Loading...
HomeMy WebLinkAbout11037_Double Oaks Site Inspection 2014_3_10Date of visit:3/10/2014 On-site:11:30 AM Off-site:12:30 PM BF staff:Personnel: 1)Industrial Commercial Institutional Recreation/Festival Residential Mixed Use Vacant 2)Existing New Both 3)N/A 4) N/A 5) 6)N/A vented not vented 7)N/A 8)N/A 9) N/A damaged repaired 10) Brownfields Program Site Inspection Sheet Project name:Double Oaks Inspection Area Lat:Carolyn Minnich Long: Project number:11037-07-60 Project address:Double Oaks Drive/Woodward Project county:Mecklenburg Use of property: grading operations underwayStructures on property: Chem. Vapor Barrier: Source: Storage of Chemicals: Exposure to Public: Condition of GW Monitoring Wells: Use of surface water or groundwater: Site Vist Responding to 3/5 call with C. Marks & B. Leifer Pre-Reg LandfillExposed Soils: Use of Basements: Last LURU submittal: Aerial Map Area of interest circled County Verified by: ROD on-line or ROD office book page rec. date 26016 132 10/27/2010 4/2/2012 Mecklenburg Instrument note Notice of Intent Register of Deeds Deed Discrepancy issue resolved Inspector Comments Purpose of the site visit was to document conditions of land adjacent to landfill property. An emphasis was noted at intersection of Double Oaks Drive and Woodward Ext. See attached map. During the site visit, the strip of land between Woodard Ext and county landfill property was being graded by small backhoe. Based on my observations, it appeared the land was being prepared for sidewalks that would be installed in coming weeks. With ten feet of the road toward the property line, the ground was being leveled. The large rocks and majority boulders that had previous been stored in this area had been removed (a few remain). The land across the street was being graded for new home building construction. No homes are in the area west of landfill property. Note, the methane wells installed by NCDENR Pre- Regulatory Landfill Program were likely destroyed during the grading operations. An underground natural gas line was recently installed in the area. It runs along north side of woodward Ext and crosses the street at the stormwater drain. I spoke with Joey an on-site worker, he referred me to Johnny at 704-507-1383. I called Johnny and explained that landfill waste would be removed in the coming weeks from adjacent landfill. I was confused why they were grading this area for sidewalks since the property owners had expressed wanting debris on the CMHP Double Oaks Property removed if found, therefore installing a sidewalk or other utilities should cease. I then placed a call to Fred Dodson of CMHP to discuss site development. He was not available and I left a message. The redevelopment in the area is going well. Next I drove to the Double Oaks Pool Brownfields Site for a drive by inspection. I departed the area at 12:30 pm. Facing NE on the Property toward sign. According to the 4/29/2013 Letter this area was clear cut in June/July 2012. Partial view of ESC Figure 2 Boring Location Diagram. View facing north at intersection of Double Oaks & Woodward Ext. Photos Both photos show land between Woodward Ext and landfill property being graded for sidewalk. A majority of rocks have been moved and land is being graded for sidewalk. Methane well was not located, likely destroyed. Photos Stormdrain between landfill and Double Oaks Drive View of land west of landfill property, being prepared for new houses Photos View of redevelopment across Double Oaks Road, South of landfill property, a portion of these homes are occupied. Photos