Loading...
HomeMy WebLinkAbout10036_South End Transit_Approved EMP_2400 South Blvd_9_8_15-OCR1  EMP Form ver.1, October 23, 2014  NORTH CAROLINA BROWNFIELDS PROGRAM  ENVIRONMENTAL MANAGEMENT PLAN    This form is to be used to prepare an Environmental Management Plan (EMP) for projects in the  North Carolina Brownfields Program at the direction of a project manager for the program.   Prospective Developers and/or their consultants must complete and submit this form and all  pertinent attachments to their project manager prior to any site earthmoving or other  development related activities.  For the resultant EMP to be valid for use, it must be completed,  reviewed by the program, and signed by all signers at the bottom.  Consult your project  manager if you have questions.    GENERAL INFORMATION    Date:   9/8/2015    Brownfields Assigned Project Name:   South End Transit: 2400 South Boulevard Parcel    Brownfields Project Number:  10036‐06‐60    Brownfields Property Address:  2400 South Boulevard, Charlotte, NC  28203    Brownfields Property Area (acres):  Total Brownfields Property: 22.41; 2400 South Blvd. Parcel: 1.5    Is Brownfields Property Subject to RCRA Permit?     ☐  Yes   ☒ No  If yes enter Permit No.: Click here to enter text.    Is Brownfields Property Subject to a Solid Waste Permit?  ☐ Yes  ☒ No   If yes, enter Permit No.: Click here to enter text.    COMMUNICATIONS    Prospective Developer (PD):  MPV 2400 South Boulevard Investors, LLC  Phone Numbers:    Office:  704‐248‐2101…..Mobile:  704‐561‐5308  Email:  gmacon@mpvre.com  Primary PD Contact: Mr. George Macon  Phone Numbers:  Office:  704‐248‐2101   Mobile:  704‐561‐5308  Email:  gmacon@mpvre.com  Environmental Consultant:  Geoscience Group, Inc.  Phone Numbers:    Office:  704‐941‐2262…..Mobile:  704‐506‐5446  Email:  thassett@geosciencegroup.com   Brownfields Program Project Manager: Mr. Tony Duque   Office:  Green Square  2  EMP Form ver.1, October 23, 2014   Email:   tony.duque@ncdenr.gov    Other DENR Program Contacts (if applicable, i.e., UST Section, Inactive Hazardous Site Branch,  Hazardous Waste, Solid Waste): N/A       NOTIFICATIONS TO THE BROWNFIELDS PROGRAM    Advance Notification Times to Brownfields Project Manager:  Check each box to accept minimum  notice periods (in calendar days) for each type of onsite task:  On‐site assessment or remedial activities:     Within 10 days ☒   Construction or grading start:        Within 10 days  ☒  Discovery of stained soil, odors, USTs, buried drums or waste, landfill, or other signs of previously  unknown contamination:      Within 48 hours ☒   Implementation of emergency actions (e.g. dewatering, flood, or soil erosion control  measures in area of contamination, venting of explosive environments):   Within 48 hours  ☒  Installation of mitigation systems:       Within 10 days ☒  Other notifications as required by local, state or federal agencies to implement  redevelopment activities: (as applicable):      Within 30 days ☒        REDEVELOPMENT PLANS    1) Type of Redevelopment (check all that apply):     ☐ Residential   ☐ Recreational  ☐  Institutional  ☐ Commercial  ☒ Office   ☒Retail  ☐ Industrial    ☒  Other  specify: Medical office building with retail space and associated parking deck, surface  parking, and landscaped areas.    2)  Summary of Redevelopment Plans (attach conceptual or detailed plans as available):   a) Do plans include demolition of structure(s)?:  ☐ Yes   ☒ No   ☐ Unknown  b)  Do plans include removal of building foundation slab(s) or pavement:    ☐  Yes  ☒ No   ☐ Unknown  c) Provide brief summary of redevelopment plans, including demolition, removal of building  slabs/pavement and other structures: The proposed improvements to the site will include a  three(3) story medical office building, a two‐story parking structure and surface pavements.   Please see the attached Drawing No. C‐3.0 "Site Plan".    3)  Which category of risk‐based screening level is used or is anticipated to be specified in the  Brownfields Agreement?  ☐ Residential    ☒ Non‐residential or Industrial/Commercial            3  EMP Form ver.1, October 23, 2014  Note: If children frequent the property, residential screening levels shall be cited in the Brownfields  Agreement for comparison purposes.     4)  Schedule for Redevelopment (attach construction schedule):  a) Phase I start date and anticipated duration (specify activities during each phase):                   10/1/2015  A detailed construction schedule is not currently available.  However, construction is anticipated  to last 10 months.       b) If applicable, Phase 2 start date and anticipated duration (specify activities during each  phase): Click here to enter a date.  N/A       c) Additional phases planned?  If yes, specify activities if known:    ☐ Yes   ☒ No   ☐ Not in the foreseeable future   ☐Decision pending  d) Provide the planned date of occupancy for new buildings: 8/1/2016    CONTAMINATED MEDIA  Contaminated Media (attach tabulated data summaries for each impacted media and figure(s) with  sample locations):  Part 1. Soil:       ☐ Yes   ☒ No    ☐  Suspected          Part 2. Groundwater:       ☒ Yes  ☐  No   ☐  Suspected          Part 3. Surface Water:    ☐ Yes  ☒  No   ☐  Suspected          Part 4.  Sediment:                          ☐ Yes   ☒ No    ☐ Suspected  Part 5. Soil Vapor:       ☐ Yes  ☐  No   ☒  Suspected          Part 6. Sub‐Slab Soil Vapor:         ☐  Yes ☒  No   ☐  Suspected          Part 7. Indoor Air:              ☐  Yes  ☒  No   ☐  Suspected           PART 1.  