HomeMy WebLinkAboutClarkson St_Rpt of Preliminary Subsurface ExplorationSP Associates RA neering surveying planning RPQRT OFPREUMINARY SIJIISJIU ACE EXPLORATION WEST ENI DEVELOP ENT CHARLOTTE NORTH CAROLINA ESP PROJECT NO E4-UD42.300 Prepared For Beazer Homes 1300 South Boulevard Suite Charlotte North Carolina 28203-4265 Prepared By ESP Associates PA 372 Crornptoæ Street Charlotte North Carolina 28273 May 30 2006 ESP Associates PA engineering surveying planning May 26 2006 Beazer Homes 1300 South Boulevard Suite CharlotteNorth Carolina 28203-4265 Attention Mr Kevin Holdenrid Reference REPORT OF PRELIMINARY SUBSURFACE EXPLORATION West End Development Charlotte North Carolina ESP Project No E4-UD42.300 Dear Mr Holdenrjd ESP Associates P.A ESP has completed the preliminary subsurface exploration for the proposed West End Development in Charlotte North Carolina This exploration sas performed in general accordance with our Proposal No E4-06052 dated April 25 2006 Authorization to proceed with this study was provided by written execution of our proposal by Mr Kevin Holdenrid of Beazer Homes on May 12006 The purpose of the exploration was to evaluate the general subsurface conditions within select site locations with regard to site development and preliminary desi and construction of the foundation and pavement systems This report presents our findings conclusions and recommendations for foundation design as well as construction considerations for the proposed foundations and paved areas P.O Box 7030 Charlone NC 28241 704 583-4949 Fax 704 583-4950 www.espassocjates corn Report of Subsurface Exploration West End Development ESP Project No E4-UD42.300 May 26 2006 ESP appreciates the opportunity to assist you during this phase of the project If you should have any questions concerning this report or if we may be of further assistance please contact us Sincerely Brian Welch PE N.C Registration No 21 P.l FWjaj opies SubnitteJ ESP Associates P.A Lii. Project Manager TABLE OF CONTENTS 1.0 INTRODUCTION 1.1 SITE AND PROJECT DESCRIPTION 1.2 PURPOSE OF SERVICES 2.0 EXPLORATION PROCEDURES 2.1 FIELD 3.0 SUBSURFACE CONDITIONS 3.1 PHYSIOGRAPHy AND AREA GEOLOGY 32 SUBSURFACE 33 SUBSURFACE WATER 40 CONCLUSIONS 4N1 RECOMMENDATIONS 41 GENERAL 42 SITE DEVELOPMENT 43 EXISTING FiLL 44 PRELIMINARy FOUNDATION SUPPORT 1045SEISMICDESIGNCATEGORY1246FLOORSLABS 1347PAVEMENTAREAS 1448CUTANDFILLSLOPES14 50 CONSTRUCTION CONSiDERATIONS 15 EXISTING UTILITIES 1552SITEPREPARATION 1653TEMPORARYEXCAVATIONSTABILITY1654DIFFICULTEXCAVATION 1755FILLMATERIALANDPLACEMENT1856SLOPINGOFBUILDINGPADS19 60 LIMITATIONS OF REPORT 19 APPENDIX FIELD EXPLORATION PROCEDURES BORING TEST PIT LOCATION PL AN FIGURE LEGEND TO SOIL CLASSIFICATION AND SYMBOLS TEST BORING RECORDS B-i THROUGH B-12TESTPITOBSERVATIONSRECORDSTP-1 THROUGH TP-14 RL7nrt /.Sll1.cur/icc E.vp1uitiin ES.P f-iicci iVo E.Li/42.$OO JI.cj EiI I.tvcIojt 1A TROIL.Ji.FIOIN LI SITE AN rRiJECT LESCR1PIRN ftc proposed site consists of approximately 22.8 acres of kind located in Charlotte North Carolina reference Boi-ing and Test Pit Location Plan Figure .At the time of our exploration the site consisted of .J generally vacant gi-ass or gravelcovered lots The urea is bounded on the north by \V Morehead Street to the south by Post Streei to the east 1w the intersection Morehead and 1277 and to the west by the existing Duke Power building and newer ommercia1 office huildir.g vlore specificafly the lots are listed as Tax Parcel 073252-1 07325210 07325209 07325601 0732502 07314105 portion of Parcel O3252l3 073252-07 073-255-01 and 07314201 Two single-story block buildings were observed in the northern quadrant ol the intersection of Clarkson and Dunhar Streets Relief on the she is estimated to be on the order of feet with the site generally sloping downward from southeast to northwest storm water utility line traverses Parcel 0732 550 from soul to noril through the parcel In general significant site grading appears to have taken place iii tile past Based on our limited research and discussion \vitl the project learn we understand this site has undergone multiple USeS in the past In the earls 900s it was reportedly developed as military flousint 13v the mid to late 1900s it was reportedly developed tr manutactu ng and/ui distribution uses Recently the site has been used as temporary parking primarily associated with arolila Panthers fbothall games Very limited mtormation has been observed by ESP Associates relative to demolition and/or construction relating to the properties current and/or past use We understand that plans are to construct residential development Consisting of multi-.faniilv dwellings with associated roadways and infrastructure on the referenced property We anticipate that the proposed structures will be moderately to lightly loaded structures with shallow Ibundations and slabongrade and/or crawl space floor systems At the time our services Report of Subsurface Exploration ESP Project No E4-UD42.300 West End Development May 30 2006 finished floor elevation FFE was not available No other detailed information has been provided at this time 1.2 PURPOSE OF SERVICES The purpose of the exploration was to evaluate the general subsurface conditions within select site areas with regard to the design and construction of foundation and pavement systems This report presents our findings conclusions and recommendations for foundation design as well as construction considerations for the proposed foundations and paved areas This report also contains brief description of the field testing procedures performed for ths study and discussion of the soil conditions encountered at the site 20 EXPLORATION PROCEDURES 21 FIELD During preparation of our exploration plan ESP reviewed and has utilized the test results from within the Mactec report titled Report of Preliminary Geotechrncal Exploration dated April 18 2005 Twelve 12 soil test bonngs Borings B-I through B-12 and fourteen 14 test pits TP-l through TP-14 were performed by ESP at the approximate locations shown on the attached Boring and Test Pit Location Plan Figure The bonng locations were approximated in the field by representative of ESP using the prehmmary site plan provided by Beazer Homes The test pit locations were selected by ESP and were field-located utilizing Garmm brand E-Trex Global Positioning System device as well as existing site features The soil test borings were extended to depths ranging between approximately 19 and 30 feet below the existEng ground surface using truck-mounted CME 550X drill rig Hollow-stem continuous flight augers were used to advance the borings into the ground The test pits were excavated to depths ranging between and 20 feet below the existing ground surface using John Deere 135 trackhoe Report of Subsurface Exploration ES Project No E4-UD42.300 West End Development May 30 2006 Standard Penetration Tests were performed at designated intervals in the soil test borings in general accordance with ASTM 1586 in order to obtain data for estimating soil strength and consistency In conjunction with the penetration testing splitspoon soil samples were recovered for soil classification and potential laboratory testing Water level measurements were attempted at the termination of drilling and