Loading...
HomeMy WebLinkAbout19991325 Ver 1_COMPLETE FILE_19991203J CAMA 25 2/act," November 30, 1999 TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: Proposes to construct a 10-slip private community dock, including parking and access road, on and adjacent to Beard Creek for the Oaks at Beard Creek Subdivision. r? Please indicate below your agency's position or viewpoint on the proposed project and return this form by December 22, 1999. If you have any questions regarding the proposed project, please contact Scott Jones at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: _N This agency has no objection to the project as proposed. Mr. Kerr T. Stevens, Director Division of Water Quality DE0 0 3 1999 DIV. OF WATER QUALITY DIRECTOR'S OFFICE Doug Huggett Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review Coastal Marketing c/o Coastal Carolina Environmental 1 Pamlico County, adjacent to Beard Creek, near the terminus of NCSR 1101, near Arapahoe, N.C. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. P-LI 1 ?2,3 16b -ent n. SIQ " L-mk nd NnIr-11 Rpsmirces esp#jT.', rnyarnnr . Wnyna 41rfl itt, se'ctt'lal? Division of Coastal tanagement Donna D. Moffitt, Director Morehead ity Office . 151-B Hwv. 24 / Hestron Plaza 11 Morehead City, NC 28557 • Phone 252-808-2808 MEMORANDUM TO: John Dorney Regional Contact: Brad Shaver Non-Discharge Branch WO Supervisor: Roger Thorpe Date: SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS Facility Name Coastal Marketing County Pamlico Project Number 99 1325 County2 Recvd From DCM Region Washington Received Date 12/3/99 Recvd By Region 1/5/99 Project Type Community dock Certificates Stream Stream Impacts (ft.) Permit Wetland Wetland Wetland Stream Class Acres Feet Type Type Impact Score Index Prim. Supp. Basin Req. Req. ME CAMA F O YO N ? 27-111 SC SWNSW 30,410. ? P7 O N F_F_r-F-F__-F_F_ Mitigation Wetland MitigationType Type Acres Feet Is Wetland Rating Sheet Attached? Q YO N Did you request more info? Q Y 0 N Have Project Changes/Conditions Been Discussed With Applicant? Q Y * N Is Mitigation required? Q Y O N Recommendation: QQ Issue O Issue/Cond O Deny Provided by Region: Latitude (ddmmss) 350046 Longitude (ddmmss) 765220 Comments: No 401 required. Submitted 1/6/99. c;c: Regional Office Central Office Page Number 1 Facility Name Coastal Marketing County Pamlico Project Number 99 1325 Regional Contact: Brad Shaver Date: Comments (continued from page 1): cc: Regional Office Page Number 2 Central Office DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Coastal Marketing c/o Coastal Carolina Environmental 2. LOCATION OF PROJECT SITE: Pamlico County adjacent to Beard Creek near the terminus of NCSR 1101 near Arapahoe, NC. Photo Index - 1989: Not Available 1995: 77-841 K-10 State Plane Coordinates - X: 2,638,300 Y: 468,500 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - February 9 and August: 16,;1999 Was Applicant Present - yes I- f 5. PROCESSING PROCEDURE: Application Received - November 18, 1999 Office - Morehead City 6. SITE DESCRIPTION: (A) . Local Land Use Plan - Pamlico County Land Classification From LUP - Rural with Services (B) AEC(s) Involved: PT, CW (C) Water Dependent: yes (D) Intended Use: Community/ Subdivision 10 Slip Dock (E) Wastewater Treatment: Existing - None Planned - None (F) Type of Structures: Existing - None Planned - 10 Slip Dock, Parking Lot, Access Road (G) Estimated Annual Rate of Erosion: None Source - Site Investigation 7. HABITAT DESCRIPTION: [AREA] nD7P lnrn UTT T LTl ^rrTTT"Ti (A) Vegetated Wetlands Coastal Marsh 700 sq. ft. usurped (B) Non-Vegetated Wetlands 11,780 sq. ft. Public Trust Waters of Brown Creek usurped (C) Other - High Ground (pier access, 10,875 sq. ft. parking lot, entrance road) (D) Total Area Disturbed: 23,355 sq. ft. (E) Primary Nursery Area: no (F) Water Classification: SC SW NSW Open: No FIELD INVESTIGATION REPORT: Coastal Marketing - The Oaks at Beard Creek PAGE #2 8. PROJECT SUMMARY: The applicant proposes to construct a 10-slip private community dock, including parking and access road, on and adjacent to Beard Creek for the Oaks at Beard Creek Subdivision. 9. NARRATIVE DESCRIPTION: The applicant, Coastal marketing and Development Company, owns a 37 acre tract of land on the west side of Beard Creek off NCSR 1101 2.1 miles south of the intersection with NCSR 1005 near the town of Arapahoe in Pamlico County. The applicant is developing a 31 lot subdivision called The Oaks at Beard Creek. According to the applicant 13 lots are waterfront. The majority of the property is a combination of old farm land and mature forest. Near the water's edge there are some scattered trees on the high ground which transitions down to an area up to 50 ft. wide that has been delineated as 404 wetlands under the jurisdiction of the U. S. Army Corps of Engineers. Beyond the 404 wetlands is a fringe of coastal marsh up to 200 ft. wide which is vegetated primarily with Juncus roemerianus and Spartina cynosuroides. The tract is approximately 15 feet above MSL. Beard Creek is approximately 880 feet wide at the project site and the water depth at the middle of the creek is -5.0 feet below NWL. Several lots have been sold in the subdivision. To date no individual pier/dock permits have been issued. The home sites will be served by individual well and septic tanks. All other waterfront lot owners will have the opportunity to construct their own private docks within their respective riparian corridor. Lot 10 has been dedicated as the location for the community dock access. The access road and parking area are 225 ft. from the NWL which is outside the Public Trust and Coastal Marsh AECs. Land use along Beard Creek is dominated by agricultural and silvicultural practices. There is a moderate number of residential, single-family home sites along this portion of the creek which are served by individual piers. Water depths in the immediate project area range from -2.5 feet to -4.1 feet below NWL. Beard Creek flows directly into the Neuse River and is classified SC SW NSW by the NC Division of Water Quality. Immediately downstream of the proposed project area, Beard Creek is classified as a Primary Nursery Area by the NC Division of Marine Fisheries. The applicant proposes to build a 10-slip community dock for the Oaks at Beard Creek Subdivision. The slips will be located on either side of a 5 ft. by 190 ft. pier. Each slip would run 14 ft. wide and 28.5 ft. in length. Six 4 ft. by 10 ft. finger piers would be constructed to provide access to the interior slips. Eighteen tie poles would also be installed. Access to the pier will be provided via a 5 ft. by 245 ft. walkway (105 ft. over high ground and 140 ft. over coastal marsh) from the parking area. A 20 ft. by 385 ft. road to a 45 ft. by 45 ft. parking lot (allowing 5 spaces) will provide community access to the facility. FIELD INVESTIGATION REPORT: Coastal Marketing - The Oaks at Beard Creek PAGE #2 8. PROJECT SUMMARY: The applicant proposes to construct a 10-slip private community dock, including parking and access road, on and adjacent to Beard Creek for the Oaks at Beard Creek Subdivision. 9. NARRATIVE DESCRIPTION: The applicant, Coastal marketing and Development Company, owns a 37 acre tract of land on the west side of Beard Creek off NCSR 1101 2.1 miles south of the intersection with NCSR 1005 near the town of Arapahoe in Pamlico County. The applicant is developing a 31 lot subdivision called The Oaks at Beard Creek. According to the applicant 13 lots are waterfront. The majority of the property is a combination of old farm land and mature forest. Near the water's edge there are some scattered trees on the high ground which transitions down to an area up to 50 ft. wide that has been delineated as 404 wetlands under the jurisdiction of the U. S. Army Corps of Engineers. Beyond the 404 wetlands is a fringe of coastal marsh up to 200 ft. wide which is vegetated primarily with Juncus roemerianus and Spartina cynosuroides. The tract is approximately 15 feet above MSL. Beard Creek is approximately 880 feet wide at the project site and the water depth at the middle of the creek is -5.0 feet below NWL. Several lots have been sold in the subdivision. To date no individual pier/dock permits have been issued. The home sites will be served by individual well and septic tanks. All other waterfront lot owners will have the opportunity