Loading...
HomeMy WebLinkAboutExhibit A-3_Subsurface Exploration Services-Oct 7 2010Tai and Associates, PLLC 5561 McNeely Drive, Suite 101 Raleigh, NC 27612 (919) 782-9525 (919) 782-9540 (Fax) October 7, 2010 Mr. Brian J. Natwick Crescent Resources, LLC 400 South Tryon Street Charlotte, North Carolina 28285 Re:Subsurface Exploration Services Erwin Square -Residential Durham, North Carolina Tai Job No.: 10-165-1 Dear Mr. Natwick: In accordance with your authorization, we have completed a subsurface exploration program for the referenced project. This program consisted of the drilling of thirteen (13) soil borings, classification of soil samples recovered, engineering services including analyses of subsurface conditions, consultation, and the preparation of this written report. The work was performed in general conformance with our September 13, 2010 proposal. FIELD EXPLORATION The field exploration program consisted of the drilling of thirteen (13) soil borings (B-1 thru B-12, and B-11A) to a maximum depth of 40.0 feet below the existing ground surface. The drilling was performed with a CME 550 ATV drill rig equipped with 2-1/4” inside diameter hollow stem augers to advance the boreholes. Standard Penetration Tests (ASTM D-1586) were performed in all borings at every 2.5-foot interval to 10.0 feet deep followed by one at every 5.0 foot interval. The approximate locations and logs of the thirteen (13) borings are shown on the attached “Boring Location Plan” and “Boring Logs”. The boring locations were staked by measuring from existing ground features and should be considered approximate. The boring elevations are interpolated from 2.0 and 10.0 foot contour lines shown on the Durham County GIS website and should be considered approximate. LABORATORY TESTING The laboratory-testing program consisted of the visual classification of all soil samples recovered (ASTM D-2488). The descriptions of the subsurface materials as represented by the soil samples recovered are indicated on the “Boring Logs.” All samples obtained will be discarded in 60 days unless otherwise instructed. Mr. Brian J. Natwick Re: Tai Job No.: 10-165-1 October 7,2010 Page 2 SUBSURFACE CONDITIONS Based on the results of the field exploration program, the subsurface material of the project site can be described as consisting of the following units of soil: 1.Surface Materials (Topsoil): The surface material in all the borings consists of 1.0 to 3.0 inches of topsoil containing sandy-silty organic soil and/or mulch. Root mat may extend to a deeper depth. 2.Fill Soil:Existing fill or backfill soils are found in eleven (11) borings. Borings B-11 and B- 11A did not encounter any fill. The deepest fill was encountered in borings B-3 and B-4 at depths of 16.0 and 18.3 feet below the ground surface, respectively. The fill depth in the remaining borings varies between 5.5 feet and 12.0 feet deep. It consists of fine sandy clay and silt with gravel. Deeper fill or backfill soil may exist elsewhere on site not drilled. We assume that the existing fill was placed in multiple phases for the construction of utility lines and structures. The upper 8.0 to 12.0 feet of this unit of soil is of moderate engineering quality. The deep fill encountered in B-3 and B-4 is of poor engineering quality and not suitable to support the proposed structures. 3.Silty-Clayey Soil: Below the fill soil is the natural residual soil and it was encountered in all thirteen (13) borings. It contains sandy-silty, or sandy-clayey, natural residual soils derived from the in-place weathering of the parent Triassic rocks. This moderate engineering quality, stiff to hard material varies in thickness from 11.0 to 23.0 feet. Boring B-12 contained a 2.5 foot thick layer of firm, clay of medium to high plasticity. 