SOIL – Please fill out the information below, using detailed site plans, if available, or estimate  using known areas of contaminated soil and a conceptual redevelopment plan. Provide a figure  overlaying new construction onto figure showing contaminated soil and groundwater locations.    1) Known or suspected contaminants in soil (list specific compounds):   The only compound detected  in soil samples collected at the site is acetone.  The detected concentrations of acetone were well  below all PSRGs (March 2015 Table) established by the IHS Branch.  2) Depth of known or suspected contaminants (feet):   No known contaminants above applicable  PSRGs.  3) Area of soil disturbed by redevelopment (square feet):   Approximately 76,200  4) Depths of soil to be excavated (feet):  Excavation of structure footings expected to be up to 9 feet  beneath existing ground surface.  Excavation for underground storm water detention expected to be  up to 11 feet beneath existing ground surface.  4  EMP Form ver.1, October 23, 2014  5) Estimated volume of soil (cubic yards) to be excavated (attach grading plan):    Estimate 2,095 CY  of topsoil/stripping to be hauled off‐site.  1,255 CY of cut soils to be reused on‐site as fill.  2,400 CY  of excess soil to be hauled off‐site.  Total volume of excavation: 5,750 CY.  Please see the attached  Drawing No. C‐4.0 "Grading Plan", Drawing No. C‐4.1 "Storm Drainage Plan", and Drawing No. C‐4.2  "Underground Detention Details".  6) Estimated volume of excavated soil (cubic yards) anticipated to be impacted by contaminants:   None  7) Estimated volume of contaminated soil expected to be disposed of offsite, if applicable: None.  IMPORTED FILL SOIL    1) Will fill soil be imported to the site?     ☐  Yes   ☒  No   ☐ Unknown  2) If yes, what is the estimated volume of fill soil to be imported?         3) If yes, what is the depth of fill soil to be used at the property?    Click here to enter text.  If a range of depths, please list the range.    4) PRIOR TO ITS PLACEMENT AT THE BROWNFIELDS PROPERTY, provide plan to analyze fill soil to  demonstrate that it meets acceptable standards and can be considered clean for use at the  Brownfields property (Check all that apply):     ☒   Volatile organic compounds (VOCs) by EPA Method 8260   ☒  Semi‐volatile organic compounds (SVOCs) by EPA Method 8270   ☐   Metals RCRA List (8) (arsenic, barium, cadmium, chromium (speciated), mercury, lead,  selenium and silver)   ☐  Metals –Hazardous Substance List ‐14 (antimony, arsenic, beryllium, cadmium, chromium  (speciated according to IHSB protocol), copper, lead, manganese, mercury, nickel, selenium, silver,  thallium, and zinc)   ☐ Metals – EPA Priority Pollutant List – 13 (arsenic, beryllium, cadmium, chromium (speciated  according to IHSB protocol), copper, mercury, nickel, lead, antimony, selenium, silver, thallium, and  zinc)   ☐ Other Constituents & Analytical Method:  Click here to enter text.  ☐ Known borrow material (DESCRIBE SOURCE AND ATTACH SAMPLING PROFILE):  Click here  to enter text.    MANAGING ONSITE SOIL     1) If soil in known or suspected areas of contamination is anticipated to be excavated from the  Brownfield Property, relocated on the Brownfields Property, or otherwise disturbed during site  grading or other redevelopment activities, please provide a grading plan that clearly illustrates  areas of cut and fill (approximate areas & volumes are acceptable, if only preliminary data  available).    2) HAZARDOUS WASTE DETERMINATION –  Does the soil contain a LISTED WASTE as defined in the  North Carolina Hazardous Waste Section under 40 CFR Part 261.31‐261.35? ☐ Yes     ☒  No        5  EMP Form ver.1, October 23, 2014  If yes, explain why below, including the level of knowledge regarding processes generating the  waste (include pertinent analytical results as needed).  Click here to enter text.    If yes, do the soils exceed the “Contained‐Out” levels in Attachment 1 of the North Carolina  Contained‐In Policy? ☐ Yes     ☐  No        NOTE: IF SOIL MEETS THE DEFINITION OF A LISTED HAZARDOUS WASTE AND EXCEEDS THE  CONTAINED‐OUT LEVELS IN ATTACHMENT 1 TO THE NORTH CAROLINA CONTAINED‐IN POLICY THE  SOIL MAY NOT BE RE‐USED ON SITE AND MUST BE DISPOSED OF IN ACCORDANCE WITH DENR  HAZARDOUS WASTE SECTION RULES AND REGULATIONS.           3) HAZARDOUS WASTE DETERMINATION – Does the soil contain a CHARACTERISTIC WASTE?:    ☐ Yes     ☒  No      If yes, mark reason(s) why below (and include pertinent analytical results).        ☐ Ignitability    ☐ Corrosivity    ☐  Reactivity    ☐  Toxicity    ☐  TCLP results    ☐ Rule of 20 results (20 times total analytical results for an individual hazardous  constituent on TCLP list cannot, by test method, exceed regulatory TCLP standard)    If no, explain rationale: The only compound detected in soil samples collected at the site is acetone.   The detected concentrations of acetone were well below all PSRGs (March 2015 Table) established by  the IHS Branch.    NOTE: IF SOIL MEETS THE DEFINITION OF A CHARACTERISTIC HAZARDOUS WASTE, THE SOIL MAY NOT  BE RE‐USED ON SITE AND MUST BE DISPOSED OF IN ACCORDANCE WITH DENR HAZARDOUS WASTE  SECTION RULES AND REGULATIONS.    