Loading...
HomeMy WebLinkAbout20001263 Ver 1_COMPLETE FILE_20000929State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director APPROVAL OF Certification for Tar-Pamlico River Mr. Russell Waters Citv of Washington Post Office Box 1988 102 East Second St Washington. NC 27889-1988 Dear Mr. NVater: IT 1 ILTI?WAA • NC ENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES November 27. 2000 Beaufort County DWQ Project #: 001263 You have our approval. in accordance with the attached conditions and those listed below, to place till material in 0. Is acres of buffers for the purpose of constructing a walkway at the NC Estuarium, as you described in your application dated September 28. 2000. This approval is valid for the Tar-Pamlico River buffer rules (15A NCAC 2B .0259). In addition. you should get any other federal. state or local permits before you go ahead with your project including (but not limited to i Sediment and Erosion Control. Coastal Stormwater. Non-Discharge and Water Supply Watershed regulations. This approval will expire when the accompanying 404 or CANIA permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application except as modified belm%. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold. the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland tills for this project (now or in the future) exceed one acre, compensatory mitigation ma% be required as described in 15A NCAC 2H .0506 (h) (6) and (7). This approval shall expire when the corresponding Nationwide Permit expires or as otherwise provided in the General Certification. For this approval to be valid. you must follow the conditions listed in the attached certification and any additional conditions listed below. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447. Raleigh. N.C. 276 1 1-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone John Domey at 919-733-9646. Sincerely, Kerr T. Stevens Attachment cc: Washington DWQ Regional Office File Copy Central Files Washington Division of Land Resources Marty Stone, Wooten Company Wetlands/401 Unit • 4401 Reedy Creek Road • Raleigh, North Carolina 27607 Telephone 919-733-1786FAX # 733-9959 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post consumer paper WoThe oten Company Engineering Planning Architecture September 28, 2000 Mr. John Dorney, Director NCDENR - Division of Water Quality Wetland/401 Unit 1621 Mail Service Center Raleigh, NC 27699-1621 K t ; SEP 2 9 20 Ih'Ltu,tdDw ^i; G,??, rp W4TFr Re: Buffer Impact Application - Boardwalk CWMTF - Urban Stormwater Management System 0 0 1 2 6 3 Washington, NC TWC No. 2838-A Dear Mr. Dorney: Please find attached seven (7) Pre-Construction Notification (PCN) applications requesting authorization to impact the Tar-Pamlico River Buffer with a boardwalk (extension of City's greenway system) as discussed in our September 13°i phone conversation (NO FEE REQUIRED). We n e? a determination to made by your office on whet her or not t e ardwalk will be'a?led in gaffer before wee submit to CAhTV for a major permt. I your office will not authorize the construction wit in the buffer, there is no need for the City to apply for a CAMA permit. The third page of the PCN applications is a copy of a faxed signature from the City in order to get the review started. An original will be mailed to your office by the City. 120 N. Boylan Avenue Raleigh, NC 27603 919-828-0531 Fax: 919-834-3589 We will be impacting approximately 1,230 lineal- feet of buffer (0.18 acres) with a boardwalk. Note that the boardwalk will not create impervious area as all stormwater will drain off the boardwalk directly in to the newly constructed Stormwater wetland. The Stormwater wetland has