day after the termination of drilling brief description of the field testing procedures is included in the Appendix While in the field representative of the geotechnical engineer visually examined each boring sample and the test pit excavations to evaluate the type of soil encountered soil plasticity moisture copditiop organic content presence of lenses and seams colors and apparent geological origin The results of the visual soil classifications for the borings as well as field test results are presented on the individual Test Boring Records and Test Pit Observations Records included in the Appendix Similar soils were grouped into strata on the boring records The strata lines represent approximate boundaries between the soil types howe er the actual transition between soil types in the field may be gradual in both the horizontal and vertical directions 30 SUBSURFACE CONDITIONS 31 PHYSIOGRAPHy AND AREA GEOLOGY The referenced property is located in Charlotte North Carolina which is in the Piedmont Physiographic Province The Piedmont Province generally consists of hills and ridges that are intertwmed with an established system of draws and streams The Piedmont Province is predommately underlain by igneous rock formed from molten material and metamorphic rock formed by heat pressure and/or chemical action which were initially formed during the Precambrian and Paleozoic eras Report of Subsurface Exploration ESP Project No E4-UD42.300 West End Development May 30 2006 The virgin soils encountered in this area are the residual product of in-place chemical weathering of rock In areas not altered by erosion or disturbed by the activities of man the typical residual soil profile consists of clayey soils near the surface where soil weathering is more advanced underlain by sandy silts and silty sands The boundary between soil and rock is not sharply defined This transitional zone termed partially weathered rock is normally found overlying the parent bedrock Partially weathered rock is defined for engineering purposes as residual material with Standard Penetration Resistances in excess of 100 blows per foot Weathering is facilitated by fractures Joints and by the presence of less resistant rock types Consequently the profile of the partially weathered rock and hard rock is quite irregular and erratic even over short horizoptal distances Also it is common to find lenses and boulders of hard rock and zones of partially weathered rock within the soil mantle well above the general bedrock level 32 SUBSURJACE Subsurface conditions as indicated by the bonngs generally consist of either grass gravel crushed brick or asphalt underlain by fill or residual soils The residual soils have formed from the weathering of the parent bedrock The generalized subsurface conditions at the site are descnbed below For more detailed soil descnptions and stratifications at particular boring location the respective Test Boring Record or Test Pit Observations Record should be reviewed The Test Boring Records and Test Pit Observations Records are included in the Appendix Surface topsoil/grass layer approximately to inches thick was encountered at iBorings B-9 and B-b An asphalt pavement and stone layer approximately 5/2 inches thick was encountered in Boring B-3 gravel/crushed bnck layer ranging in thickness from to inches was encountered at Borings B-I B-2 B-4 B-5 B-7 B-Il and 12 Fill Fill soils were encountered underlying the topsoil in Borings B-8 B-9 and B-b the asphalt in Boring B-3 the gravel layers in Borings B-i B-2 B-4 B-5 B-7 B-li and B-12 and at Report of Subsurface Exploration ESP Project No E4-UD42.300WestEndDevelopmentMay302006 the ground surface in Boring B-6 Fill soils including surficial layer of crushed stone were also encountered in Test Pits TP-2 TP-3 TP-l0 and TP-1 In Borings B-2 B-3 B-4 B-5 B-6 and B-10 stiff to very stiff silty lean clay soft to very stiff sandy silty clay with rock fragments firm silty sandy clay soft clays and firm to very stiff sandy silt with rock fragments were encountered to depths of 0.5 to feet In Borings B-7 B-8 and B-9 and in Test Pits TP-2 TP-3 TP-10 and TP-1 construction debris contammg varying amounts of concrete fragments bricks gravel concrete masonry umt CMU blocks andlor organic material were encountered within the fill material to depths of to 14 feet Intermixed with the debris in these locations were layers of fill soils containing firm sandy clay and loose to medium dense silty sand Standard Penetration Resistances N-values in the fill ranged from to 19 blows per foot bpf The fill material encountered at the site extended to depths ranging from approximately feet to 14 feet below the existing ground surface In Test Pit TP-3 it was observed that trackhoe refusal was encountered at approximately 14 feet below the existing elevation due to the presence of buried brick and concrete foundation adjacent to Clarkson Street The fill material could not be penetrated at this location Additional fill soils should be expected due to the potential presence of other buried foundations and fill areas as well as backfill over abandoned utility lines Residuum Below the gravel in Bonng B-I and underlying the fill material in all of the remaining boring locations residual soils were encountered The residuum generally onsists of firm to very stiff silty clay stiff to very stiff sandy clay firm to hard sandy silt stiff to very stiff sandy clayey silt and loose to very dense silty fine sand N-values in the residuum varied between to 73 bpf With the exception of Borings B-2 B-3 and B-i all the borings were terminated in residual soils at depths ranging between 20 and 25 feet below the existing ground sufface Report of Subsurface Exploration ESP Project No E4-UD42.300 West End Development May 30 2006 Below the ground surface in Test Pits TP-1 TP-4 through TP-8 and TP-12 through TP-14 residual soils were encountered Residual soils were also encountered underlying the fill material encountered in Test Pits TP-2 and TP-l0 The residuum consisted of sandy silts construction debris etc Test Pits TP-2 TP-5 TP-6 TP-8 and TP-l0 were terminated in residual soils at depths ranging from 16 to 20 feet below the existing ground surface Weathered Rock Within the residuum in Boring B-3 and underlying the residuum in Borings B-2 and B-Il partially weathered rock PWR was encountered PWR is defined as residual soils exhibiting N-values in excess of 100 bpf When sampled the PWR generally breaks down to silty sand with rock fragments All three bonngs were terminated PWR at depths ranging from approximately 18 to 19 feet below the existing ground surface Below the ground surface Test Pit TP-9 the fill in TP-l and below the residual soils in Test Pits TP-1 TP-4 TP-7 and TP-12 through TP-14 Weathered Rock WR was encountered WR is defined as very dense residual soils that can generally be excavated using tra k-hce but requires additional effort to do so When excavated the WR generally breaks down into silty sands Borings B-2 B-3 and B-I were terminated in the PWR at depths ranging from approximately 18 to 20 feet below the existing ground surface Test Pit TP-1l was terminated in the WR at the maximum track-hoe extension depth of 20 feet below the existing elevation Tesi Pits TP- TP-4 TP-7 TP-9 