4) Screening criteria by which soil disposition decisions will be made (e.g., left in place, capped in  place with low permeability barrier, removed to onsite location and capped, removed offsite):   ☐  Preliminary Health‐Based Residential SRGs Click here to enter a date.   ☒  Preliminary Health‐Based Industrial/Commercial SRGs  3/1/2015   ☐  Site‐specific risk‐based cleanup level, or acceptable concentrations determined via  calculated cumulative risk. Enter details of methods used for determination/explanation:    Click here to enter text.    6  EMP Form ver.1, October 23, 2014  5)  Check the following action(s) to be taken during excavation and management of said soils:    ☐  Manage fugitive dust from site:    ☐  Yes  ☒ No    If yes, describe method; If no, explain rationale:  Soils on the site are not known to be  contaminated.  Therefore, management of fugitive dusts is not needed.    ☒  Field Screening:      ☒ Yes  ☐ No   If yes, describe method; If no, explain rationale:  The soils on the site are not known to be  contaminated.  Field screening will not be implemented unless impacted sols are encountered during  construction.  The contractor will be instructed to stop excavation if suspect soils (soils exhibiting  staining or unusual odors are encountered during construction.  If suspect soils are encountered,  Geoscience will screen the suspect soils with a photoionization detector (or other field instrument as  appropriate).  If field screening indicates the presence of contaminated soils, representative soil  samples will be collected and analyzed for VOCs and SVOCs by Methods 8260 and 8270.    ☒  Soil Sample Collection:    ☒ Yes   ☐ No   If yes, describe method (e.g., in‐situ grab, composite, stockpile, etc.); If no, explain rationale:   The soils on the site are not known to be contaminated.  Soil sampling will not be implemented unless  impacted sols are encountered during construction.  The contractor will be instructed to stop  excavation if suspect soils (soils exhibiting staining or unusual odors are encountered during  construction.  If suspect soils are encountered, Geoscience will screen the suspect soils with a  photoionization detector (or other field instrument as appropriate).  If field screening indicates the  presence of contaminated soils, representative soil samples will be collected and analyzed for VOCs  and SVOCs by Methods 8260 and 8270.  The Brownfields Program will be notified if soil samples are  collected.  Following the sampling event, the Brownfields Program will be provided a report of the  sampling activities that will include the number and location of samples collected as well as the  results of the laboratory analyses.  ☐  Stockpile impacted soil in accordance with NCDENR IHSB protocol in the current version of  the “Guidelines for Assessment and Cleanup”, and providing erosion control, prohibiting  contact between surface water/precipitation and contaminated soil, and preventing  contaminated runoff.   Explain any variances:  Click here to enter text.  ☐   Analyze potentially impacted soil for the following chemical analytes:    ☐  Volatile organic compounds (VOCs) by EPA Method 8260    ☐  Semi‐volatile organic compounds (SVOCs) by EPA Method 8270    ☐   Metals RCRA List (8) (arsenic, barium, cadmium, chromium (speciated), mercury,  lead, selenium and silver)    ☐  Metals –Hazardous Substance List ‐14 (antimony, arsenic, beryllium, cadmium,  chromium (speciated according to IHSB protocol), copper, lead, manganese, mercury, nickel,  selenium, silver, thallium, and zinc)  7  EMP Form ver.1, October 23, 2014    ☐ Metals – EPA Priority Pollutant List – 13 (arsenic, beryllium, cadmium, chromium  (speciated according to IHSB protocol), copper, mercury, nickel, lead, antimony, selenium, silver,   thallium, and zinc)    ☐ Other Constituent(s) & Analytical Method(s):  Click here to enter text.     ☐  Proposed Measures to Obtain Pre‐Approval for Reuse of Impacted Soil within the  Brownfields Property Boundary    ☐  Provide documentation of analytical report(s) to Brownfields Project Manager    ☐  Provide documentation of final location, thickness and depth of relocated soil on  site map to Brownfields Project Manager once known    ☐  Use geotextile to mark depth of fill material (provide description of material)    ☐  Manage soil under impervious cap ☐ or clean fill  ☐   Describe cap or fill: Click here to enter text. (provide location diagram)    ☐ Confer with NC BF Project Manager if Brownfield Plat must be revised (or re‐ recorded if actions are Post‐Recordation).    ☐ Other: Click here to enter text.    ☒ Final grade sampling of exposed soil (i.e., soil that will not be under buildings or permanent  hardscape): [if not checked provide rationale for not needing]   Provide diagram of soil sampling locations, number of samples, and denote Chemical  Analytical Program with check boxes below (Check all that apply):       ☒  Volatile organic compounds (VOCs) by EPA Method 8260    ☒  Semi‐volatile organic compounds (SVOCs) by EPA Method 8270    ☒   Metals RCRA List (8) (arsenic, barium, cadmium, chromium (speciated), mercury,  lead, selenium and silver)    ☐  Metals –Hazardous Substance List ‐14 (antimony, arsenic, beryllium, cadmium,  chromium (speciated according to IHSB protocol), copper, lead, manganese, mercury, nickel,  selenium, silver, thallium, and zinc)    ☐ Metals – EPA Priority Pollutant List – 13 (arsenic, beryllium, cadmium, chromium  (speciated according to IHSB protocol), copper, mercury, nickel, lead, antimony, selenium, silver,  thallium, and zinc)   ☐ Pesticides   ☐ PCBs    ☐ Other Constituents & Analytical Method:  Click here to enter text.  