HomeMy WebLinkAbout22034_Fairey Finishing Plant _Brownfields Redevelopmet Summary RptIrerracon June 3, 2021 North Carolina Department of Environmental Quality Division of Waste Management — Brownfields Section 1646 Mail Service Center Raleigh, North Carolina 27699-1646 Attn: Mr. Brad Atkinson P: 919-707-8748 E: brad.atkinson@ncdenr.gov Re: Brownfields Redevelopment Summary Letter Fairey Finishing Plant Brownfields Project 1604 E. Lawson Street, Durham, Durham County, NC Brownfields Project ID: 22034-18-32 DTCC Applied Technology Building Terracon Project No. 70197104 Mr. Atkinson: On behalf of Durham Technical Community College (DTCC), Terracon Consultants, Inc. (Terracon) is pleased to submit this letter report to document the completion of redevelopment activities at the Fairey Finishing Plant Brownfields site in Durham, Durham County, North Carolina (Site). The Site is in the North Carolina Brownfields Redevelopment Now Program (BF Project Number 22034-18-32). Exhibit 1 depicts the location of the Site. The redevelopment activities were conducted in accordance with the North Carolina of Environmental Quality (NCDEQ) approved Environmental Management Plan (EMP) (NCBP, 2019). The general redevelopment actions included soil management and the installation of a vapor mitigation system beneath the constructed building. The purpose of this Redevelopment Summary Letter is to provide information related to environmental actions completed at the Site from January 2020 through the completion of the redevelopment activities in April 2021. The Site is located at 1604 E. Lawson Street in Durham, Durham County, North Carolina and is comprised of approximately 4.3-acre portion of a larger parent tract. The Site was historically a hosiery mill, warehouse, and a vacant lot. 1.0 Actions on the Brownfields Property The Site was redeveloped with a two-story, 20,467-square foot ground floor educational building. Installation of subgrade utilities, foundations, and grading activities in the building vicinity were completed on April 9, 2020. Vertical building construction activities were completed in May 2020. Interior finishes are ongoing as of May 25, 2021. Terracon Consultants, Inc. 2401 Brentwood Road, Suite 107 Raleigh, North Carolina 27604 P (919) 873-2211 F (919) 873 9555 terracon.com Brownfields Redevelopment Summary Letter Irerracon Fairey Finishing Plant Brownfields Project Durham, North Carolina June 3, 2021 Terracon Project No. 70197104 Per the Vapor Intrusion Mitigation System (VIMS) Post Construction Report (Terracon, 2019b), the VIMS was installed in a manner consistent with the VIMS design and objectives. The system was installed between February 2020 and April 2020 with post construction and pre -occupancy sampling occurring in July 2020. Based on pre -occupancy sampling results, the VIMS will remain as active system. 2.0 Soil Grading, Cut/Fill Actions, and Management of Soil Installation of subgrade utilities, foundations, and grading activities in the building vicinity were completed on April 9, 2020. Additional site grading for the parking lot and sub -grade utilities were completed on December 15, 2020. In accordance with the EMP (NCBP, 2019), the exported soil was disposed of off -site as non -hazardous soil to the permitted facility, Earthtec of NC, Inc., located in Sanford, North Carolina. Soil export activities were completed at the Site on December 15, 2020. In total, approximately 5,119 cubic yards of soil were exported from the site. Dates, tonnage, and truck load numbers are included in Table 1. Soil tickets are available upon request. 3.0 Methodologies for Field Screening and Sampling As stipulated in the EMP (NCBP, 2019), Terracon remained on -call during grading and construction activities should any unexpected environmental conditions (i.e. previously unidentified USTs, buried debris, soil staining, drums, etc.) be encountered. Unexpected environmental conditions were not encountered during redevelopment of the Site. As such, additional methodologies for field screening, sampling and laboratory analysis of environmental media outside of the data gap assessment activities and workplan (Terracon 2019) did not occur. 