4.Diabase Dikes and Sills: Diabase dikes and sills are intrusive geologic formations. This very poor engineering quality material consists of wet plastic silts, wet silty sands, gravels, and boulders of varying sizes. Evidence of diabase was encountered in boring B-11. As depicted on the boring location plan, this geologic anomaly is often found in a 5-foot. to 25-foot wide dike running slightly east of north. 5.Weathered Rock: The next unit of soil at the project site is the Weathered Triassic siltstone or sandstone which occurs below the above soil overburden. As indicated in the “Boring Logs,” the depth of this very hard material occurs at depths varying from 18.3 feet to 34.5 feet below the existing ground surface. The Triassic rock found at the site consists of a random mixture of slightly lighter colored sandstone and darker colored siltstone. This is evident by the samples collected in the weathered rock mass and also the residual soil layer above. This unit is of good engineering quality. Mr. Brian J. Natwick Re: Tai Job No.: 10-165-1 October 7,2010 Page 3 6.Partially Weathered Rock/Boulders: Some of the weathered rock becomes much harder with depth and is classified as partially weathered rock (PWR) or boulders. For this project, the partially weathered rock is defined as very hard, rock-like material having an N value of 50 blows over one inch or less. PWR was encountered in borings B-3 and B-7 at an elevation of 381.0 and 388.0, respectively. The difference between weathered rock and partially weathered rock can be very small and may vary erratically in depths from place to place. 7.Groundwater: Trapped or perched groundwater was encountered all thirteen (13) boreholes. The groundwater encountered exists in the fill above the silty-clayey residual soil. Additional trapped or perched water may exist elsewhere on site not drilled. Surface water control measures will be required throughout the site during construction. The subsurface materials encountered in the thirteen (13) borings are presented in three (3) “Subsurface Cross Sections” and a “Summary of Subsurface Materials” attached to this report. PROPOSED PROJECT We understand that the proposed project will involve the design/construction of a four-story residential structure and three-story parking deck. The residential structure will consist of one cast-in- place story and three wood framed stories above. Cut and fill depths are assumed to be 3.0 to 5.0 across the site. The proposed finish floor elevation, foundation plan, and grading plan is not available for review at the time of this report. We assume the finish floor elevation will be about 410.0. RECOMMENDATIONS Apartment Building We recommend that the columns and load bearing walls of the proposed Erwin Square Residential Apartment Building should be supported on single, combined, or continuous footings designed for a 3,000 psf bearing capacity. Subgrade improvement consisting of VibroPiers will be required. Parking Deck We recommend that the columns and load bearing walls of the proposed Erwin Square Residential Parking Deck should be supported on single, combined, or continuous footings on an improved subgrade and designed for the bearing capacity shown below. Mr. Brian J. Natwick Re: Tai Job No.: 10-165-1 October 7,2010 Page 4 Subgrade Improvement-Parking Deck 1.Localized Undercut and Replacement We recommend the shallow foundations for the parking deck be undercut and supported on an ABC stone mat layered with geotextiles. A layer of separation geofabric (Mirafi HP370) should be installed prior to ABC stone placement. The geofabric should be placed in the excavation with 2.0 feet of overlap and 2.0 of wrap-up at the edges. Two (2) layers of stabilization geogrid (Tensar Triax TX5) should be installed after the first and second lift of ABC stone with 2.0 feet overlap and 2.0 feet of wrap-up at the edges. The ABC stone should be compacted to 