OFFSITE TRANSPORT & DISPOSITION OF EXCAVATED SOIL   NOTE: Unless soil will be transported offsite for disposal in a permitted facility under applicable  regulations, no contaminated or potentially contaminated soil may leave the site without approval  from the brownfields program.  Failure to obtain approval may violate a brownfields agreement,  endangering liability protections and making said action subject to enforcement.  Justifications  provided below must be approved by the Program in writing prior to completing transport activities.  ☒  Transport and dispose of impacted soil offsite (documentation of final disposition must be sent to  Brownfields Project Manager)   ☒  Landfill – analytical program determined by landfill    ☒  Landfarm or other treatment facility  Soils will be tested in accordance with the permit  requirements of the disposal facility.   ☐  Use as Beneficial Fill Offsite – provide justification:  Click here to enter text.  8  EMP Form ver.1, October 23, 2014   ☐  Use as Beneficial Fill at another Suitable Brownfields Site – (Note: a determination that a  site is a “Suitable Brownfields” site will require, at a minimum, that similar concentrations of the same  or similar contaminants already exist at both sites, use of impacted soil as beneficial soil will not  increase the potential for risk to human health and the environment at that site, and that notarized  documentation of the acceptance of such soil from the property owner of the receiving site is  provided to Brownfields.  Provide justification:  Click here to enter text.    MANAGEMENT OF UTILITY TRENCHES  ☐  Install liner between native impacted soils and base of utility trench before filling with clean fill  (Preferred)    ☒  Last out, first in principle for impacted soils (if soil  can safely be reused onsite and is not a  hazardous waste), i.e., impacted soils are placed back at approximately the depths they were  removed from such that impacted soil is not placed at a greater depth than the original depth from  which it was excavated.     ☐ Evaluate whether necessary to install barriers in conduits to prevent soil vapor transport, and/or  degradation of conduit materials due to direct impact with contaminants? Result: Yes □ No □   If no, include rationale here.   Click here to enter text.    If yes, provide specifications on barrier materials    Other comments regarding managing impacted soil in utility trenches:   Soils on the site are not  known to be contaminated.  If contaminated soils are encountered during excavation of utility  trenches, the last out/first in principle will be implemented for such impacted soils.      PART 2.  GROUNDWATER  – Please fill out the information below and attach figure showing  distribution of groundwater contaminants at site    What is the depth to groundwater at the Brownfields Property?    Approximately 21 to 27 feet below  the existing ground surface.    Is groundwater known to be contaminated by    ☐onsite   ☐ offsite   ☐ both   ☒ or unknown   sources?  Describe source(s):  Trichloroethylene (TCE) has been detected in the groundwater beneath  the 2400 South Blvd. parcel.  The source of the release has not been determined but is suspected to  be the result of an unidentified offsite release north or northeast of the 2400 South Blvd. parcel.  No  potential source of TCE has been identified on the 2400 South Blvd. parcel.    What is the direction of groundwater flow at the Brownfields Property?  Groundwater flow beneath  the site has been measured as towards the south‐southwest.    Will groundwater likely be encountered during planned redevelopment activities?    ☐ Yes    ☒  No  If yes, describe these activities:  Click here to enter text.    In the event that contaminated groundwater is encountered during redevelopment activities (even if  no is checked above), list activities for contingent management of groundwater (e.g., dewatering of  9  EMP Form ver.1, October 23, 2014  groundwater from excavations or foundations, containerizing, offsite disposal, discharge to sanitary  sewer, or sampling procedures):  The anticipated construction excavations are anticipated to  terminate approximately 10 feet above the water table.  As such, groundwater is not expected to be  encountered.  If groundwater is encountered, the contractor will be instructed to notify Geoscience so  that the conditions can be assessed.  Geoscience, in conjunction with the Brownfields Program will  determine appropriate additional actions.      PART 3.  SURFACE WATER – Please fill out the information below.  Attach a map showing the location of surface water at the Brownfields Property.    Is surface water at the property known to be contaminated:    ☐  Yes  ☒  No       Will workers or the public be in contact with surface water during planned redevelopment activities?       ☐ Yes    ☒  No    In the event that contaminated surface water is encountered during redevelopment activities,  or  clean surface water enters open excavations, list activities for management of such events (e.g.  flooding, contaminated surface water run‐off, storm water impacts):  Surface water is not known to  be contaminated at the site.  