been permitted by Land Quality (permit no. NPDES - NCGO10000) and Stormwater (permit no. SW7000706) sections of NCDENR. The wetland construction within the buffer was authorized by NCDENR in a letter to the City of Washington dated August 1, 2000 (DWQ Project # 000984). The construction of the boardwalk will not require additional erosion control measures nor will it modify the existing stormwater permit. However, the addition of the boardwalk will be submitted to Land Quality and Stormwater for their records. Should you have any questions or need additional information, please let us know. Sincerely, Since 1936 The Wooten Company ,7x7 ?,7N Marty tone, PE Enclosures c: Mr. Russell Waters, City of Washington, Director of Public Works 001263 t SEP 2 9 X00 DWQ ID: CORPS ACTION ID: W BUFFER IMPACT only NO FEE REQUIRED PRE-CONSTRUCTION NOTIFICATION APPLICATION FOR NATIONWIDE PERMITS THAT REQUIRE: 1. NOTIFICATION TO THE CORPS OF ENGINEERS 2. APPLICATION FOR SECTION 401 CERTIFICATION 3. COORDINATION WITH THE NC DIVISION OF COASTAL MANAGEMENT SEND THE ORIGINAL AND (1) COPY OF THIS COMPLETED FORM TO THE APPROPRIATE FIELD OFFICE OF THE CORPS OF ENGINEERS (SEE AGENCY ADDRESSES SHEET). SEVEN (7) COPIES MUST BE SENT TO THE NC DIVISION OF WATER QUALITY, ATTN: JOHN DORNEY, 4401 REEDY CREEK ROAD, RALEIGH, NC 27607. PLEASE PRINT OR TYPE. 1. OWNER'S NAME: City of Washington 2. MAILING ADDRESS: P.O. Box 1988, 102 E. 2"d Street SUBDIVISION NAME: CITY: Washin to on STATE: NC ZIP CODE: 27889-1988 PROJECT LOCATION ADDRESS, INCLUDING SUBDIVISION NAME (IF DIFFERENT FROM MAILING ADDRESS ABOVE): 3. TELEPHONE NUMBER: (HOME) N/A (WORK) 1-252-975-9300 4. IF APPLICABLE: AGENT'S NAME OR RESPONSIBLE CORPORATE OFFICIAL, ADDRESS, PHONE NUMBER: Mr. Russell Waters Director of Public Works see #2 above for the address 1-252-975-9332 5. LOCATION OF WORK (PROVIDE A MAP, PREFERABLY A COPY OF USGS TOPOGRAPHIC MAP OR AERIAL PHOTOGRAPHY WITH SCALE): COUNTY: Beaufort - NEAREST TOWN: Washington SPECIFIC LOCATION (INCLUDE ROAD NUMBERS, LANDMARKS, ECT.) Located along waterfront off of Water Street on the east side of the N.C. Estuarium 6. IMPACTED OR NEAREST STREAM/RIVER: Pamlico River RIVER BASIN: Tar - Pamlico 7. (a) IS PROJECT LOCATED NEAR WATER CLASSIFIED AS TROUT, TIDAL SALTWATER, (SA), HIGH QUALITY WATERS (HQW), OUTSTANDING RESOURCE WATERS (ORW), WATER SUPPLY (WS-I OR WS-II)? YES ? NO ® IF YES, EXPLAIN: Project located near waters classified as SC NSW. (b) IS THE PROJECT LOCATED WITHIN A NORTH CAROLINA DIVISION OF COASTAL MANAGEMENT AREA OF ENVIRONMENTAL CONCERN (AEC)'? YES ® NO ? Parts of the boardwalk will be constructed within 30 feet of the water which is defined as an AEC as of August 1. 2000. (c) IF THE PROJECT IS LOCATED WITHIN A COASTAL COUNTY (SEE PAGE 7 FOR LIST OF COASTAL COUNTIES), WHAT IS THE LAND USE PLAN (LUP) DESIGNATION? Industrial (I1) 8. (a) HAVE ANY SECTION 404 PERMITS BEEN PREVIOUSLY REQUESTED FOR USE ON THIS PROJECT? YES ? NO ® IF YES, PROVIDE ACTION I.D. NUMBER OF PREVIOUS PERMIT AND ANY ADDITIONAL INFORMATION (INCLUDE PHOTOCOPY OF 401 CERTIFICATION): (b) ARE ADDITIONAL PERMIT REQUESTS EXPECTED FOR THIS PROPERTY IN THE FUTURE? YES E] NO ® IF YES, DESCRIBE ANTICIPATED WORK: Please note that the City has already received authorization from NCDENR to construct the wetland within the buffer. 