4.0 Suspect or Contaminated Materials Materials suspected or confirmed to be contaminated with regulated substances were not encountered during redevelopment activities and as such, stockpiling, containerizing, decontaminating, treating, handling, laboratory analysis, and/or disposition of soil, groundwater, and/or other materials did not occur. 5.0 Summary On behalf of DTCC, Terracon has prepared this final Brownfields Redevelopment Summary Report to document redevelopment activities completed at the Site. A summary of redevelopment activities include: Management of soil: In accordance with the EMP (NCBP, 2019), the 5,119 cubic yards of soil was exported to the permitted facility, Earthtec of NC, Inc. Soil export activities were completed on December 15, 2020. VIMS: The VIMS for the building was installed in a manner consistent with the VIMS design and objectives between February 2020 and April 2020. Based on pre -occupancy sampling results, the VIMS will remain active. Responsive Resourceful Reliable 2 Brownfields Redevelopment Summary Letter Fairey Finishing Plant Brownfields Project Durham, North Carolina June 3, 2021 Terracon Project No. 70197104 If you have any questions, please contact us at (919) 873-2211. Sincerely, Terracon Consultants, Inc. elo<zt- - Analee L. Farrell, El Senior Staff Environmental Engineer Cc: Andrew W. Kleitsch (DTCC) Attachments: Exhibit 1 — Site Location Table 1 — Soil Export Table References: Irerracon JL stin L. Fabriziani, RSM Department Manager NCBP, 2019. North Carolina Brownfields Program Environmental Management Plan: Fairey Finishing Plant, New Applied Technologies Building, Durham, Durham County, North Carolina. Brownfields Project No. 22034-18-032. December 4. Terracon, 2019. Brownfield Data Gap Assessment Report: Fairey Finishing Plant, Durham, North Carolina. Terracon Project No. 70197104, dated May 7. Terracon Consultants, Inc. (Terracon), 2020a, Vapor Intrusion Mitigation Design Submittal. Fairey Finishing Plant, New Applied Technologies Building, 1604 E. Lawson Street Durham, Durham County, NC. February 28. Terracon, 2020b, Vapor Intrusion Mitigation System Pilot Testing and Vapor Sampling Brownfields Work Plan, DTCC Applied Technologies Building, 1604 E. Lawson Street Durham, Durham County, NC. April 23. Terracon, 2021. VIMS Installation, Pilot Testing, and Vapor Sampling Report; Fairey Finishing Plan Brownfields Project, Durham, North Carolina. Brownfields Project No. 22034-18-032. Terracon Project No. 70197104, dated February 10. Responsive Resourceful Reliable 3 EXHIBIT .� r. 4 T �� un �,��`� '4, r rT1LJ �� � ^r; 1 + �� o •_'' l ' 'fir s:, s'� ;� I, .1 • ✓ , fi I h I�� `l - , � , -- •� � � it ! f� - r1 -''\ � ". /��ri! f �� 7 ! �� II� �J �-. 5 Fame isiii �.r �t SITE t t '�� 1 r � � � V J d I� � I�%� j � �f�` t�'rt t �, ���� ' II �� •"I i ! � I � I �� ' ��-�, � . ���`i�� . �� ' -� ''� Ji:�• i f r �� I��L,�1f,I�-'r� // � r. �f� 4 ,k� `� ��:� � .�'�; 1 4�: � ,� � r��f r .}.� .j�,��•'• �,� r�� �,,�,�—`7J ..���i� 4 r �r rl �fJ �!'f1 . t , F � f } f .. � f ^J ��f TOPOGRAPHIC MAP IMAGE COURTESY OF THE U.S. GEOLOGICAL SURVEY QUADRANGLES INCLUDE: SOUTHWEST DURHAM, NC (1/1/2002) and SOUTHEAST DURHAM, NC (1/1/2002). Project Manager: Project % SITE LOCATION MAP Exhibit ALF 1"=2,0 04 Irerracon Drawn by: ALF scale: 000' Fairey Finishing Plant Checked by: JLF 70197104 Brownfield Project Number: 22034-18-32 2401 Brentwood Rd Ste 107 1604 East Lawson Street Approved by: JLF JUN 2021 Raleigh, NC 27604-3686 Durham, North Carolina TABLE Soil Export Table Fairey Finishing Plant Bronfields Project Durham, North Carolina Brownfields Project ID: 22034-18-32 Terracon Project No. 70197104 Export Event Date of Export Truck Loads Total Export Amount (tons) 1 March 13-17, 2020 95 1642.55 2 April 3, 2020 26 483.74 3 April 9, 2020 32 575.49 4 May 7-8, 2020 50 859.51 5 May 13-15, 2020 39 722.85 6 May 26-27, 2020 42 739.86 7 June 1, 2020 17 277.94 8 June 3-5, 2020 16 257.23 9 June 12,2020 2 41.08 10 June 24,2020 6 91.63 11 July 20, 2020 3 56.56 12 August 11-14, 2020 46 780.59 13 August 17 & 31, 2020 24 406.74 14 September 1-4, 2020 19 317.52 15 December 15, 2020 29 425.22 Total Export (tons): 7678.51 Approximate Total Cubic Yards: 5119.01