If contaminated surface water is encountered, or clean surface water  comes into contact with contaminated soils, the contractor will be instructed to notify Geoscience so  that the conditions can be assessed.  Geoscience, in conjunction with the Brownfields Program will  determine appropriate additional actions.    PART 4.  SEDIMENT – Please fill out the information below.    Is sediment at the property known to be contaminated:    ☐  Yes  ☒  No       Will workers or the public be in contact with sediment during planned redevelopment activities?       ☐ Yes    ☒  No    If yes, attach a map showing location of known contaminated sediment at the property.    In the event that contaminated sediment is encountered during redevelopment activities, list  activities for management of such events (stream bed disturbance):  Contaminated sediments are not  expected to be encountered.  If contaminated sediments are encountered, the contractor will be  instructed to notify Geoscience so that the conditions can be assessed.  Geoscience, in conjunction  with the Brownfields Program will determine appropriate additional actions.      PART 5.  SOIL VAPOR – Please fill out the information below.    Do concentrations of volatile organic compounds at the Brownfields property exceed the following  vapor intrusion screening levels in the following media:    IHSB Residential Screening Levels:   Soil Vapor:    ☐ Yes      ☐  No     ☒  Unknown  10  EMP Form ver.1, October 23, 2014   Groundwater:  ☒ Yes      ☐  No     ☐  Unknown    IHSB Industrial/Commercial Screening Levels:  Soil Vapor:    ☐ Yes      ☐  No     ☒  Unknown   Groundwater:  ☒ Yes      ☐  No     ☐  Unknown    Attach a map showing the location of soil vapor contaminants that exceed site screening levels.     If applicable, at what depth(s) is soil vapor known to be contaminated?  N/A    Will workers encounter contaminated soil vapor during planned redevelopment activities?       ☐ Yes    ☐  No  ☒  Unknown    In the event that contaminated soil vapor is encountered during redevelopment activities (trenches,  manways, basements or other subsurface work, list activities for management of such contact:   Groundwater concentrations suggest maximum soil vapor concentrations less than 10% of the PEL  established by OSHA for TCE.  Therefore, worker exposure to soil vapor is not expected to be an issue.   However, if VOC vapor odors are encountered during construction, the contractor will be instructed to  notify Geoscience so that the conditions can be assessed.  In the unlikely event that soil vapor  exposure is determined to pose an unacceptable risk for construction workers, Geoscience, in  conjunction with the Brownfields Program, will determine appropriate additional actions.      PART 6.  SUB‐SLAB SOIL VAPOR ‐please fill out the information below if existing buildings or  foundations will be retained in the redevelopment.    Are sub‐slab soil vapor data available for the Brownfields Property?    ☐ Yes   ☒  No  ☐  Unknown    If data indicate that sub‐slab soil vapor concentrations exceed screening levels, attach a map showing  the location of these exceedances.    At what depth(s) is sub‐slab soil vapor known to be contaminated?   ☐  0‐6 inches  ☐  Other,  If other  describe:  Click here to enter text.      Will workers encounter contaminated sub‐slab soil vapor during planned redevelopment activities?       ☐ Yes    ☒  No   ☐  Unknown    In the event that contaminated soil vapor is encountered during redevelopment activities, list  activities for management of such contact:  No existing slabs are present on the site.        11  EMP Form ver.1, October 23, 2014  PART 7.  INDOOR AIR – Please fill out the information below .     Are indoor air data available for the Brownfields Property?    ☐   Yes   ☒  No    ☐  Unknown    If yes, attach a map showing the location where indoor air contaminants exceed site screening levels.    If the structures where indoor air has been documented to exceed risk‐based screening levels will not  be demolished as part of redevelopment activities, will workers encounter contaminated indoor air  during planned redevelopment activities?       ☐ Yes    ☒  No  ☐ Unknown    In the event that contaminated indoor air is encountered during redevelopment activities, list  activities for management of such contact:  No Existing buildings are present on the site.       PART 8 – Vapor Mitigation System – Please fill out the information below .     Is a vapor intrusion mitigation system proposed for this Brownfields Property?         ☒ Yes    ☐  No  ☐ Unknown    If yes, provide the date the plan was submitted to the Brownfields Program.  The vapor mitigation system plan is currently being prepared.  Attach the plan. The plan is not yet available.    Has the vapor mitigation plan been approved by the NC Brownfields Program?   ☐  Yes   ☒  No     ☐  Unknown  Has the vapor mitigation plan been signed and sealed by a North Carolina professional engineer?       ☐ Yes    ☒  No      What are the components of the vapor intrusion mitigation system?  ☐  Sub‐slab depressurization system  ☐  Sub‐membrane depressurization system  ☐  Block‐wall depressurization system  ☐ Drain tile depressurization system  ☒  Passive mitigation methods   ☐ Vapor barriers   ☐ Perforated piping vented to exterior  ☐  Other method:  Click here to enter text.      PART 9.  