98% of the NC DOT modified proctor. See “Subgrade Improvement Section” attached to this report for additional details. The design bearing capacity of this option is 8,000 psf. 2.VibroPiers We recommend the VibroPiers extend to residual soil. The VibroPier size and locations should be determined on a design-build basis by a registered professional engineer. We recommend consulting with Mr. Todd Ross, PE, Hayward Baker, Inc., 336-668-0884. Our firm should review the VibroPier submittal with design calculations, pier locations, depths and specifications. The design bearing capacity for this option is 6,000 psf. The VibroPier design and construction must take into account fill soils, groundwater, and possible soft diabase soils. It appears that pre-drilling will be required to advance the piers through the fill and a bottom-feed VibroPier system will be required. All footing excavations must be inspected for the design bearing capacity. The maximum total and differential post-construction settlement will be about 1.0 inches and 0.5 inches, respectively. Expansion joints should be provided on the exterior walls at regular intervals and at every building break. There should be at least 12 inches of cover on all exterior footings to prevent frost penetration. Footings should be designed at an elevation that no utility lines, utility line excavation, and any other footings are located within the 1:1 zone of influence of the subject footing edge. Seismic Site Classification The project site belongs to seismic Site Class D, according to the 2009 International Building Code. Groundwater During construction, the groundwater will not cause major construction problems but trapped water within the existing fill will enter deep excavations during construction. We expect that, at least in Mr. Brian J. Natwick Re: Tai Job No.: 10-165-1 October 7,2010 Page 5 some areas, surface and groundwater control measures, such as trenching, ditching, sumps, pumps, French drains, etc., will be required. Excavation All normal size earth-moving equipment can easily move the materials above the weathered rock layer. Normally, slow excavation with a large hydraulic excavator such as CAT 330, or equal, should be able to excavate the hard soil and most of the weathered rock layer.Rock should be defined as material that cannot be excavated with a track mounted hydraulic excavator, equipped with rock teeth, equivalent to a CAT 330. Boulders exceeding 1.0 cy in mass excavations and 0.75 cy in trench excavations should also be classified as rock. Definition and unit prices for rock and trench excavation should be included in the specification and contract. Rock excavation in utility trenches and footings may be required near boring B-11 and possibly elsewhere between the borings. Fill and Backfill All fill and any backfill should be placed and compacted to a minimum of 98% of the Standard Proctor Density (ASTM D-698). The moisture content of the fill during placement must be kept within 3% of the optimum value. Most of the dry fill, natural soil, hard soil, and weathered rock in the cut areas should provide suitable regular backfill material except for any plastic clay pockets and all boulders larger than 6.0 inches in any dimension. In-place density tests should be performed at a rate of one test per 2,500 sf, per lift, per day (ASTM D-1556). The final slope of cut and fill should be 2H:1V starting at least 5.0 feet from the edge of all footings and paved areas. Utilities All utility pipes should be supported on top of at least 6.0 inches of suitable granular soil or #57 washed stone. The backfill should consist of clean natural soil, or suitable fill, and should be compacted to 98% of the Standard Proctor Density (ASTM D-698). Removal of weathered rock or isolated boulders by a large track backhoe equipped with rock teeth will be required