and TP-12 through TP-14 were terminated in the WR upon track-hoe refusal at depths ranging between to 14 feet below the existing elevation Track-hoe refusall is defined as material that could not be penetrated with the excavating equipment used on the project Refusal material appeared to consist of very dense Weathered Rock or the top of parent bedrock except as noted TP-3 AtJ.Hrl .Sithsuricc Exjloraiimi ESP 1rR ci ElI 11.12. IJ.i Ed ivelij.niei ti 3O.2o 3-3 SUBSURFACE \VATER Water level measurements were attempted in the borms at the termination ot dri 11mg and day after the termination of drilling At termination water was ibservecl in Boring 1310 it 19.7 feet below the existing ground surtitce The remainder ol the borings were dr at termination Subsequent water levels measured at day indicated water was present in Borings B--.Bi and BI at depths of 14.5 feet 14.5 feet and 12 feel i-espectivelv The remainder of he torings were dry at day Hole cavein depths ranged between 15 and 22 feet below the exisi ing ground surfItce Hole cavein may he an indication of aler present Subsurface water was riot relorted in the borings pertorrned by others Subsurthee water levels tend to fluctuate with seasor.ai and climatic variations as well as with some types ol construction operations Thereftre water may be encountered during construction at depths not indicated during this study 4.0 CONCLUSIONS AND RECOMMENDATIONS 4.1 GENERAL Our .onc1usions and recommendations are based on the project infonnation previousi disusscd and on the data obtained from the field testing rog.ram If the sirucwral loading geometry or proposed building locations are changed or significantly differ irom those discussed or if conditions are encountered during consiruction that differ from those encountered by time borings requests the opportunity to review our recommendations based on the new inforiation and make any necessary changes Additional evaluations may he approptiate once final grading plans are available Report of Subsuiface Exploration ESP Project No E4-UD42.300 West End Development May 30 2006 4.2 SITE DEVELOPMENT The results of the field testing program aiid analyses indicate that the majority of the property appears to be suitable for constructing lightly to moderately loaded structures provided the following measures are considered Borings B-2 B-3 11 and Test Pits TP-TP-4 TP-7 TP-9 and TP-l through TP-14 encountered partially weathered rock PWR or weathered rock WR at depths ranging between and 18 feet below the existing ground surface Track-hoe refusal due to WR was encountered withip Test Pits TP-l TP-TP-7 TP-9 and TP-12 through TP 14 at depths ranging from to 14 feet below the existing ground surface Based on review of the previous geotechnical study performed at the site Mactecs Bonngs B-l B-3 B-4 B-5 B-6 B-7 B-9 and B-13 encountered auger refusal due to PWR at depths ranging from to 24 feet below the existing ground surface We recommend that the depth to the PWR WR and/oi test pit/auger refusal be considered when establishing final grades and evaluating grading challenges Fill soils were encountered in Bonngs B-2 through B-12 and in Test Pits IP-2 TP-3 TP-10 and TP-1 The fill extended to depths ranging between and 14 feet below the existing ground surface It was observed that the fill material an these areas contained debris consisting of bricks concrete CMU blocks and varying amounts of organic material It should be noted that the fill material could not be penetrated in Test Pit TP-3 due to the presence of concrete mass at 14 feet below the existing elevation Based on information obtained from Mr Kevin Holdenrid with Beazer Homes and our observations it appears that topographic elevations at the site have changed considerably along the southern quadrant of the mtersection of Dunbar and Clarkson Streets Report of Subsurface Exploration ESP Project No E4-UD42.300 West End Development May 30 2006 Lower consistency residual soils N-values less than bpf were encountered in Boring B-12 at depth of feet below the existing elevation The soft soils extended to depth of approximately 14 feet below the existing ground surface We anticipate that the approximate location of Boring B-12 will be in fill area These results should be re-evaluated once site grading plan is available We recommend that soft soils encountered during grading near final grades be stabilized or removed and replaced with compacted structural fill The soft subgrade soils should be evaluated in the field by representative of the geotechnical engineer using proofrolhng operations hand auger borings and/or test pit excavations An abandoned water line was discovered at Test Pit TP-11 at depth of approximately feet below the existing elevation It is our understanding that the proposed site has history of residential and commercial developments Because of this the presence of other abandoned utility lines should be anticipated dunng grading operations Pipelines provide path for water movement which can cause soil erosion and voids in the underlying subgrade soils Evaluation by the geotechrncal engineers representative should be performed during grading and construction operations to help reduce the potential of such materials from directly underlying the building pavement or other structures which could be affected by soil movement 43 EXISTING FILL Results from the soil test borings performed the site indicate that fill soils are present in Borings B-2 through B-12 The fill extends to depths varying between to 13 feet below the existing ground surface Standard Penetration Resistances N-values obtamed in the fill ranged from to 19 bpf Similary fill soils were observed to be present in Test Pits TP-2 P-3 TP-10 and TP-l to depths varying between and 14 feet below the existing ground surface Based on our visual observations of the split-spoon samples recovered and our test pit observations at varying depths and locations the fill encountered contained concentrated organics construction Report of Subsurface Exploration ESP Project No E4-UD42.300 West End Development May 30 2006 debris and other deleterious materials intermixed with soil Please refer to the attached est Boring Records and Test Pit Observations Records for more information Concentrated organics bricks CMIJ blocks concrete and other construction debris were observed in Test Pits TP-2 TP-3 TP-1O and TP-l1 and in Borings B-7 B-8 and B-9 However due to the limited testing performed and the wide spacing of test pits and borings the possibility of deleterious inclusions and variable density material in or under the existing fill is likely Since the fill encountered contained organics soft lenses and trash construction debris excessive settlement will likely result ii built upon causing building and slab on grade distiess Also the presence of the existing fill beneath pavement areas presents nsk of increased settlement and subsequently possible increased long term maintenance of the pavement areas These conditions are not considered acceptable for buildings therefore several options should be onsidered These options may include relocate the buildings to other areas to bear on competent residual soils remove the existing fill and replace with compacted suitable structural fill