CONTINGENCY FOR ENCOUNTERING UNKNOWN TANKS, DRUMS, OR OTHER WASTE  MATERIALS    Please provide a contingency plan in the event unknown tanks, drums, fuel lines, landfills, or other  TABLE 1 MONITOR WELL CONSTRUCTION VACANT PARCEL (FORMER MCDONALDS) 2400 SOUTH BOULEVARD CHARLOTTE, MECKLENBURG COUNTY, NORTH CAROLINA Ground Date Water Well Casing Screened Bottom of Surface Depth to Depth to Monitor Date Level Depth Interval Well Elevation Top-of-Casing Water Water Well ID Installed Measured (feet BGS) (feet BGS) (feet BGS) (feet) Elevation (feet) (feet BGS) (feet BTOC) MD-GW-1 10/19/06 10/20/06 19.6 19.6-34.6 34.6 100.11 100.56 22.26 22.71 MD-GW-2 10/19/06 10/20/06 18.4 18.4-33.4 33.4 98.35 98.95 20.89 21.49 MD-GW-3 10/19/06 10/20/06 10.2 10.2-20.2 20.2 95.76 97.36 DRY DRY Elevations referenced to temporary bench mark assigned an elevation of 100.00 feet above mean sea level. Temporary bench mark located at WS-GW-6/WS-SB-6 on Welders Supply property at 2300 South Boulevard McDonalds Tables.xls\Well Const Page 1of1 Free Groundwater Product Elevation Thickness (feet) (feet) Comments 77.85 None 1" PVC temporary monitor well 77.46 None 1" PVC temporary monitor well DRY None 1" PVC temporary monitor well TABLE2 SOIL SAMPLE ANALYTICAL RESULTS VACANT PARCEL (FORMER MCDONALDS) 2400 SOUTH BOULEVARD CHARLOTTE, MECKLENBURG COUNTY, NORTH CAROLINA I < 0 ~ (j) 0 ca Ill ::i "II ()"iii' (') is: '"O o en '"O 3 n 3 '"O .. 0 ID -§ CD Sample Depth 3! c. 2. ID Date (feet BGS) 01/) ::i ~' IQ MD-SB-1 10/19/06 2-4 <1 MD-SB-2 10/19/06 2-4 <1 MD-SB-3 10/19/06 2-4 <1 IHSP RG Soil-Groundwater Cleanup Level 2 EPA Region 9 PRG-Residential 3 EPA Region 9 PRG-lndustrial I Commercial 3 Only detected compounds are shown in table mg/kg = Milligrams per kilogram BGS = Below ground surface ND -Not Detected at Method Detection Limit NE = Not established VOLATILE ORGANIC COMPOUNDS Method 8260 (mg/kg) !l;; ~ !!1 0 0 )> 3 "O (') 0 ~ c :l ::i a. Q) UJ ND ND 0.12 ND 0.062 ND 2,800 - 2.81 - 14, 127 - 54,321 - J -Estimated value between Reporting Limit and Method Detection Limit 1 -NCDENR IHSP RG -Inactive Hazardous Sites Program Remediation Goal 2 -NCDENR Aquifer Protection Section Clean Up Level 3 -EPA Region 9 Preliminary Remediation Goal Results shown in bold exceed RG levels or Soil-Groundwater Cleanup Level, where applicable. TABLE 3 GROUNDWATER SAMPLE ANALYTICAL RESULTS VACANT PARCEL (FORMER MCDONALDS) 2400 SOUTH BOULEVARD CHARLOTTE, MECKLENBURG COUNTY, NORTH CAROLINA VOLATILE ORGANIC COMPOUNDS by EPA 82608 (ug/L) -f :::!. ~ C) :.... :::r 0 ~ a ::;! ::!I :::!. c: C) C) (') 0 :::r :::r :::r a 0 0 0 3 a a a m. m. m. Sample O' :::r :::r :::r I Ill ID Ill ID Date 3 ::i ::i ::i ID ID ID MD-GW-1 10/20/06 2.0 1.7 J 100 0.56J MD-GW-2 10/20/06 12 0.85 J 78 ND MD-GW-3 10/20/06 Dry at Geoprobe Refusal at 20 ft BGS NC Groundwater Standard 70 2,100 Only detected compounds are shown in table µg/L = micrograms per liter BGS = Below ground surface ND -Not Detected at Method Detection Limit NE= Not established - = Not Analyzed 2.8 NE I l J -Estimated value between Reporting Limit and Method Detection Limit Results shown in bold exceed North Carolina Groundwater Standard (2L) C) ! ~ 0 5· :::r 0 a m. :::r ID ::i ID 2.1 1.1 70 ~ ~ 6 Ci" :::r 0 a ~ ID ::i ID 2.8 1.7 70 ~ Q :::r ID .... (') 0 3 "O 0 c: :::> c.. en I ND ND NE Property Date Water Well Casing Location I Date Level Depth Monitor Well ID Installed Measured (feet BGS) 2300 South Boulevard (Welders Supply) continued WS-GW-8 10/19/06 10/23/06 16.6 WS-GW-9 10/17/06 10/23/06 15.4 TABLE2 MONITOR WELL CONSTRUCTION CHEROKEE SOUTHLINE TRANSIT-ORIENTED DEVELOPMENT SOUTH BOULEVARD AREA CHARLOTTE, MECKLENBURG COUNTY, NORTH CAROLINA Screened Ground Surface Top-of-Casing Ground Water Interval Bottom of Well Elevation Elevation Depth to Water Depth to Water Elevation (feet SGS) (feetBGS) (feet) (feet) (feet SGS) (feet BTOC) (feet) 16.6-26.6 26.60 --18.53 19.78 - 15.4-25.4 25.44 --19.13 21.03 - 2316 South Boulevard (Fonner Georgia Carolina Products Company, Inc.) RJ-GW-1 10/18/06 10/23/06 19.4 19.4-34.4 34.4 ---24.85 25.30 - RJ-GW-2 10119/06 10/23/06 14.5 14.5-29.5 29.5 - -20.45 20.55 - RJ-GW-3 10/19/06 10/23/06 10.9 10.9-25.9 25.9 --25.82 26.32 - MW-1 Unknown 10/18/06 Unknown Unknown 27.5 --24.4 24.64 - 12316 Well) 2400 South Boulevard (Fonner McDonald's Restaurant) MW-2 12/28/07 1/3/08 15 15-30 30 -749.0 751.24 27.04 29.28 721.96 MD-GW-1 10/19/06 10/20/06 19.6 19.6-34.6 34.6 --22.26 22.71 - MD-GW-2 10/19/06 10/20/06 18.4 18.4-33.4 33.4 --20.89 21.49 - MD-GW-3 10/19/06 10/20/06 10.2 10.2-20.2 20.2 - -DRY DRY DRY :r"S .-~ 250812522 South Boulevard (Former Dry Cleaner and Gas Station Properties) -- MW-1 3/16/05 4/5/05 13.0 13.0-23.0 23.0 - - -15.22 - 11/30/05 ---16.31 - MW-2 3/16/05 4/5/05 12.0 12.0-22.0 22.0 ---13.91 - 11/30/05 ---13.99 - MW-3 3/16/05 4/5/05 14.0 14.0-24.0 24.0 737.56 737.37 15.64 15.45 721 .92 11/30/05 17.39 17.20 720.17 1/3/08 18.61 18.42 718.95 MW-4 11/29/05 11/30/05 15.0 15.0-25.0 25.0 ---15.61 - MW-5 11/29/05 11/30/05 13.0 13.0-23.0 23.0 736.74 736.11 17.50 16.87 719.24 1/3/08 19.16 18.53 717.58 MW-6 11/28/05 11/30/05 13.0 13.0-23.0 23.0 ----15.82 - DW-1 11/30/05 11/30/05 40.0 40.0-45.0 45.0 ---14.69 - MW-1A 10/21/04 415105 15.0 15.0-25.0 25.0 ----14.98 - 12/1/05 ---15.75 - SB-GW-1 10/16/06 10/18/06 20 20'-30' 30.0 ---16.63 18.71 - SB-GW-2 10/16106 10/18/06 17 17'-27' 27.0 --21.78 20.55 - Page 2 of 2 Free Product Thickness (feet) Comments None 1-inch PVC temporary monitor well Abandoned on Nov. 12, 2006 None 