in any deep utility trenches. Pavement The pavement system should be supported on a carefully prepared site subgrade as outlined in the next section. Based on the AASHTO Method, 20-year life, and assumed soaked CBR Value of 6.0, the heavy-duty pavement should consist of 4.0 inches of asphalt over 10.0 inches of ABC stone. Regular parking areas should be paved with 2.0 inches of asphalt over 7.0 inches of ABC stone. A layer of geofabric such as Mirafi 500X may be required. Mr. Brian J. Natwick Re: Tai Job No.: 10-165-1 October 7,2010 Page 6 Slabs The floor slab area should be constructed over 4.0 inches of compacted ABC stone over a well prepared compacted subgrade. Any plastic clay soil or existing fill soil encountered in the subgrade should be undercut at least 2.0 feet and replaced with suitable soil compacted to 98% of the Standard Proctor Density. Expansion joints should be provided as required by ACI to minimize uncontrolled shrinkage cracks. The fine, silty, clayey soil will be disturbed after grading by the construction activities. Any damaged subgrade must be repaired prior to the placement of stone and concrete. The modulus of subgrade reaction for slabs and concrete pavements is 300 kips per cubic foot. CONSTRUCTION CONSIDERATIONS Engineering Behavior of Soils The on-site silty soils are sensitive to surface water damage. Grading operations performed in the wet winter months of November through March will be difficult, time consuming, and expensive. Grading The project site should be cleared of all the existing surface features such as topsoil, debris, etc. Most of the non-plastic fill and natural, residual soil can be reused as structural fill. Surface water control measures must be placed prior to any grading and earthwork activity. The cleared site will not promote surface water drainage. We anticipate that very little surface water will percolate into the fine silty-clayey soil. As a result, the construction team should plan for all surface water being directed trenches and stormwater ponds. The cleared site where fill is required should be carefully proofrolled and inspected to identify any soft soil, plastic clay, or other unsuitable soil that requires undercutting and backfilling with suitable soil and/or placement of geofabric (Mirafi 500X or equal). Backfill should consist of clean, existing fill, sandy-silty, residual soil, or approved off-site borrow, placed in 8.0-inch layers and compacted to 98% of the required Standard Proctor Density (ASTM D-698). The moisture content should be maintained to within 3% of the optimum. In -Place Density tests should be performed on the fill and backfill at a rate of one test per 2,500 sf, per lift, per day (ASTM D- 1556). We recommend removing the soft, loose existing backfill above the utility line near borings B-1 and B-4 and replacing with suitable well-compacted backfill. Where located below foundations, the utility should be removed or grouted solid and abandoned in-place Mr. Brian J. Natwick Re: Tai Job No.: 10-165-1 October 7,2010 Page 7 Shallow Foundations The building pad should be rough graded prior to Vibro Pier Installation. Footings not poured on the same day of excavation should be protected with a 2-inch thick concrete mud-mat to protect from surface water damage. All footing subgrades must be compacted with a rammax or jumping jack and inspected by a representative of this firm utilizing field engineering judgment. VibroPiers The VibroPier design should be submitted for review to the structural engineer and to our firm. The pier installation should take place after mass grading and after the building pad is on rough grade. Clean, dry, non plastic soil excavated during pre-drilling may be suitable for re-use as structural fill. VibroPier installation will be time consuming and difficult where diabase is encountered due to