extend the foundation through the existing fill to bear on competent residual soils or use of deep foundations to support the structures To reduce the risk imposed by the existing fill additional evaluations including additional test pit excavations ground penetrating radar hand-auger borings with dynamic cone penetroineter tests proofrolling and/or additional soil test borings could be performed to further evaluate the character and continuity of the fill If the owner chooses to allow the existing fill to remain in place beneath the pa ements thorough field evaluation should be performed by representative of the geotechmcl engineer or senior soils techmciarr under his direction at the time of construction 44 PRELIMINARY FOUNDATION SUPPORT For satisfactory perfoance the foundation for any sthicture must satis independent design criteria First it must have an acceptable factor of safety against bearing failure of the 10 Report of Subsurface Exploration ESP Project No E4-UD42 300 West End Development May 30 2006 foundation soils under the maximum design loads Second the settlement of the foundations due to consolidation of the underlying soils should be within tolerable limits for the structures Based on the results of the soil test borings the proposed structures can be adequately supported on shallow foundations bearing on the low-plasticity residual soils andlor newly placed suitable structural fill provided the site development site preparation and fill placement procedures outlined in this report are implemented net allowable bearing pressure ranging between 2000 and 5000 pounds per square foot psf can be used for design of the foundations bearing on residual soils Structural fill compacted to at least 95 percent of the soils Standaid Proctor maximum dry density can be designed for an allow able bearing pressure ranging between 2000 and 3000 psf Specific allowable beanng pressures per building can be evaluated once final plans are available Old existing fill soils were encountered in Bormgs B-2 through B-12 and in Test Pits TP-2 TP-3 TP-l and TP-1 to depths ranging from feet to 14 feet below the existing elevation As previously stated since portions of the fill material encountered contained orgamcs trash and construction debris unacceptable settlement will likely result causing building distress Due to the risk of mcreased settlement it is not considered acceptable for the foundations to bear upon the existing fill materials containing the above materials Alternate foundation types as outlmed in Section 43 should be considered for building support Minimum wall and column footing dimensions of 18 and 24 inches respectively should be mamtamed to reduce the possibility of localized punching-type shear failure Exterior foundations and foundations in unheated areas should be designed to bear at least 18 inches below finished grade for frost protection Based on the general stratigraphy in the building areas past experience with similar proJects and the anticipated magnitude of the building loads it is our opinion that the total and differential settlement potentials within firmer residual soils and/or newly placed structural fill for the proposed structures RLJrt Subsui-/ict Ephratio ES I1oJL1 E4 42.30i IL.J EzJ DiiItpiniu /.i.i 2E should be on the order of inch and 1/2 inch respectively This COnCluSion LS Contngent uptfl cilnpliancc with the site repa ration and till placement iecommey.idations outlined in this report 4.5 SEISMIC DESIGN CATEGORY Due to the difference in subgrade soil conditions observed at the site the area was divided ir to 1w sections ljr seismic design category determination Parcels located West of Clarkson Street and Pat-eels located tast ol Clarkson Street West ol Clarkson Street Based on the soil test horin2s performed at the site and our review of Section 61 and 616 of the current building code Seismic Site Class and Seismic Design Category was identifed for structural design The tUowing parameters were uliliied during our design category determination based on Seismic Use Group II as outlined in the referenced building code 1.52 Si.s 0.534 2.25 S.11 0.309 S0.352 S5O.356 0.137 S1 0.206 t4ote Ssand were obtained fioin the 1996 USGS Seismic hazard Maps If higher less restrictive seismic design category is desired additional evaluation including shear wave velocity testing can he performed to evaluat the potential Ibr an Lmproved design category 12 Report of Subsurface Exploration ESP Project No E4-UD42.300 West End Development May 30 2006 Eastern Side of Clarkson Street Based on the soil test borings performed at the site and our review of Section 1615 and 1616 of the current building code Seismic Site Class and Seismic Design Category was identified for structural design The following parameters were utilized during our design category determination based on Seismic Use Group II as outlined in the referenced building code PA 1.20 SMS 0.422 F166 SMIO228 Ss0352 SDsO281 S10137 SDIO152 Note Ssand S1 were obtamed from the 1996 USGS Seismic Hazard Maps If higher less restnctive seismic design category is desired additional evaluation includmg shear wave velocity testing can be performed to evaluate the potential for an improved design category 46 FLOOR SLABS Slab-on-grade floor systems can be adequately supported on low-plasticity residual soils or newly placed structural fill provided the pieviously discussed site development issues are addressed and the site preparation and fill placement procedures outlined this report are implemented If the floor slabs are designed as typical slabs-on-grade they should be completely isolated from the structural components to alIo independent movements of the slabs and building foundations Slabs constructed above the unsuitable fill soils should be structurally supported by the building foundation system Immediately prior to constructing the floor slabs we recommend the areas be proofrolled to detect unstable areas that may have been exposed to wet weather or construction traffic Areas that are found to be unstable or indicate pumping action during the proofrolling should be 13 Report of Subsurface Exploration ESP Project No E4-UD42 300 West End Development May 30 2006 undercut and replaced with adequately compacted structural fill The proofrolling should be observed by representative of the geotechnical engineer 4.7 PAVEMENT AREAS We recommend that special care be given to providing adequate drainage away from pavement areas to reduce infiltration of surface water to the base course and subgrade materials in these areas This is very important on this site due to the presence of the silty soils If these materials are allowed to become saturated during the life of the pavement section then there wiLl be strength reduction of the materials that could result in reduced life of the pa rernent section All water should be routed away from the pavement areas and adequate slopes provided to maintain drainage off site Pavement areas should be proofrolled prior to placing structural fill and/or base course Proofrolling procedures are outlined in subsequent sections of this report As previously stated old fill soils containing trash construction debns and organic materials were encountered in Test Pits TP-2 TP-3 TP-lO and TP-ll and Borings B-7 and B-9 The presence of the existing fill beneath pavement areas presents the risk of pre-mature distress and subsequently possible increased long term maintenance of the pavement areas However if the owner is willing to accept this risk in the paved areas the proposed parking may be partially undercut and replaced with geotextile fabric Mirafi 500X or equivalent and suitable compacted structural fill material It is recommended that the parking areas be further evaluated and addressed on case-by-case basis dunng the grading process 48 CUT AND FILL SLOPES For landscaping and mowmg concerns final project slopes should be designed to be honzontal to vertical or flatter Slopes can generally be designed as steep as horizontal to vertical however erosion and slope maintenance should be expected The tops and bases of all slopes should be located minimum of 10 feet from structural and feet from pavement limits The fill 14 Report of Subsurface Exploration ESP Project No E4-UD42.300 West End Development May 30 2006 slopes should be adequately compacted as outlined below and all slopes should be seeded and maintained after construction Retaining walls were not shown on the information provided to us and retaining wall analysis was not apart of our scope of services However any retaining walls should be designed using appropriate soil parameters based on the site conditions Also any walls designed must be properly analyzed by the wall design engineer with respect to global stability analysis 50 CONSTRUCTION CONSIDERATIONS 51 EXISTING UTILITIES Based on review of the bonng location diagram provided to us and our visual observations dunng the subsurface exploration we understand that an underground storm water utility line traverses the southern quadrant of the parcel located at the intersection of Clarkson and Dunbar Streets Also an abandoned water line was discovered at Test Pit TP-11 located in the southern quadrant of the intersection of Cedar and Dunbar Streets We recommend special care be taken dunng site grading operations to reduce the likelihood of damage to the existing storm water pipeline Additionally all trench backfill matenal should be removed and the subgrade in all trench excavations be evaluated by representative of the geotechnical engmeer pnor to backflhling The subgrade evaluation should consist of visual observations probing with steel od andlor performing hand auger bonngs with Dynamic Cone Penetrometer tests to evaluate their suitability for receiving structural fill Once all trenches are evaluated and approved they should be monitored and backfilled with adequately compacted structural fill compacted to minimum of 95%of the Standard Proctor maximum dry density value 15 /tpi/t 1.1/SulSur/cL E.i1I tin ES Irqjcii L42 Uc.i /-nc /rI/h1 _i1 20uc 5.2 SITE PREPARATION ftc entire building and pavement areas should be stripped ol all topsoil organic soils soil near surface soils trash debris and other organic materials to minimum of 10 feet he oud the structural limits Upon completion of the strippng operations the exposed subgrade in areas to receive ill should be proofi-olled with loaded dump truck or simi1r pneumatic tired vehicle ininunum loaded weight of 20 tons wider the observation ul representative of the geotechnical engineer The proofrolhng procedures should consist of tour complete p.sses of the expoSed UfaS with two ul the passes being in directioii perpciiclictilar ti the preceding ones \ftcr excavation of the site has been completed the exposed SUigrLldC ui cut areas should also he prootrilled as ireviously described Any areas which deflect rut or pump excessively during proofrolling or fail to improve sufficiently after successive passes should be undercut lo suitable soils and replaced with structural fill Within the existing till material organics hrick ..MU blocks curici-ele and oilier construction debris were observed ni Test iits TP2 TP3 FE It and TP and in Borings 13--S and Bu Due to the limited testing perfrnned and the vkle spacing of test pits and borings the possibility of deleterious inclusions and variable density material in other areas of he site is likel These materials should he removed from structural areas 5.3 TEMPOR-tRV EXCA VAF ION STABJLITV Excavations greater than thur feet in depth shoud be sloped or shored in accordance \Vitl local state and federal regulations including OSI IA tonstruclion Standard for Excaviions 29 CFR Part 1926 The contractor is usually solely responsible tbr site safety This infoma.ion is rovided only as service and under no circums ances should ESP be assumed to he responsible tbr construction site safety Ii Report of Subsurface Exploration ESP Project No E4-UD42.300 West End Development Maj 30 2006 5.4 DIFFICULT EXCAVATION Final site grades were not available during our analysis however it appears that Borings B-2 and B-i may be located in potential fill areas The soils and PWR encountered at these borings appear to be excavatable for mass grading Boring B-3 encountered PWR that appears to be excavatable to depth of approximately 16 feet below the existing ground elevation Shallow depths to PWR were encountered at Test Pits TP-l TP-7 and TP-9 with trackhoe refusal encountered at depths of feet feet and 3.5 feet respectively below the existing elevation Blasting would likely be necessary in these areas in order to remove the material below the depths of to feet below existing elevation in addition the borings performed by Mactee indicate shallow PWR and alluvium Based on the information obtained from our test pit observations it appears that partially weathered rock lense extends from Test Pits TP-1 across Cedar Street to TP-7 and TP-9 Also based on review of the Mactee report titled Report of Preliminary Geotechnical Exploration partially weathered rock was encountered in Mactees Borings B-i through B-9 Based on this information the PWR ridge appears to extend onward from the eastern portion of the site to the central portion near Clarkson Street Blasting will likely be necessary to remove the material below the refusal depths in this report and the borings by Mactee The remainder of the site appears to consist of exeavatable soils The depth to and thickness of PWR and rock lenses or seams can vary dramatically in short distances and between boring locations therefoie PWR or bedrock may be encountered during construction at locations or depths between boring locations not encountered during this exploration It has been our past experience in this geologic area that materials having Standard Penetration Resistances of less than 50 blows per 0.4 foot can generally be excavated using pans and scrapers by first loosening with ripper attached to suitable sized dozer such as Caterpillar 17 Report of Subsurface Exploratton ESP Project No E4-UD42.300 West End Development May 30 2006 D-8 or D-9 On earthwork projects requiring ripping questions sometimes develop as to whether the materials can be removed by ripping or whether blasting is required It should be noted that ripping is dependent upon finding the right combination of equipment and techniques used as well as the operators skill and experience The success of the ripping operation is dependent on fmding the proper combinations for