1-inch PVC temporary monitor well Abandoned on Nov. 12, 2006 None 1' PVC temporary monitor well Abandoned on Nov. 12, 2006 None 1" PVC temporary monitor well Abandoned on Nov. 12, 2006 None 1" PVC temporary monitor well Abandoned on Nov. 12, 2006 None 2" PVC penmanent monitor well Abandoned on Sept. 28, 2007 None 2' PVC penmanent monitor well above-grade well, - 2.2 ft stickup None 1" PVC temporary monitor well Abandoned on Nov. 12, 2006 None 1" PVC temporary monitor well Abandoned on Nov. 12, 2006 None 1" PVC temporary monitor well Abandoned on Nov. 12, 2006 ~ None Existing well Installed by NCDENR DSCA flush-mount None Existing well installed by NCDENR DSCA flush-mount None Existing well installed by NCDENR DSCA flush-mount None Existing well installed by NCDENR DSCA flush-mount None Existing well Installed by NCDENR DSCA flush-mount None Existing well installed by NCDENR DSCA flush-mount None Existing well Installed by NCDENR DSCA flush-mount None Existing well installed by NCDENR DSCA flush-mount None 1-inch PVC temporary monitor well. Abandoned on Nov. 12, 2006 None 1-inch PVC temporary monitor well. Abandoned on Nov. 12, 2006 Elevations referenced to mean sea level. Construction data regarding permanent monitor wells at 2508 South Boulevard (fonmer drycleaners) obtained from Shield Engineering report dated Jan. 31, 2006. Cherokee Southline\Tables Phase II Addendum 2006-2008.xls\Well Const TABLE 4 SUMMARY OF GROUND WATER SAMPLING RESULTS CHEROKEE SOUTHLINE TRANSIT-ORIENTED DEVELOPMENT SOUTH BOULEVARD AREA CHARLOTTE, MECKLENBURG COUNTY, NORTH CAROLINA VOLATILE ORGANIC COMPOUNDS by EPA 82608 lua/Ll Property Location I Sample ID Date 0 :::J" 0 a O' 3 ~ w 6 i'i" :::J" 0 a CT Cl> :::s N Cl> :::s Cl> 0 !: ~ 0 er :::J" 0 a Cl> s: Cl> :::s Cl> NC Groundwater Standard I 70 I 170 I 70 2300 South Boulevard (Former Welders Supply) -Continued WS-GW-8 110/23/061 ND I ND I 3.5 WS-GW-9 10/23106 ND ND ND ~ ~ 6 ff :::J" 0 a Cl> s: Cl> :::s Cl> 7 ND ND 2316 South Boulevard (Former Georgia Carolina Products Company, Inc.) RJ-GW-1 I 10/23/06 I ND I ND I ND I ND RJ-GW-2 RJ-GW-3 2316 WELL* 10/23/06 10/23/06 10/18/06 10 ND ND ND ND ND 2400 South Boulevard (Former McDonald's Restaurant) MD-GW-1 110120/061 2.0 I ND MD-GW-2 10/20/06 12 ND ND ND ND 2.1 1.1 ND ND ND 2.8 1.7 MD-GW-3 MW-2 10/20/06 I Dry at Geoprobe Refusal at 20 ft BGS 1/3/08 ND I ND I ND I ND 250812522 South Boulevard (Former Dry Cleaner and Gas Station Properties) SB-GW-1 110/19/061 ND I ND I ND I ND SB-GW-2 10/19/06 ND ND ND ND MW-3 (DSCA) MW-3 (DSCA) A MW-5(DSCA) MW-5 (DSCA) • MW-1 (DSCA) • MW-1A (DSCA) • MW-2 (DSCA) • MW-4 (DSCA) • MW-6 (DSCA) • DMW-1 IDSCAl • 1/4/08 1/25/08 1/4/08 1/25/08 1/25/08 1/25/08 1/25/08 1/25/08 1/25/08 1/25/08 0.70 0.82 ND ND 0.74 J 4.2 1.0 0.93 J ND 9.3 ND ND ND ND ND ND ND ND ND ND 0.98 0.88 ND ND ND 3.1 0.61 J ND ND 4.3 ND ND ND ND ND 1.9 ND ND ND 7.8 ~ "N 6 ff :::J" 0 a ~ :::J" D> :::s Cl> 0.38 ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND 0.58 J ND "iii 0 -0 a -0 'S. 9: ~ \l .!!] 70 ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND 170 ND s:: 9: 'S. ro-a. D> -< CT c:: ~,z S::--1 Cl> OJ s: .!!) ~ 200 ND ND ND ND ND ND ND ND ND 4.3 ND ND ND ND ND ND ND ND ND 170 ND d c ~ Cl> 1,000 ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND i :::J" 0 a ~Cl> \l ~ 0 16 m::s ~Cl> 0.7 ND ND ND ND ND 2.7 ND ND ND ND ND 29 51 ND ND ND 60 32 83 ND 7.7 ~ 0 a "=l~ 0 16 m :::s ~Cl> 2.8 3.0 ND ND ND ND ND 100 78 5.0 ND ND 40 53 0.75 ND ND 69 1.5 J 3.6 ND 200 -I ~-:::J" 0 g, c:: 0 a 3 Cl> s: II> :::s Cl> 2,100 ND ND ND ND ND ND 1.7 J 0.85 J ND ND ND ND ND ND ND ND ND ND ND ND 2.2 ~ ~ "N ~ B· :::J" 0 a Cl> s: II> :::s Cl> NE ND ND ND ND ND ND 0.56 J ND ND ND ND ND ND ND ND ND ND ND ND ND 1.1 -: Not Analyzed J -Estimated value between Reporting Limit and Method Detection Limit Results shown In bold exceed North Carolina Groundwater Standard (2L) ~ Cb :::s Cl> Ill 530 ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND Only detected compounds are shown In table ND -Not Detected at Method Detection Limit NE : Not established µg/L : Micrograms per llter • Existing Monitoring Well • -Sampled by NCDENR DSCA Program, historical analytical results not presented. Page 2 of4 OJ Cl> :::s N Cl> :::s Cl> ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND 2.3 ND ~ 0 s: ~ gi 3 ~ c:: :::s a. Ill NE ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND ND Cherokee Southline\Tables Phase II Addendum 2006-2008.xls\Groundwater-VOCs Contingency For Encountering Unknown Tanks, Drums, Or Other Waste Materials Previously Unidentified or Unforeseen Conditions: Previously unidentified or unforeseen conditions are defined to mean the discovery of potentially regulated (i.e., by NCDENR) soil or groundwater that presents, through normal and routine field observations, field detection instruments or laboratory analyses, characteristics different from other non-affected media in the area being worked. These characteristics are typically expected to be triggered by visual and/or odor indications. If previously unidentified or unforeseen conditions are encountered during site development, it is each worker's obligation to report such conditions to their immediate supervisor who will, in-turn, notify the Prospective Developer. The protocol presented herein will then be implemented as applicable and appropriate, to manage the proper resolution of unidentified or unforeseen conditions. Work