9. (a) ESTIMATED TOTAL NUMBERS OF ACRES IN TRACT OF LAND: N/A (b) ESTIMATED TOTAL NUMBER OF ACRES OF WETLANDS LOCATED ON PROJECT SITE: 10. (a) NUMBER OF ACRES OF BUFFERS IMPACTED BY THE PROPOSED PROJECT BY: FILLING: EXCAVATION: FLOODING: OTHER: Boardwalk: Impact = (1,230' x 6') + (12' x 24') + (6' x 12') = 7,740 ft2 DRAINAGE : TOTAL ACRES TO BE IMPACTED: 7,740 ftz = 0.18 acres of buffer area (b) (1) STREAM CHANNEL TO BE IMPACTED BY THE PROPOSED PROJECT (IF RELOCATED, PROVIDE DISTANCE BOTH BEFORE AND AFTER RELOCATION: N/A LENGTH BEFORE: FT AFTER: FT WIDTH BEFORE (based on normal high water contours): FT AVERAGE DEPTH BEFORE: FT AFTER: FT (b) (2) STREAM CHANNEL IMPACTS WILL RESULT FROM: (CHECK ALL THAT APPLY) N/A OPEN CHANNEL RELOCATION: PLACEMENT OF PIPE IN CHANNEL: CHANNEL EXCAVATION: CONSTRUCTION OF A DAM/FLOODING: OTHER: 11. IF CONSTRUCTION OF A POND IS PROPOSED, WHAT IS THE SIZE OF THE WATERSHED DRAINING TO THE POND? n/a WHAT IS THE EXPECTED POND SURFACE AREA? n/a 12. DESCRIPTION OF PROPOSED WORK INCLUDING DISCUSSION OF TYPE OF MECHANICAL EQUIPMENT TO BE USED? (ATTACH PLANS; 81/2 BY I i DRAWINGS ONLY) A boardwalk is to be constructed adjacent to / along the Pamlico River using a backhoe, pile driver, and 13. PURPOSE OF PROPOSED WORK: To construct a boardwalk and 2 observation decks to serve as part of the City's reg enway system, an extension to the Estuarium's educational facility, and as a means for maintaining the newly constructed stormwater wetland. 14. STATE REASONS WHY IT IS BELIEVED THAT THIS ACTIVITY MUST BE CARRIED OUT IN BUFFER (INCLUDE ANY MEASURES TAKEN TO MINIMIZE WETLAND IMPACTS) Locatine the boardwalk within the buffer will better serve its vuraose as stated in number 13 above. Note that the boardwalk will not increase impervious area. Runoff will go into the stormwater treatment wetland before entering the river. 15. YOU ARE REQUIRED TO CONTACT THE US FISH AND WILDLIFE SERVICE AND/OR NATIONAL MARINE FISHERIES SERVICE REGARDING THE PRESENCE OF ANY FEDERALLY LISTED OR PROPOSED FOR LISTING ENDANGERED OR THREATENED SPECIES OR CRITICAL HABITAT IN THE PERMIT AREA THAT MAY BE AFFECTED BY THE PROPOSED PROJECT. DATE CONTACTED: N/A 16. YOU ARE REQUIRED TO CONTACT THE STATE HISTORIC PRESERVATION OFFICER (SHPO) REGARDING THE PRESENCE OF HISTORIC PROPERTIES IN THE PERMIT AREA WHICH MAY BE AFFECTED BY THE PROPOSED PROJECT. DATE CONTACTED Sept. 27, 1999 17. DOES THE PROJECT INVOLVE AN EXPENDITURE OF PUBLIC FUNDS OR THE USE OF PUBLIC (STATE) LAND? YES 0 NO E] (IF NO, GO TO 16) 27700 WED 1:02 PM CITY OF WASHINGTON NC FILE No. 751 0927 '00 09:29 ID-'TIE WOOTEN COMPANY 919834$588 (u) u- YES, DOES THR Pf40JPC!T RFQUIRli NRFPARATION OF AN FNVIRONMUNI'AI, WCUMENT PURSUANT TO THR. RF%QUIRUMFN'j'S OP'THC- NORTH CAROLINA L'NVIRONMENT'AL POLICY ACT'! YES M NO 14 (b) If4 Y[S. IIAS TH13 EX"MRN'T RFFN RGVIUWUU'1'IIKOIJGK THR NORTH LAROLINA PP.PARTMFNT OF ADMINOrl'KATION $1-A'1'S CI.RARINOMOUSI! YUS [] NO 0 IF ANSWUK I7b IS YUS, `I'I]CN SUBMIT APPROPRIATH DUCUM12NTATION FROM THE STATE, CLEARINOHOUSR WITH THR NORTH CAROLINA VNVIRONMFISITAL POLICY AG I', QUESTIONS RIMAKD1146'171L STATE: Q.FARMUHouai RUv1Uw PRO-KsS SHOULD 114' DIRRCI'R'f) TO MS. CHRYS BAGGO'1'I', DIRLICI'OR STATF, CLRARINGHOUSU. NORTH CAROLINA DBPARTMRNT OF ADMINISTRATION, 116 WCST JONR4 RTREIST, KALI:1011, NORTH CAROLINA 27603403, TULI::PHON13 (919) 73,3-&169. IN, THE FOLLOWING ITEMS SHOULD 11121 INCLUDOD WITH THIS APPLICA'TION' IF PROPO,SFT) ACTIVITY INVOI.VF-S THE UISC;HAKCU 417 EXCAVATED OF FILL MA"I'GRIAL INTO WETLANDS: NIA In) WI?'I'LAND I)E:WNRA'TION MAP SHOWINU ALI,. WUrI.,ANDS, STREAMS, LAKES. AND PONDS ON THI? PROPtsRTY (FOR NATIONWIDE K-RMrr NUM11611S 14, 19, 21, 26.229. AND )S). AI.I. STREAM (INTERMITTENT AND PUKMANP14'r) ON THR PR0PI3K'rY MUST RF. SHOWN ON Tl IL( MAP, MAP SCAL S SHOULD BE I INCH UOUALS 50 PART OF I INCH RQUA1.,S RKI F'13fi'T or 1-HEIR I;Qvi ALL%NI'. lb) JI, A VAILAFIIX, RFPRESFNTATIVF- PH(YIY)UKAPH OF WNTLANDS TO BE IMPAC1,1911) BY PRODUrr. (a) IF DISL.INVATION WAS PBRFORMED BY A CONSULTANT, INCLUDE A1.1. DATA SHFFI'S RELLVANT I'O'1'HCs PLAC13MRMT OF THE DELINUA'I'ION LIN& (d) A'1"I-ACII A COPY OFTHE STORMWATUR MANAGaMENT PLAN IF R A)UIREL), (a) WHAT IS LAND USO 0I1 SURROUNDINO PROPRRTYr (1) Ili APPI„ ICARLR, WHAT IS PROPOSED Mli l'HOD OF SRWAQE DISPOSAL'! SIGNED AND DATED AOFNT AU'THORIZA'TION I.131YEK, 11+ AIH1I.ICAKE. NOTE: WEETLANDS Olt WATERS OIL THE US MAY NOT BE IMPAL 1*110 PRIOR 70- I. ISSUANCII OF A SECTION 414 COKPS OF RKINEORS PERMIT. 