Loading...
HomeMy WebLinkAbout20080600 Ver 1_Certification of Completion_20091019og - o,?oo ? DS @ G C?Q?I A4 .. ..?= Q C T 1 9 2009 NCDENR M;* - WATER QL*,n North Carolina Department of Environment and Natural Re9KRA6iil4D5T0 wA1ERQRAWA Division of Water Quality Beverly Eaves Perdue Coleen 1-1. Sullins Dee Freeman Governor Director Secretary DWQ Project No.: uZ. 00C - b 4 o O County: C kO w A fk) Applicant: M 11-C L,- Q f-o L.))\) Project Name: AC-CI?Y5 /Lo*-b 9-'r ?23 yS Perry DRt V6' ,?'? rJ c N C C j wVtnl C'o? N?? Date of Issuance of 401 Water Quality Certification: Al 4 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1, m l 6 s CZu w'J , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: / b - /7 - z v,) 5 Agent's Certification 1, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional 1, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Date North Carolina Division of Water Quality 943 Washington Square Mall Washington, NC 27889 Phone: 252-946-6481 1 FAX: 252-946-9215 Internet: www.ncwaterquality.orq An Equal Opportunity 1 Affirmative Action Employer Registration No. North Carolina ;V49turallry