by each site contractor and site sub-contractor must be accomplished within the framework of an appropriate Site-Specific Health and Safety Plan (HASP). Level D Personal Protect Equipment (PPE), which includes hard-hats, steel-toed safety boots, safety glasses with side-shields and high-visibility safety vests, is the minimum level of PPE to be used for all site work. All truck drivers who exit their trucks on-site will be subject to the health and safety requirements established for the Site. Geoscience will make available to contractors and subcontractors, upon request from the contractors and sub- contractors for provision, the due diligence data so that informed and responsible decisions can be made by those contractors and subcontractors regarding the health and safety of their employees. Each contractor and sub-contractor is specifically and wholly responsible for the safety of their workers, including any PPE and training, as may be warranted or required by law and regulations. Prospective Developer and Geoscience Group, Inc., are responsible only for the safety of their respective employees. In the event unknown tanks, drums, other waste materials or previously unidentified impacted soils are encountered, Geoscience Group, Inc. shall characterize the the encountered items in geneal accordance with Il-ISB protocol. The extent of suspected impacted soils encountered during construction, or other excavation activities, will be determined through field observation. Screening of the excavated suspect soils using a PID will also be performed as appropriate. Suspect soils will be stockpiled on-site pending the results of characterization testing. In general accordance with typical stockpile sampling protocols, such as those provided in NCDENR Division of Waste Management's Guidelines for Sampling, composite samples (consisting of six sub-samples) will be collected at a frequency of approximately one sample per 200 cubic yards of stockpiled suspect soil. The characterization samples will be submitted for analysis consistent with perceived contaminants encountered at the site. Excavation of known or suspected impacted soil shall follow these procedures: It is not anticipated that soil handling will require a work stoppage or an upgrade from Level D PPE to Level C. However, in the event of the discovery of a previously unknown area of potential soil contamination, the Site Environmental Representative will be responsible for evaluating whether a work stoppage or a PPE upgrade is appropriate. In the event of work stoppage, the Site Environmental Representative will inform the NCBP Representative and the Prospective Developer. The number of samples to be collected from the excavated soil will depend upon the quantity of soil generated and the specific conditions at hand. Excavated areas will be managed as practicably as possible to prevent accumulation of rainwater. Whenever possible, excavation of suspect contaminated soil will be performed when prevailing and incipient weather conditions are favorable. Plastic sheeting and temporary backfilling with non-contaminated soil may be used to reduce/preclude the accumulation of storm water in the excavated areas. The potentially-affected area will be clearly marked. Safety precautions will be adjusted, as appropriate, based on the circumstances. For instance, high visibility snow fencing, safety cones, temporary signage and/or temporary hard-fencing may be used as needed to best suit the specific condition at-hand. • Areas used for soil staging will be clearly marked both in the field and on sketch outlines. Stockpiling of soil for several days prior to loading may be performed, pending receipt of laboratory analysis results. Stockpiled potentially impacted soil will be stored on a liner and will be covered with secured plastic sheeting while not being worked and at the end of each day. Appropriate erosion and sediment controls, such as hay bales and/or silt fencing, will also be implemented to prevent runoff from this soil. Transport and Disposal of Contaminated Soil: Contaminated soil scheduled for off-site disposal will be properly characterized for disposal, manifested, transported and disposed of in compliance with applicable laws. A record of each truck dispatched from the Site for off-site disposal will be paired with the associated manifest and weight ticket report received from the disposal facility. Based on previous environmental assessment activities conducted at Site, off-site disposal of soil, if required, is expected to be characterized as non-hazardous solid waste. Truck loads will be covered prior to leaving the Site. During bulk transport of non-hazardous soils, applicable marking requirements will be used to display the appropriate DOT placards. Proper Class 9 placards will be used if hazardous soil/material is being transported off- site for disposal, although this is not anticipated. Proper documentation required for the shipment of contaminated waste off-site will be managed in the field. A record of each truck dispatched from the Site for off-site disposal will be paired with the associated manifest and weight ticket report received from the landfill or disposal facility. Soil will be disposed of in accordance with applicable state and local regulations at an appropriate disposal facility approved by Prospective Developer or their authorized representative.