2. GITHUR THU ISSUANCV OR WAIVER OF A 401 DIVISION OF WATI?R QUALITY CLICHFICATION, AND 3, (IN THE TWEN'T'Y C'OAS'TAL COUNTIF„S ONLY). A 1,431111K FROM THE, NORTH CAROLINA DIVISION OPCOASTAL MANACIFMENi 1'A'PING THR PROPOSED ACT'IVI'TY IS CONSISTENT WITH THE NO1011 CAROLINA COASTAL. MANAGUMlINT 1,R0(]RAM, 0WNL 'S /A (JUN -1 "S S113NATIJRF fiATF P. 2 PAGE 4 (ACIINTi ,SIONATURE VALID ONLY IF AUTUORIZATIUN I.I 'I'MR FROM TIC OWNER IS PROVIDI-11.)). NO PRACTICAL ALTERNATIVES EXPLANATION Applicant: City of Washington P.O. Box 1988 Washington, N.C. 27889-1988 1-252-975-9300 Activity: Construction of Boardwalk (Extension of Greenway) Location: County: Beaufort Specific: Located along waterfront off of Water Street on the east side of the North Carolina Estuarium Map: See Attached Plan Explanation: The boardwalk is to be an extension of the City's waterfront boardwalk which extends from the west side of the Estuarium. The boardwalk will connect to an existing deck located over the water in front of the Estuarium (which will be extended to the property line under a "letter a refinement" from LAMA) and run over the river to just beyond the emergency bypass and then over into the buffer area and down the edge of the river and eventually terminate at Water Street. The total length of the boardwalk is approximately 1,890' with approximately 1,230' of the boardwalk located within the Pamlico River buffer. Please see the attached drawing. The boardwalk will serve both as part of the City's reg enway system, an extension to the Estuarium's educational facility, and as a means for maintaining the wetland. Locating the walk anywhere other than where proposed will sacrifice its total use potential. Controlling Impacts: Standard erosion control measures will be used to minimize any land disturbances during construction. The boardwalk will not create additional ous area. )l9l.Y,7g Ni 1 v/V 1 1 , , 1 1 , 1 , 1 :D 1 tl of, .r! /W rl", , , n I , S ? 2 ?u lw• ' ..r.rr? , i , 1 I ? 1 r? s a 3 d- ? IA ill ?o e ON 0 0 0 0 N N N a v a b w ''' N ro OD N CID N N L U N O 4 a iL D Z 0 v `V N THE WOOTEN COMPANY ENGINEERING - PLANNING - ARCHITECTURE 120 North Boylan Avenue RALEIGH, NORTH CAROLINA 27603 Telephone (919) 828-0531 Fax (919) 834-3589 LETTER OF TRANSMITTAL TO NCDENR - DWQ WETLAND/401 UNIT 1621 MAIL SERVICE CENTER RALEIGH, NC 27699-1621 WE ARE SENDING YOU ¦ Attached ? Under separate cover via the following items: ? Shop Drawings ? Prints ? Plans ? Samples ? Specifications ? Copy of Letter ? Change Order ? Other eposit for Plans and Specifications requested in the amount of $ ? Deposit for Plans and Specifications is acknowledged in the amount of $ ? Deposit for Plans and Specifications in amount of $ is returned herewith. ? Refund of $ on your plan deposit is attached herewith. ? 20 - [:1 PRINTS RETURNED AFTER LOAN TO US D = For your use ? Rejected ? As requested ? Submit ? Corrected ? Return ¦ For review and comment ? Other ? FOR BIDS DUE 0 For approval ? Reviewed ? Revise and resubmit REMARKS REQUEST FOR AUTHORIZATION TO CONSTRUCT BOARDWALK EXTENSION OF GREENWAY) IN BUFFER COPY TO SIGNED: If enclosures are not as noted, kindly notify us a Inc copies for distribution . corrected prints 001263 THESE ARE TRANSMITTED as checked below: