HomeMy WebLinkAbout10002_Rea_ Building 5-VMI Letter 2012_12_21Certification of Vapor Mitigation Installation-Building 5 S&ME Project Number 1353-12-060 Silos, Charlotte, NC (Brownfields Site No. 11009-07-60) December 21, 2012 ______________________________________________________________________________________ 2 Vapor Mitigation System As approved in the Notification letter, the vapor mitigation system for Building 5 consisted of an active venting system as well as a spray-applied (Geo-Seal®) seamless membrane located beneath the building’s concrete slab and above the ground surface. The active venting system consists of a Geo-Seal Vapor Vent piping system incorporated within the gravel subgrade that is piped from below the building slab, through the building walls to centrifugal fans (blowers) located on the roof. The membrane consists of a bottom layer of Geo-Seal Base, then the spray-applied 60-mil (minimum thickness) Geo-Seal Core, and topped with a Geo-Seal Bond layer. The installation of the vapor mitigation system was generally installed per the design specified in the approved April 12, 2012 Notification letter and appended Technical Specifications for Vapor Barrier And Active Venting System, Silos Community (Technical Specifications) dated April 11, 2012 prepared by WSP-Sells. The only deviation from these specifications was the August 24, 2012, NCDENR-approved reduction in specified curing time of the spray-applied barrier (Geo-Seal Core) prior to collecting thickness measurements. This reduced curing time was based on information and specifications provided to the NCDENR by the manufacturer. Installation Dates The installation of the vapor vent and barrier systems below Building 5 was done in multiple stages due to construction logistical scheduling, weather delays, etc. Installation activities began on August 24, 2012 at the Building 5 elevator pit only. Installation of the Vapor Vent piping began on October 26, 2012 and was completed on October 27, 2012 for the rest of the building. Application of the overlying vapor barrier began in October 27 and was completed on December 11, 2012. S&ME was present and observed the installation and conducted the specified Quality Assurance/Quality Control (QA/QC) testing on the dates listed on Table 1.Figure 4 indicates the approximate location of the various QA/QC thickness test locations. QA/QC Testing As specified in the approved Notification and Technical Specifications, S&ME conducted and/or observed the following QA/QC testing during membrane installation: Observed the ground surface for sharp objects prior to installing the barrier system; Observed and documented the installation of the Geo-Seal Vapor Vent system; Observed and documented the installation of the Geo-Seal Base; Observed and documented the installation of the spray-applied Geo-Seal Core; Observed the sealing of penetrations (i.e., piping, wiring conduits, etc.); Collected two samples per approximate 1,000 square feet of the Geo-Seal Base and Geo-Seal Core after application and measured for thickness; FIGURES Scale: AS SHOWN Checked by:DAH Drawn by: RAS Date:11/1/12 USGS Topographic Map Silos Site 121 Lancaster Street Charlotte, North Carolina Figure 1S&ME Project No.: 1353-12-060 Site Area Charlotte West USGS Quadrangle dated 1993 and Charlotte East USGS Quadrangle dated 1967 and Photorevised in 1988. Scale: AS SHOWN Checked by: DAH Drawn by: RAS Date:11/1/12 2009 Aerial Photographic Map Silos Site 121 Lancaster Street Charlotte, North Carolina Figure 2S&ME Project No.: 1353-12-060 Base Map obtained from Mecklenburg County GIS Website Site Boundary Light Rail Corridor South Boulevard Youngblood Street Fairwood Avenue Griffith Street Lancaster Street Remount Road Approximate Scale: 1” = 186’ Silos SILOS (EXISTING)SILOS (EXISTING)SILOS (EXISTING) POOL AREA S I T E C O N C E P T U A L P L A N P R O P O S E D W O O D F I E L D S I L O S C O M M U N I T Y L A N C A S T E R S T R E E T & Y O U N G B L O O D S T R E E T C H A R L O T T E , N O R T H C A R O L I N A 3 1 3 5 4 -1 1 -1 9 8 1 " = 8 0 D D H 1 -1 1 -2 0 1 2 R A S FIGURE NO. S C A L E : P R O J E C T N O : D A T E : D R A W N B Y : C H E C K E D B Y : W W W .S M E I N C .C O M REFERENCE:BASE MAP PROVIDED BY DESIGN RESOURCE GROUP, PA. PLEASE NOTE THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. IT IS NOTMEANT FOR DESIGN, LEGAL, OR ANY OTHER USES. THERE ARE NO GUARANTEES ABOUT ITS ACCURACY. S&ME, INC. ASSUMES NORESPONSIBILITY FOR ANY DECISION MADE OR ANY ACTIONS TAKEN BY THE USER BASED UPON THIS INFORMATION. 0 80 160 Feet ± h h h h 1 2 3 4 4A 5 5A 6 6A 7 8 9 10 11 12 12A 131414A 15 15A 16 17 18 18A R1 R2 12 B U I L D I N G 5 V A P O R B A R R I E R T H I C K N E S S S A M P L E L O C A T I O N S W O O D F I E L D S I L O S C O M M U N I T Y L A N C A S T E R S T R E E T & Y O U N G B L O O D S T R E E T C H A R L O T T E , N O R T H C A R O L I N A 4 1 3 5 3 -1 2 -0 6 0 D D H 1 2 .1 9 .2 0 1 2 D A H FIGURE NO. S C A L E : P R O J E C T N O . D A T E : D R A W N B Y : C H E C K E D B Y : W W W .S M E I N C .C O M REFERENCE:BASE DRAWING PROVIDED BY WSP SELLS. PLEASE NOTE THIS MAP IS FOR INFORMATIONALPURPOSES ONLY. IT IS NOT MEANT FOR DESIGN, LEGAL, OR ANY OTHER USES. THERE ARE NOGUARANTEES ABOUT ITS ACCURACY. S&ME, INC. ASSUMES NO RESPONSIBILITY FOR ANYDECISION MADE OR ANY ACTIONS TAKEN BY THE USER BASED UPON THIS INFORMATION. 0 20 40 Feet ± 1 " = 2 0 ' F -0 1 7 6 E N G I N E E R I N G L I C E N S E N O . Q :\1 3 5 3 \2 0 1 2 \0 6 0 S i l o s \f i g 4 _V a p o r B a r r i e r S a m p l e s B l d g 5 .m x d h Approximate Exhaust Line Approximate Vapor Vent Piping Approximate Sample Locations Vapor Barrier Installation Dates: 8/24/2012 11/2/2012 12/11/2012 TABLE Table 1 Summary of QA/QC Testing Results Observe Installation? Generally Installed per Specifications? Sample ID Average Thickness1 Pass/ Fail2 1 0.1420 Pass 2 0.1193 Pass 10/27/2012 Observe installation of Vapor Vent System within gravel Building 5- Remainder of Building Yes Yes No N/A N/A N/A No N/A 1 0.1158 Pass 2 0.1105 Pass 3 0.0963 Pass 4 0.0681 Fail 5 0.0625 Fail 6 0.0640 Fail 7 0.0886 Pass 8 0.0791 Pass 9 0.0958 Pass 10 0.0646 Fail Not retested, but passed smoke test 11 0.0826 Pass 12 0.0646 Fail 13 0.0951 Pass 14 0.0616 Fail 15 0.0535 Fail 16 0.0910 Pass 17 0.1020 Pass 18 0.0550 Fail 4A 0.0940 Pass Retest of sample #4 after reapplication 5A 0.0876 Pass Retest of sample #5 after reapplication 6A 0.0800 Pass Retest of sample #6 after reapplication 12A 0.1068 Pass Retest of sample #12 after reapplication 14A 0.1233 Pass Retest of sample #14 after reapplication 15A 0.0975 Pass Retest of sample #15 after reapplication 18A 0.8383 Pass Retest of sample #18 after reapplication R1 0.0977 Pass R2 0.1401 Pass Notes: N/A = Not Applicable Vapor Vent Installation Yes N/A NCDENR Brownfields Project No. 11009-07-60 2 Thickness measurement required to be a minimum of 74 mil (0.074") for 14 mil thickGeo-Seal Base layer and 60 mil thickGeo-Seal Core layer in order to meet specification requirement of 60 mil forGeo-Seal Core layer. Yes after additional application in some areas 10/26/2012 Observe installation of Vapor Vent System within gravel Building 5, South side Building No. 5 - Silos Community Poindexter Drive & Griffith Street Charlotte, Mecklenburg County, North Carolina S&ME Project No. 1353-12-060 Date Activity Location Thickness Measured? Thickness Measurements Smoke Testing Conducted? Smoke Testing Pass? Comment 11/1 & 2/2012 Observe Vapor Vent system after installation; observe installation of Base, spray-applied Core layer; collect thickness samples, and observe smoke testing. Building 5 Yes YesNo Yes 1 Thickness measured with pre-calibrated calipers. 3 On August 17, 2012, NCDENR verbally approved a reduction in required curing time that reduced the time between application of spray-on barrier (Core layer) and thickness testing from >24 hrs to same day as application. An email written approval was sent from the NCDENR on August 24, 2012. No N/A N/A N/A No N/A Yes Yes As indicated above, Sample 10 collected and measured on Nov. 2, 2012 failed the thickness measurement at an average thickness of 0.0646 mil and the area was resprayed but follow up thickness samples were not collected. However, the area passed smoke testing. 12/11/2012 Observe installation of Base, spray- applied Core layer, collect thickness samples and smoke test. (Vapor vent system installation of this area observed on 11/2/12) Building 5 Ramp Yes Yes Yes Yes Yes8/24/2012 Observe installation of Base, spray- applied Core, collected thickness samples, and smoke tested. Building 5, Elevator Pit No N/A Yes SITE PHOTOGRAPHS Silos Community Site 121 Lancaster Street, Charlotte, NC Project #: 1353-12-060 Sheet 1 of 5 9751 Southern Pine Blvd. Charlotte, NC 28273 Photo 1 D a t e : 0 8 /2 4 /2 0 1 2 P h o t o g r a p h e r . B r i a n W i l s o n Location Silos Community – Building No. 5 Remarks Subsurface below elevator pit prior to vapor barrier installation. Photo 2 D a t e : 0 8 /2 4 /2 0 1 2 P h o t o g r a p h e r . B r i a n W i l s o n Location Silos Community – Building No. 5 Remarks Installing Geo-Seal Base upon subsurface and piles in elevator pit. Pile PilePiles PilePilesPilePilesPiles Silos Community Site 121 Lancaster Street, Charlotte, NC Project #: 1353-12-060 Sheet 2 of 5 9751 Southern Pine Blvd. Charlotte, NC 28273 Photo 3 D a t e : 0 8 /2 4 /2 0 1 2 P h o t o g r a p h e r . B r i a n W i l s o n Location Silos Community – Building No. 5 Remarks Patching above piles and spray-applying Geo-Seal Core barrier (black color) above Geo-Seal Base (gray color) in elevator pit. Photo 4 D a t e : 1 0 /2 6 /2 0 1 2 P h o t o g r a p h e r . B r i a n W i l s o n Location Silos Community – Building No. 5 Remarks Building 5 during installation of Geo-Seal Vapor Vent piping within stone. Silos Community Site 121 Lancaster Street, Charlotte, NC Project #: 1353-12-060 Sheet 3 of 5 9751 Southern Pine Blvd. Charlotte, NC 28273 Photo 5 D a t e : 1 0 /2 4 /2 0 1 2 P h o t o g r a p h e r . B r i a n W i l s o n Location Silos Community – Building No. 5 Remarks Unrolling and installing Geo-Seal Vapor Vent within stone. Photo 6 D a t e : 1 0 /1 5 /2 0 1 2 P h o t o g r a p h e r . J i m m y G o s n e l l Location Silos Community – Building No. 5 Remarks Geo-Seal Vapor Vent piping being installed in stone. Vapor Vent Silos Community Site 121 Lancaster Street, Charlotte, NC Project #: 1353-12-060 Sheet 4 of 5 9751 Southern Pine Blvd. Charlotte, NC 28273 Photo 7 D a t e : 1 0 /2 6 /2 0 1 2 P h o t o g r a p h e r . B r i a n W i l s o n Location Silos Community – Building No. 5 Remarks Installing Geo-Seal Vapor Vent prior to covering with stone. Photo 8 D a t e : 1 0 /2 7 /2 0 1 2 P h o t o g r a p h e r . B r i a n W i l s o n Location Silos Community – Building No. 5 Remarks Piping connection between different sections of Geo-Seal Vapor Vent prior to covering. Silos Community Site 121 Lancaster Street, Charlotte, NC Project #: 1353-12-060 Sheet 5 of 5 9751 Southern Pine Blvd. Charlotte, NC 28273 Photo 9 D a t e : 1 1 /0 1 /2 0 1 2 P h o t o g r a p h e r . B r i a n W i l s o n Location Silos Community – Building No. 5 Remarks After installation of Geo-Seal Base and spray-applied Core above stone containing Vapor Vent, prior to covering with Geo-Seal Bond. Photo 10 D a t e : 1 1 /0 1 /2 0 1 2 P h o t o g r a p h e r . B r i a n W i l s o n Location Silos Community – Building No. 5 Remarks Building 5 pad after installation of Geo-Seal Vapor Vent piping, Base, thickness measurements, smoke testing but before covering with Geo-Seal Bond. Vapor Vent