January 29, 2024
NCDEQ – Division of Waste Management
Brownfields Redevelopment Section
1646 Mail Service Center
Raleigh, North Carolina 27699-1646
Attention: Mr. Bill Schmithorst
Re: Annual Redevelopment Summary Report
Durafiber
7401 Statesville Boulevard
Salisbury, North Carolina
Brownfields Project No. 22030-18-060
H&H Job No. SDC-001
Dear Bill:
Hart & Hickman, PC (H&H) is providing this Annual Redevelopment Summary Report for the
Durafiber Brownfields property (Brownfields Project No. 22030-18-060) located at 7401
Statesville Boulevard in Salisbury, Rowan County, North Carolina (Site). The Site consists of
one approximately 500-acre parcel of land (Rowan County Parcel ID No. 750-002) located in a
rural area approximately six miles west of downtown Salisbury. The Site is improved with an
approximate two million square foot former manufacturing campus that includes administrative
offices, warehouse areas, production areas, shipping and receiving areas, a maintenance building,
a fence manufacturing facility, and a wastewater treatment plant. A Site location map is
provided as Figure 1.
A Brownfields agreement between the North Carolina Department of Environmental Quality
(DEQ) and Salisbury Investments I, LLC was recorded for the Site on September 15, 2022.
Land use restrictions included in the recorded Brownfields agreement indicate that physical
redevelopment of the Brownfields property will be completed pursuant to a DEQ-approved
Mr. Bill Schmithorst
January 29, 2024
Page 2
https://harthick.sharepoint.com/sites/masterfiles-1/shared documents/aaa-master projects/sdc investments - durafiber/annual
redevelopment reporting/january 2024/22030 - durafiber_annual redevelopment summary report_2024.doc
Environmental Management Plan (EMP) and that a summary of environment-related
redevelopment activities will be provided to DEQ each year for as long as physical
redevelopment of the Brownfields property continues.
Redevelopment activities at the Site in 2023 included the installation of new sub-surface natural
gas lines and a new natural gas regulator station. In addition, redevelopment activities included
limited leveling for the placement of containers associated with a bitcoin server farm. The
locations of the new natural gas lines and new regulator station are shown in Figure 2A. The
locations of the new server farm containers are shown in Figure 2B.
The natural gas utility installations were completed in accordance with the DEQ-approved EMP
dated June 19, 2023. The server farm installation activities were completed in accordance with
the DEQ-approved EMP dated November 10, 2023. Contractors did not report observations of
potentially impacted Site media or unknown buried materials. In addition, redevelopment
activities at the Site in 2023 did not include importing soil to the Site or exporting soil from the
Site, and no soil was re-located outside of the designated Solid Waste Management Units
(Figures 2A and 2B).
Future redevelopment activities that disturb Site media are not planned at this time. A EMP will
be prepared for DEQ review and approval should future plans include additional redevelopment
activities.
Figures
REVISION NO. 0
JOB NO. S26-001
DATE: 1-29-2024
FIGURE NO. 2A
DURAFIBER TECHNOLOGIES
7401 STATESVILLE BOULEVARD
SALISBURY, NORTH CAROLINA
SITE MAP
LEGEND
BROWNFIELDS PROPERTY BOUNDARY
RAILROAD TRACKS
SURFACE WATER FEATURE
NEW NATURAL GAS LINES
SOIL IMPACT AREA
APPROXIMATE OUTLINE OF
REGULATOR STATION
RCRA SWMU ID
CELANESE DRIVESTAPLE WAREHOUSE
GLYCOL STORAGE
GLYCOL RECO ERY STORAGE
FORMER GRUB LANDFILL
GLYCOL RECOVERY UNIT
FUEL OIL STORAGE
POLYMER SPINNING
DOW STORAGE
FILAMENT
WAREHOUSE
DOW BOILERS
DOWTHERM AREA
DOW STORAGE
DOW BOILERS
POLYMER SPINNING
UTILITIES
GROUNDWATER
REMEDIATION SYSTEM
POLISHING
POND
POLISHING
POND
POLISHING
POND
POLISHING
POND
PROCESS
WATER POND
FIBER
LAKE
DIGESTOR
EQUALIZATION TANKS
(FORMER CRU BASIN)
(2) AERATION BASINSWASTE WATER
TREATMENT PLANT
CLARIFIER
ABANDONED AERATION BASIN
PARKINGPARKING
REC CLUBHOUSE
TEXT
2923 South Tryon Street-Suite 100
Charlotte, North Carolina 28203
704-586-0007(p) 704-586-0373(f)
License # C-1269 / #C-245 Geology
NOTES:
1.AERIAL IMAGERY OBTAINED FROM NC ONEMAP,
2023.
2.PARCEL DATA OBTAINED FROM ROWAN COUNTY
GIS, 2023.
3. RCRA = RESOURCE CONSERVATION AND RECOVERY ACT
SWMU = SOLID WASTE MANAGEMENT UNIT
SECOND CREEKID RCRA SWMU
1 DOWTHERM HEATER AREA
2 GRU HEAT TRANSFER STORAGAGE AREA
3 GRUB LANDFILL
4 CRU IMPOUNDMENTS
5 POLISHING PONDS
S:\AAA-Master Projects\SDC Investments - Durafiber\EMP\2023 EMP\CAD Files\SiteMap_GasLines.dwg, FIG 4, 6/16/2023 12:08:28 PM, kmckinney
REVISION NO. 0
JOB NO. S26-001
DATE: 1-29-2024
FIGURE NO. 2B
DURAFIBER TECHNOLOGIES7401 STATESVILLE BOULEVARD
SALISBURY, NORTH CAROLINA
SITE MAP
LEGEND
BROWNFIELDS PROPERTY BOUNDARY
RAILROAD TRACKS
SOIL IMPACT AREA
DATA PROCESS CONTAINER
AND CHILLER LOCATION
RCRA SWMU ID
STAPLE WAREHOUSE
GLYCOL STORAGE
GLYCOL RECO ERY STORAGE
FORMER GRUB LANDFILL
GLYCOL RECOVERY UNIT
FUEL OIL STORAGE
POLYMER SPINNING
DOW STORAGE
FILAMENTWAREHOUSE
DOW BOILERS
DOWTHERM AREA
DOW STORAGE
DOW BOILERSPOLYMER SPINNING
UTILITIES
GROUNDWATERREMEDIATION SYSTEM
POLISHINGPOND
DIGESTOR
EQUALIZATION TANKS(FORMER CRU BASIN)
WASTE WATERTREATMENT PLANT
2923 South Tryon Street-Suite 100Charlotte, North Carolina 28203704-586-0007(p) 704-586-0373(f)License # C-1269 / #C-245 Geology
NOTES:
1.AERIAL IMAGERY OBTAINED FROM NC ONEMAP, 2023.
2.PARCEL DATA OBTAINED FROM ROWAN COUNTY GIS, 2023.
3.RCRA = RESOURCE CONSERVATION AND
RECOVERY ACTSWMU = SOLID WASTE MANAGEMENT UNIT
ID RCRA SWMU
1 DOWTHERM HEATER AREA
2 GRU HEAT TRANSFER STORAGAGE AREA
3 GRUB LANDFILL
4 CRU IMPOUNDMENTS
5 POLISHING PONDS
S:\AAA-Master Projects\Linco Brothers Inc - Durafiber\EMP\Figures\CAD Files\SiteMap_FIG4.dwg, FIG 4, 11/3/2023 11:11:10 AM, tmarbuery