boulders. Boulders or obstructions encountered within the top 10.0 should be excavated using normal earth moving equipment. Once the excavation is properly backfilled, VibroPier installation can resume. Slab Subgrades The subgrade for the concrete slab system will require inspection of the subgrade and ABC stone subbase using field engineering judgment. Some additional improvement may be required including undercutting and/or placement of Mirafi 500X geofabric due to damage by surface water and construction traffic. ADDITIONAL SERVICES Based on our experience working on projects similar to Erwin Square Residential, revisions and modifications may be necessary as the design progresses. The foundation and earthwork design recommendations presented in this report are based not only on our field and laboratory test results, but also on the very limited preliminary project information currently available to us. When grading and foundation plans become available, we would be pleased to have the opportunity to review the plans to check for compatibility with the geotechnical recommendations. We believe that the vibro piers may be able to be omitted in the residential section. Instead, additional undercut would be required. For this option to be explored, we recommend additional exploration by Test Pits in the general area of borings B-3 and B-4. FIELD SERVICES All earthwork, foundation, slab, and utility construction activities should be observed by one of our experienced geotechnicians. He will offer assistance in determining the depth of any unsuitable subgrade soil, the foundation bearing capacity, the adequacy of compaction, the areas that require Mr. Brian J. Natwick Re: Tai Job No.: 10-165-1 October 7,2010 Page 8 geofabric, the definition of rock or trench rock, and any other site-related problems. We cannot be held responsible for any construction problems or the performance of the foundation unless we are authorized to provide these field services. CLOSURE It has been a pleasure to work with you on the pre-design phase of this project. If you have any questions, or if you would like to discuss the issue further, please feel free to call at your convenience. Very Truly Yours, Tai and Associates, PLLC Firm License No.: P-0370 Allan Paul, EI Matthew T. Ryan, PE Attachments: 1.Boring Location Plan (1) 2.Boring Logs (13) 3.Subsurface Cross Sections (3) 4.Summary of Subsurface Materials 5.Subgrade Improvement Section BORING LOCATION PLAN WITH ELEVATION OF RESIDUAL SOIL ERWIN SQUARE RESIDENTIAL DURHAM, NORTH CAROLINA TAI JOB NO.: 10-165-1 SEPTEMBER 2010 B-1 (388.0) B-11/11A B-12 B-10 B-2 B-3 B-4 B-5 B-6 B-7 B-8 B-9 (397.5) (386.7) (399.5)(406.5) (402.5) (402.0)(407.5) (405.5) (408.5)(414.0) (394.0) DEPTH DESCRIPTION GW ELEV 10 50 90 BORING LOG TAI and ASSOCIATES, PLLC 5561 McNEELY DRIVE, SUITE 101, RALEIGH, NC 27612, 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. PAGE 1 OF 1 DATE: N-VALUE (ASTM D-1586) 19 8 11 8 9 33 0.4 13.1 0.1 2.5 5.5 8.0 12.0 16.0 23.5 30.0 TOPSOIL FILL - Brown, very stiff, sandy SILT FILL - Tan, Brown, firm, sandy SILT FILL - Brown, stiff, sandy SILT with asphalt FILL - Tan, firm, sandy SILT with gravel Dark brown, gray, stiff, fine sandy, silty, CLAY Gray, dark brown, hard, SILT WEATHERED ROCK - Gray Triassic SANDSTONE Boring Terminated at 30.0 Feet 10-165-1 B-1 SEPTEMBER 20, 2010 ERWIN SQUARE RESIDENTIAL DURHAM, NORTH CAROLINA CRESCENT RESOURCES, LLC 50 0.4 50 400 395 390 385 380 375 370 365 360 DEPTH DESCRIPTION GW ELEV 10 50 90 BORING LOG TAI and ASSOCIATES, PLLC 5561 McNEELY DRIVE, SUITE 101, RALEIGH, NC 27612, 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. PAGE 1 OF 1 DATE: N-VALUE (ASTM D-1586) 26 11 13 15 24 48 20 12.0 0.2 3.0 5.5 12.0 16.0 22.0 28.0 35.0 TOPSOIL FILL - Brown, gray, very stiff, sandy SILT POSSIBLE FILL - Gray, orange, stiff, silty CLAY