ - - _ ~ - r..~-~ ~ Q r - 4 - - ~ ~ ~ - I - - rr ~ i F ~ , _ - ~ ,r , , l~ , t o r^ r r' m i .~..F.._ l ~ ~ i ~ L p y w s , Q U~ I ~ i. . ~ i .r ..,.....mv, f f - , ~ . - / ri r - ~ ~ ; / ~ / / ~ i r _ r ~ ~ _ , J . t _ . - - ~ - - - . - s i 1 ~ ~ ,r f I / _ ~ r / ~ - F _ _ r r ~a - ' p~ / x ~4._ ~ ~ . W Q Q l _ , - rr ~ r r i~ I ~ D l E - a ~ r ~ / / 6.14 .~C F _ . r ~ _ ~ , Z , y ~ _ ,P .r r ~ ~ ~ 1 ~ . I ~ b~ E ~ - _ ~ F u~ o. ~ ~ / Y_ . _ _ - ~ _ s _ . ~ v ~ ~ z e v - / ~ ~ -q r , _ , - , - ~ TM_.,_... ~ . _ r , M. ~ , r~ . . R 2 / r - - ~ r rr_.~.- _ ~ w,~ , r r• ,e b . ' r ~ ` r - i h I F J~ ~ r ~ / t. 1 ~ f f _ , i , ~ , ~ F _ ' - a.., - r f a ~ _ f ' - ~ m ~ , r .i ~ ~ ~ ~ ~ / ~ , .y „n- ~ S t _ .rte ,v Y - y t _ i ~ . - ~ 4 f ~ ~ ! ? r , j / , ~ ~1 I - ti ~ ~ r' ~ ~ .4 < r r , 1 / Y y F = - s U r " J r _ " t s i ~ e % y.P~ r ~ r ~ ~ ~ , j > r ~ f ~ r 1 ~ ~ , II , ~ ~ i ' , - ~ , • r d • mw.._ ~ " ; ,s t ~ i e, _ i ' ` v ' - ~ ! ' v~ s ~ ~ - , ~i e r - - - .,.,....,r . , r` i - a ~ F : f , f r i -._v_... - t ~ , { . - ~ - r ~ „ ~ , ~ r ~ f t i t x r i r i t r - r , i ; ' s ~ , r ~ ~ ,l GRAPHIC SCALE loo o w ~aa zoo aoo BEFORE YOU DIG! CALL 1-800-632-4949 PROJECT # 1041 N.C. ONE-CALL CENTER ( IN FEET) IT'S THE LAW! POST DA 1 inch = 100 ft. @ BUILD-OUT I