Loading...
HomeMy WebLinkAbout24062_South Hollis LoSo Final Grade Sampling WP_20230926 Via Email September 26, 2023 NCDEQ – Division of Waste Management Brownfields Redevelopment Section 1646 Mail Service Center Raleigh, North Carolina 27699-1646 Attn: Mr. Bill Schmithorst, PG Re: Final Grade Soil Assessment Work Plan South and Hollis LoSo South Boulevard and Hollis Road Charlotte, North Carolina Brownfields Project No. 24062-20-060 H&H Job No. AKR-007 Dear Mr. Schmithorst: On behalf of KA LoSo Holdings LLC, please find enclosed a copy of the Final Grade Soil Assessment Work Plan prepared for the South and Hollis LoSo Brownfields property (Brownfields Project No. 24062-20-060) located in Charlotte, Mecklenburg County. Should you have questions or need additional information, please do not hesitate to contact us at (704) 586-0007. Sincerely, Hart & Hickman, PC Matt Bramblett, PE Haley Martin, PG Principal Senior Project Manager Enclosure: cc: Mr. Dan Coith and Mr. Dan Outen, Akridge (Via Email) Ms. Kary Katherine Stukes, Moore & Van Allen, PLLC (Via Email) Ms. Laura Truesdale, Moore & Van Allen, PLLC (Via Email) Work Plan and Report Checklist  Version 3 March 2023  Minimum Requirements Checklist Site Assessment Work Plans and Reports NCDEQ Brownfields Redevelopment Section– March 2023 Instructional Page All references to Prospective Developers include follow-on owners who may be conducting work in accordance with the Brownfields Property Management Branch. To increase predictability and most efficiently assess Brownfields Properties and the redevelopment timing requirements of Prospective Developers or follow-on owners, the Brownfields Redevelopment Section has standardized the format for Site Assessments. This format has been generated in the form of a checklist to allow for ease in submission by the prospective developer’s consultant and for the Brownfields Redevelopment Section’s completeness review. This checklist outlines the minimum requirements and submittal format under the Brownfields Redevelopment Section for Assessment Requirements and Reporting. All Assessment Work Plans and Report submissions to the Brownfields Redevelopment Section must include this completed checklist in the outlined format. These requirements allow DEQ to reduce review time for the Assessment Work Plan and Report and increase process predictability for prospective developers. This checklist will also provide reliable data for risk-based decisions and further expedite the project timeline. Any divergence from these requirements will lengthen the process of assessing risks on the site, may necessitate reprioritization of a project manager’s queue towards projects that meet these requirements. Therefore, delaying production of the brownfields agreement and/or environmental management plan. Any alterations to the checklist on a site-specific basis must be reviewed and approved by the Section prior to implementation. However, in order to respect the schedule of all projects in house and keep the Section’s entire project pipeline moving, we strongly recommend against seeking changes to the checklist. Based on a review of environmental and risk data from our project inventory, please note there are some new points of emphasis that are included herein: 1. For ALL residential reuses; sub-slab vapor assessment (full list EPA TO-15) is required, regardless if existing structures will be removed. If no structures or slabs exist on the Brownfields Property, exterior soil gas assessment is required within all proposed structure footprints.  2. ALL properties require groundwater data (VOCs, SVOCs and RCRA Metals) from a minimum of three sample locations, depth to groundwater and a resulting potentiometric map.  3. Soil shall be assessed based on areas of concern and redevelopment plans and across the depth interval of the cut/grading. Work Plan and Report Checklist  Version 3 March 2023  Environmental Site Assessment Work Plan Checklist Reviewed and checked by (Name): Carolyn Minnich, Brownfields Redevelopment Section Title Page The title page should include the following information. Letter style reports are acceptable, as long as this information is somewhere on the first page. ☒ Title of Work Plan ☒ Brownfields Project Name (not the development name) ☒ Brownfields Project Number ☒ Date (updated with each revision) ☐ Revision Number ☒ Firm PE/PG License Number ☒ Individual PE/PG seal & signature Section 1 – Introduction ☒ Provide the site location, address, and acreage. ☐ Provide a BRIEF summary of the history of the property and its history in the Section. For example: reiterate RECs from a Phase I ESA, indicate if the scope of work was negotiated during a Data Gap Meeting, etc. ☒ Briefly list and describe the data gaps the assessment is attempting to fill ☒ Indicate if the assessment data is for the use of any other DEQ programs in addition to the Brownfields Redevelopment Section (i.e. the site is a regulated UST, IHSB, etc. property) Section 2 – Scope of Work ☒ Provide a general description of proposed scope of work covered in this plan (i.e. 2 new monitoring wells, 6 groundwater samples, 5 exterior soil gas sampling points and 6 soil borings) ☒ Discuss samples to be collected by media and source area/location. Generally, the reasoning for the sample locations selected. ☒ Describe depths of samples to be collected (Reference Table 1) or how that decision will be made in the field, if needed. ☒ State for what each sample will be analyzed (briefly). Reference Table 1. Note: For all residential reuses, sub slab vapor is required, if no slabs exist, exterior soil gas is required within all proposed footprints. Section 3 – Sampling Methodology ☒ Reference the guidance documents you intend to use. IHSB, EPA SESD, VI Guidance, Well Construction Rules (NCAC 2C). Note deviations or methodology planned that is not covered by Work Plan and Report Checklist  Version 3 March 2023  such guidance (e.g., multi-increment sampling, passive air samplers, mobile labs, Hapsite, simultaneous indoor/outdoor radon, high-volume sub-slab vapor testing, PFAS sampling). ☒ Describe what will be installed (soil boring, temporary well, permanent well, sub-slab vapor, exterior soil gas, etc.). Include construction details. ☒ Discuss installation methodology (Hand Auger, DPT, etc.) Discuss Equilibration Times  Monitoring wells (equilibration time prior to development and equilibration post well development should be 24 hours, per EPA standard protocols).  Vapor: a. Sub slab vapor with minimally invasive points (e.g. Vapor Pins): Manufacturer’s guidelines generally suggest 20 minutes may be sufficient with an airtight cap installed; or b. Sub slab vapor points (other than minimally invasive points) or exterior soil gas points: at least 24 hours (to be purged at installation and at time of sampling with an air-tight cap in place in the interim). ☒ Discuss sample collection procedures. Include the following, at a minimum:  Equipment to be used  Purging methods and volumes  Stabilization parameters for groundwater sampling  Field screening methods  Leak check procedures for sub-slab vapor and exterior soil gas samples (Note this is required)  Discuss how and when vacuum readings will be collected (for summa cans)  Submission of the samples to the laboratory within 48 hours of collection and/or written documentation of temperature maintenance if the situation requires extension beyond 48 hours prior to lab submittal ☒ Discuss sample point abandonment Section 4 – Laboratory Analyses ☒ Discuss the proposed analyses (include method number, preparation method, if there are concerns with short hold times, etc). ☒ Discuss any proposed limitations on the contaminants of concern, if any, and the reason for such limitation (sufficient previous data, indoor air interferences, etc). ☒ Discuss laboratory certifications. Please note, NC does not certify labs for air samples. Please specify what certification the proposed air lab holds. ☒ Indicate that the Reporting Limits/Method Detection Limits will meet applicable screening criteria (to the extent feasible). Include reporting of J-Flags to meet criteria. ☒ Indicate what Level QA/QC will be reported by the laboratory. Level II QA/QC is typically acceptable. Section 5 – QA/QC ☒ Specify the duplicate sample frequency. Minimum requirement: 1 duplicate per 20 samples, per media, per method. ☐ Discuss Trip Blank. 1 Trip Blank per cooler/shipment of groundwater VOC analyses is required. ☒ Discuss how the lab will have sufficient sample volume for MS/MSD analyses. Work Plan and Report Checklist  Version 3 March 2023  ☒ Discuss chain of custody and shipping. Section 6 – Investigation Derived Waste (IDW) Management ☒ Discuss what IDW will be generated and how it is proposed to be managed. Management recommendations should be in accordance with 15A NCAC 02T.1503 and 15A NCAC 02H. 0106. Generally, if the Brownfields Property has not previously been assessed, then all IDW must be containerized and characterized prior to management. Previous assessment data that indicate no Hazardous Waste (listed or characteristic) is likely to be encountered in the area of proposed assessment will be required before thin spreading of IDW on-site is permitted. Section 7 – Reporting This section should discuss the components of the assessment report which will be prepared as a result of the above sample collection. At a minimum, the report shall include: ☒ Title Page that is consistent with the requirements listed above. ☒ Reporting/summary of site work conducted for all sections outlined above in this checklist; ☒ Summary of findings and possible recommendations; ☒ All applicable tables and figures (shall include at a minimum the items below) ☒ Tables for tabulated analytical data per media sampled and analyzed, compared against applicable screening levels, sample depths and depth to groundwater; ☒ Figure depicting actual sample locations collected, with each media depicted in the legend, graphic scale and north arrow; and ☐ Groundwater potentiometric map, with graphic scale and north arrow. ☒ Appendices shall include (as applicable): ☒ Copies of field notes ☒ Boring logs for all soil borings, newly constructed monitoring wells, and exterior soil gas locations ☐ Well construction and abandonment records Work Plan Approval Signature Page (see Attachment 1). The Consultant shall complete and submit the Approval Signature Page with the work plan submittal for DEQ signature. Work Plan and Report Checklist  Version 3 March 2023  Attachments ☒ Attachment 1 – Work Plan Approval Signature Page ☒ Table 1 – Proposed Sample Locations and Analyses on a Summary Table that includes: ☒ Sample ID ☒ Sample Objective ☒ Proposed Depth(s) ☒ Analytical Method(s) ☒ QA/QC Samples ☐ Background Samples ☒ Figure 1 – Site Location Map ☒ Site location on a topographic map base ☒ Graphic scale and north arrow ☒ Figure 2 – Site Map should include the following ☒ Buildings ☐ Historical sample locations ☐ RECs or other areas of concern ☒ Proposed sample locations ☒ Sample identification labels ☐ Background samples ☐ QA/QC samples ☒ Graphic scale and north arrow ☒ High quality aerial suggested as the base map ☐ Figure 3 – Site Potentiometric Map that includes the following ☐ Buildings ☐ Groundwater sample identification labels ☐ Arrow noting direction of groundwater flow ☐ Graphic scale and north arrow ☐ Figure 4 – Site Plume Maps (groundwater, soil vapor, etc.) ☒ Figure 5 – Proposed Development (if available) ☒ Overlay of historical and proposed sample locations ☒ Graphic scale and north arrow ☐ Appendix – Summary of Historical Analytical Data (if needed) – to include tables and figures only. ATTACHMENT 1 DEQ Brownfields Redevelopment Section Assessment Work Plan Approval Signature Page To be completed by Development Team and returned to DEQ Brownfields for review & signature. Brownfields Project Name: South and Hollis LoSo Brownfields Project Number: 24062-20-060 Work Plan Title: Final Grade Soil Assessment Work Plan Date: September 26, 2023 Revision Number: N/A Be advised that this approval from DEQ Brownfields does not waive any applicable requirement to obtain any necessary permits, licenses, or certifications for the above listed activities nor does it waive any requirement to comply with applicable law for such activities. Prospective Developer (PD) and Property Owner: KA LoSo Holdings LLC Contact Person: Mr. Dan Coith Phone Numbers: Office: 402-326-5800 Mobile: Email: dcoith@akrige.com Property Owner (if different from above): Contact Person: Phone Numbers: Office: Mobile: Email: Environmental Consultant: Hart & Hickman, PC Contact Person: Ms. Haley Martin Phone Numbers: Office: 704-526-2045 Mobile: Email: hmartin@harthickman.com Signature: Brownfields Project Manager: Mr. Bill Schmithorst Phone Numbers: Office: 919-707-8159 Mobile: N/A Email: William.schmithorst@ncdenr.gov Signature: Consultant: Hart & Hickman, PC Date Printed Name/Title/Company: Ms. Haley Martin, PG / Senior Project Geologist Brownfields Project Manager: Bill Schmithorst Date i https://harthick.sharepoint.com/sites/masterfiles-1/shared documents/aaa-master projects/akridge/akr.007 loso brownfields implementation/final grade soil assessment/work plan/24062 - south and hollis - fg soil assessment work plan.doc Final Grade Soil Assessment Work Plan South and Hollis LoSo South Boulevard and Hollis Road Charlotte, North Carolina Brownfields Project No. 24062-20-060 H&H Job No. AKR-007 Table of Contents 1.0 Introduction .............................................................................................................................1  2.0 Final Grade Assessment Activities ........................................................................................3  2.1 Final Grade Soil Sampling Activities ....................................................................................3  2.2 Quality Assurance / Quality Control .....................................................................................4  2.3 Investigation Derived Waste .................................................................................................5  3.0 Reporting .................................................................................................................................6  List of Tables Table 1 Proposed Final Grade Soil Sample Summary List of Figures Figure 1 Site Location Map Figure 2 Site Map Figure 3 Proposed Final Grade Soil Sample Location Map List of Appendices Appendix A Required Overall Planting Plan 1 https://harthick.sharepoint.com/sites/masterfiles-1/shared documents/aaa-master projects/akridge/akr.007 loso brownfields implementation/final grade soil assessment/work plan/24062 - south and hollis - fg soil assessment work plan.doc Final Grade Soil Assessment Work Plan South and Hollis LoSo South Boulevard and Hollis Road Charlotte, North Carolina Brownfields Project No. 24062-20-060 H&H Job No. AKR-007 1.0 Introduction On behalf of KA LoSo Holdings LLC (Prospective Developer or PD), Hart & Hickman, P.C. (H&H) has prepared this Final Grade Soil Assessment Work Plan (Work Plan) for the South and Hollis LoSo Brownfields property (Brownfields Project No. 24062-20-060) located at 3424 and 3441 South Boulevard and 111 Hollis Road in Charlotte, Mecklenburg County, North Carolina (Site). The Site consists of one approximately 2.6-acre parcel of land (Mecklenburg County Parcel Identification No. 14905301) located in a mixed commercial and residential area of lower South End Charlotte. A Site location map is provided as Figure 1, and the Site and surrounding area are shown in Figure 2. A Brownfields Agreement between the North Carolina Department of Environmental Quality (DEQ) and the PD was recorded on June 2, 2022. Land Use Restriction (LUR) 12.f. of the Brownfields Agreement generally states that no occupancy of the Brownfields property may occur after redevelopment until representative final grade soil samples have been collected in areas at the Site that are not covered by building foundations, sidewalks, or asphalt or concrete parking areas and driveways (hardscape). The Brownfields Agreement also generally states that physical redevelopment of the Site will be completed in accordance with a DEQ-approved Environmental Management Plan (EMP). The EMP prepared for the South and Hollis LoSo redevelopment received DEQ approval on July 8, 2021. In accordance with the DEQ-approved EMP and LUR 12.f. of the recorded Brownfields Agreement, final grade soil sampling will be conducted at the Site in areas that are not covered with building foundations, sidewalks, or asphalt or concrete parking areas and driveways following completion of redevelopment activities that disturb soil. Redevelopment of the Site 2 https://harthick.sharepoint.com/sites/masterfiles-1/shared documents/aaa-master projects/akridge/akr.007 loso brownfields implementation/final grade soil assessment/work plan/24062 - south and hollis - fg soil assessment work plan.doc included razing the former Site buildings for construction of a mixed-use apartment and retail building and an associated parking deck. A Required Overall Planting Plan prepared by Land Design depicting the redevelopment and landscaping plan is provided as Appendix A. The proposed final grade soil assessment scope of work is provided in the following sections. 3 https://harthick.sharepoint.com/sites/masterfiles-1/shared documents/aaa-master projects/akridge/akr.007 loso brownfields implementation/final grade soil assessment/work plan/24062 - south and hollis - fg soil assessment work plan.doc 2.0 Final Grade Assessment Activities The soil assessment activities described herein will be conducted in general accordance with the DEQ Inactive Hazardous Sites Branch (IHSB) Guidelines for Assessment and Cleanup of Contaminated Sites (Guidelines) dated September 2022, the most recent versions of U.S. Environmental Protection Agency (EPA) Region IV Laboratory Services and Applied Science Division (LSASD) Field Branches Quality System and Technical Procedures guidance, and the DEQ Brownfields Minimum Requirements Checklist for Site Assessment Work Plans and Reports dated March 2023. The purpose of the final grade soil assessment activities is to evaluate potential direct exposure risks to future Site occupants and workers from shallow soil in landscaped areas at the Site. A description of the final grade soil assessment activities is provided in the following sections. 2.1 Final Grade Soil Sampling Activities Based on review of the Required Overall Planting Plan, observations at the Site, and communications with the PD, landscaped areas at the Site have been identified and divided into three (3) final grade evaluation areas (FG-1 through FG-3). To evaluate soil within each final grade evaluation area, five (5) shallow soil borings will be advanced in each area for collection of aliquot soil samples. The final grade evaluation areas and approximate locations of the aliquot soil boring locations are shown in Figure 3. Each aliquot soil boring will be advanced from the surface to approximately two (2) feet below ground surface (ft bgs) using a decontaminated stainless-steel hand auger. During boring advancement, continuous soil samples will be collected from the center of the hand auger bucket. Soil samples will be described for lithologic purposes and observed for obvious evidence of staining and unusual odors. A portion of the soil sample from each aliquot location will be allowed to volatilize and will be field screened for the presence of volatile organic vapors using a calibrated photoionization detector (PID). 4 https://harthick.sharepoint.com/sites/masterfiles-1/shared documents/aaa-master projects/akridge/akr.007 loso brownfields implementation/final grade soil assessment/work plan/24062 - south and hollis - fg soil assessment work plan.doc Remaining portions of the aliquot soil samples will be homogenized to form a composite soil sample representative of shallow soil in each evaluation area. Composite soil samples will be submitted for laboratory analysis of semi-volatile organic compounds (SVOCs) by EPA Method 8270 and Resource Conservation and Recovery Act (RCRA) metals plus hexavalent chromium by EPA Methods 6020/7471/7199. Based on results of field screening, a grab soil sample from an undisturbed portion of the aliquot location exhibiting the highest likelihood for impact will be collected from each of the final grade evaluation areas and will be submitted for laboratory analysis of volatile organic compounds (VOCs) by EPA Method 8260. If field screening results do not identify the obvious presence of impacts in an aliquot soil sample within an evaluation area, the final grade evaluation area grab sample will be collected from the 1 to 2 ft bgs sample interval from a randomly selected aliquot soil boring in each evaluation area. Soil samples selected for laboratory analysis will be collected directly into laboratory-supplied glassware; labeled with the sample identification, date, and requested analysis; and placed in a laboratory supplied cooler with ice. The sample cooler will be submitted to a North Carolina certified laboratory under standard chain of custody protocols. A final grade soil sample summary is provided as Table 1. Following sampling activities, the soil borings will be abandoned and the surfaces will be repaired similar to pre-drilling conditions. In addition, the soil sample locations will be estimated using a hand-held global positioning system (GPS) unit. 2.2 Quality Assurance / Quality Control Non-dedicated equipment and tools will be decontaminated prior to use at each boring location. To evaluate the reproducibility of the sample results, H&H will collect one (1) duplicate soil sample (FG-DUP) as part of the final grade sampling. The duplicate sample will be submitted for the same analyses as the parent soil sample. 5 https://harthick.sharepoint.com/sites/masterfiles-1/shared documents/aaa-master projects/akridge/akr.007 loso brownfields implementation/final grade soil assessment/work plan/24062 - south and hollis - fg soil assessment work plan.doc Laboratory quality assurance / quality control (QA/QC) procedures will be employed to ensure appropriate sample handling and analysis and to aid in the review and validation of the analytical data. QA/QC procedures will be conducted in accordance with the method protocols and will include regular equipment maintenance, equipment calibration, and adherence to specific sample custody and data management procedures. Samples will be analyzed in conjunction with appropriate blanks, laboratory duplicates, continuing calibration standards, surrogate standards, and matrix spiking standards in accordance with approved methodologies to monitor both instrument and analyst performance. H&H will request that laboratory method detection limits for each analyte be at or below the DEQ Residential Preliminary Soil Remediation Goals (PSRGs), where possible. Additionally, H&H will request that the laboratory include estimated concentrations for compounds that are detected at levels above the laboratory method detection limit, but below the laboratory reporting limit (J flags). The laboratory analytical data report and QA package for the final grade soil samples submitted to and analyzed by the subcontracted laboratory will be provided in an appendix to the final report. Laboratory QA data consistent with Level II documentation will be requested for this project. A copy of the completed chain-of-custody record and shipping receipt will be appended to the corresponding laboratory analytical report and will be included with the final report. 2.3 Investigation Derived Waste Based on results of previous soil assessment completed at the Site, investigation derived waste (IDW) generated during the assessment activities will be thin spread on-Site. However, if significant impacts are suspected based on field screening results (i.e., presence of free product, etc.), the soil cuttings will be containerized in 55-gallon drums and staged on-Site pending analytical results of a composite IDW sample. Based on laboratory analytical results of IDW sample (if collected), the IDW will be managed in general accordance with DEQ IHSB 15A NCAC 02T.1503 and 15A NCAC 02H. 0106 rules. 6 https://harthick.sharepoint.com/sites/masterfiles-1/shared documents/aaa-master projects/akridge/akr.007 loso brownfields implementation/final grade soil assessment/work plan/24062 - south and hollis - fg soil assessment work plan.doc 3.0 Reporting Following completion of the assessment activities and receipt of the laboratory analytical data, H&H will prepare a Final Grade Soil Assessment Report. The report will include a description of field activities, field screening results, a tabular summary of the analytical results in comparison to regulatory screening levels, risk calculations, boring logs in tabular form (will include boring IDs, field screening/PID results, and soil descriptions), figures depicting the sample locations, laboratory analytical reports and chain of custody records, a discussion of QA/QC data, and conclusions and recommendations based upon our assessment activities. The report will be sealed by a North Carolina Professional Engineer (PE) or Professional Geologist (PG) and the firm PE/PG numbers will be provided. Table Table 1 Proposed Final Grade Soil Sample Summary South and Hollis LoSo Charlotte, North Carolina H&H Job No. AKR-007 https://harthick.sharepoint.com/sites/masterfiles-1/shared documents/aaa-master projects/akridge/akr.007 loso brownfields implementation/final grade soil assessment/work plan/table 1 - sample summary.docx Sample ID Sample Objective Aliquot Soil Borings Aliquot Boring Depth (ft bgs) Grab VOC Samples (8260) Composite SVOC Samples (8270) Composite RCRA Metals + Hexavalent Chromium Samples (6020/7471/7199) FG-1 Shallow Soil Exposure Risk 5 2 1 1 1 FG-2 5 2 1 1 1 FG-3 5 2 1 1 1 FG-DUP QA/QC 5 2 1 1 1 Notes: U.S. Environmental Protection Agency analytical method is shown in parentheses. VOCs = volatile organic compounds; SVOCs = semi-VOCs; RCRA = Resource Conservation and Recovery Act ft bgs = feet below ground surface; QA/QC = quality assurance/quality control The duplicate sample location will be selected in the field. Figures USGS The National Map: National Boundaries Dataset, 3DEP ElevationProgram, Geographic Names Information System, National HydrographyDataset, National Land Cover Database, National Structures Dataset, andNational Transportation Dataset; USGS Global Ecosystems; U.S. CensusBureau TIGER/Line data; USFS Road Data; Natural Earth Data; U.S.Department of State Humanitarian Information Unit; and NOAA NationalCenters for Environmental Information, U.S. Coastal Relief Model. Datarefreshed August, 2021. SITE LOCATION MAP SOUTH AND HOLLIS LOSOSOUTH BOULEVARD AND HOLLIS ROADCHARLOTTE, NORTH CAROLINA DATE: 7-25-2023 JOB NO: AKR-007 REVISION NO: 0 FIGURE NO: 1 2923 South Tryon Street - Suite 100Charlotte, North Carolina 28203704-586-0007 (p) 704-586-0373 (f)License # C-1269 / # C-245 Geology TITLE PROJECT 0 2,000 4,000 SCALE IN FEET SITE Path: S:\AAA-Master Projects\Akridge\AKR.007 LoSo Brownfields Implementation\Redevelopment Report\2022\Figures\Figure-1.mxdN U.S.G.S. QUADRANGLE MAP CHARLOTTE EAST, NORTH CAROLINA 2019CHARLOTTE WEST, NORTH CAROLINA 2019 QUADRANGLE7.5 MINUTE SERIES (TOPOGRAPHIC) REVISION NO. 0 JOB NO. AKR-007 DATE: 7-25-23 FIGURE NO. 2 SOUTH AND HOLLIS LOSO SOUTH BOULEVARD AND HOLLIS ROAD CHARLOTTE, NORTH CAROLINA SITE MAP LEGEND BROWNFIELDS PROPERTY BOUNDARY PARCEL BOUNDARY LINE 2923 South Tryon Street-Suite 100 Charlotte, North Carolina 28203 704-586-0007(p) 704-586-0373(f) License # C-1269 / #C-245 Geology H O L L I S R O A D UNDER CONSTRUCTION MULTI-TENANT RETAIL (3609 SOUTH BOULEVARD) RESIDENTIAL WESTON STREETSOUTH BOULEVARDSOUTH BOULEVARDH A R T F O R D A V E N U E GOLDIES (3601 SOUTH BOULEVARD) NOTES: 1. PARCEL DATA AND AERIAL IMAGERY OBTAINED FROM MECKLENBURG COUNTY GIS, 2023. SATTO TIRES (3407 SOUTH BOULEVARD) MASTER AUTO COLLISION (3411 SOUTH BOULEVARD)S:\AAA-Master Projects\Akridge\AKR.007 LoSo Brownfields Implementation\Redevelopment Report\2022\Figures\Site Map_20220810.dwg, FIG.2 (2), 7/25/2023 3:16:16 PM, shaynes REVISION NO. 0 JOB NO. AKR-007 DATE: 8-23-23 FIGURE NO. 3 SOUTH AND HOLLIS LOSO SOUTH BOULEVARD AND HOLLIS ROAD CHARLOTTE, NORTH CAROLINA PROPOSED FINAL GRADE SOIL SAMPLE LOCATION MAP LEGEND BROWNFIELDS PROPERTY BOUNDARY PARCEL BOUNDARY LINE LIGHT RAIL RESIDENTIAL BUILDING FOOTPRINT PROPOSED LANDSCAPING AREA PAVED AREA RETAIL/AMENITY SPACE PROPOSED FG-1 SOIL SAMPLE LOCATION PROPOSED FG-2 SOIL SAMPLE LOCATION PROPOSED FG-3 SOIL SAMPLE LOCATION 2923 South Tryon Street-Suite 100 Charlotte, North Carolina 28203 704-586-0007(p) 704-586-0373(f) License # C-1269 / #C-245 Geology H O L L I S R O A D WESTON STREETSOUTH BOULEVARDSOUTH BOULEVARDH A R T F O R D A V E N U E NOTES: 1.BASE DATA OBTAINED FROM MECKLENBURG COUNTY GIS, 2023. 2.OVERALL LANDSCAPE PLAN PREPARED BY LAND DESIGN DATED FEBUARY 23, 2022. FG-1BFG-1A FG-1C FG-1D FG-1E FG-3A FG-3B FG-3C FG-3D FG-3E FG-2E FG-2C FG-2B FG-2A FG-2D PARKING DECK COUR T Y A R D S:\AAA-Master Projects\Akridge\AKR.007 LoSo Brownfields Implementation\Final Grade Soil Assessment\Work Plan\Figures\AKR.007_20230822.dwg, FIG.3, 8/24/2023 12:22:38 PM, shaynes Appendix A Required Overall Planting Plan