Brown, gray, stiff, silty CLAY Brown, very stiff, slightly sandy, silty CLAY Dark brown, hard, silty CLAY Dark brown, gray, very stiff, silty CLAY WEATHERED ROCK - Gray Triassic SANDSTONE Boring Terminated at 35.0 Feet 10-165-1 B-2ERWIN SQUARE RESIDENTIAL DURHAM, NORTH CAROLINA CRESCENT RESOURCES, LLC SEPTEMBER 17, 2010 0.3 50 0.5 50 403 398 393 388 383 378 373 368 363 DEPTH DESCRIPTION GW ELEV 10 50 90 BORING LOG TAI and ASSOCIATES, PLLC 5561 McNEELY DRIVE, SUITE 101, RALEIGH, NC 27612, 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. PAGE 1 OF 1 DATE: N-VALUE (ASTM D-1586) 6 5 9 5 1 34 21 10.9 0.1 2.5 5.5 8.0 12.0 16.0 27.0 31.0 TOPSOIL FILL - Brown, orange, tan, firm, sandy SILT FILL - Tan, brown, firm, sandy CLAY FILL - Brown, tan, orange, stiff, sandy SILT FILL - Brown, orange, gray, moist, firm, sandy CLAY FILL - Tan, gray, wet, very soft, sandy SILT Dark brown, gray, hard to very stiff, silty CLAY WEATHERED ROCK - Brown Triassic SILTSTONE 10-165-1 B-3ERWIN SQUARE RESIDENTIAL DURHAM, NORTH CAROLINA CRESCENT RESOURCES, LLC SEPTEMBER 20, 2010 35.0 Boring Terminated at 35.0 Feet PARTIALLY WEATHERED ROCK - Gray Triassic SANDSTONE 0.2 50 0.1 50 410 405 400 395 390 385 380 375 370 DEPTH DESCRIPTION GW ELEV 10 50 90 BORING LOG TAI and ASSOCIATES, PLLC 5561 McNEELY DRIVE, SUITE 101, RALEIGH, NC 27612, 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. PAGE 1 OF 1 DATE: N-VALUE (ASTM D-1586) 16 8 16 8 1 18.2 0.1 2.5 5.5 8.0 12.0 18.3 25.0 TOPSOIL FILL - Tan, brown, very stiff, sandy SILT FILL - Tan, brown, firm, sandy SILT FILL - Gray, very stiff, sandy CLAY FILL - Brown, gray, sandy CLAY with coal FILL - Gray, moist, very soft, sandy CLAY WEATHERED ROCK - Gray Triassic SANDSTONE Boring Terminated at 25.0 Feet 10-165-1 B-4ERWIN SQUARE RESIDENTIAL DURHAM, NORTH CAROLINA CRESCENT RESOURCES, LLC SEPTEMBER 20, 2010 *Petroleum Odor 0.5 50 0.2 50 405 400 395 390 385 380 375 370 365 DEPTH DESCRIPTION GW ELEV 10 50 90 BORING LOG TAI and ASSOCIATES, PLLC 5561 McNEELY DRIVE, SUITE 101, RALEIGH, NC 27612, 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. PAGE 1 OF 1 DATE: N-VALUE (ASTM D-1586) 17 7 11 9 16 22 10.2 0.1 2.5 5.5 8.0 16.0 30.0 TOPSOIL FILL - Gray, brown, black, firm, silty SAND FILL - Gray, brown, orange, firm, silty CLAY Gray, brown, stiff, silty CLAY Brown, stiff to very stiff, silty CLAY Gray, dark brown, very stiff, fine sandy, silty CLAY WEATHERED ROCK - Gray Triassic SANDSTONE Boring Terminated at 30.0 Feet 10-165-1 B-5ERWIN SQUARE RESIDENTIAL DURHAM, NORTH CAROLINA CRESCENT RESOURCES, LLC SEPTEMBER 17, 2010 22.0 0.5 50 0.3 50 405 400 395 390 385 380 375 370 365 DEPTH DESCRIPTION GW ELEV 10 50 90 BORING LOG TAI and ASSOCIATES, PLLC 5561 McNEELY DRIVE, SUITE 101, RALEIGH, NC 27612, 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. PAGE 1 OF 1 DATE: N-VALUE (ASTM D-1586) 17 8 11 4 5 27 18 11.2 0.2 3.0 5.5 8.0 12.0 16.0 22.0 28.5 TOPSOIL FILL - Tan, firm, silty SAND FILL - Tan, brown, firm, sandy CLAY Tan, brown, black, firm, silty SAND with slickensides Light brown, tan, orange, moist, very loose, silty SAND Tan, gray, moist, loose, silty SAND Tan, purple, moist, very firm, silty SAND Tan, brown, yellow, wet, firm, silty SAND 10-165-1 B-6ERWIN SQUARE RESIDENTIAL DURHAM, NORTH CAROLINA CRESCENT RESOURCES, LLC SEPTEMBER 20, 2010 35.0 Boring Terminated at 35.0 Feet WEATHERED ROCK - Reddish brown, wet, WEATHERED ROCK - Gray, wet, Triassic SILTSTONE 32.0 Triassic SILTSTONE 0.3 50 0.5 50 with mica with mica with mica with mica with mica 412 407 402 397 392 387 382 377 372 DEPTH DESCRIPTION GW ELEV 10 50 90 BORING LOG TAI and ASSOCIATES, PLLC 5561 McNEELY DRIVE, SUITE 101, RALEIGH, NC 27612, 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. PAGE 1 OF 1 DATE: N-VALUE (ASTM D-1586) 19 10 6 12 16 20.8 0.1 3.0 6.0 8.5 13.0 19.0 23.0 25.0 TOPSOIL FILL - Brown, gray, silty, firm, clayey, medium