to construct their own private docks within their respective riparian corridor. Lot 10 has been dedicated as the location for the community dock access. The access road and parking area are 225 ft. from the NWL which is outside the Public Trust and Coastal Marsh AECs. Land use along Beard Creek is dominated by agricultural and silvicultural practices. There is a moderate number of residential, single-family home sites along this portion of the creek which are served by individual piers. Water depths in the immediate project area range from -2.5 feet to -4.1 feet below NWL. Beard Creek flows directly into the Neuse River and is classified SC SW NSW by the NC Division of Water Quality. Immediately downstream of the proposed project area, Beard Creek is classified as a Primary Nursery Area by the NC Division of Marine Fisheries. The applicant proposes to build a 10-slip community dock for the Oaks at Beard Creek Subdivision. The slips will be located on either side of a 5 ft. by 190 ft. pier. Each slip would run 14 ft. wide and 28.5 ft. in length. Six 4 ft. by 10 ft. finger piers would be constructed to provide access to the interior slips. Eighteen tie poles would also be installed. Access to the pier will be provided via a 5 ft. by 245 ft. walkway (105 ft. over high ground and 140 ft. over coastal marsh) from the parking area. A 20 ft. by 385 ft. road to a 45 ft. by 45 ft. parking lot (allowing 5 spaces) will provide community access to the facility. DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Coastal Marketing c/o Coastal Carolina Environmental 2. LOCATION OF PROJECT SITE: Pamlico County adjacent to Beard Creek near the terminus of NCSR 1101 near Arapahoe, NC. ` Photo Index - 1989: Not Available 1995: 77-841 K-10 State Plane Coordinates - X: 2,638,300 Y: 468,500 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - February 9 and August 16, 1949 Was Applicant Present - yes 5. PROCESSING PROCEDURE: Application Received - November 18, 1999 Office - Morehead City 6. SITE DESCRIPTION: aJ 13 S (A) . Local Land Use Plan - Pamlico County / Land Classification From LUP - Rural with Services (B) AEC(s) Involved: PT, CW (C) Water Dependent: yes (D) Intended Use: Community/ Subdivision 10 Slip Dock (E) Wastewater Treatment: Existing - None Planned - None (F) Type of Structures: Existing - None Planned - 10 Slip Dock, Parking Lot, Access Road (G) Estimated Annual Rate of Erosion: None Source - Site Investigation 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands Coastal Marsh 700 sq. ft. usurped (B) Non-Vegetated Wetlands 11,780 sq. ft. Public Trust Waters of Brown Creek usurped (C) Other - High Ground (pier access, 10,875 sq. ft. =parking t, entrance road) (D) Total Area Disturbed: 23,355 sq. ft. (E) Primary Nursery Area: no (F) Water Classification: SC SW NSW Open: No I FIELD INVESTIGATION REPORT: Coastal Marketing - The Oaks at Beard Creek PAGE #3 Approximately 11,780 sq. ft. of Public Trust Waters of Beard Creek would be usurped by the installation of the docking facility. Of that total, proposed docks and finger piers would shade approximately 1,190 sq. ft. of shallow water habitat. The installation tie poles and pilings would create some short term, construction related increases in turbidity to the adjacent waters as well as some minor impacts to bottom habitat. The construction of the access walkway to the pier would shade approximately 700 sq. ft. of coastal marsh (primarily Spartina cynosuroides and Juncus roemerianus). The walkway crossing coastal marsh would be elevated a minimum 3 ft. above the marsh substrate. The most obvious question of impact lies on what influence will boats docking in 2.5 ft. to 4.1 ft. of water have on the system's productivity. Typically power boats, shoal draft sailboats, and retractable keel / centerboard sailboats under 27 feet in length (appropriate for a 28.5 ft. slip) draw less than 4 ft. of water. Consequently, boats of this class should present a minimal impact to the resource. Larger or fixed keel vessels may require more draft thus presenting a greater threat to the resource. Based on the proposed structure, there should be no adverse impacts to navigation in the area (proposed pier length S 1/4 distance across creek). All roads and parking would be located outside of any AEC. No further development is being proposed by the developer at this time. Individual lot owners would be responsible for obtaining CAMA permits on their lots for development along Beard Creek. Scott Jones DCM - Morehead City Field Office November 24, 1999 It Form DCM-MP-1 APPLICATION (To be completed by all applicants) 1. APPLICANT a. Landowner: Name Address 303 Middle Street City New Bern State NC Zip 28560 Day Phone 252.633.6091 Fax 252.633.6027 b. Authorized Agent: Name Coastal Carolina Environmental jig 4, clavu s&-c!