Loading...
HomeMy WebLinkAbout24007_Wrights Executive Sales II_VIMS Sample Point Location Adjustments_20240103-21 SG-2/PFE I i I SG-1/PFE-1/IA-1 I -�EtuaraRstwr� SG-5/PFE-5 SG-4/PFE-4 Move point SG/PFE-4 outsitle of PRE-OCCUPANCYSUB-SLAB- loading dock into garage aria SAMPLING LOCATIONS __- SG-3/PFE-3/IA-3 _ SG-6/PFE-6 L 1 ulunE��3c :^ oPAarcrv� 1 l I Level 3 retail space in this area I SG-7/PFE-7 A - -.-- currently does not have a concrete 11 slab, base is just gravel. The slab will not be poured until after Move points SG/PFE-8 apd 9 �J /0) VAPOR PiN (T PICAI) slightly into areas anticipated to L VEi1 RETAIL tenants come in further in the be more publicly accessible spaces SG-8/PFE-8 future, once after occupancy is in retails ace. approved. Pre -occupancy sub -slab p I SG-13/PFE-13 Move points SG/PFE-10 and 11 points SG/PFE-14 and 13 cannot LEVEL 3RETAIL be installed in January 2024. SG-9/PFE-9 outside of storage space into i garage area 1 SG-1 /PFE-12 c I Y l LEVEL 3 REtAIL LEVEL 3 RETAIL F4/PFE-14 = LEVEL 2 RETAIL SG-11/PFE-11 P1 , I SG-10/PFE-10 `... .......... :I ' 1 ❑ 15 36 SOURCE: k FIGURE 4 PFE Testing and Sample Location Map • Legend Sub indoor PFE testing location Vapor Intrusion Mitigation Design s Wright's Executive Sales II -slab, air, and ECS, Southeast LLP (July 12, 2022) Brownfields Project Number 24007-20-032 721 & 723 Rigsbee Ave; 620 & 616 Foster St. Sub -slab and PFE testing location only SCALE SHOWN ABOVE Durham, Durham County, North Carolina ® Adjusted SG/PFE Monitoring Point Location ECS Project Number:49-10039-B