the conditions encountered Excavation of the weathered rock is typically much more difficult in confined excavations Jackhammering or blasting is anticipated to be required for materials having Standard Penetration Resistances in excess of 50 blows per 0.2 foot We would like to OLflt out that our expenence indicates rock in weathered bouldei and massive form vanes erratically in location and depth in the Piedmont Geologic Province which contains Charlotte North Carolina Therefore there is always potential that thes matenals could be encountered at shallow depths between the bonng locations 55 FILL MATERIAL AND PLACEMENT All fill used for site grading operations should onsist of clean free of organics and debns lower plasticity soil Plasticity Index lecs than 30 The proposed fill should have maximum dry density of at least 90 pounds per i.ubic foot LIS determined by Standard Proctor compaction test ASTM 698 All fill should be placed in loose lifts not exceeding inches in thickness and compacted to minimum of 95 percent of its Standard Proctor maximum dry density with 100 percent achieved at the surface We recommend that field density tests includmg one-point Proctor venfication tests be performed on the fill as it is being placed at frequency determined by an expenenced geotechrncal engineer to verify the compaction entena Based on our expenence and exploration of the project site the majonty of the residual soils encountered appear suitable to use as structural fill If low urnt weight soils are encountered during grading mixing with higher unit weight soils or increased compaction effort will be required Based on the size of the gravel and crushed brick that we observed across several 18 Report of Subsurface Exploration ESP Project No E4-UD42.300 West End Development A/lay 30 2006 sections of the site these materials appear suitable for use as structural fill We anticipate that some moisture conditioning of the on-site soils will be required if they are re-used as structural fill 5.6 SLOPING OF BUILDING PADS We recommend that all building pads be sloped at final grade to allow for drainage during inclement weather The silty soils present at the site are extremely moisture sensitive If the pads are not properly sloped at fmal subgrade inclement weather could result in excessive softening of the subgrade soils 60 LIMITATIONS OF RJPORT This report has been prepared in accordance with generally accepted geotechnical engineering practice with regard to the specific conditions and requirements of this site The conclusions and recommendations contained in this report were based on the applicable standards of our practice in this geographic area at the time this report was prepared No other warranty expressed or implied is made The analysis and recommendations submitted herein are basea in part upon the data obtained from the subsurface exploration The nature ard extent of vanations between the bonngs and test pits will not be known until construction is underway If vanations appear evident then we request the opportunity to re-evaluate the recomMendations of this report In the event that any changes in the nature design or location of the structures are planned the conclusions and recommendations contained in this report will not be considered valid unless the changes are reviewed and conclusions modified or verified in writing by ESP 19 Report of Subswface Exploration ESP Project No E4-UD42 300 West End Development May 30 2006 In order to verify that earthwork and foundation recommendations are properly interpreted and implemented we recommend that ESP be provided the opportunity to review the final plans and specifications Any concerns observed will be brought to our clients attention in writing 20 FLELI EXPLORATION PROCEDURES Soil Test Boring Twelve 12i soil test borings were drii led at the approximate loctflons shown on the attached Borimr and Test Pit Location Plan with Site Vicimtv Map Fiwire Soil sampling and penetration testing were performed in accordance with ASTM The bot ings were advanced with hollowstem augers and at standard intervals soil samples were obtained with standard 1.4inch 1.D 2inch O.D.splitrube sampler The sampler as tirst seated six inches to penetrate any loose cuttings then driven an additional iot with blows of 140pound hammer frilling 30 inches The number of hammer blows is ilesinakd the Standard Penetration Resistance When properly evaluated the Standard Peneration Resistances provide an index to soil strength relative density and abil itv to support Joiindations Select portions of each soil sample were placed in sealed containers and taken to our oiIice samples were examined by representative of the geotechnical engineer thr classificaion Tet Boring Records arc auacliccl showing the soil descriptions and Standard Peneiration Reistances Test Pits Fourteen 14 test pits were excav3ted at the approximate locations shown l.rI the attached Boring and Test Pit Location Plan with Site Vicinity Map Figure The test pits were excavated by John Deere 135 iraekhoe haing an approximate depth capability ot 20 feet representative of the geotechriical engineer was present to observe excavation of the test pits The soil excavated from the test pit was casiIied by rcpresentativL ol the geutechnical engineer Summary of Test Pit Observations sheet giving the general soil stral gllDiiV is included in the ppendi BORING AND TEST PIT LOCATION PLAN PROJECT WEST END DEVELOPMENT PROJECT LOCATION ChaiIotte NC CLIENT BºzTer lb SHEET TITLE THIS DRAWING IS INTENDED TO SHOWAPPROXIMATE BORING LOCATIONS ONLY NO OTHER INFORMATION IS EXPRESSED OR IMPLIED LEGEND TO SOIL CLASSIFICATION AND SYMBOLS SOIL TYPES Shown in Graphic Log Asphalt Concrete Organic EEfl Sandy Silt Eli Topsoil Sandy Claye Silt Gravel fU Silty Sandy Clay Sand Clayey Silty Clay Silt Silty Sand Partially Weathered Rock Clay Clayey Sand Cored Rock SAMPLER TYPES CONSISTENCY OF COHESIVE SOILS Shown in Samples Column STD PENETRATION RESISTANCE Shelby Tube CONSISTENCY BLOWS FOOT Split Spoon Very Soft to Soft 3to4 Rock Core Firm to No Recovery Stiff to 15 VGry Stiff 16 to Hard 31 to 50 Very Hard Over 50 WATER LEVELS CONSISTENCY OF COHESIONLESS SOILS Shown in Waler Level Column STD PENETRATION RESISTANCE Water Level at Termination of Boring CONSISTENCY BLOWS FOOT Water Level Taken After 24 Hours Very Loose to Loose to ID thss of Drilling Water Medium Dense 11 to 30 Hole Cave Dense 31 to 50 Very Dense Over 50 TERMS Standard-The Number of Blows of 140 lb Hammer Falling 30 in Dynamic Cone The Number of Blows of 15 lb Penetration Required to Drive 1.4 in l.D Split Spoon Sampler Foot Penetrometer Hammer Fa ling 20 in Required Resistance N-Value As Specified in ASIM D-1 586 Test Data to Drive Cone Point 314 in When Properly Evaluated it can REC Total Length of Rock Recovered in the Core Barrel Divided be compared to the Standard by the Total Length of the Core Run Times 100 expressed Penetration Resistance as percentage RQD Total Length of Sound Rock Segments Recovered that are Longer Than or Equal to mechanical breaks included ESP ASSOGIATES P.A engtneerng urJ JIng piLnn%npDividedbythe Total Length of the Core Run Times 100 expressed as percentage PAGE of PROJECT West End Development Charlotte North Carolina TEST BORING