to FILL - Brown, stiff, sandy, silty CLAY FILL - Brown, tan, firm, plastic CLAY Gray, stiff, fine sandy, clayey SILT Gray, brown, very stiff, CLAY WEATHERED ROCK - Brown Triassic SANDSTONE PARTIALLY WEATHERED ROCK - Brown Boring Terminated at 25.0 Feet 10-165-1 B-7ERWIN SQUARE RESIDENTIAL DURHAM, NORTH CAROLINA CRESCENT RESOURCES, LLC SEPTEMBER 20, 2010 coarse SAND Triassic SANDSTONE 0.2 50 0.1 50 411 406 401 396 391 386 381 376 371 DEPTH DESCRIPTION GW ELEV 10 50 90 BORING LOG TAI and ASSOCIATES, PLLC 5561 McNEELY DRIVE, SUITE 101, RALEIGH, NC 27612, 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. PAGE 1 OF 1 DATE: N-VALUE (ASTM D-1586) 41 8 7 12 43 43 7.0 0.1 3.0 5.5 8.0 12.0 20.5 30.0 TOPSOIL FILL - Gray, dense, silty SAND FILL - Gray, tan, firm, silty CLAY FILL - Gray, firm, silty CLAY Brown, black, stiff, slightly sandy, silty CLAY Brown, hard, silty CLAY WEATHERED ROCK - Brown Triassic SILTSTONE Boring Terminated at 30.0 Feet 10-165-1 B-8ERWIN SQUARE RESIDENTIAL DURHAM, NORTH CAROLINA CRESCENT RESOURCES, LLC SEPTEMBER 17, 2010 0.3 50 0.3 50 410 405 400 395 390 385 380 375 370 DEPTH DESCRIPTION GW ELEV 10 50 90 BORING LOG TAI and ASSOCIATES, PLLC 5561 McNEELY DRIVE, SUITE 101, RALEIGH, NC 27612, 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. PAGE 1 OF 1 DATE: N-VALUE (ASTM D-1586) 9 4 7 12 14 28 10.3 0.2 3.0 5.5 8.0 16.0 30.0 TOPSOIL FILL - Brown, red, gray, stiff, silty CLAY POSSIBLE FILL - Tan, orange, soft, slightly sandy, Gray, tan, firm, fine sandy SILT Tan, firm, silty SAND Gray, very firm, silty SAND WEATHERED ROCK - Tan Triassic SANDSTONE Boring Terminated at 30.0 Feet 10-165-1 B-9ERWIN SQUARE RESIDENTIAL DURHAM, NORTH CAROLINA CRESCENT RESOURCES, LLC SEPTEMBER 20, 2010 21.9 0.3 50 0.5 50 silty CLAY 413 408 403 398 393 388 383 378 373 DEPTH DESCRIPTION GW ELEV 10 50 90 BORING LOG TAI and ASSOCIATES, PLLC 5561 McNEELY DRIVE, SUITE 101, RALEIGH, NC 27612, 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. PAGE 1 OF 1 DATE: N-VALUE (ASTM D-1586) 14 7 11 23 23 31 27 48 29.1 0.1 3.0 5.5 16.0 22.0 25.0 36.0 40.0 TOPSOIL FILL - Brown, stiff, sandy SILT FILL - Brown, tan, wet, firm, silty CLAY Dark brown, gray, very stiff, silty CLAY Gray, dense, silty, fine SAND Gray, brown, very stiff to hard, silty CLAY WEATHERED ROCK - Brown Triassic SILTSTONE WEATHERED ROCK - Gray Triassic SANDSTONE Boring Terminated at 40.0 Feet 10-165-1 B-10ERWIN SQUARE RESIDENTIAL DURHAM, NORTH CAROLINA CRESCENT RESOURCES, LLC SEPTEMBER 20, 2010 0.3 50 0.550 8.5 FILL - Brown, gray, stiff, silty CLAY 414 409 404 399 394 389 384 379 374 DEPTH DESCRIPTION GW ELEV 10 50 90 BORING LOG TAI and ASSOCIATES, PLLC 5561 McNEELY DRIVE, SUITE 101, RALEIGH, NC 27612, 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. PAGE 1 OF 1 DATE: N-VALUE (ASTM D-1586) 11 10 15 12 13.2 0.1 3.0 5.5 13.5 TOPSOIL Orange, red, brown, stiff, sandy SILT Red, brown, firm, silty CLAY with slickensides Brown, moist, stiff, sandy SILT (Diabase Dike) Auger Refusal at 13.5 Feet 10-165-1 B-11ERWIN SQUARE RESIDENTIAL DURHAM, NORTH CAROLINA CRESCENT RESOURCES, LLC SEPTEMBER 17, 2010 Numerous boulders and cobbles encountered 0.050 414 409 404 399 394 389 384 379 374 DEPTH DESCRIPTION GW ELEV 10 50 90 BORING LOG TAI and ASSOCIATES, PLLC 5561 McNEELY DRIVE, SUITE 101, RALEIGH, NC 27612, 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. PAGE 1 OF 1 DATE: N-VALUE (ASTM D-1586) 5 17 13 30 51 12.8 13.5 17.0 22.0 27.0 34.5 40.0 AUGER PROBE TO 13.5' Dark tan, firm, sandy, silty CLAY Dark tan, firm, silty SAND Dark brown, purple, hard, fine sandy, silty CLAY Tan, wet, hard, slightly sandy SILT WEATHERED ROCK - Brown, wet, Triassic Boring Terminated at 40.0 Feet 10-165-1 B-11AERWIN SQUARE RESIDENTIAL DURHAM, NORTH CAROLINA CRESCENT RESOURCES, LLC SEPTEMBER 17, 2010 OFFSET 10' TOWARD B-12 SILTSTONE 0.350 414 409 404 399 394 389 384 