( 02 Address 38i5 Fsjm*?:? City Ll/ ggabGRA Q y State C L a71o2q Asa - ;? 13 -li4a Zipasw Day Phone 25.'2„24 4491 Fax c. Project name (if any) The Oaks at Beards Creek NOTE: Permit will be issued in name of landowner(s), and/or project name. 2. LOCATION OF PROPOSED PROJECT a. County Pamlico b. City, town, community or landmark Townshin One-Pamlico rnnnty c. Street address or secondary road number SR 1101 d. Is proposed work within city limits or planning jurisdiction? Yes X_ No e. Name of body of water nearest project (e.g. river, creek, sound, bay) Beard's Creek 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. Ten slip communily dock b. Is the proposed activity maintenance of an existing project, new work, or both? New c. Will the project be for public, private or commercial use? Private d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages. The proposed ten slip dock will provide docking for owners of interior lots Revised 03/95 Form DCM-MP-1 APPLICATION (To be completed by all applicants) A 1. APPLICANT a. Landowner: Name Coastal M Address 303 Middle Street City New Bern State NC Zip 28560 Day Phone 252.633.6091 Fax 252.633.6027 b. Authorized Agent: Name Coastal Carolina Environmental ? 1 g ?, ?Q'vV /ls?r?? It D2 Address 40f§ FaftTmy:&ffld Gu, ?r?'?CLk City AdgwbeadLky State NC -3 ' Zip 4MW Day Phone IS2,247,6391 Fax c. Project name (if any) The Oaks at Beards Creek NOTE: Permit will be issued in name of landowner(s), and/or project name. 2. LOCATION OF PROPOSED PROJECT a. County Pamlico b. City, town, community or landmark Township One-Pamlico County c. Street address or secondary road number SR 1101 d. Is proposed work within city limits or planning jurisdiction? Yes X_ No e. Name of body of water nearest project (e.g. river, creek, sound, bay) Beard's Creek 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. Ten slip community dock b. Is the proposed activity maintenance of an existing project, new work, or both? New c. Will the project be for public, private or commercial use? Private d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages. The nronosed ten slin dock will nrovide dnckina for owners of interior lots Revised 03/95 Form DCM-MP-1 4. LAND AND WATER CHARACTERISTICS a. Size of entire tract 37 Q t?PS b. Size of individual lot(s) I "F DIY c. Approximate elevatiop of tract above MHW or NWL -Y I'5, d. Soil type(s) and texture(s of tract e. Vegetation on tract T r? f. Man-made features now on tract h gap, r g. What is the CAMA Land Use Plan land classification of the site? (Consult the local land use plan.) Conservation Transitional Developed Community -_ Rural(with services) Other h. How is the tract zoned by local government? Not zoned AX- G a 6 ;x,:,,.19 in. Describe existing wastewater treatment facilities. n. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges.) none proposed o. Describe existing drinking water supply source. None 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: • A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. i. Is the proposed project consistent with the applicable zoning? Yes No (Attach zoning compliance certificate, t (applicable) J. Has a professional done for the tract? If yes, by whom? _ archaeological assessment been - Yes X No k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes _x No • An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an 8 1/2" by 11" white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the 1. Are there wetlands on the site? _x Yes - No Coastal (marsh) Other If yes, has a delineation been conducted? Am