RECORD B-I PROJECT No ELEVATION existing DRILLING METHOD NOTES E4-UD42.300 ground elevation 2-1/4 ID Hollow stem Drilling services provided by Anieridrill LOGGED BY BORING DEPTH DRILL RIG Jennifer Payne 25 FEET CME55 DATE DRILLED WATER LEVEL 05/02/06 Dry TOB Dry day __j SOIL DESCRIPTIO STANDARD PENETRATION TEST DATAI-uJ-Blowstft 10 50 709 BRICK 13 15 13 10 20 25 30T 35 RESIDUUM Stiff Red Silty CLAY With Manganese Stains Stiff Brownish Tan Fine Sandy SILT With Manganese Stains Firm Light Blackish Tan Fine Sandy SILT With Mica Boring was terminated at 25 feet Hole cave-in was observed at 22 feet 20 CS -J I- uc DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OFTIlESOILTYPES ENCOUNTERED AT THE BORING LOCATIONS DO NOT USE DEPTH MEASUREMENTS FOR DETERMINATION OF DISTANCES ORQUANTITIES 372 crompton St Charlotte NC 28273 704 504-1015 I- th CS I- PROJECT West End Development Charlotte North Carolina TEST BORING RECORD B-2 PROJECT No ELEVATION existing DRILLING METHOD NOTES -_________________ E4-UD42.300 ground eievation 2-114 ID Hollow stem Drilling services provided by Aniericirill LOGGED BY BORING DEPTH DRILL RIG Jennifer Payne 19 FEET CME55 DATE DRILLED WATER LEVEL 05102/06 Dry TOB Dry day Ui Ui STANDARD PENETRATION TEST DATA IL C1 00 SOIL DESCRIPTION Ui Blows/ft 10 30 50 709 STOMF RAS FILL Firm Red Fine Sandy SILT RESIDUUM Stiff Tan Fine Sandy SILT To Very Stiff Medium Dense Tannish Yellow Silty Fine SAND Whiteish Tan Silty SAND -\ 10---- 1-s rMIILYivcMInu Rock When Sampled BecomesVery Dense Whiteish Tan Silty Fine SAND 10 18 32 50/0.5 3010.4 10 15 20 25 30 Boring was terminated at 19 feet Hole cave-in was observed at 15 feet 30 DEPTH MEASUREMENTS ARE SHOWN TO-ILLUSTRATE THE GENERAL ARRANGEMENTS OFTHESOIL-TYPES ENCOUNTERED AT THE BORING LOCATIONS DO NOT USE DEPTI-t MEASUREMENTS FOR DETERMINATION OF DISTANCES ORQUANTITIES ES Associates P.A t5Xhtte.g.sunyi.j 372 Crompton St Charlotte NC 28273 704 504-1015 PAGE of PROJECT West End Development Charlotte North Carolina FILL Red Fine Sandy Silty CLAY With Pebbles ./ RESIDUUM Grayish Tan Fine Sandy SILT RESIDUUM Tannish White Silty SAND With Rock Fragments TEST BORING RECORD B-3 PROJECT No ELEVATION existing DRILLING METHOD NOTES -_______________ E4-U042.300 ground elevation 2-114 ID Hollow stem Drilling services provided by Ameridrill LOGGED BY BORING DEPTH DRILL RIG Jennifer Payne 18.7 FEET CME55 DATE DRILLED WATER LEVEL 05/02/06 Dry TOB 0.6 feet day Lu Lu I-STANDARD PENETRATION TEST DATA LLSOIL DESCRIPTION a-Liiw- BIOW5/ft 10 30 50 7091 FILL Red Silty CLAY \ASPHALT \STONE BASE PARTIALLY -jROCK When Sampled Becomes Very Dense Grayish White Silty SAND With Rock Fragments 1010 15 20 25 3QI 35 -in 16 60 50 73 iO/0.2 i..i.Y WEATHERED ROCK When Sampled Becomes Very Dense Tan Silty SAND With Rock Fragments Boring was terminated at 18.7 feet Hole cave-in was observed at 15 feet 15 I- DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OFTHESOILTYPESENCOUNTERED AT THE BORING LOCATIONS DO NOT USE DEPTH MEASUREMENTS FOR DETERMINATION OF DISTANCES OR 372 CrompionStQUANTITIES Charlotte NC 28273 704 504-10151of1 t-j Ct PROJECT TEST BORING RECORD B-4 10 15- 20 West End Development Charlotte North Carolina PROJECT No ELEVATION existing DRILLING METHOD NOTES -______________ E4-UD42.300 ground elevation 2-1/4 ID Hoflow stem Drilling services provided by Arneridrill LOGGED BY BORING DEPTH DRILL RIG Jennifer Payne 20 FEET CME55 DATE DRILLED WATER LEVEL 05/02/06 Dry TOB Dry day LU LU I-STANDARD PENETRATiON TEST DATAQoSOIL DESCRIPTION i-LUuj Blowslft 10 30 50 709 STONE BASE FILL Blackish Brown Fine Sandy SILT FILL Red Silty CLAY RESIDUUM Reddish Tan Fine Sandy Silty CLAY Stiff Reddish Tan Fine Sandy SILT 10 15 17 13 13 20 14 33WhiteishBrownSiltySAND 25 to -J Boring was terminated at 20 feet Hole cave-in was observed at 18 feet DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OFTHESOILTYPES ENCOUNTERED AT THE BORING LOCATIONS 0tttot0 DO NOT USE DEPTH MEASUREMENTS FOR DETERMINATION OF DISTANCES OR 372 CrornptonSrQUANTITIES Charlotte NC 28273 704 504-Jo/s PAGE of PROJECT West End Development Charlotte North Carolina RESIDUUM Very Soft Tan nish Yellow Fine Sandy Clayey SILT TEST BORING RECORD B-5 10 15 n_ PROJECT No ELEVATION existing DRILLING METHOD NOTES E4-UD42.300 ground elevation 2-1/4 ID Hollow stem Drilling services provided by Ameridrill LOGGED BY BORING DEPTH DRILL RIG Jennifer Payne 20 FEET CME55 DATE DRILLED WATER LEVEL 05/02/06 Dry TOB Dry day It9 -4LULU STANDARD PENETRATION TEST DATASOIL DESCRIPTION LUw-Blowslft _____10 30 50 7090 STONE BASE FILL Tannish Red Fine Sandy SILT With Pebbles Brownish Tan Fine Sandy SILT With Manganese Stains f1 tzI 19 15 16 13 11 11 10 15 20 25-- 30 35 Boring was terminated at 20 feet Hole cave-in was observed at 18 feet Li 25 -J I.- DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OFTHESOILTYPESENCOUNTREDAT THE BORING LOCATIONS DO NOT USE DEPTH MEASUREMENTS FOR DETERMINATION OF DISTANCES ORQUANTITIES 372 ronptoa St Charlotte NC 28273 704 504-1015 PAGE of PROJECT West End Development Charlotte North Carolina Whitesh Brown Ftne Sandy SILT TEST BORING RECORD B-6 PROJECT No ELEVATION existing DRILLING METHOD NOTES E4-UD42.300 ground elevation 2-1/4 ID Hollow stem Drilling services provided by Arneridrill LOGGED BY BORING DEPTH DRILL RIG Jennifer Payne 20 FEET CME55 DATE DRILLED WATER LEVEL 05/02/06 Dry TOB 14.5 feet day --i--I I-STANDARD PENETRATION TEST DATASOIL DESCRIPTION I- Blows/if 10 30 50 7091 FILL Tan Fine Sandy SILT With Gravel RESIDUUM Tannish White Fine Sandy SILT RESIDUUM Tannish Red Fine Sandy SILT With Manganese Stains 10- .4._ 10 15 20 25 30 10 60 59 33 15 23 r.J th -j jx 25 Boring was termnated at 20 feet Hole cave-in was observed at 16 feet DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OFTHESOILTYPESENCOUNTERED AT THE BORING LOCATIONS DO NOT USE DEPTH MEASUREMENTS FOR DETERMINATION OF DISTANCES ORQUANTITIES 8SPdssocjjes P.A girng...ymg .pM..th.g 372 crompion St Gharloue NC 28273 7041 504-1015 IACE of PFOJECT West End Development TEST BORING RECORD B-7 Charlotte North Carolina PROJECT No ELEVATION existing DRILLING METHOD NOTES E4-UD42.300 ground eevation 2-1/4 ID Hollow stem Drilling services provided by Arneridrill LOGGED BY BORING DEPTH DRILL RIG Jennifer Payne 20 FEET CME55 DATE DRILLED WATER LEVEL 05/02/06 Dry TOB Dry day -.3 STANDARD PENETRATION TEST DATASOILDESCRIPTIONWjliiBlows/ft 10 30 50 709 -SOE BASE FILL Orange Fine Sandy CLAY With Concrete Fragments and Large Debris 10 7T FILL Olive Orange Fine Sandy CLAY ..j rIIJuuuvI blackish Tan Silty SAND 11 10 32 Olive Orange Silty SAND With Rock Fragments In th -j I- __ 35--- boring was terminated at 20 feet Hole cave-rn was observed at 16 feet 25 30 35 DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OFTHESOILTYPESENCOUNTERED AT THE BORING LOCATIONS DO NOT USE DEPTH MEASUREMENTS FOR DETERMINATION OF DISTANCES ORQUANTITIES PAGE of ES Associates P.4 sngisnig phI. 372 Grompton Si Charlone NC 28273 704 504-1015 PROJECT West End Development Charlotte North Carolina FILL Gray Silty SAND With Rock Fragments arid Large Debris FILL Red Silty CLAY Wet TEST BORING RECORD B-8 PROJECT No ELEVATION existing DRILLING METHOD NOTES E4-UD42.300 ground elevation 2-1/4 ID Hollow stem Drilling services provided by Ameridrill LOGGED BY BORING DEPTH DRILL RIG Jennifer Payne 20 FEET CME55 DATEDRILLED WATERLEVEL 05/02/06 Dry TOB Dry day .1 STANDARD PENETRATION TEST DATA .