379 374 DEPTH DESCRIPTION GW ELEV 10 50 90 BORING LOG TAI and ASSOCIATES, PLLC 5561 McNEELY DRIVE, SUITE 101, RALEIGH, NC 27612, 919-782-9525 PROJECT: LOCATION: CLIENT: BORING NO. PAGE 1 OF 1 DATE: N-VALUE (ASTM D-1586) 27 11 9 8 9 73 19 47 14.2 0.1 3.0 5.5 9.5 12.0 18.5 22.0 27.0 TOPSOIL FILL - Tan, very stiff, sandy SILT FILL - Tan, brown, stiff, sandy CLAY FILL - Orange, tan, gray, stiff, clayey, sandy SILT Gray, firm, plastic CLAY Gray, dark brown, stiff, silty CLAY Gray, moist, very dense, silty SAND Tan, moist, firm, silty SAND 10-165-1 B-12ERWIN SQUARE RESIDENTIAL DURHAM, NORTH CAROLINA CRESCENT RESOURCES, LLC SEPTEMBER 20, 2010 27.0 Tan, moist, dense, silty SAND 40.0 WEATHERED ROCK - Gray, wet, Triassic Boring Terminated at 40.0 Feet SILTSTONE WEATHERED ROCK - Brown, wet, Triassic SILTSTONE 35.0 0.550 0.4 50 418 413 408 403 398 393 388 383 378 13.118.2 20.8 12.0 23.5 30.0 18.3 25.0 8.5 19.0 23.0 25.029.1 25.0 40.0 8.5 420 415 410 405 395 400 385 390 380 375 370 B-10 B-7 B-4 B-1 14 7 11 23 23 31 27 48 19 8 11 8 9 33 0.4 0.4 0.5 0.3 19 10 6 12 16 0.2 0.1 16 8 16 8 1 0.2 0.5 FILL RESIDUAL WR PWR DIABASE TAI JOB NO. 10-165-1 TAI and ASSOCIATES, PLLC 5561 McNEELY DRIVE, SUITE 101, RALEIGH, NC 27612, 919-782-9525 SUBSURFACE CROSS SECTION - A PROJECT: LOCATION: CLIENT: PAGE 1 OF 1 DATE: ERWIN SQUARE RESIDENTIAL DURHAM, NORTH CAROLINA CRESCENT RESOURCES, LLC SEPTEMBER 2010 12.0 10.2 7.0 13.2 12.8 5.5 28.0 35.0 5.5 30.0 8.0 20.5 30.0 5.5 13.5 13.5 34.5 40.0 22.0 420 415 410 405 395 400 385 390 380 375 370 B-11 B-11A B-8 B-5 B-2 11 10 15 12 0.0 5 17 13 30 0.3 51 41 8 7 12 43 43 0.3 0.3 17 7 11 9 16 22 0.3 0.5 26 11 13 15 24 48 20 0.5 0.3 FILL RESIDUAL WR PWR DIABASE TAI JOB NO. 10-165-1 TAI and ASSOCIATES, PLLC 5561 McNEELY DRIVE, SUITE 101, RALEIGH, NC 27612, 919-782-9525 SUBSURFACE CROSS SECTION - B PROJECT: LOCATION: CLIENT: PAGE 1 OF 1 DATE: ERWIN SQUARE RESIDENTIAL DURHAM, NORTH CAROLINA CRESCENT RESOURCES, LLC SEPTEMBER 2010 10.9 11.2 10.3 14.2 16.0 27.0 31.0 5.5 28.5 5.5 30.0 9.5 35.0 35.0 21.9 30.0 40.0 420 415 410 405 395 400 385 390 380 375 370 B-12 B-9 B-6 B-3 27 11 9 8 9 73 19 47 0.5 0.4 9 4 7 12 14 28 0.5 0.3 17 8 11 4 5 27 18 0.5 0.3 6 5 9 5 1 34 21 0.2 0.1 FILL RESIDUAL WR PWR DIABASE TAI JOB NO. 10-165-1 TAI and ASSOCIATES, PLLC 5561 McNEELY DRIVE, SUITE 101, RALEIGH, NC 27612, 919-782-9525 SUBSURFACE CROSS SECTION - C PROJECT: LOCATION: CLIENT: PAGE 1 OF 1 DATE: ERWIN SQUARE RESIDENTIAL DURHAM, NORTH CAROLINA CRESCENT RESOURCES, LLC SEPTEMBER 2010 SUMMARY OF SUBSURFACE MATERIALS ERWIN SQUARE RESIDENTIAL DURHAM, NORTH CAROLINA B-1 30.0 400.0 12.0 388.0 23.5 376.5 13.1 386.9 B-2 35.0 403.0 5.5 397.5 28.0 375.0 12.0 391.0 B-3 35.0 410.0 16.0 394.0 27.0 383.0 10.9 399.1 B-4 25.0 405.0 18.3 386.7 18.3 386.7 18.2 386.8 B-5 30.0 405.0 5.5 399.5 22.0 383.0 10.2 394.8 B-6 35.0 412.0 5.5 406.5 28.5 383.5 11.2 400.8 B-7 25.0 411.0 8.5 402.5 19.0 392.0 20.8 390.2 B-8 30.0 410.0 8.0 402.0 20.5 389.5 7.0 403.0 B-9 30.0 413.0 5.5 407.5 21.9 391.1 10.3 402.7 B-10 40.0 414.0 8.5 405.5 25.0 389.0 29.1 384.9 B-11/B11A 40.0 414.0 414.0 34.5 379.5 12.8 401.2 B-12 40.0 418.0 9.5 408.5 27.0 391.0 14.2 403.8 DEPTH TO GROUNDWATER (ft) GROUNDWATER ELEVATION (ft)BORING ID BORING DEPTH (ft) FILL DEPTH (ft) ELEVATION OF RESIDUAL (ft) SURFACE ELEVATION DEPTH TO WEATHERED ROCK (ft) ELEVATION OF WEATHERED ROCK (ft) TAI JOB NO.: 10-165-1 9/29/2010 GEOFABRIC (MIRAFI HP 370) GEOGRID (TENSAR TX160) ABC STONE 95% NC DOT MODIFIED PROCTOR ADD WATER EACH LIFT 2.0 FOOT OVERLAP 2.0 FOOT WRAP-UP ON EACH EDGE 2.0 FOOT OVERLAP 2.0 FOOT WRAP-UP ON EACH EDGE TAI JOB NO. 10-165-1 TAI and ASSOCIATES, PLLC 5561 McNEELY DRIVE, SUITE 101, RALEIGH, NC 27612, 919-782-9525 SUBGRADE IMPROVEMENT SECTION (TYP) PROJECT: LOCATION: CLIENT: PAGE 1 OF 1 DATE: ERWIN SQUARE RESIDENTIAL DURHAM, NORTH CAROLINA CRESCENT RESOURCES, LLC SEPTEMBER 2010