el, .j (Attach documentation, if available) Revised 03/95 Form DCM-MP-1 4. LAND AND WATER CHARACTERISTICS a. Size of entire tract 37 a iPPs b. Size of individual lot(s) 14 mil`[ c. Approximate elevatiop of tract above MHW or NWL -Y 15? d. Soil type(s) and textures of tract e. Vegetation on tract ? )W f. Man-made features now on tract hmt`P g. What is the CAMA Land Use Plan land classification of the site? (Consult the local land use plan) Conservation Transitional Developed Community X Rural(with services) Other h. How is the tract zoned by local government? Not zoned i. Is the proposed project consistent with the applicable zoning? Yes No (Attach zoning compliance certificate, if applicable) Has a professional done for the tract? If yes, by whom? _ k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes x No in. Describe existing wastewater treatment facilities. n. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges.) none proposed o. Describe existing drinking water supply source. None 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: • A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an 8 1/2" by I V white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the I 1. Are there wetlands on the site? _ x Yes _ No Coastal (marsh) Other If yes, has a delineation been conducted? &4 A4? c/u-1 (Attach documentation, if available) archaeological assessment been Yes X No Revised 03/95 Form DCM-MP-1 site. Include highway or secondary road (SR) numbers, landmarks, and the like. • A Stormwater Certification, if one is necessary. • A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name i // RN AC94L Address C N Phone t-a Name ?6,>rz, 1 4C l C / Address Phone / Name Address Phone • A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. • A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. • A signed AEC hazard notice for projects in oceanfront and inlet areas. • A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. A, 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. d This is the _Z da:3 19 . Print Name 7 he- Signature J (, ` ?,I K i!;? a Landowner or Authorized Agent Please indicate attachments pertaining to your proposed project. DCM MP-2 Excavation and Fill Information _ DCM MP-3 Upland Development x DCM MP-4 Structures Information _ DCM MP-5 Bridges and Culverts - DCM MP-6 Marina Development NOTE: Please sign and date each attachment in the space provided at the bottom of each form. Revived 03/95 Orm L%,ivi-ivir-i h U 2 << : ` y site. Include highway or secondary road (SR) numbers, landmarks, and the like. 6. CERTIFICATION AND PERMISSION • A Stormwater Certification, if one is necessary. TO ENTER ON LAND A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. Name i Q Address C Phone ct Name S l 4C `` C / Address Phone / Name Address Phone • A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. • A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover*the costs of processing the application. A signed AEC hazard notice for projects in oceanfront and inlet areas. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. a? This is the day of i1gd, 19f,-. Print Name 7e ?S Signature Fez Landowner or Authorized Agent Please indicate attachments pertaining to your proposed project. _ DCM MP-2 Excavation and Fill Information DCM MP-3 Upland Development x DCM MP-4 Structures Information DCM MP-5 Bridges and Culverts DCM MP-6 Marina Development NOTE: Please sign and date each attachment in the space provided at the bottom of each form. Revised 03/95 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major e. Mooring buoys AUG 1 c ;ic oq Permit, Form DCM-MP-1. Be sure to complete all other (1) _ Commercial -Community _ Private sections of the Joint Application which relate to this (2) Number proposed project. (3) Description of buoy (Color, inscription, size, anchor, etc.) a. Dock(s) and/or Pier(s) (1) _ Commercial X Community - Private (2) Number one (3) Length 190' (4) Width of water body (4) Width « S l (5) Distance buoy(s) to be placed beyond shoreline (5) Finger Piers x Yes No (i) Number six (ii) Length Mkw 10' f. Mooring structure (boatlift, mooring pilings, etc.) (iii) Width (1) - Commercial -Community _ Private (6) Platform(s) Yes X_ No (2) Number (i) Number (3) Length (ii) Length (4) Width (iii) Width (7) Number of slips proposed 10 g. Other (Give complete description) (8) Proximity of structure to adjacent riparian property lines , (9) Width of water body 10? 