-SOIL DESCRIPTION Ui Blows/ft ---10 30 50 709 \TOPSOILIGRASSMAT FILL Grayish White Silty SAND With Rock Fragments arid Large Debris 10 15 nfl RESIDUUM Yellowish Red Silty CLAY Firm Orangeish Tan Fine Sandy SILT With Rock Fragments 15 14 15 IiII 15 20Boringwasterminatedat20feetHolecave-in was observed at 16 feet 25 30 DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OFTHESOILTYPESENCOUNTERED AT THE BORING LOCATIONS DO NOT USE DEPTH MEASUREMENTS FOR DETERMINATION OF DISTANCES ORQUANTITIES 35 PAGE of --ESPAsocjateg P.AJn 372 Cronpton Sr Char/cue NC 28273 704 504.1015 PROJECT West End Development Chartotte North Carolina FILL Reddish Brown Silty SAND With Concrete Fragments and Large Debris FILL Tan Fine Sandy SILT With Rock Fragments\nd Large Debris FILL Red Silty CLAY FILL Red Silty CLAY With Rock Fragments and Large Debris Tan Fine Sandy SILT With Mica DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OFTHESOILTYPESENCOUNTEREDAT THE BORING LOCATIONS DO NOT USE DEPTH MEASUREMENTS FOR DETERMINATION OF DISTANCES ORQUANTITIES TEST BORING RECORD B-9 PROJECT No ELEVATION existing DRILLING METHOD NOTES E4-UD42300 ground elevation 2-1/4 ID Hollow stem Drilling services provided by Arneridrill LOGGED BY BORING DEPTH DRILL RIG Jennifer Payne 20 FEET CME55 DATE DRILLED WATER LEVEL 05/02/06 Dry TOB Dry day ------ RIPTIONSOILDESC Lii Ui STANDARD PENETRATION TEST DATA Li Blowsift-i 10 30 50 709 RESIDUUM Reddish Tan Fine Sandy Clayey SILT 12 17 10 15 20- .25 30 35 27 35 th .2 .4 -v- 20-__- 25 Boring was terminated at 20 feet Hole cave-in was observed at 16 feet 372 Crompion St Charlozie NC 28273 704 504-1015 PAGE TT PROJECT West End Development Charlotte North Carolina TEST BORING RECORD B-b PROJECT No ELEVATION existing DRILLING METHOD NOTES E4-UD42.300 ground elevation 2-1/4 ID Hollow stem Drilling services provided by Ameridrill LOGGED BY BORING DEPTH DRILL RIG Jennifer Payne 25 FEET CME55 DATE DRILLED WATER LEVEL 05/02106 19.7 feet lOB 12.0 feet dayLD _l SOIL DESCRIPTION STANDARD PENETRATION TEST DATA Lii Bows/ft Cl 10 30 50709 -.JOPSOIL/GRASSMAT FILL Red Fine Sandy CLAY With Pebbles Wet 10 15 FILL Red Silty CLAY RESIDUUM Orangeish Red Fine Sandy CLAY Whiteish Tan Silty SAND 20 16 10 ray Fine Sandy SILT -J .4 Boring was terminated at 25 feet l-IIe cave-in was observed at 20 feet 30 35_ ES Associates P.4 h.4 372 Croinpion St Charlotte NC 28273 704 504-1015 DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OFTHESOILTYPESENCOUNTERED AT THE BORING LOCATIONS DO NOT USE DEPTH MEASUREMENTS FOR DETERMINATION OF DISTANCES ORQUANTITIES I-Atit of ci ci PROJECT West End Development Charlotte North Carolina TEST BORING RECORD B1 PROJECT No ELEVATION existing DRILLING METHOD NOTES E4UD42.3O0 ground elevation 2-1/4 ID Hollow stem Drilling services provided by Arneridrill LOGGED BY BORING DEPTH DRILL RIG Jennifer Payne 19.5 FEET CME55 DATE DRILLED WATER LEVEL 05102106 Dry TOB Dry day STANDARD PENETRATION TEST DATA LLSOIL DESCRIPTION Blows/ft-J 10 30 50 709 15 10 11 16 50/0.5 -TONE BASE FILL Red Silty Fine Sandy CLAY RESIDUUM Reddish Brown Fine Sandy SILT Yellowish Tan Fine Sandy SILT With Quartz Fragments PARTIALLY WEATHERED ROCK When Sampled -...Bepmes Tan Silty SAND With Rock Fragments Boring was terminated at 19.5 feet Hole cave-in was observed at 17 feet 10 15 20 25 30 35 20 ci iO F- --35 DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OF 11 _4THESOILTYPESENCOUNTERED AT THE BORING LOCATIONS DO NOT USE DEPTH MEASUREMENTS FOR DETERMINATION OF DISTANCES OR 372 Crornpion StQUANTITIES Charlotte NC 28273 704 504-10151of1 West End Development TEST BORING RECORD B-12 Charlotte North Carolina PROJECT No ELEVATION existing DRILLING METHOD NOTES E4-UD42.300 ground elevation 2.114 ID hollow stem Drilling services provided by Ameridrill LOGGED BY BORING DEPTH DRILL RIG Jennifer Payne 25 FEET CME55 DATE DRILLED WATER LEVEL 05/02/06 Dry TOB Dry day I-10 .1 SOIL DESCRIPTION STANDARD PENETRATION TEST DATA IL uj Blows/ft 10 30 50709 -SjOrE BASE FILL Red Silty CLAY With Mica RESIDUUM Soft Orangeish Tan Fine Sandy SILT WithMica Yellowish White Fine Sandy SILT With Mica 20 10 17 25 PROJECT RESIDUUM Red Clayey Fine Sandy SILT With Mica 10 15 20 Brownish White Fine Sandy SILT With Mica HC Boring was terminated at 25 feet Hole cavein was observed at 22 feet 30 LI 1- 35 ________________________________________35 -J DEPTH MEASUREMENTS ARE SHOWN TO ILLUSTRATE THE GENERAL ARRANGEMENTS OFTHESOILTYPESENCOUNTERED AT THE BORING LOCATIONS DO NOT USE DEPTH MEASUREMENTS FOR DETERMINATION OF DISTANCES OR LQUANTITIE5 ISFASSociatesF.A 372 Crompton St Char1otte NC 28273 7041 504-10/5 PAGE of TEST PIT OBSERVATION RECORDS STRATIFICATION DATE TEST LOCATION DEPTH FEET SOIL DESCRIPTION REMARKS 5/12/06 TP-1 0-2 PARTIALLY WEATHERED ROCK When sampled becomes Tan Silty SAND Test pit terminated upon track hoe refusal at feet 5/12106 TP-2 5-16 FILL Bricks and Construction Debris RESIDUAL SOILS Tan Sandy SILT Test pit terminated at 16 feet 5/12/06 TP-3 0-14 FILL Bricks and Concrete mixed with various soil types Test pit terminated upon track hoe refusal at 14 feet 5/12/06 TP-4 0-13 RESIDUAL SOILS Tan Sandy SILT Test pit terminated upon track hoe refusal at 13 feet PROJECT West End Development CLIENT Beazer Homes LOCATION Charlotte North Carolina JOB NO E4-JD42 300 TEST PIT OBSERVATION RECORDS STRATIFICATION DATE TEST LOCATION DEPTH FEET SOIL DESCRIPTION REMARKS 5/12/06 TP-5 20 RESIDUAL SOILS Tan Sandy SILT Test pit terminated at 20 feet 5/12/06 TP-6 0-20 RESIDUAL SOILS Tan Sandy SILT Test pit terminated at 20 feet 5/12/06 TP-7 0-RESIDUAL SOILS Tan Sandy SILT Test pit terminated upon track hoe refusal at feet 5/12/06 TP-8 0-20 RESIDUAL SOILS Tan Sandy SILT Test pit terminated at 20 feet PROJECT West End Development CLIENT Beazer Homes LOGATION Charlotte North Carolina JOB NO E4-UD42.300 TEST PIT OBSERVATION RECORDS STRATIFICATION DATE TEST LOCATION DEPTH FEET SOIL DESCRIPTION REMARKS 5/12/06 TP-9 3.5 RESIDUAL SOILS Red Sandy SILT Test pit terminated upon track hoe refusal at 3.5 feet 5/12/06 TP-10 -20 FILL Organics/Concrete/Bricks RESIDUAL SOILS Red Sandy SILT Test pit terminated at 20 feet 5/12/06 TP-1 6-20 FILL Old Water Line and Various Soil Types PARTIALLY WEATHERED ROCK When sampled becomes Tan Silty SAND with rock fragments Test pit terminated at 20 feet 5/12/06 TP-12 0-1.5 1.5 11 RESIDUAL SOILS Red Sandy SILT PARTIALLY WEATHERED ROCK When sampled becomes Tan Silty SAND with rock fragments Test pit terminated upon track hoe refusal at 11 feet PROJECT West End Development CLIENT Beazer Homes LOCATION Charlotte North Carolina JOB NO E4-U D42.300 TEST PIT OBSERVATION RECORDS STRATIFICATION DATE TEST LOCATION DEPTH FEET SOIL DESCRIPTION REMARKS 5/12/06 TP-13 0-3 3-13 RESIDUAL SOILS Red Sandy SILT PARTIALLY WEATHERED ROCK When sampled becomes Tan Silty SAND Test pit terminated upon track hoe refusal at 13 feet 5/12/06 TP-14 0-2.5 2.5 14 RESIDUAL SOILS Red Sandy SILT PARTIALLY WEATHERED ROCK When sampled becomes Tan Silty SAND Test pit terminated upon track hoe refusal at 14 feet PROJECT West End Development CLIENT Beazer Homes LOCATION Charlotte North Carolina JOB NO E4-UD42.300