500 `F (10) Water depth at waterward end of pier at MLW or NWL VW - IV wL b. Boathouse (including covered lifts) (1) Commercial Private (C (2) Length l (3) Width App^lic/ant r Pr jec TNe 6! c. Groin (e.g. wood, sheetpile, etc.) signature (1) Number (2) Length(s) Date d. Breakwater (e.g. wood, sheetpile, etc.) (1) Length (2) Average distance from MHW, NWL or wetlands (3) Maximum distance beyond MHW, NWL or wetlands Revised 03/95 Form DCM-MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAM A. Major e. Mooring buoys Permit, Form DCM-MP-1. Be sure to complete all other (1) _ Commercial -Community _ Private sections of the Joint Application which relate to this (2) Number proposed project. (3) Description of buoy (Color, inscription, size, anchor, etc.) a. Dock(s) and/or Pier(s) (1) _ Commercial XCommunity _ Private (2) Number one (3) Length 190' (4) Width of water body (4) Width .S (5) Distance buoy(s) to be placed beyond shoreline (5) Finger Piers x Yes No (i) Number six (ii) Length Ebw 10' f. Mooring structure (boatlift, mooring pilings, etc.) (iii) Width (1) _ Commercial -Community _ Private (6) Platform(s) Yes X No (2) Number (i) Number (3) Length (ii) Length (4) Width (iii) Width (7) Number of slips proposed 10 g. Other (Give complete description) (8) Proximity of structure to adjacent riparian property lines . (9) Width of water body ?M 500 'F (10) Water depth at waterward end of pier at MLW or NWL IM - 7 NwL b. Boathouse (including covered lifts) (1) Commercial Private 4 (2) Length l ??f (3) Width App/l?icca?nt r Pr jec N e c. Groin (e.g. wood, sheetpile, etc.) Signature (1) Number (2) Length(s) Date d. Breakwater (e.g. wood, sheetpile, etc.) (1) Length (2) Average distance from MHW, NWL or wetlands (3) Maximum distance beyond MHW, NWL or wetlands Revised 03/95 z Q L L L 0 ^L_ f-? O O ?? V 5 0 4) Co W (73 C. rl, N +I v ?v v ors v r ?s ?' := t i n C Y c? 3 "G cc r-+ 3 Ci. O cC C/? Forin DCAI :MP-3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-I. Re sure to complete all other sections of the Joint Application that relate to this proposed project. a. Type and number of buildings, facilities, units or structures proposed X__ 0.A-11 C_ b. Number of lots or parcels _ c. Density (give the number of resident' units and the units r acre) d. Size of area to be graded, filled or disturbed including reads, ditches, etc. _ lRoo ;x G_o _ - .;?, Y 7 ac ? -? e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? ___><_ yes o If yes, date submitted [d Z f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for paved surfaces. 1?7 412 g. Give the percentage of the tract within 75 feet of MHW or NWL, or within 575 feet in the case of an Outstanding Resource Water, to be covered by impervious and/or built-upon surfaces, such as pavement, buildings, rooftops, or to be used for vehicular driveways or parking, OCT 77 1999 COASTALMANAGEMENT MOREHEAD - h, Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. Has a site development plan been submitted to the D7_1:yes ' io f Environmental Management for review? No if yes, date submitted ?i. Describe proposed method of sewage disposal, ON E, I' ? S yQ 7Lc c j, Have the facilities described in item i. above received state or local approval? ` !?Iz. (Attach appmpruotr documeniarion) 7 k. Describe location and type of proposed discharges to waters of the state (for example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges). U Al G- 1. Describe proposed drinking water supply source (e.g. well, community, public system, etc.) A.;? t[_L m. Will water be impounded? Yes , No If yes, how manv acres? n, If the project is a oceanfront development, when was the lot(s) platted and recorded? A-Ae-D Applicant or Project Name signature bate No// '?. a ., yin;'7 ile .:. SURVEYOR AUG 1 ?; ?? ?? z Q L L L P1 L' H O M--r rL V C/D 0 0 a? cn 'v W cat 0. N +I % -Z-air / v -..r f ryr`r v J --NNW mow f i lw r ?r - ?a _ i i? ti c 3 - Y C cc 3 O ct L. i..o cn